B.08.03 Kanapolis Bridge Amendment 12 12 22.pdf
PDF 592 KB Posted
- Attached to
- Kanopolis Lake Project Superstructure Bridge Painting Federal contract opportunity
- Solicitation number
- W912DQ23B1002
About this file
This document contains an amendment to a solicitation for a federal contract to repaint the steel superstructure of a bridge at Kanopolis Lake.
The amendment provides updated specifications, instructions to bidders, and definitive responsibility criteria. Bidders must have experience painting steel structures using the specified USACE 3-A-Z vinyl paint system within the past ten years. Email bids are due by December 29, 2022. The low bidder must provide information to demonstrate responsibility within two business days of bid opening if not included with the bid.
The solicitation is for a firm-fixed-price contract to remove the existing lead-based paint from the bridge superstructure, bearings, handrails and other metal surfaces. The selected contractor will then clean, inspect, and repaint the structures using an approved paint system while protecting other surfaces. The U.S. Army Corps of Engineers District in Kansas City is the issuing agency for this project at Kanopolis Lake.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C.04.01 Abstract OFKA 23B1002 19 JAN 23.pdf | ||
| B.08.03 Kanapolis Bridge Amendment 0004 18 Jan 23.pdf | ||
| B.08.03 Kanapolis Bridge Amendment 3 01 04 23.pdf | ||
| B.08.03 Kanapolis Bridge Amendment 2 12 28 22.pdf | ||
| B.07.01 Site Visit sign in.pdf | ||
| B.08.02 KA_REPAINT SERVICE BRIDGE SUPERSTRUCTURE_DRAWINGS 2022.pdf | ||
| B.08.02 Solicitation KA REPAINT SERVICE BRIDGE SUPERSTRUCTURE.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Update to solicitation documents.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Dec-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ23B1002
X 9B. DATED (SEE ITEM 11)
22-Nov-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Dec-2022
CODE
USACE, KANSAS CITY +
FEDERAL BLDG, CT-C +
601 E 12TH ST RM 647
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DQ23B1002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT DETAILS
The SOLICITATION is amended as follows:
NOTE: Deleted text is shown in RED with strikethrough. Added text is shown in GREEN with underline.
1. SPECIFICATIONS
Section 01 50 00 – Temporary Construction Facilities and Controls
Add the following two (2) documents as attachments to the end Section 01 50 00.
Bipartisan Infrastructure Law Project Safety Performance Sign
2. Definitive Responsibility Criteria (DRC) have been added. See below for details and updated instructions to bidders.
SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS
The following have been modified:
SUBMISSION REQUIREMENTS
Email bid packages by the due date and time specified in BLOCK 13 to the following email addresses:
Erynn.N.Wright@usace.army.mil David.M.Best@usace.army.mil
This IFB will result in one Firm-Fixed-Price contract.
Submit one (1) copy of the following in your bid package:
Bid schedule - complete with your bid amount Ensure all Amendments are acknowledged Bid Bonds - required with your submission Provisions/clauses are filled out that have not been acknowledged in SAM registration Field Office information filled out- see Section 01 30 00 Ensure Bid is reviewed and signed by a Principal of your company with authority to do so
DEFINITIVE RESPONSIBILITY CRITERIA
In addition to examining the criteria in FAR 9.104-1, the Contracting Officer will also examine whether the low bidder can meet the one (1) definitive responsibility criteria, in accordance with FAR 9.104-2. The apparent low bidder will be required to meet the following experience requirements:
Within the past ten years, have experience in painting steel structures, using the specified USACE 3-A-Z vinyl paint system (09 97 02, Sect. 3.6). Such experience must be demonstrated through at least one (1), but not more than three (3), construction contracts.
If a Bidder wishes to receive credit for the experience of a subcontractor, the Bidder must submit a letter of commitment to use the proposed subcontractor on the project, signed both by the subcontractor and the Bidder. The subcontractor must be projected to play a substantial role in contract performance and this role shall be indicated in the parties’ letter referenced above.
The Contracting Officer will verify the submitted projects meet the definitive responsibility criteria as part of the responsibility determination. Bidders are not required to submit additional documentation related to these criteria at the time of bid but may elect to submit the necessary information with their bid package and are encouraged to do so in the interest of time and efficiency.
