This solicitation is for the construction of a training facility in Mexico City, Mexico. The U.S. Army Corps of Engineers, Kansas City District is seeking a firm fixed price contract to construct a 2,000 square meter, three-story training facility with classrooms, simulator rooms, audio/visual production space, administration and support spaces on the campus of the National Center for Disaster Prevention in Mexico City. The scope of work includes demolishing an existing storage building, site improvements, electrical and mechanical systems, fire protection, water, sewer, gas, paving, and sustainability considerations for the primary facility. Responses are due under Solicitation Number W912DQ21R4014 by the Army Corps of Engineers to build this facility as part of the Autonomous University of Mexico campus. Both small and large businesses are eligible to respond to this unrestricted, full and open competitive acquisition.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers Kansas City District Alaska District Building Strong
Mexico National Civil Protection School (ENAPROC)
Mexico City, Mexico
Construction Solicitation and Specifications
As Advertised
June 2021
This page was intentionally left blank for duplex printing.
TC-1
DEPARTMENT OF THE ARMY
Kansas City District, Corps of Engineers
647 Federal Building Kansas City, Missouri 64106
SPECIFICATIONS FOR CONSTRUCTION OF
MEXICO NATIONAL CIVIL PROTECTION SCHOOL (ENAPROC)
MEXICO CITY, MEXICO
TABLE OF CONTENTS
COVER
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00 SOLICITATION
00 21 00 INSTRUCTIONS
00 21 16 INSTRUCTIONS TO PROPOSERS
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 70 00 CONDITIONS OF THE CONTRACT
00 72 00 GENERAL CONDITIONS
DIVISION 1 – GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
DIVISION 02 - EXISTING CONDITIONS
02 32 00 SUBSURFACE DRILLING, SAMPLING, AND TESTING
02 41 00 DEMOLITION AND CONSTRUCTION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 05 – METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 52 00 METAL RAILINGS
(Continued)
TC-2
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 42 29.00 23 TERRACOTTA PANEL RAINSCREEN WALL SYSTEM
07 54 19 POLYVINYL-CHLORIDE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 – OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 51 23 STEEL WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 84 20 ACOUSTICAL WALL PANELS
09 90 00 PAINTS AND COATINGS
DIVISION 10 – SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 39 FOLDING PANEL PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 – FURNISHINGS
12 21 00 WINDOW BLINDS
TC-3
12 51 00.00 23 FURNITURE, FIXTURES, AND EQUIPMENT (FF&E) REQUIREMENTS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 73 SEISMIC CONTROL FOR MISCELLANEOUS EQUIPMENT
DIVISION 14 - CONVEYING EQUIPMENT
14 21 23 ELECTRIC TRACTION PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 00.00 40 FIRE-SUPPRESSION SPRINKLER SYSTEMS
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 21 00 FIRE EXTINGUISHING SPRINKLER SYSTEMS (RESIDENTIAL)
21 30 00 FIRE PUMPS
DIVISION 22 – PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 14 29.00 40 SUMP PUMPS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 05 48.19 SEISMIC BRACING FOR HVAC
DIVISION 26 - ELECTRICAL
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS
26 32 15.00 ENGINE-GENERATOR SET STATIONARY 15-2500 KW, WITH AUXILIARIES
26 33 53 STATIC UNINTERRUPTIBLE POWER SUPPLY (UPS)
26 36 23 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
TC-4
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 20 BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING
32 11 23 AGGREGATE BASE COURSES
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13.53 HIGH-SECURITY FENCES (CHAIN LINK AND ORNAMENTAL) AND GATES
32 93 00 EXTERIOR PLANTS
DIVISION 33 – UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
Mexico National Civil Protection School (ENAPROC), Mexico City, Mexico The United States Army Corps of Engineers; Kansas City District requires the complete construction of a training facility w ith classrooms, simulator rooms, audio/visual production space, administration and support spaces at the CENAPRED campus in Mexico City, CDMX, Mexico.
The project scope includes supporting facilities such as site improvements, electrical service, f ire protection and alarm systems, w ater, sew er, gas, paving, w alks, curbs, storm drainage, and sustainability/energy considerations. The primary facility is a 2,000 Square Meter (M²), three-story rectangular structure. A small storage building must be demolished to accommodate the new facility, but no other demolition of structures w ill be required. SEE SPECIFICATIONS FOR FULL DETAILS.
