B.08.02 KA_REPAINT SERVICE BRIDGE SUPERSTRUCTURE_DRAWINGS 2022.pdf
PDF 22 MB Posted
- Attached to
- Kanopolis Lake Project Superstructure Bridge Painting Federal contract opportunity
- Solicitation number
- W912DQ23B1002
About this file
This federal contract opportunity solicitation requests offers for bridge painting services at Kanopolis Lake. The solicitation number is W912DQ23B1002 and it was issued by the Department of the Army Corps of Engineers Engineering District Kansas City. The contractor will be required to provide all labor, equipment, and materials to remove the existing lead-based paint system from the steel superstructure of the bridge, including the bearings and handrails. The contractor must then clean and prepare the metal surfaces, inspect the bridge prior to painting, furnish and apply the new paint system, and protect surfaces not being painted. The selected paint system must be tested and approved. Offers are due by the date specified in the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C.04.01 Abstract OFKA 23B1002 19 JAN 23.pdf | ||
| B.08.03 Kanapolis Bridge Amendment 0004 18 Jan 23.pdf | ||
| B.08.03 Kanapolis Bridge Amendment 3 01 04 23.pdf | ||
| B.08.03 Kanapolis Bridge Amendment 2 12 28 22.pdf | ||
| B.08.03 Kanapolis Bridge Amendment 12 12 22.pdf | ||
| B.07.01 Site Visit sign in.pdf | ||
| B.08.02 Solicitation KA REPAINT SERVICE BRIDGE SUPERSTRUCTURE.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
...\RepaintServiceBridgeSuperstructure\6.0 Engineering-Design\6.1 Drawings_Imperial_U6\CAD_BIM\_Sheets\COVER SHEET
10:07:36 AM 10/26/2022 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript of Engineers
US Army Corps
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
G-002
G-001
S-001
STRUCTURAL
GENERAL
LOCATION AND VICINTY MAP
KA_G-001.DGN
KA_G-002.DGN
KA_S-001.DGN
SHEET NO. TITLE FILE NO. CADD FILE NO.
RECORD DRAWINGS - FOR INFORMATION ONLY
RS700 KA_RS700.DGN
KA KK2-5-2
KA KK2-5-1
RS701 KA_RS701.DGN
RS702 KA_RS702.DGN
COVER AND INDEX
SHEET INDEX
SERVICE BRIDGE PLAN AND ELEVATION
SERVICE BRIDGE DETAILS OF SUPER-STRUCTURE
G-003 KA_G-003.DGNOVERALL SITE PLAN
SERVICE BRIDGE ELECTRICAL AND COMMUNICATION LINES RELOCATION DETAILS
INTAKE TOWER AND SERVICE BRIDGE ELECTRIC SERVICE AND EXTERIOR LIGHTING C-2-166
S-002 KA_S-002.DGN
S-003 KA_S-003.DGN
RIVET INSPECTION DETAILS
INSPECTION DETAILS
KANSAS CITY DISTRICT
SEE COVER SHEET
A S
V
IT
A K
G-001
A N
S I
D
S E
E C
O V
E R S
H E
E T
K A
N S
A S C
IT
Y
M O
E T
H S
T R
E E
T
K A
N S
A S C
IT
Y D
IS
T R
IC
T
D R
A W
IN
G C
O D
E
F
IL
E N
A M
E
J
M A
X W
E L L
KANOPOLIS DAM AND RESERVOIR
K A
N O
P O
L
IS
D
A M A
N D R
E S
E R
V O
IR
E F
E R
N A
N D
E Z
E F
E R
N A
N D
E Z
C O
V E
R S
H E
E T A
N D
S H
E E
T I
N D
E X
REPAINT SERVICE BRIDGE SUPERSTRUCTURE
