W912DR-14-R-0026_Amendment_2.pdf
PDF 38 KB Posted
- Attached to
- SATOC for Baltimore-Washington Corridor
- Solicitation number
- W912DR-14-R-0026
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912DR-14-R-0026_Amendment_1.pdf | ||
| Attachment_D_.pdf | ||
| Contractor_Format_for_RFIs.xlsx | XLSX spreadsheet | |
| W912DR-14-R-0026.pdf | ||
| Division_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate the follow ing changes:
A. Provide answ ers to Requests for Information (RFIs).
B.The time and date of proposal closing has not been extended.
C. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Apr-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR-14-R-0026
X 9B. DATED (SEE ITEM 11)
04-Apr-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Apr-2014
CODE
US ARMY CORPS OF ENGINEERS BALTIMORE DIS
10 SOUTH HOWARD STREET
BALTIMORE MD 21201-2536
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DR-14-R-0026
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been added by full text:
AMENDMENT 2 RFIS
Question 12: Please provide description (i.e. location, size) of area that existing vinyl composite tile is to be demoed?
Answer: Note break area (with sink and refrigerator) adjacent to conference room. Area is approximately 10 foot by 6 foot.
Question 13: Please provide description (i.e. location, size) of area that new ceramic tile is to be installed and provide size/type of tile required.
Answer: Note break area (with sink and refrigerator) adjacent to conference room. Area is approximately 10 foot by 6 foot. Install 12" X 12" glazed thin set ceramic tile.
Question 15: Please provide dimension of windows.
Answer: 3' wide x 4' high.
Question 17: How high off the ground is the bottom of the windows?
Answer: The ground is four inches from the bottom of the windows.
Question 19: Per 2.1.2. Not shown on drawings: Demolish existing VCT. What is the quantity of VCT and Wall Base?
Answer: Area is approximately 10 foot by 6 foot.
Question 20: Per 2.2.2. Not shown on drawings: Provide and install ceramic tiles. What is the quantity (Wall and/or Floor)?
Answer: Note break area (with sink and refrigerator) adjacent to conference room. Area is approximately 10 foot by 6 foot. Install 12" X 12" glazed thin set ceramic tile.
Question 21: Per 2.2.2 Provide an instantaneous water heater for domestic water. What capacity?
Answer: Capacity is 3.2 gallons per minute.
Question 22: Where are panels PDU1, PDU2 located?
Answer: Assume all panels are located at or near the location shown on the ED-101.
Question 23: Where is Panel PK4 to be located?
Answer: Assume all panels are located at or near the location shown on the ED-101.
Question 24: Is there a basis of design for the Door Dam’s or additional spec’s?
W912DR-14-R-0026
Answer: No additional specifications are available.
Question 26: Solicitation, Offer, and Award, Section 00100 Proposal Submission Requirements and Instructions, Section 3. General Proposal Format, Paragraph 3.8, TAB E: indicates Performance and Payment Bonds will be issued per task order. In addition, there is a requirement for a Bid Bond based on a $20,000,000 bid price. The surety companies are viewing the Bid Bond requirement as excessive. Can the basis for the Bid Bond be reduced to a $1,000,000 bid price?
Answer: No, the bonding requirement for this contract is as following. Performance and Payment Bonds will be issued per task order and may range from $2,000 to $49,000,000. To determine the required amount for a Bid Bond, the amount, $20,000,000 will be used as the bid price. Bid Bonds are required in the amount of 20 percent of the bid price or $3,000,000.00, whichever is less.
Question 27: In response to Amendment 1, Question and Answer 1: The Statement of Work indicates the project involves approximately 390 square feet located in Building 8888, Fort Meade, MD. Please clarify which 390 square feet of Building 8888 is to be included in the Sample Project.
Answer: The Statement of Work incorrectly states 390 square feet. It should be 3900 square feet which is the whole basement shown in the drawings.
(End of Summary of Changes)