This Request for Proposal (RFP) w ill result in the aw ard of a single Design-Bid-Build Firm-Fixed Price Construction Contract.
The North American Industry Classif ication (NAICS) Code is 236220 w ith a small business size standard of $39.5 Million Dollars.
The magnitude of this project is betw een $5 Million to $10 Million.
KEANDRE D MALONE 816-389-3596
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
22-Jun-2021
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________23 Jul 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USACE, KANSAS CITY +
FEDERAL BUILDING CT-M, RM 647 601 EAST 12TH S
KANSAS CITY MO 64106-2896
W912DQ
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
11:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
816-389-2029/2030FAX:TEL: 816-389-3824 TEL: FAX:
W912DQ21R4014 63
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job ENAPROC Facility
FFP
Includes all costs for the ENAPROC Facility and any sitework (Site Preparation, Site Improvements, Site Utilities, and Site Communications) per the contract documents, excluding all options and Furniture, Fixtures, and Equipment (FF&E).
FOB: Destination
PSC CD: Y1AZ
NET AMT
0002 1 Job OPTION Furniture, Fixtures, and Equipment FF&E
FFP
Includes all costs for acquisition of the ENAPROC Facility’s Furniture, Fixtures and Equipment (FF&E) per the contract documents, as indicated within Section 12 51 00.00 23 and on sheets IF110, IF111, IF112, IF120, IF122, IF123, IF130, IF131, IF132, IF501 and IF502.
0003 1 Job OPTION General AV Systems
FFP
Includes all costs associated with all the Audio-Visual system per contract documents, as indicated within Section 27 51 16 and on sheets EY110, EY120, EY130, E-801, E-811, E-812, E-821, E-831 and the following:
a. All microphones.
b. Three Projectors for the classrooms.
c. Two (2) wall mounted 70â € televisions and related brackets in the meeting room.
d. Twelve (12) wall mounted 42â € televisions and related brackets in the simulator rooms.
Note: Any work not specifically noted shall be priced with the most closely related
CLIN.
Section 00 21 00 - Instructions
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.207-1 Notice Of Standard Competition MAY 2006 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.222-5 Construction Wage Rate Requirements--Secondary Site of the
Work
MAY 2014
52.222-56 Certification Regarding Trafficking in Persons Compliance Plan.
OCT 2020
252.215-7008 Only One Offer JUL 2019
CLAUSES INCORPORATED BY FULL TEXT
52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)
Offers submitted in response to this solicitation shall be in the English language. Offers received in other than English shall be rejected.
(End of provision)
52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)
Offers submitted in response to this solicitation shall be in terms of U.S. dollars. Offers received in other than U.S.
dollars shall be rejected.
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed Price contract resulting from this solicitation.
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c)The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
U.S. Army Corps of Engineers Kansas City District Attn: Alice M Jeffres 601 E. 12th St, Suite 635 Kansas City, MO 64106-2824
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
Date: 13 July 2021 Time: 10:00am – 1:00pm (Central Standard Time)
(c) Participants will meet at— CENAPRED Campus located at:
Av. Antonio Delfin Madrigal No. 665, Pedregal de Santo Domingo, Coyoacán, 04360 Ciudad de México, CDMX, Mexico Please contact the USACE Project Manager, Jennifer Counts, for site visit information.
Phone: 816-389-3457 Email: Jennifer.r.counts@usace.army.mil
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
Federal Acquisition Regulations System (FAR) https://www.acquisition.gov/browse/index/far
Department of Defense Federal Acquisition Regulation Supplement (DFARS) https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any DFARS (48 CFR Chapter 99) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
Section 00 21 16 - Instructions to Proposers
SUBMISSION REQUIREMENTS
SECTION 00 21 16: BEST VALUE EVALUATION FACTORS ONE STEP
1.0 GENERAL PROPOSAL INFORMATION
The proposal should be prepared simply and economically, providing straightforward, concise delineation of capabilities to perform the contract. The proposal should be practical, legible, clear and coherent.