R E
P A
IN
T S
E R
V
IC
E B
R
ID
G E S
U P
E R
S T
R U
C T
U R
E
BIDDABILITY, CONSTRUCTIBILITY, OPERABILITY, ENVIRONMENTAL, AND SUSTAINABILITY
K A
G -0
.d g n
P2 - 486823, FY2022
P
F
Y
SMOKY HILL RIVER, KANSAS
S M
O K
Y H
IL
L R
IV
E R
K A
N S
A S
W912DQ23B1002
W
D Q
B
OCTOBER 2022
O C
T O
B E
R
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:11:13 AM 10/26/2022
...\RepaintServiceBridgeSuperstructure\6.0 Engineering-Design\6.1 Drawings_Imperial_U6\CAD_BIM\_Sheets\LOCATION AND VICINTY MAP
K A
N O
P O
L
IS
D
A M A
N D R
E S
E R
V O
IR
F
IL
E N
A M
E
A N
S I
D
G-002
E
E C
O V
E R S
H E
E T
K A
N S
A S C
IT
Y
M O
E T
H S
T R
E E
T
K A
N S
A S C
IT
Y D
IS
T R
IC
T
D R
A W
IN
G C
O D
A W
IN
G
C O
D E
J
M A
X W
E L
LOCATION
PROJECT
L O
C A
T
IO
N A
N D V
IC
IN
T Y M
A P
P A
IN
T S
E R
V
IC
E B
R
ID
G E S
U P
E R
S T
R U
C T
U R
E
K A
G -0
.d g n
S M
O K
Y H
IL
L R
IV
E R
K A
N S
A S
P
F
Y
A S
V
IT
A K
E F
E R
N A
N D
E Z
E F
E R
N A
N D
E Z
BIDDABILITY, CONSTRUCTIBILITY, OPERABILITY, ENVIRONMENTAL, AND SUSTAINABILITY
W
D Q
B
O C
T O
B E
R
STAGING AREA
INTAKE TOWER
STAGING AREA
HANDRAILS
TRUSS MEMBERS AND
REPAINT SERVICE BRIDGE
HANDRAILS
TRUSS MEMBERS AND
REPAINT SERVICE BRIDGE
HANDRAILS
TRUSS MEMBERS AND
REPAINT SERVICE BRIDGE
BEARINGS AT ABUTMENT
REPAINT (2) BRIDGE
BEARINGS AT TOWER
REPAINT (2) BRIDGE
BEARINGS AT PIER
REPAINT (4) BRIDGE
BEARINGS AT PIER
REPAINT (4) BRIDGE
JUNCTION BOX AT ABUTMENT
SOUTH ELECTRICAL CONDUIT
JUNCTION BOX AT ABUTMENT
NORTH ELECTRICAL CONDUIT
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:11:40 AM 10/26/2022
...\RepaintServiceBridgeSuperstructure\6.0 Engineering-Design\6.1 Drawings_Imperial_U6\CAD_BIM\_Sheets\OVERALL SITE PLAN
K A
N O
P O
L
IS
D
A M A
N D R
E S
E R
V O
IR
F
IL
E N
A M
E
A N
S I
G-003
E C
O V
E R S
H E
E T
K A
N S
A S C
IT
Y
M O
E T
H S
T R
E E
T
K A
N S
A S C
IT
Y D
IS
T R
IC
T
D R
A W
IN
G C
O D
A W
IN
G
C O
D E
J
M A
X W
E
V
E R
A L L S
IT
E P
L A
N
B1
PROJECT AREA MAP
SCALE: NTS
N
R E
P A
IN
T S
E R
V
IC
E B
R
ID
G E S
U P
E R
S T
R U
C T
U R
E
K A
G -0
.d g n
S M
O K
Y H
IL
L R
IV
E R
K A
N S
A S
P
F
Y
A S
V
IT
A K
E F
E R
N A
N D
E Z
E F
E R
N A
N D
E Z
BIDDABILITY, CONSTRUCTIBILITY, OPERABILITY, ENVIRONMENTAL, AND SUSTAINABILITY
W
D Q
B
O C
T O
B E
R
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
COMMUNICATION LINE BOX AT BRIDGE ABUTMENT
NORTH ELECTRICAL CONDUIT JUNCTION
TRUSS BOTTOM CHORD
REHUNG IN THE ORIGINAL MANNER AFTER COMPLETION OF PAINTING.
BE TEMPORARILY RELOCATED PRIOR TO PAINT REMOVAL AND
NORTH ELECTRICAL CONDUIT AND TELECOMMUNICATION LINE TO
AFTER COMPLETION OF PAINTING.
PRIOR TO PAINT REMOVAL AND REHUNG IN THE ORIGINAL MANNER
SOUTH ELECTRICAL CONDUIT TO BE TEMPORARILY RELOCATED
TRUSS BOTTOM CHORD
BOX AT BRIDGE ABUTMENT
SOUTH ELECTRICAL CONDUIT JUNCTION
NOTE 33.
