Veh_MX Amendment 0002.pdf
PDF 45 MB Posted
- Attached to
- Construct Vehicle Maintenance Facility at Whiteman AFB Federal contract opportunity
- Solicitation number
- W912DQ21R4002
About this file
This document outlines a federal contract opportunity for the construction of a Consolidated Vehicle Maintenance Facility at Whiteman Air Force Base. The U.S. Army Corps of Engineers, Kansas City District is seeking proposals for a firm fixed price construction contract between $10-25 million. The scope of work involves constructing a two-story maintenance facility with areas for general and special vehicle maintenance. Construction will include a reinforced concrete foundation, structural steel frame, split-face concrete masonry unit veneer and standing seam metal roof. Infrastructure to support functions such as an overhead crane and paint booth will also be provided. Supporting site work includes utilities, pavements, and other site improvements. The solicitation will be issued as a Request for Proposals to both small and large businesses. Submission requirements and the evaluation process will be detailed in the solicitation, which will result in a single award of a firm fixed price construction contract. Small businesses are encouraged to consider teaming arrangements to leverage bonding and financial capacities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.08.03 Amendment 0003.pdf | ||
| B.08.03 Amendment 0001.pdf | ||
| B.07.01 Site Visit Attendance List March 17, 2021.pdf | ||
| SOLICITATION INSTRUCTIONS TO OFFERORS.pdf | ||
| A.02.06 J&A Brand Names or Equal Final post.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Consolidated Vehicle Maintenance Facility, Whiteman AFB, MO
Due date has changed from April 16, 2021 to April 22, 2021 @ 11:00 a.m. CDT.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Apr-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ21R4002
X 9B. DATED (SEE ITEM 11)
04-Mar-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Apr-2021
CODE
USACE, KANSAS CITY +
FEDERAL BUILDING CT-M, RM 647 601 EAST 12TH S
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
The SOLICITATION is amended as follows:
NOTE: Deleted text is shown with strikethrough. Added text is shown with underline.
1. To include Option CLIN 0018, update Option Clause 52.217-7, revise the attach drawings, updated the below narratives described in the Project Manual, revise section the below specification sections.
2. Proposal due date has extended from April 16, 2021 TO April 22, 2021 @ 11:00 A.M. CDT.
3. Offeror is required to acknowledge receipt of this amendment. Failure to acknowledge this amendment may cause rejections of the proposal.
4. All other terms and conditions remain unchanged and in full force.
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise options CLINS 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, by written notice to the Contractor within 240 calendar days from Notice to Proceed CLINS: 0015, 0016, 0017 and 0018 will expire 60 days after notice to proceed.
Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of clause)
Revise Drawings as follows:
Revise Sheets FG101, PL003, PL103, P-602, P-703, P-704, MG100, MH101, MH102, MH103, MH104, MP101, MP102, MP103, MP104, M-401, M-603, M-605, M-
608, M-703, M-704, M-706, M-707, E-503, and E-708, as attached.
On Sheet G-002, add “M-707 MECHANICAL SCHEDULES” to the SHEET INDEX.
Revise Project Manual as follows:
Add attached Specification Section 07 57 13 SPRAYED POLYURETHANE FOAM
(SPF).
Add attached Appendix 3: Building 159 As-Built Drawings.
Revise Specification Section 01 11 00 SUMMARY OF WORK by deleting the following paragraphs:
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Salvage Plan; G,RO
1.3 OCCUPANCY OF PREMISES
Building will be occupied during performance of work under this Contract.
Occupancy notifications will be posted in a prominent location in the work area.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.6 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area.
Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
Revise Specification Section 01 22 00.00 10 PRICE AND PAYMENT PROCEDURES by replacing it with the furnished version with additions and revisions:
See revised 01 22 00.00 10
Revise Specification Section 02 41 00 DEMOLITION AND DECONSTRUCTION by adding the following paragraph:
1.2 PROJECT DESCRIPTION
Refer to Appendix: Building 159 As-Built Drawings for B159 utility disconnect requirements, ground loop disconnect requirements, site demolition requirements (separate CLIN), and building and site as-built drawings.