2.0 GENERAL PROPOSAL
SUBMISSION INSTRUCTIONS
INSTRUCTIONS FOR SUBMITTING
ELECTRONIC PROPOSALS:
DoD SAFE (Secure Access File Exchange) is a web-based tool that provides authenticated DoD CAC users and guests (unauthenticated users) the capability to securely send and receive large files, including files that are too large to be transmitted via email. Guests can receive files from CAC users and (only if CAC users requested files) send files to CAC users. Notification is achieved via email.
In effort to reduce paperwork and cost, all proposals shall be submitted electronically through the SAFE site. Submission shall be in Adobe PDF format. You are limited to five
(5) maximum files per upload (total size cannot exceed 2GB). If you have a large number of files, recommend that you combine or ZIP your files before uploading to the SAFE site.
Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
SAFE INSTRUCTIONS
The Offeror’s proposal shall be submitted electronically, as described below. The Offeror’s proposal shall not contain classified data. The use of hyperlinks within a proposal is prohibited.
NOTE: The only authorized transmission method for proposals in response to this solicitation is electronically via SAFE online submission. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.
The Offeror’s proposal must be received by the Government by the date/time specified in the solicitation. Offerors shall electronically submit their proposals using the following link:
https://safe.apps.mil/
Failure to properly submit a proposal by the due date and time specified in the solicitation will render it late, and late proposals will be rejected. As this is an electronic submission subject to internet connectivity and other potential network traffic issues, offerors are cautioned to plan accordingly.
REQUEST FOR UPLOAD CODE: In order to electronically submit a proposal through DoD SAFE, offerors must email the Contract Specialist Keandre D. Malone at keandre.d.malone@usace.army.mil and the Contracting Officer Alice M Jeffres at alice.m.jeffres@usace.army.mil no later than five (5) working days prior to the proposal due date to receive a request code which will allow for file uploads via the SAFE site. Offerors that fail to email for request a code five (5) working days before proposal submission date may not receive a request code in time to upload their submission. For larger submissions that require multiple sessions to upload, multiple codes may need to be requested. Please plan accordingly when requesting a code(s) for uploads in order to have sufficient time to upload prior to the proposal due date.
FILE DESCRIPTION: Include a “File Description” for each file(s) you upload. The “File Description” will be included in the email notice to each of the recipients you choose to have access your file(s). Title the files(s):
Solicitation# COMPANY NAME_Cover letter and TAB A Solicitation# COMPANY NAME_TABs B-C Solicitation# COMPANY NAME_TAB D
NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.) Submission shall be in Adobe PDF format.
INSTRUCTIONS FOR USING THE SAFE WEBSITE:
Once at the SAFE website select the “Drop-off” icon. This allows users without a Common Access Card (CAC) or users whose computer is not configured to read a CAC the option to access the SAFE site as a guest.
After selecting the “Click Here” link you will be prompted to add your personal information, file information, recipient (Government representative) information and email settings.
When completing your file information for transmittal via the SAFE website, you will be required to enter the email address for all recipients. For this solicitation, the recipients are the Contract Specialist and the Contracting Officer.
The email address for the Contract Specialist for this solicitation is keandre.d.malone@usace.army.mil AND the Contracting Officer is alice.m.jeffres@usace.army.mil. The email address of the Government Employee who initiated the request code will be automatically populated. The Offeror must enter the email address for both the Contracting Officer and Specialist. The Offeror can enter an additional email address if desired. After entering an email address, click the ADD button to add the person(s) email to the “Recipients List” of your response. When your proposal is submitted, a notification will be sent to the recipients you added.
NOTE: Do NOT send the SAFE site packages to group email accounts.
Even if you successfully upload your proposal to the SAFE site, notification will not be sent to the government recipients until you verify your email address. Entering an incorrect email may result in the rejection of your submission for lateness. Successful file submission will be confirmed by the ‘Drop-Off Completed” screen which generates once a file is uploaded.
RECEIPT OF SUBMISSIONS:
For the purposes of determining whether a proposal submission is timely, the government shall utilize the date and time the submission is completely uploaded into the SAFE website as indicated by the SAFE system time stamp. For proposals larger than the 2GB capacity of the SAFE website and require multiple submissions will require multiple requests for codes, the Government will utilize the system generated date and time stamp of the last submission. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases.
The government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.