Bidders are not penalized for not doing so, nor rated on any information provided. If responsibility information is provided with the bid package, it should be in a separate email attachment marked “Responsibility Information”, and it will not be opened or reviewed prior to establishment of the apparent low bidder. If not included in the bid package, the required information must be provided to the Contracting Officer within two business days after bid opening.
INQUIRIES/QUESTIONS/PLAN ROOM FOR DRAWINGS
Prospective Bidders shall submit contracting and technical inquiries and questions concerning this solicitation document via Bidder Inquiry in ProjNet at www.projnet.org/projnet.
To submit and review offer inquiry items, Offerors will need to be a current registered user or self-register into the system. To self-register, go to the aforementioned web page and click on Register. Select Agency: USACE, then select Site: Contractor. Complete the required fields and then click the Register button.
If you are registered, enter the Managing Agency: USACE, your email address, and the Bidder Inquiry Key for this solicitation listed below, check the security box, and then click Sign in.
From this page, you may view all bidder inquiries or add a new inquiry.
Bidders will receive an acknowledgement of their questions via email, followed by an answer to their questions after it has been processed by our technical team. ***Please Note: Bidders shall only submit one (1) question per inquiry.
All inquiries containing multiple questions shall be rejected***
The Solicitation Number is: W912DQ23B1002 The Bidder Inquiry Key is: PUDQW7-WXIAUW The Plan Room Key is : I4C4VD-5H77U9
The Bidder Inquiry System will be unavailable for new inquiries after 29 December 2022, at 3 PM local Kansas City time in order to ensure adequate time is allotted to form an appropriate response to inquiries and amend the solicitation, if necessary.
Bidders are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The telephone number for the Call Center is (833) 389-1097 or (217) 367-3273. Email to: staff@projnet.info.
Offerors are requested to review the specification in its entirety and review all amendments for answers to questions prior to submission of a new inquiry.
(End of Summary of Changes)
2”
SAFETY PERFORMANCE SIGN
Legend Group 1: Standard two-line title “Safety is a Job requirement” with (8 od.)
Safety Green First Aid logo.
Color: to match PMS 347 Typeface: 3” Helvetica Bold Color: Black
Legend Group 2: One to two-line project title legend describes the work being done under this contract and name of host project.
Color: Black Typeface: 1.5” Helvetica Regular Maximum line length: 42”
Legend Group 3: One to two-line iden-tification; name of prime contractor and city, state address.
Color: Black Typeface: 1.5” Helvetica Regular Maximum line length: 42”
Legend Group 4: Standard safety record captions as shown.
Color: Black Typeface: 12.5” Helvetica Regular
Each contractor’s safety record is to be posted on Corps managed or supervised construction projects and mounted with the construction project identification sign.
The graphic format, color, size and typefaces used on the sign are to be reproduced exactly as specified below. The title with First Aid logo in the top section of the sign and the performance record captions are standard for all signs of the type. Legend Groups 2 and 3 below identify the project and the contractor and are to be placed on the sign as shown.
Safety record numbers are mounted on individual metal plates and are screw mounted to the background to allow for daily revisions to posted safety performance record.
Safety is a Job Requirement
3” 3”3” 8”31”
3” 17”
3”
4.875”
4.875”
4.875”
30.375”
3.875”
1.875” 3”
1.875”
4”
1.875”
3”
2.25”
2.25”
6”
4.5”
10.5”
3”
Public Use Area Development, Stage IV Osage River Basin
Pacific Maine Construction Corp oration Galveston, Texas
This project has operated:
Days without a lost time injur y
Total days worked on this contract
Lost time injur ies
5 6
2.5”2.5” 2.5”
.875”
.875”
3.25”
Sign Type
CID-02
Legend Size Various
Panel Size 4’ X 4’
Post Size 4” X 4”
Specification Code
HDO-3
Mounting Height
48”
Color Bkg/Lgd
WH/BK - GR
Replaceable numbers are to be mounted on white .060 aluminum plates and screw-mounted to back-ground.
Color: Black Typeface: 3” Helvetica Regular Plate size: 2.5” X 5”
All typography is flush left and rag right. Upper and lower case with initial capitals only as shown.