A10_Solicitation_Amendment-0001.pdf
PDF 71 KB Posted
- Solicitation number
- W912DR-13-T-0015
About this file
This Amendment is to extend the due date of the proposals add additional site visit and minor editing in the Statement of Work (SOW).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A25_Award_NotificationFBO.pdf | ||
| A10_Amendment0003.pdf | ||
| A03_2_Drawing.pdf | ||
| A25_13Dec2012SiteVisit.pdf | ||
| A10_Amendment00002.pdf | ||
| A25_November_27-Site_visit_sheet.pdf | ||
| A09_Solicitation.pdf | ||
| A03_DRAWING.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Contracting POC: Cheley Auguste at 410-962-4978
The above reference solicitation is hereby amended to extend due date of proposals, extend due date of Request for Information (RFIs), answ er vendor quesitons, and to add an additional site visit as follow s:
(See summary of changes)
1. CONTRACT ID CODE PAGE OF PAGES
1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Dec-2012
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR-13-T-0015
X 9B. DATED (SEE ITEM 11)
20-Nov-2012
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Dec-2012
CODE
US ARMY CORPS OF ENGINEERS BALTIMORE DIS
10 SOUTH HOWARD STREET
BALTIMORE MD 21201-2536
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DR-13-T-0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 07-Dec-2012 12:00 PM to 21-Dec-2012 12:00 PM.
The number of offeror copies required has decreased by 1 from 1 to 0.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
OFFERORS QUESTIONS
All Requests for Information (Request for Information) shall be submitted no later than December 17, 2012 by 12:00 p.m. After that date, no more questions will be accepted.
SCOPE OF WORK
Location of Work
This work will be performed at the McMillan Water Treatment Plant (WTP), which is located at 2500 First Street, NW, Washington, D.C. 20001.
CONTRACTOR QUALIFICATIONS
Acceptable Contractor experience to be eligible to perform the required work for this RFP shall meet the following requirement:
A restoration or residential contractor with a mason having a minimum of five (5) years of experience performing rehabilitation work of a similar scope to this project.
Submitting Contractors shall submit, as part of their proposal, a resume of projects illustrating the required experience. Additionally, a resume of the Contractor’s mason shall accompany the proposal. The mason shall have work experience with historic masonry structures during the entire five (5) year experience qualification requirement.
Additionally, the Contractor shall hire a structural engineer currently licensed in the
District of Columbia to develop and stamp the work plan, provide necessary drawings, and oversee the installation of the tensioning tie rods and the truss realignment as outlined in the Scope of Work description. Further, the structural engineer shall sign a letter certifying the masonry and roof truss rehabilitation has returned the structure to the original state of construction alignment and stability and recommending removal of shoring (removal by separate contract). This letter shall be submitted to the Government prior to close out of the job.
SCOPE OF WORK
Please refer to the attached Sketches S-1 through S-5 for reference. The Contractor shall schedule a Preconstruction Preparatory Meeting no more than 10 days following Notice to Proceed with representatives from the Government.
The Contractor shall have the following personnel present during the meeting, and may include additional personnel at their discretion: Site Superintendant, Safety Officer, Head Mason, and the Structural Engineer. (Reference Contractor Qualifications Above.) The Contractor shall ensure all plans conform to applicable OSHA and EM 385-1-1 regulations.
The scope of the repair and rehabilitation work for this project will consist of realignment and repair of the historical masonry bearing walls, realignment of the roof truss framing members, reattachment of the roof truss heels to the bearing walls and the Letter of Certification asserting the structure has been returned to the original state of structural alignment and stability, and that the removal of shoring is recommended (shoring removal shall be performed by others under a separate contract). The existing shoring shall not be removed, damaged or modified. The Contractor shall exercise every precaution to prevent contamination of the site soils or the water stored within the vault beneath the structure from the repair materials utilized during this Contract.
Realignment of the historical masonry walls shall be performed by a mason with the qualifications indicated above. The realignment shall be achieved through the installation of an assembly of tie rods, turnbuckles plates and decorative wall plates. The contractor shall ensure all material compatibilities are maintained during selection of components, with special consideration given to dissimilar metals that will bear in contact with one another. Selection of the decorative wall plates will be at the sole discretion of the Washington Aqueduct and Project Manager. The contractor shall provide a minimum of six (6) options of various shape and design (not including color), of which three (3) physical samples shall be presented for review and selection by the Project Manager.
The sequence of tie rod installation is the responsibility of the Contractor and shall be included as part of the design by the Contractor’s Structural Engineer. A recommended procedure has been included as part of this RFP. The Contractor’s structural engineer shall be on site at all times during tie rod tensioning and masonry wall realignment. The engineer shall monitor the integrity of the wall and shall notify the Project Manager of any adverse condition developments immediately. (Reference Contractor Qualifications Above.)
