B.08.03.01 - Question & Answer #1.pdf
PDF 42 KB Posted
- Attached to
- Stockton Lake Project Pavement Replacement, Demolition and Installation of New Pavement and Aggregate Base
- Solicitation number
- W912DQ25QA015
About this file
This document is a Questions and Answers (#1) for the Stockton Lake Project, a pavement replacement contract with Solicitation # W912DQ25QA015. The document addresses a specific technical question regarding compaction engineering test requirements for subsurface/concrete base material. The U.S. Army Corps of Engineers (USACE) officially responded that third-party testing will not be required, and instead, a visual test will be conducted between USACE and the contractor due to minimal project risk, with reference to Section 03 30 00 3.2.2 for additional details.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers #1
Stockton Lake Project
Pavement Replacement, Demolition and Installation of New Pavement and Aggregate Base
Solicitation # W912DQ25QA015
Question #1: Are there were any compaction engineering test requirements for the subsurface/concrete base material?
Official Answer #1: See Section 03 30 00 3.2.2. Regarding the subsurface/concrete base material, third party testing will not be required. This will be a visual test between USACE and the Contractor due to the minimal risk.