Because uploaded documents expire in DoD SAFE, the submission of proposals should only occur during a limited window of time. Proposals should be submitted no earlier than 5 days before the proposal due date in order to ensure that the submitted proposals doesn’t expire before the proposal due date.
Offerors are responsible for ensuring that the submitted proposal does not expire prior to proposal due date.
There is a SAFE User Guide available at https://dl.dod.cyber.mil/wp-content/uploads/dcs/pdf/unclass- DOD_SAFE_User_Guidev0_2d1.pdf
If an Offeror needs help, the SAFE helpdesk will not be able to help you. The Contract Specialist listed above will need to open a ticket for them to address system or user help issues.
3.0 PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS
1. In order to be considered for award of a contract for the requirements of this solicitation, the Offeror must submit a proposal with its offer. Failure to submit a complete proposal may result in the entire offer being rejected. The proposals shall be submitted in TABs as follows:
Submit the proposal in a tabbed, file identified by the Solicitation Number, project title, name, address, and telephone number of the Offeror(s). Arrange tabs as follows:
a) Technical Proposal (TABs B and C):
TAB B, FACTOR 1 Corporate Experience TAB C, FACTOR 2 Performance Confidence
b) Price Proposal, (TAB D), consists of an original signed Standard Form 1442
“Solicitation, Offer, and Award”; providing a price for all line items in the corresponding bid schedule; and acknowledgment of all amendments to the solicitation.
The originals of the Bid Guarantee must be provided by close of business within 2 business days of the proposal submission deadline at the following address:
2. Proposal Characteristics
a) Each file of the proposal shall be identified by the Solicitation Number W912DQ21R4014, Mexico
National Civil Protection School (ENAPROC), Mexico City, Mexico, name, address, and telephone number of the Offeror, and the following on the files:
TABs B-C: TECHNICAL PROPOSAL
TAB D: PRICE PROPOSAL
b) The Proposal’s clarity, organization and cross referencing are mandatory. No material shall be incorporated by reference. General cross-references or cross referencing guides will not be considered appropriate cross-references.
3. Additional Information to be provided:
Pro Forma Requirements to be provided in TAB A:
This information consists of the following:
a) The Offeror will submit a cover letter containing:
i. Solicitation number.
ii. Name, address, email, and telephone and fax numbers of the Offeror.
iii. Names, title, email, and telephone and fax numbers of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this RFP.
iv. Name, title and signature of the person authorized to sign the proposal.
v. A statement specifying agreement with all terms, conditions and provisions included in the
RFP.
vi. CAGE Codes and DUNS numbers for the Offeror, and all teaming partners who participated in the Factor 1 – Corporate Experience.
b) The completed Section 00 45 00 of the RFP (Representations and Certifications), printed Entity
Record from the System for Award Management (SAM).
c) Bid Guarantee. See FAR 52.228-1.
d) Financial statement and bank letter that verify that sufficient funds will be available to finance the work.
e) For Joint Ventures, the information required by paragraph “Joint Ventures”.
f) Copy of Bid Guarantee (see paragraph 3.1.(3) above for submission of original Bid
Guarantee).
4.0 INQUIRIES/QUESTIONS
Technical inquiries and questions relating to this solicitation shall be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org). To submit and review inquiry items, prospective Offerors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective offeror who submits a comment /question will receive an acknowledgement of their comment/question via email.
Another email to the same address will notify the prospective offeror once the reply is available for viewing.
***Please Note: Offerors shall only submit one question per inquiry. All inquiries containing multiple questions shall be rejected.
The Solicitation Number is: W912DQ21R4014 The Bidder Inquiry Key is: 8EAR4C-JC8SQZ The Plan Room Key is: JW7SVD-2EEN9Z
Instructions for first-time ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. Select agency USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Instructions for future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret
Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. Select agency USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
The Bidder Inquiry System will be unavailable for new inquiries 10 days prior to the date proposals are due at 4 p.m. CST in order to ensure adequate time is allotted to form an appropriate response to inquiries and amend the solicitation if necessary.
Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago) or by appointment for OCONUS. The telephone number for the Call Center is 1-800-428-HELP. Email to staff@rcesupport.com.
5.0 JOINT VENTURES
Joint Ventures shall submit the following additional documentation regarding their business entities:
1) A certified copy of their Joint Venture agreement.
