This document contains a federal contract opportunity solicitation for construction services at Tadpole Chute on the Missouri River. The solicitation is for repairs to an existing flow control structure and adjacent bank paving with no floating plant access available. It is a 100% total small business set-aside with one firm-fixed price award between $1,000,000 to $5,000,000. The NAICS code is 237990 and size standard is $39,500,000. The opportunity is issued by the U.S. Army Corps of Engineers, Kansas City District for bid responses. Accompanying the solicitation is a questions and answers document pertaining to the Tadpole Construction Contract that provides clarification on issues like dust control requirements, potential site condition differences, and coordination needed with railroad authorities regarding flaggers.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project: IIJA Tadpole Chute Repair FY23 (sorted by CommentlD ) Displaying 3 inquiries.
I Id II Discipline 110225439 II Contracting
Bid Inquiry Contractor Report All Inquiries
Review: Tadpole Construction Contract (00001)
II Sheet II Detail
II II
Comment Classification:
Will the contractor be responsible for dust control on Klein Drive or other public roads?
On: Apr 21 2023.
II Spec
II 01 30 00
c=JIGovernment Response. . The information on the requirement for dust control is located in Section 1 50 00, paragraph 2.2.3 Dust Control. On: May 01 2023
I I llcurrent Request Status: Request Closed
11023046711 Civil II II II 01 11 00 Comment Classification:
The Summary of Work states "No adjustments will be made to the contract price solely related to the approximate estimated quantities provided." Will adjustments to contract price be made in the event the existing bankline and riverbed differ from what's shown in the project plans?
On: Apr 25 2023.
c=JIGovernment Response. . The information is located in contract clause 52.236-2 Differing Site Conditions, which is incorporated by reference. On: May 01 2023
I llcurrent Request Status: Request Closed
11023047911 Civil II c100 II A1 11 Comment Classification:
The access route shows crossing an at-grade railroad crossing. Will Railroad Flaggers be required when hauling?
On: Apr 25 2023.
c=JIGovernment Response. . Refer to SECTION 01 30 00 and SECTION 01 50 00, which requires coordination with Federal, State, and Local Authorities. This coordination includes potential need for flaggers. On: May 01 2023 c=JIGovernment Response. . The contract does not require flaggers. Bidders should check with the railroad and local authorities to determine if flaggers are needed. On: May 01 2023
I I llcurrent Request Status: Request Closed
Report Complete
Patent 11/892,984 ProjNet property of ERDC since 2004.