Section 00 10 00 - Solicitation
AMOUNT
Construct Consolidated Vehicle Maint Fac
FFP
The Contractor shall furnish all labor equipment, materials, and perform all task necessary for the Construction of the Consolidated Vehicle Maintenance Facility located at Whiteman AFB, MO. See SPECS 01 22 00.00 10 FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
0001 1 Job
Supporting Facilities
FFP
The Contractor shall furnish all labor equipment, materials, and perform all task necessary for the Supporting Facilities of the Consolidated Vehicle Maintenance
Facility located at Whiteman AFB, MO. See SPECS 01 22 00.00 10 FOB: Destination
NET AMT
Commission in g
The Contractor shall furnish all labor equipment, materials, and perform all task necessary for the Commissioning of the Consolidated Vehicle Maintenance
Abatement and Demolition
The Contractor shall furnish all labor equipment, materials, and perform all task necessary for the Abatement and Demolition of the Consolidated Vehicle Maintenance Facility located at Whiteman AFB, MO. See SPECS 01 22 00.00 10
0002 1 Job
0003 1 Job
0004 1 Job
OPTION Option A - FFE Package
The Contractor shall furnish all labor equipment, materials, and perform all task necessary for the FFE Package of the Consolidated Vehicle Maintenance Facility located at Whiteman AFB, MO. See SPECS 01 22 00.00 10
OPTION Option B - Exterior Pavement
The Contractor shall furnish all labor equipment, materials, and perform all task necessary for the Exterior Pavement of the Consolidated Vehicle Maintenance
0005 1 Job
0006 1 Job
OPTION Option C - Paint Booth
The Contractor shall furnish all labor equipment, materials, and perform all task necessary for the Paint Booth of the Consolidated Vehicle Maintenance Facility
OPTION Option D - Dock Lift
The Contractor shall furnish all labor equipment, materials, and perform all task necessary for the Dock Lift of the Consolidated Vehicle Maintenance Facility
0007 1 Job
0008 1 Job
OPTION Option E - Air Compressor
The Contractor shall furnish all labor equipment, materials, and perform all task necessary for the Air Compressor of the Consolidated Vehicle Maintenance
OPTION Option F - Public Address System
The Contractor shall furnish all labor equipment, materials, and perform all task necessary for the Public Address System of the Consolidated Vehicle Maintenance
0009 1 Job
0010 1 Job
OPTION Option G - Electrical Cord Reels
The Contractor shall furnish all labor equipment, materials, and perform all task necessary for the Electrical Cord Reels of the Consolidated Vehicle Maintenance
OPTION Option H - Veh Fluid and Air Sys Reels
The Contractor shall furnish all labor equipment, materials, and perform all task necessary for the Vehicle Fluid and Air System Reels of the Consolidated Vehicle
Maintenance Facility located at Whiteman AFB, MO. See SPECS 01 22 00.00 10
OPTION Option I -Surface Mount Lifts
The Contractor shall furnish all labor equipment, materials, and perform all task necessary for the Surface Mount Lifts of the Consolidated Vehicle Maintenance
0011 1 Job
0012 1 Job
0013 1 Job
OPTION Option J - Inground Platform Lift
The Contractor shall furnish all labor equipment, materials, and perform all task necessary for the Inground Platform Lift of the Consolidated Vehicle Maintenance
OPTION Option K - Inground Scissor Lift
The Contractor shall furnish all labor equipment, materials, and perform all task necessary for the Inground Scissor Lift of the Consolidated Vehicle Maintenance
0014 1 Job
0015 1 Job
OPTION Option L - Inground Scissor Lifts
The Contractor shall furnish all labor equipment, materials, and perform all task necessary for the Inground Scissor Lift of the Consolidated Vehicle Maintenance
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0017 1 Job OPTION Option M - Inground Lifts
FFP
The Contractor shall furnish all labor equipment, materials, and perform all task necessary for the Inground Lifts of the Consolidated Vehicle Maintenance Facility
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0018 Job OPTION B159 Site Demolition
FFP
The Contractor shall furnish all labor, equipment, materials, and perform all tasks necessary to demolish existing Building 159 site, as indicated in Appendix:
Building 159 As-Built Drawings.
0016 1 Job
This page was intentionally left blank for duplex printing.
NO SCALE
NO SCALE
CONCRETE DUCT BANK
16"NOM.