2) A detailed statement outlining the following in terms of percentages, where appropriate.
a. The relationship of the joint venture parties in terms of business ownership, capital contribution, and profit distribution or loss sharing.
b. The management approach of the joint venture in terms of who will conduct, direct, supervise and control the project and have custody and control of the assets of the Joint Venture and perform the duties necessary to complete the work.
c. The structure of the joint venture and decision-making responsibilities of the Joint Venture parties in terms of who will control the manner and method of performance of the work.
d. The bonding responsibilities of the Joint Venture parties.
e. Identification of the key personnel having authority to legally bind the Joint Venture to subcontracts and state who will provide or contract for the labor and materials for the Joint Venture.
f. Identification of party maintaining the Joint Venture bank accounts for the payment of all expenses and the deposits of all receipts, keep the books and records, and pay applicable taxes for the Joint Venture.
g. Identification of party furnishing the facilities, such as office supplies and telephone service.
h. Identification of party having overall control of the Joint Venture.
Other sections of the proposal shall identify, where appropriate, whether key personnel are employees of the individual Joint Venture parties and identify the party, or hired as employees of the Joint Venture.
If one of the Joint Venture parties possesses experience and/or past performance as a Federal Government contractor or as a Corps of Engineers contractor, that experience and/or past experience will be included as the experience and/or past experience of the Joint Venture.
6.0 SUBCONTRACTORS/TEAMING PARTNER
If an Offeror wishes to receive credit for the work of a subcontractor or teaming partner, the Offeror must submit a letter of commitment to use the proposed subcontractor on the project, signed both by the subcontractor and the Offeror.
The letter of commitment will be in a form substantially the same as the Sample Letter of Commitment at Attachment 1 to this Section. The commitment letter must be submitted even if the subcontractor/teaming partner is in some way affiliated with the Offeror (for example, the subcontractor/teaming partner is a subsidiary of a joint venture partner, or a subsidiary of a firm to which the joint venture partner is also a subsidiary). Include the subcontractor letters of commitment in TAB B, Factor 1, Corporate Experience.
SAMPLE LETTER OF COMMITMENT to
USE SUBCONTRACTOR/TEAMING
PARTNER [COMPANY LETTERHEAD]
TO: Contracting Officer, Kansas City District, United States Army Corps of Engineers
SUBJECT: Letter of Commitment for Proposed Contract for [insert project name]
Dear Sir or Madam:
[Insert name of Offeror] and [insert name of subcontractor/teaming partner] hereby make the unequivocal commitment that, in the event that the company receives award of the Solicitation for [insert project name], [insert name of subcontractor/teaming partner] will perform the following work required by the Solicitation.
[Insert list of tasks to be performed by the subcontractor/teaming partner] Sincerely, [Authorized Official] [Legal Name of Offeror] Date: ______________
[Subcontractor/Teaming Partner] [Legal Name of Firm] Date: _____________
7.0 BASIS FOR AWARD
The Government intends to select for award the single responsible Offeror whose proposal conforms to the solicitation that proposes a price that is fair and reasonable, and that provides the Best Value to the Government.
The selection will be based on evaluation of the following evaluation factors: Corporate Experience, Performance Confidence, and Price.
The award will be made based on the best overall (i.e. best value) proposal that is determined to be the most beneficial to the Government, with appropriate consideration given to the following evaluation factors:
Corporate Experience, Performance Confidence, and Price. The non-price factors are not of equal importance as shown in Table 3 below.
The Government reserves the right to enter into discussions. In the event that discussions are not necessary then we intend to award without discussions, to the responsible Offeror whose proposal conforms to the solicitation and is determined to be the best value.
The two Non-Price factors, when combined, are significantly more important than price. Offerors, receiving an Unacceptable rating on any individual factor will not be considered for award. Offerors are cautioned that award may not be made to the lowest price offered.
8.0 SOURCE SELECTION PROCESS
The Source Selection Evaluation Board (SSEB) will be established to conduct the evaluation of proposals received in response to this solicitation. The evaluation will be based on the content of the proposal, revised proposals, if necessary, and any information obtained from other sources, e.g. past performance information. The SSEB will not consider any documents incorporated by reference, except as expressly allowed by this solicitation.
