W81W3G11989636

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

P.O.C.: Wanda Coates-Flow ers (410)962-6818, Contracting P.O.C.: Jackie Henderson (410)962-2841 The above referenced solicitation is hereby modified to include additional information in a question and answ er format regarding framed artw ork for Evans Army Community Hospital, Fort Carson, Colorado. All other terms and conditions of Solicitation no. W912DR-11-T-0105 remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Sep-2011

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR-11-T-0105

X 9B. DATED (SEE ITEM 11)

22-Sep-2011

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Sep-2011

CODE

US ARMY CORPS OF ENGINEERS BALTIMORE DIS

10 SOUTH HOWARD STREET

BALTIMORE MD 21201-2536

W912DR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DR-11-T-0105

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS & ANSWERS

1. must include an Adobe pdf catalog of the images (100 minimum) available for selection- although you opened this to fedbid this catalog requirement is proprietary to GSA Vendors and excludes Custom Art Package Vendors from participating.

ANSWER: The requirement for a pdf catalog is not proprietary to GSA vendors. A website link may also be provided as long as there are clear instructions as to which images are being submitted for selection. Bid as advertised.

2. window mat, deckled edge border – why have a window mat covering up deckled edge when floating on back mat? Extra mat unnecessary cost?

ANSWER: Window mat dimension should read - 26" x 32” inside dimension

3. Photograph - 24” x 30” - Window mat - 21 ½” x 27 ½” inside dimension – That is smaller than the photo image of 24X30? Does the mat cover up the deckled border and part of the photo? Why? Why go to the expense of a deckled edge border and cover it up?

ANSWER: Window mat dimension should read - 26" x 32” inside dimension

4. Deckled edge border – 23 ½” x 29 ½” inside dimension -Do you mean outside dimension?

ANSWER: Window mat dimension should read - 26" x 32” inside dimension.

5. Frame color, Matt and edge border colors and textures shall be selected by the Government after contract award from the vendor’s standard stock – what standard stock? What is the time frame for selection after award given requirement for deliver/install?

ANSWER: If contractor does not have standard stock items than selection shall be from a range of materials that is typically employed by the contractor. Selections shall be made within one day after submission for approval.

6. After contract award the Government will select the twenty nine images from the vendors catalog. No less than

100 images must be available to select the subject matter images from – MEDCOM has already selected images – Government will select images again after award? A bid normally requires submitting images as part of specifications? What is the time frame for Government to select after award?

ANSWER: The government will select the images within three working days after award.

7. The Government shall identify the location for mounting the photographs inside of the Ft. Carson Dental Clinic after award. – really? Government will determine after award? Government has already specified locations and it will be done again after award! Bid normally requires this information . . when will Government notify the vendor about the locations?

ANSWER: "The Government shall identify the location for mounting the photographs inside of the Ft. Carson Dental Clinic after award. Mounting locations will be in accessible locations." Bid with the specified location as advertised.

8. Frames shall be constructed from dimensionally stable framing hardwood of beech, eastern hard maple, African mahogany, or obeche. –is it legal to use African mahogany wood in U.S. ?

ANSWER: Bid as advertised. (See the following that specifies many wood types:

https://www.fbo.gov/index?s=opportunity&mode=form&tab=core&id=e69fb0a7ee3f2eaa8693af06c472bd84)

9. Finished prints shall be interleaved and stored carefully to prevent scratching before mounting-if this is requirement what material do you want for “interleave”? Will you need to see the prints interleaved before framing?

ANSWER: Bid as advertised. (Jackie and Linda - don’t really care what material the interleaving is. The point was to have a material between the photographs so they don't get scratched. If the contractor scratches them we won't accept them.)

10. Photographic Print Paper- not watercolor paper as requested in art package? Mat finish or glossy photo paper?

ANSWER: "The textured matt surface must be similar to a watercolor paper." Bid as advertised.

11. Prototype – what is time frame to deliver to Government for approval? What photo should be included in prototype? How long between receipt of prototype receipt by Government and approval to print?

ANSWER: Delivery of the prototype to the Government and selection of the photograph is at the Contractors discretion. Prototype shall be approved or rejected within one day after receipt by the Government. The Contractor must meet the contract dates.

1) Does a photographer that is “regionally known”, mean regionally to Colorado or the USA.

ANSWER: Photographer may be regionally known from any location.

2) We have images from Colorado, but not 100. Is it our responsibility for the bidding to represent another photographer as well to accumulate that many images, or are you considering using multiple photographers that might apply?

ANSWER: The bidder must supply a minimum of 100 images to select from.

3) We produce artwork for the ceiling on illuminated light panels for light fixtures, or replace ceiling panels that aren’t illuminated, for dental offices. Could that be a consideration for artwork even though it is not on the solicitation?

ANSWER: Bid as advertised.

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 26-Sep-2011 02:00 PM to 27-Sep-2011 02:00 PM.

(End of Summary of Changes)