All existing Government owned equipment within the work area shall be protected by the Contractor from damage caused by construction operations due to dust, vibration, water, heat or other conditions resulting from construction activities. Existing work damaged by construction operations shall be promptly repaired by the Contractor at his own expense. For clarity existing electrical, plumbing and other utilities in and around the structure are not shown. All utilities are to remain in service for the duration of the work. The Contractor’s Work Plan shall address provisions for protecting existing utilities during the course of the work as well as adjustments required prior to or following the realignment work.
The Contractor shall realign the roof trusses to engage the top and bottom chords and bring the roof trusses back into a state of alignment stability and bearing in keeping with the original construction condition of the structure. The Contractor shall install wood squash blocks and plywood plates as indicated.
(Reference the Appendix Sketch S-5.) The Contractor shall re-establish truss bearing on the exterior bearing walls and mechanically fasten the trusses to the exterior walls. Attachment to the exterior walls may be made using strap-type connections and masonry anchors selected by the Contractor, meeting the minimum uplift force indicated. Installation of masonry anchors shall only occur on the inside face of the structure and shall not exceed more than one (1) anchor per brick unit. The Contractor’s structural engineer shall periodically monitor truss modification and shall be present be on site at all times during re-establishment of truss bearing until such time that the engineer is confident the Contractor can complete the work without adversely affecting the integrity of the bearing walls. The engineer shall monitor the integrity of the walls and trusses and shall notify the Project Manager of any adverse condition developments immediately. (Reference Contractor Qualifications Above.) The Contractor shall investigate the extent of missing roof tiles that need to be replaced. The Contractor shall inform the Government the number of missing and damaged roof tiles. The contractor shall replace the missing historical clay roof tiles with Government furnished units once truss bearing has been established. Approved replacement roof tiles shall be turned over to the contractor upon notification that the roof investigation has been completed.
The Contractor shall assume a maximum of fifty (50) roof tiles will require replacement.
In preparation for rehabilitation of the historical masonry, the Contractor shall clean and prepare the areas where masonry work shall commence. Cleaning shall only be performed using soft nylon brushes and mild detergents if brushing alone proves insufficient. Any cleaning agents used must be non-toxic and environmentally approved for use in conjunction with potable water supplies and shall not cause damage or discolor the existing masonry or grout. The Contractor shall repair and replace the damaged or missing masonry with approved, historical units. Bedding, re-pointing and repair of cracks shall be performed using the approved mortar mix as described within this document and the associated Appendix Sketches. Approval of replacement masonry units and repair mortar appearance shall be at the sole discretion of the Project Manager. The contractor shall prepare a sample 2’-0” by 2’-0” panel of mortar and brick work that has cured for a minimum of 28 days in order for the Project Manager to review and approve the color and appearance match with the existing historical masonry. The sample panel shall be placed adjacent to the work site upon approval of the Project Manager.
Once all wall and roof truss rehabilitation work has been completed, the Contractor shall confirm the tensioning and sag condition of the tie rods and truss bearing engagement. Additionally, the Contractor shall submit a Letter of Certification signed by the Contractor’s structural engineer stating that the structure has been returned to the original state of construction alignment and stability and recommending removal of shoring (removal by separate contract).
The Contractor shall make provisions for a final review of the masonry wall and roof truss rehabilitation once the shoring has been removed (removal by separate contract).
Submittals: The Contractor shall submit shop drawings, samples and work plan documents to the Government. The following are the submittals that the Contractor shall provided to the Project Manager’s Representative (COR) at the Washington Aqueduct for review and approval:
Prior to start of work:
o Document - Contractor’s Safety Plan o Document - Contractor’s Work Plan including proposed schedule and scaled drawings with a PE’s stamp.
o Document - Rod Installation Procedure Plan of Action o Document - Truss Repair Procedure Plan of Action o Shop Drawing - Rods, Turnbuckles, Steel Plates and Washers o Shop Drawing - Repair Mortar Mix Design o Shop Drawing - Truss Repair and Anchorage Materials o Sample - Wall Plates, (3) physical samples of (6) total options for CO selection o Sample - Repair Mortar Mock-up o Sample - Brick Mock-up
Upon completion of work:
o Document – As-Built Drawings and Documents o Document – Letter of Certification recommending shoring removal signed by the Contractor’s structural engineer
Meetings: Prior to the commencement of work a Preconstruction Meeting shall be held between the Contractor and the Government. The Contractor shall have the following personnel present during the meeting, and may include additional personnel at their discretion: Site Superintendant, Safety Officer, Head Mason, and the Structural Engineer. The Contractor shall introduce their project staff and review their Safety and Work Plans at the Preconstruction meeting. A weekly progress meeting, conducted by the Contractor’s site superintendant, shall be held at the project site where the Project Engineer from the Washington Aqueduct shall be presented with a status update of ongoing tasks along with a two week look-ahead for upcoming tasks.