Members of the SSEB will independently evaluate the information provided in the proposal. Once these individual evaluations are completed, the SSEB will deliberate and assign a consensus rating for each evaluation factor. It is the responsibility of each member of the SSEB to provide and document sufficient strengths, weaknesses, and/or deficiencies to support the assigned rating for each factor.
The results of the SSEB evaluations will be presented to the Source Selection Authority. The SSA will determine whether it is appropriate to engage in clarifications, communications or discussions. The ratings on individual factors, to include all support documentation, will be provided to the SSA. The SSA, independently exercising prudent business judgment, will determine which offeror presents the best overall value to the Government and will be selected for award.
9.0 TECHNICAL RATING
The SST will use a combined technical/risk rating system that includes consideration of risk in conjunction with the strengths, weaknesses, and deficiencies in determining technical ratings. Assessment of technical risk, which is manifested by the identification of weakness(es), considers potential for disruption of schedule, increased costs, degradation of performance, the need for increased Government oversight, and/or the likelihood of unsuccessful contract performance.
Combined technical/risk evaluations shall utilize the combined technical/risk ratings listed in Table 1A and the risk descriptions set forth in Table 1B.
Table 1A. Combined Technical/Risk Ratings Color Rating Description
Blue
Outstanding
Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Purple
Good
Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Green
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow
Marginal
Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red
Unacceptable
Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
Table 1B. Technical Risk Rating Method
Adjectival Rating Description Low Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance.
Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Moderate Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
Unacceptable Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.
Ratings will be assigned for each of the technical evaluation factors for each offeror. No overall rating will be assigned.
10.0 DEFINITIONS
Rating: The rating for the Technical factor will be expressed as an adjectival assessment of Outstanding, Good, Acceptable, Marginal, or Unacceptable.
Deficiency: A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.
Strength: Any aspect of an offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
Weakness: A flaw in the proposal that increases the risk of unsuccessful contract performance.
Significant Weakness: A flaw that appreciably increases the risk ofunsuccessful contract performance.
11. DEBRIEFING OFFERORS
Offerors may request a debriefing in accordance with FAR 15.505 Pre-award Debriefing of Offerors, and FAR
15.506 Post-award Debriefing of Offerors.
12. TECHNICAL FACTORS TO BE EVALUATED
The Government will select a single offeror based on their overall merit after consideration of the evaluation factors described below. The relative weight given to the evaluation factors is described in the table below.
Table 2. Relative Weight of Evaluation Factors
Location Factor Number Description Relative Importance Tab B Factor 1 Corporate Experience This factor is more important than
Factor 2
Tab C Factor 2 Performance Confidence This factor is less important than Factor 1
Tab D Factor 3 Price All non-price factors, when combined, are significantly more important than Price.
TAB B, FACTOR 1 –CORPORATE EXPERIENCE
Submission Requirements
Submit three to five projects demonstrating the offeror’s recent and relevant corporate experience for substantially similar requirements as outlined in the RFP. If less than three projects are submitted the proposal will not be evaluated. If more than five projects are submitted, only the first five will be evaluated. The projects submitted shall be limited to no more than two (2) pages each and any information beyond the limit will not be evaluated. Submit projects in accordance with the following:
i. Projects shall demonstrate experience in the construction of similar size, scope and complexity projects as the project in this RFP.
ii. Completed within the last six (6) years of the proposal submission date, except that one (1) project may be substantially complete (90%) at the time of proposal submission. If an offeror presents a project which is substantially complete (at least 90%), the proposal must include an explanation why that project should be considered substantially complete.
Multiple Award Task Order Contracts (MATOCs) or any other type of task-order contracts that provide for the issuance of task orders for the performance of tasks will not be considered projects for the purposes of this evaluation. Only individual task orders issued under such contracts will be evaluated as projects. A phased project for a single customer with multiple inter-dependent facilities on a single site may be considered as one project for the purposes of this evaluation. Project descriptions that do not clearly describe the offeror’s experience, the scope of the project, or the periods of project performance will not be considered.
Provide the following information for each project:
1) General Project Information: Project Title, Location, and Contract Number.
2) Role of Offeror: Indicate type and percentage of work the offeror self-performed and/or subcontracted. Indicate if work was performed as the prime contractor or as a subcontractor.