4"
"N
O M
4"
2" 2"
MINIMUM 3,500 PSI CONCRETE.
COMPACT SUBSURFACE TO
MINIMUM 95% COMPACTION.
M
IN
IM
U
M
1. PROVIDE CARLON SNAP-LOC S288 & S289 SERIES SPACERS (OR EQUIVALENT)
BETWEEN ALL CONDUITS, ON MAXIMUM 8'-0" INTERVALS ALONG ENTIRE LENGTH
OF DUCT BANK.
2. CONDUIT TYPE, SIZE, AND NUMBER AS PER PLANS AND SPECIFICATIONS.
3. PROVIDE WARNING METALLIC TRACER TAPE ABOVE CONCRETE DUCT BANK FOR
ABOVE GRADE DETECTION.
4. ALL DIMENSIONS ARE MINIMUM VALUES.
5. CONDUITS MAY BE INSTALLED ONE (1) LAYER DEEP (ALL SIDE-BY-SIDE VERSES
STACKED), HOWEVER, DISTANCES MUST BE MAINTAINED AS PER DETAIL AND
DUCT BANK'S HORIZONTAL LENGTH INCREASED TO MAINTAIN
DISTANCES.
FOR DUCT BANKS THAT REQUIRE TWO (2) CONDUITS,
MAINTAIN REQUIREMENTS ABOVE BUT REMOVE TOP TWO (2)
CONDUITS FOR ONE ROW OF TWO CONDUITS.
GRADE OR DRIVEWAY
EARTH BACK FILL
FREE OF ROCKS
AND DEBRIS,
#6 REBAR, 6" O.C. (TYP)
REBAR SHALL BE INSTALLED A
MINIMUM 2" FROM END/EDGE
OF DUCT BANK
COMPACTED
PRIMARY
SECONDARYGROUND ROD
SLEEVE
10" DIA PIERS
(6- PLACES)
BENT TIE RE-RODS
(6-PLACES)
3"
3"
6X6-6/6 PAD REINFORCEMENT
(2-LAYERS)
PLAN VIEW
#4 RE-RODS TOP & BOTTOM
9'-6" LONG (8-PLACES)
B
B
AA
COORDINATE PAD SIZE AND
CONDUIT LOCATIONS WITH
TRANSFORMER REQUIREMENTS
1-1/2" CHAMFER (BEVEL)
TOP EDGE
2"MIN.
6" MAX. 6"
4" MAX.
2"MIN.
CABLE BOX-OUT
1" CONCRETE OVER BACKFILL
6X6-6/6 WWF
PAD REINFORCEMENT
(2-LAYERS)
GRADE LINE
2"X10" SLEEVE
PLASTIC OR GALV. STEEL
GROUND ROD
SECTION "A-A"
#7 BENT TIE-RODS
(6 PLACES)
8"
2"
2"
4"
4"
#4 RE-RODS (SEE PLAN
VIEW)
7' -6
7' -1
12"
POLYETHYLENE FILM
1"-2" THICK SAND
LEVELING BED (NO ROCK)
10" DIA. PIERS
(6-PLACES)
SECTION "B-B" DESIGN DATA
CONCRETE: f'c > 3000 psi AT 28 DAYS
REINFORCING STEEL: ASTM A 615-40
6X6-6/6 WELDED WIR FABRIC (WWF)
ASTM A 185
SOIL: > 1000 PSI PBV.NO SCALE
ALL DETAILS ON THIS SHEET ARE PROVIDED AS
SUPPLEMENTARY INFORMATION AND DO NOT EXCLUDE
ANY REQUIREMENTS OF NEC, EIA/TIA OR APPLICABLE CODES.
CEILING
HINGED CONSOLIDATION BOX, MINIMUM 12"L x 12"W x 6"H, COORDINATE EXACT SIZE WITH ACCESS CONTROL
EQUIPMENT, LABEL "ACCESS CONTROL". CONTROL PANEL
BOX IN ACCESSIBLE CEILING SPACE OR ABOVE ACCESS PANEL
CONDUIT WITH CONDUCTORS TO
ACCESS CONTROL SYSTEM PANELS
IN COMM ROOM. CONDUIT SHALL BE
ROUTED TO NEAREST CABLE TRAY.