Materials: The materials used shall be as specified below:
Wall Plates – 2’-0”x2’-0”x½” (minimum). . . . . . . . . . . . . . . . . . . . . Cast Iron Tensioning Rods, Plates, Washers, Nuts. . . . . . . . . . .. . . . . . . . . . . A36, Fy =
36 ksi (G120 Galvanized) Turnbuckles (3½ clevise compatible w/ 21 KIP safe . . . . . . . . . . . A36, Fy =
36 ksi working load) (G120 Galvanized)
6x6 Squash Blocks (ripped to fit) . . . . . . . . . . . . . . . . . . . . . . . . . . . No.2 Southern Pine
15/32” CDX Plywood Sheathing Plates. . . .. . . . . . . . . . . . . . . . . . . Structural Grade
Nails (Common type ONLY, No Sinker Nails permitted). . . . . . . . . 10d galvanized
Repair Mortar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Type O (350 psi)
Historic Bricks (COR approval required) . . . . . . . . . . . . . . . . . . . . . Match Existing
Historic Clay Roof Tiles Government Furnished
Sequence of Work: The following proposed sequence of work is presented for information only and does not constitute a directive to the Contractor or supersede the Contractor’s authority of Means and Methods. The only exception to this being, the existing roof shoring shall remain in place and may not be modified. Removal of this shoring shall be under a separate contract.
The Contractor’s proposed sequence of work shall be submitted as part of the Contractor’s design/work plan which shall be signed and sealed by a licensed P.E.
Proposed Sequence:
o Install rod assembly and tension rods in the long direction of the building. Monitor movement and measure plumbness of bearing walls.
o Install rod assembly and tension rods in the short direction of the building. Monitor movement and measure plumbness of bearing walls.
o Individually align trusses and install truss squash blocks (rip to fit) and install plywood sheathing plates.
o Re-establish truss bearing and anchorage at masonry bearing walls.
o Repair and re-point missing and broken bricks with approved historical masonry and approved repair mortar.
o Repair and dress cracks in masonry wall with approved repair mortar.
o Replace missing clay roof tiles with historical, approved matches.
o Verify tension rod sag, tensile load of rods and truss bearing.
o Submit signed Letter of Certification recommending shoring removal.
APPENDIX OF SUPPORT SKETCHS
S-1 GENERAL NOTES
S-2 PLAN VIEW
S-3 ELEVATION VIEW - NORTH AND SOUTH (DOOR NOT SHOWN)
S-4 ELEVATION VIEW - EAST AND WEST
S-5 SECTION – TRUSS REPAIR
Some historical as-built documents exist and may be provided at Contractor request.
PROJECT DURATION and LIQUIDATED DAMAGES
(a) If the Contractor fails to complete the work within 120 calendar days of contract award, the Contractor shall pay liquidated damages to the Government in the amount of $338.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
SITE VISIT
A second site visit for all interested parties shall be held on December 13, 2012 at 10:00
am. Individuals interested in attending the site visit MUST submit their Name, Company Name, Date of Birth, Driver's License Number and issuing State to the project engineer, Benjamin Strause by email (benjamin.c.strause2@usace.army.mil) or fax (202�764�2756) no later than 2:00 p.m. on the business day before the site visit in order to be admitted to the site.
FACILITY SECURITY and ACCESS REQUIREMENTS
The Washington Aqueduct has been designated a Critical Infrastructure Facility under the National Critical Infrastructure Program which was outlined in Presidential Decision Directive 63. All Contractor and sub-contractor personnel must consent to a review of public records and screening of personal background information before access is granted to the McMillan Water Treatment Plant. Failure to provide requested information may result in denial of access to facilities. No information will be released to outside agencies. The following major types of adverse information may exclude a contractor, his employees, or sub-contractors from gaining access to Washington Aqueduct property. Each case will be reviewed on its own merit:
a) Illegal use or abuse of drugs or alcohol, theft or dishonesty, unreliability, instability, use of force, violence and weapons related incidents that indicate a general disregard for the law.
b) Aberrant, deviant sexual behavior or bizarre sexual conduct. Contributing to the delinquency of minors, child molestation, and/or rape. Records or testimony of employment, education or military service where the individual was involved in serious offenses or incidents that would reflect adversely on the honesty, integrity, trustworthiness, or stability of the individual.
c) Excessive indebtedness, bad checks, financial difficulties or irresponsibility.
d) Failing or refusing to sign the proper authorization documents to conduct the background screenings.
e) Knowingly providing false information on Official Government Documents.
f) Contractors must ensure that employees are legal residents of the United States and supply that proof.
g) Involvement with known terrorists, terrorist organizations, terrorist-supporting financial organizations, subversive organizations or individuals who advocate violence or the violent overthrow of the US Government.