NOTE 22.
NOTE 11.
GENERAL NOTES|GENERAL SHEET NOTES|GENERAL (DISCIPLINE) NOTES|LEGEND
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:20:00 AM 10/26/2022
...\RepaintServiceBridgeSuperstructure\6.0 Engineering-Design\6.1 Drawings_Imperial_U6\CAD_BIM\_Sheets\SERVICE BRIDGE ELECTRICAL AND COMMUNICATION LINES RELOCATI
E1 SCALE: NTS
ABUTMENT NORTH CORNER ELECTRICAL JUNCTION BOX
A1
ABUTMENT SOUTH CORNER ELECTRICAL JUNCTION BOX
SCALE: NTS A6 SCALE: NTS
E6 SCALE: NTS
SOUTH ELECTRICAL CONDUIT - LOOKING TOWARDS INTAKE TOWER
NORTH ELECTRICAL CONDUIT - LOOKING TOWARDS INTAKE TOWER
F
IL
E N
A M
E
A S
V
IT
A K
S-001
S E
E C
O V
E R S
H E
E T
W
D Q
B
D R
A W
IN
G C
O D
E
A N
S I
D
J
M A
X W
E L L
E F
E R
N A
N D
E Z
K A
N O
P O
L
IS
D
A M A
N D R
E S
E R
V O
IR
K A
N S
A S C
IT
Y
M O
E T
H S
T R
E E
T
K A
N S
A S C
IT
Y D
IS
T R
IC
T
E F
E R
N A
N D
E Z
C O
M M
U N
IC
A T
IO
N L
IN
E S R
E L
O C
A T
IO
N D
E T
A
IL
S
S E
R V
IC
E B
R
ID
G E E
L E
C T
R
IC
A L A
N D
R E
P A
IN
T S
E R
V
IC
E B
R
ID
G E S
U P
E R
S T
R U
C T
U R
E
BIDDABILITY, CONSTRUCTIBILITY, OPERABILITY, ENVIRONMENTAL, AND SUSTAINABILITY
K A S -0
.d g n
S M
O K
Y H
IL
L R
IV
E R
K A
N S
A S
P
F
Y
O C
T O
B E
R
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:21:21 AM 10/26/2022
...\RepaintServiceBridgeSuperstructure\6.0 Engineering-Design\6.1 Drawings_Imperial_U6\CAD_BIM\_Sheets\RIVET INSPECTION DETAILS
MINIMUM REVIT DIMENSIONS
DIAMETER "D"
RIVIT SHANK
DIAMETER "A"
MINIMUM HEAD
DIAMETER "H"
MINIMUM HEAD
DIAMETER "A"
MINIMUM HEAD
DIAMETER "H"
MINIMUM HEAD
LOADING: PRIMARILY SHEAR TENSION OR UNKNOWN
LOADING: TENSION & SHEAR
"8
"8
"4
"8
"8
"16 3"8
"8
1" "4
1"
"8
"4
" 16
"16
RIVET EVALUATION CRITERA
DRAWINGS.
METHODS SUCH AS A D-METER OR CALIPERS AND COMPARED TO ORIGINAL
SECTION LOSS. MEMBER THICKNESS SHOULD BE VERIFIED USING NDT
PLATES FOR SIGNS OF PACK RUST, DISTORTION FROM OVERLOAD, AND
SPECIAL ATTENTION WILL BE MADE CONCERNING GUSSET AND COVER 7.
SHALL PERFORM NDT USING A DYE PENETRATION TEST KIT, ETC.
MEMBERS. IF A SUSPECTED CRACK IS FOUND, THE BRIDGE INSPECTOR
THE BRIDGE INSPECTOR SHALL INSPECT ALL BRIDGE STRUCTURAL 6.
NECESSARY FOR CORRECTING AND CLEANING HOLE.
A RESULT OF MISALIGNED PLATES. REAMING OF THE HOLES MAY BE
RIVET CAMMING - A CONDITION WHERE THE RIVET HOLE IS NOT STRAIGHT AS 5.
CONTRACTING OFFICER.
REMOVAL AND ONLY AFTER APPROVAL HAS BEEN OBTAINED FROM THE
WITH A SCARFING TIP WILL BE PERMITTED ONLY FOR PROBLEMATIC RIVET
ANY STRUCTURAL MEMBERS IN TENSION . USE OF A GAS CUTTING TORCH
MEMBER TO REMAIN. NO FLAME CUTTING METHODS WILL BE PERMITTED ON
CONTRACTOR TO ENSURE NO DAMAGE WILL OCCUR TO THE EXISTING
ENGINEER REVIEW. ACCEPTANCE WILL REQUIRE DEMONSTRATION BY THE
PROPOSED RIVET REMOVAL METHODS TO THE CONTRACTING OFFICER FOR
A WORKING DRAWING AS PART OF THE BRIDGE INSPECTION PLAN DETAILING
PRIOR TO STARTING ANY RIVET REMOVAL, THE CONTRACTOR SHALL SUBMIT 4.
TENSIONED BEFORE THE NEXT RIVET MAY BE REMOVED.
ANY CONNECTION. THE REPLACEMENT BOLT SHALL BE FULLY INSTALLED AND
ENGINEER, ONLY ONE RIVET MAY BE REMOVED AND REPLACED AT A TIME AT
UNLESS OTHERWISE SHOWN IN THE PLANS OR APPROVED BY THE 3.
00.
BE INSTALLED AND TENSIONED IN ACCORDANCE WITH SPECIFCATION 05 12
1/8" MAXIMUM TO FACILITATE BOLT INSTALLATION IF NEEDED. BOLTS SHALL
REPLACE. EXISTING HOLES MAY BE REAMED TO THE RIVET DIAMETER PLUS
SHALL HAVE A DIAMETER MATCHING THE DIAMETER OF THE RIVET THEY
BOLTS SHALL CONFORM TO ASTM F3125 GR A325. BOLTS REPLACING RIVETS 2.
97 02.
05 12 00, AND PREPARED FOR PAINT IN ACCORDANCE WITH SPECIFICATION 09
SHALL BE INSTALLED AND TENSIONED IN ACCORDANCE WITH SPECIFICATION
THE RIVET EVALUATION CRITERIA SHOWN ON THIS SHEET. NEW H.S. BOLTS
COMPLETED AND SHALL BE REMOVED AND REPLACED IN ACCORDANCE WITH
PAINTED SHALL BE EVALUATED AFTER FIELD PREPARATION FOR PAINTING IS
EXISTING RIVETS TO REMAIN ON MEMBERS AND/OR GUSSETS BEING 1.
RIVET INSPECTION AND REPLACEMENT NOTES
IRREGULAR SECTION LOSS, CONTACT THE CONTRACTING OFFICER FOR DIRECTION.
UNCLEAR AS TO THE RIVET LOADING CONDITION OR USE THE SECTION LOSS CRITERIA FOR "UNKNOWN" LOADING CONDITION. FOR RIVETS WITH
REPLACE RIVET IF SECTION LOSS IS EQUAL TO OR GREATER THAN THE DIAGRAM SHOWN BELOW. THE ENGINEER SHALL BE CONSULTED IF 3.
PERPENDICULAR TO ITS SHANK WITH A 40 OZ HAMMER.
CONFIRMED LOOSE IF IT CAN BE FELT TO MOVE AFTER BEING STRUCK ON THE SIDE OF THE HEAD IN A DIRECTION APPROXIMATELY
REPLACE RIVET IF THE RIVET VISUALLY APPEARS TO BE LOOSE FOR ANY REASON. RIVETS VISUALLY SUSPECT OF BEING LOOSE SHALL BE 2.
δ) REPLACE RIVET IF THERE IS SEPARATION BETWEEN THE SOUND METAL SURFACES OF EITHER RIVET HEAD AND THE RIVETED PARTS. (SEE SYMBOL 1.
RIVETS SHALL BE REPLACED IF THEY FAIL TO MEET ANY ONE OF THESE CRITERIA.
D1 SCALE: NTS
RIVET LOADING CONDITION - PRIMARILY SHEAR (DIAGONALS)
SCALE: NTSA1
RIVET LOADING CONDITION - PRIMARILY TENSION, TENSION & SHEAR, OR UNKOWN (FLOOR BEAMS)
F
IL
E N
A M
E
S-002
S E
E C
O V
E R S
H E
E T
D R
A W
IN
G C
O D
E
J
M A
X W
E L L
K A
N O
P O
L
IS
D
A M A
N D R
E S
E R
V O
IR
K A
N S
A S C
IT
Y
M O
E T
H S
T R
E E
T
K A
N S
A S C
IT
Y D
IS
T R
IC
T
R E
P A
IN
T S
E R
V
IC
E B
R
ID
G E S
U P
E R
S T
R U
C T
U R
E
BIDDABILITY, CONSTRUCTIBILITY, OPERABILITY, ENVIRONMENTAL, AND SUSTAINABILITY
K A S -0
.d g n
S M
O K
Y H
IL
L R
IV
E R
K A
N S
A S
P
F
Y
A S
V
IT
A K
A N
S I
D
E F
E R
N A
N D
E Z
E F
E R
N A
N D
E Z
R
IV
E T I
N S
P E
C T
IO
N D
E T
A
IL
S
S E
R V
IC
E B
R
ID
G E
O C
T O
B E
R
W
D Q
B
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:17:49 AM 10/26/2022
...\RepaintServiceBridgeSuperstructure\6.0 Engineering-Design\6.1 Drawings_Imperial_U6\CAD_BIM\_Sheets\INSPECTION DETAILS
SPECIFICATION 09 97 02.
DETAILS A1 AND A5. PAINT FOLLOWING THE PROCEDURES OUTLINED IN
AND IN POCKETS OF BRIDGE BEARINGS PRIOR TO REPAINTING AS SHOWN IN
THOROUGHLY ALL SIDES OF BRIDGE LACING, BACKSIDES OF "C" CHANNELS,
THE CONTRACTOR SHALL MAKE EVERY EFFORT TO MEDIA-BLAST CLEAN 3.
PROCEDURES OUTLINED IN SPECIFICATION 09 97 02.
UNDERSIDE OF COVER PLATES ARE CLEAN, PAINT FOLLOWING THE
UNDER ALL COVER PLATES OF THE BRIDGE AS SHOWN IN DETAIL D5. AFTER
THE CONTRACTOR SHALL MAKE EVERY EFFORT TO MEDIA-BLAST CLEAN 2.
IN SPECIFICATION 09 97 02.
SHALL BE CLEANED AND PAINTED FOLLOWING THE PROCEDURES OUTLINED
AS SHOWN IN DETAIL D1, ALL BRIDGE EXPANSION SLIDING PLATE JOINTS 1.
NOTES
A1
STRUCTURAL LACING
SCALE: NTS
D1
BRIDGE EXPANSION JOINT SLIDING PLATES
SCALE: NTS D5
PACK RUST UNDER COVER PLATES
SCALE: NTS
A5
BRIDGE FIXED AND ROLLER BEARINGS
SCALE: NTS
F
IL
E N
A M
E
S-003
S E
E C
O V
E R S
H E
E T
D R
A W
IN
G C
O D
E
J
M A
X W
E L L
K A
N O
P O
L
IS
D
A M A
N D R
E S
E R
V O
IR
K A
N S
A S C
IT
Y
M O
E T
H S
T R
E E
T
K A
N S
A S C
IT
Y D
IS
T R
IC
T
R E
P A
IN
T S
E R
V
IC
E B
R
ID
G E S
U P
E R
S T
R U
C T
U R
E
K A S -0
.d g n
S M
O K
Y H
IL
L R
IV
E R
K A
N S
A S
P
F
Y
A S
V
IT
A K
A N
S I
D
E F
E R
N A
N D
E Z
E F
E R
N A
N D
E Z
R
IV
E T I
N S
P E
C T
IO
N D
E T
A
IL
S
S E
R V
IC
E B
R
ID
G E
BIDDABILITY, CONSTRUCTIBILITY, OPERABILITY, ENVIRONMENTAL, AND SUSTAINABILITY
W
D Q
B
O C
T O
B E
R
NORTH FACE NORTH FACE
ABUTMENT
NORTH FACE
SOUTH FACE
SOUTH FACE SOUTH FACE
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:13:35 AM 10/26/2022
...\RepaintServiceBridgeSuperstructure\6.0 Engineering-Design\6.1 Drawings_Imperial_U6\CAD_BIM\_Sheets\SERVICE BRIDGE PLAN AND ELEVATION
K A
N O
P O
L
IS
D
A M A
N D R
E S
E R
V O
IR
F
IL
E N
A M
E
A N
S I
E C
O V
E R S
H E
E T
K A
N S
A S C
IT
Y
M O
E T
H S
T R
E E
T
K A
N S
A S C
IT
Y D
IS
T R
IC
T
D R
A W
IN
G C
O D
A W
IN
G
C O
D E
J
M A
X W
E
RS-700
E
R V
IC
E B
R
ID
G E
P L
A N A
N D E
L E
V A
T
IO
N
FOR INFORMATION ONLY
R E
P A
IN
T S
E R
V
IC
E B
R
ID
G E S
U P
E R
S T
R U
C T
U R
E
S M
O K
Y H
IL
L R
IV
E R
K A
N S
A S
P
F
Y
K A
R S -7
.d g n
A S
V
IT
A K
E F
E R
N A
N D
E Z
E F
E R
N A
N D
E Z
BIDDABILITY, CONSTRUCTIBILITY, OPERABILITY, ENVIRONMENTAL, AND SUSTAINABILITY
W
D Q
B
O C
T O
B E
R
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:13:48 AM 10/26/2022
...\RepaintServiceBridgeSuperstructure\6.0 Engineering-Design\6.1 Drawings_Imperial_U6\CAD_BIM\_Sheets\SERVICE BRIDGE DETAILS OF SUPER-STRUCTURE
K A
N O
P O
L
IS
D
A M A
N D R
E S
E R
V O
IR
F
IL
E N
A M
E
A N
S I
E C
O V
E R S
H E
E T
K A
N S
A S C
IT
Y
M O
E T
H S
T R
E E
T
K A
N S
A S C
IT
Y D
IS
T R
IC
T
D R
A W
IN
G C
O D
A W
IN
G
C O
D E
J
M A
X W
E
RS-701
E
R V
IC
E B
R
ID
G E
D E
T A
IL
S O
F S
U P
E R -S
T R
U C
T U
R E
FOR INFORMATION ONLY
R E
P A
IN
T S
E R
V
IC
E B
R
ID
G E S
U P
E R
S T
R U
C T
U R
E
K A
R S -7
.d g n
S M
O K
Y H
IL
L R
IV
E R
K A
N S
A S
P
F
Y
A S
V
IT
A K
E F
E R
N A
N D
E Z
E F
E R
N A
N D
E Z
BIDDABILITY, CONSTRUCTIBILITY, OPERABILITY, ENVIRONMENTAL, AND SUSTAINABILITY
W
D Q
B
O C
T O
B E
R
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:17:18 AM 10/26/2022
...\RepaintServiceBridgeSuperstructure\6.0 Engineering-Design\6.1 Drawings_Imperial_U6\CAD_BIM\_Sheets\INTAKE TOWER AND SERVICE BRIDGE ELECTRIC SERVICE AND EXTER
FOR INFORMATION ONLY
K A
N O
P O
L
IS
D
A M A
N D R
E S
E R
V O
IR
F
IL
E N
A M
E
A N
S I
D
S E
E C
O V
E R S
H E
E T
K A
N S
A S C
IT
Y
M O
E T
H S
T R
E E
T
K A
N S
A S C
IT
Y D
IS
T R
IC
T
D R
A W
IN
G C
O D
E
D R
A W
IN
G
C O
D E
J
M A
X W
E L L
RS-702
IN
T
A K
E T
O W
E R A
N D S
E R
V
IC
E B
R
ID
G E
E L E
C T
R
IC
S
E R
V
IC
E A
N D E
X T
E R
IO
R L
IG
H T
IN
G
R E
P A
IN
T S
E R
V
IC
E B
R
ID
G E S
U P
E R
S T
R U
C T
U R
E
K A
R S -7
.d g n
S M
O K
Y H
IL
L R
IV
E R
K A
N S
A S
P
F
Y
A S
V
IT
A K
E F
E R
N A
N D
E Z
E F
E R
N A
N D
E Z
BIDDABILITY, CONSTRUCTIBILITY, OPERABILITY, ENVIRONMENTAL, AND SUSTAINABILITY
O C
T O
B E
R
W
D Q
B
| KA_G-001 |
| KA_G-002 |
| KA_G-003 |
| KA_S-001 |
| KA_S-002 |
| KA_S-003 |
| KA_RS-700 |
| KA_RS-701 |
| KA_RS-702 |
File details come from the government source that posted it. Updated .