3/4"
CONDUIT
CEILING
SINGLE-GANG
JUNCTION BOX FOR
FUTURE EXTERIOR
OR INTERIOR
CARD READER
PAD-MOUNTED TRANSFORMER DETAIL
ACCESS CONTROL ROUGH-IN DETAIL
4"
6.
MAG
LOCK
1/2" CONDUIT FOR MAGNETIC LOCK CONCEALED TO
CONSOLIDATION JUNCTION BOX ABOVE DOOR.
PROVIDE INDICATION IN DOOR FRAME WHERE CONDUIT
ROUTES TO/CONTACTS DOOR FRAME.
1/2" CONDUIT FOR REQUEST-TO-EXIT CONCEALED TO
CONSOLIDATION JUNCTION BOX ABOVE DOOR.
PROVIDE INDICATION IN DOOR FRAME WHERE CONDUIT
ROUTES TO/CONTACTS DOOR FRAME.
1. DOUBLE MAGNETIC LOCK ROUGH-INS FOR DOUBLE DOORS.
M
IN
IM
U
M
2-#3 CLOSED CIRCULAR
TIES AT 3" O.C.
3/4" DIA x
8'-0" LONG
GRD ROD
CONCRETE
LUG #8 BARE
COPPER GRD
TO POLE
ANCHOR
BOLTS
Y
1" CHAMFER
NONMETALLIC GROUT
AS REQUIRED
PROVIDE BASE COVER
LUG GROUND
WIRE TO POLE
LUG #8 BARE
COPPER GRD
TO POLE
3' WHERE APPLICABLE
PARKING SURFACE
1/2" COMPRESSIBLE FILLER
WITH JOINT SEALANT ALL
AROUND
6-#6 VERTICAL REINFORCING
CONDUIT TO ADJACENT
FIXTURES AS REQUIRED
#3 CLOSED CIRCULAR
TIES AT 12" O.C. (TYP)
X"
ROUND
3" CLEAR
POLE HEIGHT
15'
20'
25'
30'
35' 24"
24"
24"
24"
18"
X Y
60"
60"
72"
84"
90"
NO SCALE
POLE LIGHT BASE DETAIL
PLAN
12" ROUND
3" M
IN
VERTICAL SUPPORT TO BE
STRUCTURAL STEEL
CHANNEL MEMBER
GRIND CORNERS SMOOTH
FINISH SUPPORT WITH TWO
COATS OF GRAY ENAMEL
PAINT
FASTEN BOX & CONDUIT
SECURELY TO SUPPORTING
STEEL (TYPICAL)
CONCRETE
CONDUIT TO PANEL
HORIZONTAL RUN TO BE 24"
MINIMUM BELOW GRADE
C R
O U
S E
-H
IN
D S
-G
A N
G 'F
S ' S
E R
IE
S
T
A N
D E
M B
O X
W
IT
H
-S
IN
G
LE
N E
M A
5-
R
E C
E P
T A
C
LE
IN
E
A C
H B
O X
E C
T
IO
N C R
O U
S E
-H
IN
D S
W
LR
E
R
IE
S D
E V
IC
E
B
X
C
V E
R
T Y
P
NO SCALE
RECEPTACLE PEDESTAL DETAIL
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
E-503
E L E
C T
R
IC
A L D
E T
A
IL
S
W H
IT
E
M A
N A
F B
M
IS
S
O U
R I
K A
N S
A S
C
IT
Y D
IS
T
R
IC
T E
A S
T
T
H S
T K
A N
S A
S C
IT
Y
M
O
F A
R R
IS
E
N G
IN
E
E R
IN
G
P
S T
R E
E T
S
U
IT
E
L
IN
C O
L N
N
E
R D
M
R D
M
M D
W
J A
N U
A R
Y
W -X
X -X
-X X
X X
W -X
X -X
-X X
X X
C O
N S
O L
ID
A T
E D
V E
H
IC
L E
M A
IN
T
E N
A N
C E
F A
C
IL
IT
Y
P N
Y W
H G
A
M E
N D
M E
N T
A
P R
IL
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
E-708
E L E
C T
R
IC
A L S
C H
E D
U L E
S
W H
IT
E
M A
N A
F B
M
IS
S
O U
R I
K A
N S
A S
C
IT
Y D
IS
T
R
IC
T E
A S
T
T
H S
T K
A N
S A
S C
IT
Y
M
O
F A