3) Total Construction Dollar Amount
4) Start and Completion Dates: Project must be identified as complete or substantially complete. If an Offeror presents a project that is substantially complete (90%), the proposal must include an explanation of why that project should be considered.
5) Description of Project: Address how the project experience is relevant to the Mexico National Civil Protection
School training facility project as described in this solicitation. Include: the size and function of the building(s) constructed, the scope of the effort performed by the offeror, any required site improvements, and any coordination with the Government of Mexico or construction requirements for the project. Provide a narrative that includes details on each of the above topics in order for the board to evaluate the relevancy of each project.
Indicate if the project was new construction or renovation/repairs.
6) Customer Primary Point of Contact: Name, relationship to project, agency/firm, phone number, and e-mail address. The Government may contact and interview project references. Reference information will not be revealed to other parties.
Evaluation Criteria
Based on the submission provided, the Government will evaluate the Corporate Experience provided and assign one combined technical and risk rating for this factor. The Government will evaluate the offeror’s Corporate Experience for strengths, weaknesses and deficiencies in the following areas (criteria are not listed in order of importance).
a. Projects that demonstrate new construction of buildings that are similar in size (square meters and cost), scope, and complexity. Similar scope and complexity includes, but is not limited to: multi-story construction; training facility construction with classrooms, simulator rooms, audio/visual production space, administration and support spaces; site improvements; electrical service; fire protection and alarm systems; sustainability/energy considerations; storm drainage; sewer/water/gas utilities; or other required features identified in this RFP.
b. Projects in which the prime contractor’s role is similar to the role proposed for this contract.
c. Projects which show similar experience with coordination and meeting construction requirements of the
Government of Mexico.
Unacceptable: a proposal will be rated "Unacceptable" if it does not substantially meet the requirements listed above.
TAB C – FACTOR 2 – PERFORMANCE CONFIDENCE
Submission Requirements
For each of the projects submitted under Factor 1, provide a final CPARS report with the proposal. If a CPARS is not available for the project, provide a Past Performance Questionnaire (PPQ) to a representative of the owner that can provide the owner’s opinion of the offeror’s past performance for the project. The PPQ (Form PPQ-0) template included in the solicitation is provided for the offeror or its team members to submit to the owner for each project.
The PPQ-0 does not have to be sent directly from the client. If the offeror is unable to obtain a completed PPQ-0 from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ- 0, which will provide contract and client information for the respective project(s). Ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Keandre D. Malone via email at keandre.d.malone@usace.army.mil prior to proposal closing date. The offeror is responsible for ensuring that the completed questionnaires are submitted by the closing date. If you have questions regarding the attached questionnaire, or require assistance, please email the Contract Specialist at keandre.d.malone@usace.army.mil.
To ensure the agency has all relevant past performance information, the offeror also should submit copies of Federal/DoD/Navy/Army performance reviews that are likely already in the agency’s databases or likely within the agency’s arm’s reach, i.e., Contractor’s copy of CCASS or CPARS evaluations. To improve accuracy of database searches, the offeror will also provide the CAGE Codes for the prime contractor and all teaming partners, i.e.
design firms, key subcontractors, Joint Venture Partners.
The Contract Number and Project Name should be placed in the top left-hand corner of each page of the Past Performance Data. There is no page limit for this factor.
The Government will evaluate the responses from the customers from which Past Performance Questionnaires have been received. The Government may contact and interview the owner’s representative on the PPQ-0 and reserves the right to interview other individuals acting for the owner’s representative, if the owner’s representative is not available. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror.
In addition to the above, the Government may review any other sources of information for evaluating past performance. Past performance information may be obtained from any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Construction Contractor Appraisal Support System (CCASS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency.
At no time during this process, nor during the debriefing, nor after award, will the names of the individuals providing reference information about an offeror’s past performance be revealed to the Offerors or to any other party. If discussions are held, Offerors may be afforded the opportunity to respond to adverse comments made by references in accordance with guidelines identified in FAR Part 15.3. In this case, comments will be extracted and provided to the offeror. Copies of the questionnaires will not be furnished to the offeror and will remain confidential.
Provide the DUNS number(s) and CAGE code(s) for the prime contractor and all teaming partners, e.g.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .