B.08.03.01 - Question & Answer #1.pdf

PDF 42 KB Posted

Attached to
Stockton Lake Project Pavement Replacement, Demolition and Installation of New Pavement and Aggregate Base
Solicitation number
W912DQ25QA015
Issued by

About this file

This document is a Questions and Answers (#1) for the Stockton Lake Project, a pavement replacement contract with Solicitation # W912DQ25QA015. The document addresses a specific technical question regarding compaction engineering test requirements for subsurface/concrete base material. The U.S. Army Corps of Engineers (USACE) officially responded that third-party testing will not be required, and instead, a visual test will be conducted between USACE and the contractor due to minimal project risk, with reference to Section 03 30 00 3.2.2 for additional details.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers #1

Stockton Lake Project

Pavement Replacement, Demolition and Installation of New Pavement and Aggregate Base

Solicitation # W912DQ25QA015

Question #1: Are there were any compaction engineering test requirements for the subsurface/concrete base material?

Official Answer #1: See Section 03 30 00 3.2.2. Regarding the subsurface/concrete base material, third party testing will not be required. This will be a visual test between USACE and the Contractor due to the minimal risk.