R R
IS
E
N G
IN
E
E R
IN
G
P
S T
R E
E T
S
U
IT
E
L
IN
C O
L N
N
E
R D
M
R D
M
M D
W
J A
N U
A R
Y
W -X
X -X
-X X
X X
W -X
X -X
-X X
X X
C O
N S
O L
ID
A T
E D
V E
H
IC
L E
M A
IN
T
E N
A N
C E
F A
C
IL
IT
Y
P N
Y W
H G
G = GFCI BREAKER
REMARKS:
Total Est. Demand Current: 124 A
Spare 6000 VA 50.00% 3000 VA Total Conn. Current: 157 A
Other 17433 VA 80.00% 13946 VA Total Est. Demand: 44546 VA
Welding 12000 VA 100.00% 12000 VA Total Conn. Load: 56633 VA
Receptacle 21200 VA 73.58% 15600 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
41 0 VA 0 VA -- SPACE ONLY -- -- 42
39 0 VA 0 VA -- SPACE ONLY -- -- 40
30 A 3 SURGE PROTECTION DEVICE
0 VA 0 VA -- SPACE ONLY -- -- 38
35 20 A 1 SPARE 1000 VA 1000 VA SPARE 1 20 A 36
33 20 A 1 SPARE 1000 VA 1000 VA SPARE 1 20 A 34
31 20 A 1 SPARE 1000 VA 1000 VA SPARE 1 20 A 32
29 2250 VA 2500 VA 30
30 A 2
SPECIAL RCPT: L6-30R
(LOW BAY E101/E100 - WEST WALL)
G
2250 VA 2500 VA 28
25 20 A 1 CORD REEL: LOW BAY D103 WEST 1800 VA 2500 VA
G
SPECIAL RCPT: L14-30R
(LOW BAY E101/E100 - WEST WALL)
3 30 A
23 20 A 1 CORD REEL: LOW BAY D104 WEST 1800 VA 1800 VA CORD REEL: LOW BAY D103 WEST 1 20 A 24
21 20 A 1 CORD REEL: LOW BAY D104 WEST 1800 VA 1800 VA CORD REEL: LOW BAY D103 WEST 1 20 A 22
19 20 A 1 CORD REEL: LOW BAY E100 WEST 1800 VA 1800 VA CORD REEL: LOW BAY E100 WEST 1 20 A 20
17 2929 VA 1800 VA CORD REEL: LOW BAY E101 WEST 1 20 A 18
15 2929 VA 961 VA 16
35 A 3 2-POST LIFT - 5HP (LOW BAY E100 - WEST)
2929 VA 961 VA 14
11 961 VA 961 VA
OVERHEAD DOOR - LOW BAY E101 - WEST 3 15 A
9 961 VA 961 VA 10
15 A 3 OVERHEAD DOOR - LOW BAY E100 - WEST
961 VA 961 VA 8
5 20 A 1 RCPTS: LOWBAY - WEST SIDE/EXTERIOR 1400 VA 961 VA
OVERHEAD DOOR - LOW BAY D104 - WEST 3 15 A
3 20 A 1 RCPTS: LOWBAY - WEST SIDE/EXTERIOR 1400 VA 1200 VA RCPTS: LOWBAY - WEST SIDE 1 20 A 4
1 20 A 1 RCPTS: LOWBAY - WEST SIDE/EXTERIOR 1400 VA 1400 VA RCPTS: LOWBAY - WEST SIDE/EXTERIOR 1 20 A 2
CCT AMP P DESCRIPTION
RE
M
A B C A B C
RE
M
DESCRIPTION P AMP CCT
MOUNTING: Surface
WIRES: 4
PHASE: 3
VOLTAGE: 208/120 Wye
MAINS: 225 A - MCB AIC RATING: 10,000
PANEL LN4
G = GFCI BREAKER
REMARKS:
Spare 3000 VA 50.00% 1500 VA Total Est. Demand Current: 184 A
Other 12609 VA 80.00% 10087 VA Total Conn. Current: 210 A
Welding 19500 VA 85.00% 16575 VA Total Est. Demand: 66228 VA