Government or contracted personnel may be working in and around the McMillan North Clearwell Gatehouse during periods when the Contractor is providing service. Contractor’s work shall not unduly interfere with Government personnel or other contractors’ work in the area, and the Contractor shall maintain safe access to the building and surrounding areas at all times. Under certain emergency situations, the Contractor may not be granted access to the McMillan Water Treatment Plant or the North Clearwell Gatehouse Building.
The Contractor shall provide and maintain within the construction area minimum field-type sanitary facilities approved by the COR as stated in the EM 385 1-1 (03 Nov 03), Section 2. Government toilet facilities will not be available to Contractor's personnel.
This structure is located over a finished water storage tank and therefore, no hazardous material including, but not limited to, fuel, oil and other chemicals unsuitable for use with finished drinking water will not be allowed inside building or on top or the clearwell.
The contractor shall not drive vehicles of any size on the grassy area surrounding the clearwell gatehouse structure. The top slab of the existing clearwell is not designed to accommodate vehicular loads. The contractor shall also not stockpile construction material (brick or other related materials) in the clearwell gatehouse or on the top of the clearwell. Proposed loadings to the existing clearwell top slab shall be included as part of the Contractor’s Work Plan, to be sealed by a licensed Professional Engineer.
Storage and staging areas shall be as directed by the Contracting Officer. No materials or equipment shall be stored on the clearwell.
SUBMITTAL DEADLINE
You are requested to submit your RFQ by 12:00 p. m on December 21, 2012. This Request for quote (RFQ) is not a Notice to Proceed (NTP).
SECTION 00700 - CONTRACT CLAUSES
The following have been added by full text:
QUESTIONS AND ANSWERS
Question No. 1:
Please clarify how the bid is to be submitted. Item #2 on the solicitation is not marked as either a sealed bid or a negotiated bid. The price schedule calls for a lump sum price for the entire contract and leads me to believe that this is a sealed bid. However page 9 of the solicitation calls for a breakdown of prices for anything over $2,000. This points to this as being a negotiate bid.
This needed to be clarified as it is very unusual that the USACE would request a lump sum price with a breakdown of the lump sum price required. Also please specify the basis of award for this contact.
Answer No. 1:
See the attached amendment and the basis for this contract will be Request for Qutoe (RFQ).
Question No. 2:
The Scope or work and the contract sketches refer to the roof support system as a truss system however after the site visit it appears as if the roof is not composed of individual trusses but of a joist and rafter system. Please advise as what type of roof support system is in place as these two options are very different in nature.
Answer No. 2:
The rectangular building consists of a timber truss framed hip roof supporting a clay tile roof with an approximate 8:12 pitch. The timber trusses are spaced at varying dimensions ranging from approximately 2’-3” o.c. to 2’-8” o.c. The trusses bear on all four of the exterior walls with the hips bearing at the building corners with no interior bearing supports.
Question No. 3:
During the site visit it was noticed that there are many pipes, conduits, and instrumentation devices that run along and perpendicular to the wall that has the crack in it. These pipes and conduits also run along the ceiling and the other walls of the structure. According to the USACE personnel on site these existing conduits, pipes, and instrumentation equipment need to stay in service at all times and modifications to them are not part of the contact. By repairing the walls and realigning them, there would need to be disruption in service to these items. In addition the pipe and conduits are ridged and run perpendicular to the walls that are to be realigned. By realigning the walls the distance between the walls will decrease or increase, however the conduits and piper are to remain untouched and keep the same distance. Please note that at least one of the conduits, installed in the securities upgrade contact, was installed after the walls shifted and potentially all of the conduits were installed after the walls shifted. Please advise.
Answer No. 3:
See attached amendment.
Question No. 4:
Is it possible to get a copy of the sign in sheet for the site visit?
Answer No. 4:
See attached document for A copy of the sign in sheet for the November 27, 2012 site visit.
Question No. 5:
Will additional site visits be allowed.
Answer No. 5:
See attached amendment.
The following have been modified:
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for—
Monday December 13, 2012 at 10:00 AM EST
(c) Participants will meet at -
McMillan Water Treatment Plant. (See the Statement of Work for exact Location and how to submit requirement information prior to the site visit.
(End of provision)
(End of Summary of Changes)