Power 25466 VA 100.00% 25466 VA Total Conn. Load: 75775 VA
Receptacle 15200 VA 82.89% 12600 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
41 0 VA 0 VA -- SPACE ONLY -- -- 42
39 0 VA 0 VA -- SPACE ONLY -- -- 40
30 A 3 SURGE PROTECTION DEVICE
0 VA 0 VA -- SPACE ONLY -- -- 38
35 20 A 1 SPARE 1000 VA 1000 VA SPARE 1 20 A 36
33 1321 VA 1000 VA SPARE 1 20 A 34
31 1321 VA 1800 VA CORD REEL: TIRE REPAIR D101 WEST 1 20 A 32
20 A 3 DOCK LIFT
1321 VA 1800 VA CORD REEL: TIRE REPAIR D101 WEST 1 20 A 30
27 8382 VA 1800 VA CORD REEL: ALIGNMENT/TOOLS D102 WEST 1 20 A 28
25 8382 VA 1800 VA CORD REEL: ALIGNMENT/TOOLS D102 WEST 1 20 A 26
A
3 PARTS WASHER (LARGE): TIRE REPAIR D101
8382 VA 2500 VA 24
21 2250 VA 2500 VA 22
30 A 2
SPECIAL RCPT: L6-30R
(ALIGN/TOOLS D102 - WEST WALL)
G
2250 VA 2500 VA
G
SPECIAL RCPT: L14-30R
(ALIGN/TOOLS D102 - WEST WALL)
3 30 A
17 3750 VA 961 VA 18
50 A 2
SPECIAL RCPT: L6-50R
(ALIGN/TOOLS D102 - WEST WALL)
G
3750 VA 961 VA 16
13 961 VA 961 VA
OVERHEAD DOOR - LOW BAY D103 - WEST 3 15 A
11 961 VA 961 VA 12
15 A 3 OVERHEAD DOOR - LOW BAY D102 - WEST
961 VA 961 VA 10
7 20 A 1 INFRARED HEATER & CONTROL PANEL:... 320 VA 961 VA
OVERHEAD DOOR - RECEIVING B121 3 15 A
5 20 A 1 RCPTS: LOWBAY - WEST SIDE/EXTERIOR 1400 VA 1400 VA RCPTS: LOWBAY - WEST SIDE/EXTERIOR 1 20 A 6
3 20 A 1 RCPTS: LOWBAY - WEST SIDE/EXTERIOR 1400 VA 1200 VA RCPTS: LOWBAY - WEST SIDE 1 20 A 4
1 20 A 1 RCPTS: LOWBAY - WEST SIDE/EXTERIOR 1400 VA 1200 VA RCPTS: LOWBAY - WEST SIDE 1 20 A 2
CCT AMP P DESCRIPTION
RE
M
A B C A B C
RE
M
DESCRIPTION P AMP CCT
MOUNTING: Surface
WIRES: 4
PHASE: 3
VOLTAGE: 208/120 Wye
MAINS: 225 A - MCB AIC RATING: 10,000
PANEL LN5
G = GFCI BREAKER
REMARKS:
Spare 3000 VA 50.00% 1500 VA
Other 5764 VA 80.00% 4611 VA
Welding 39000 VA 60.00% 23400 VA Total Est. Demand Current: 188 A
Power 6680 VA 100.00% 6680 VA Total Conn. Current: 259 A
Receptacle 24400 VA 70.49% 17200 VA Total Est. Demand: 67886 VA
Mechanical 12665 VA 100.00% 12665 VA Total Conn. Load: 93339 VA
Lighting 1830 VA 100.00% 1830 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
59 0 VA 0 VA -- SPACE ONLY -- -- 60
57 0 VA 0 VA -- SPACE ONLY -- -- 58
30 A 3 SURGE PROTECTION DEVICE
0 VA 0 VA -- SPACE ONLY -- -- 56
53 915 VA 1000 VA SPARE 1 20 A 54
20 A 2
DESTRATIFICATION PUMP: DSP-4 (1.0 HP).
SERVES MAU-3
915 VA 1000 VA SPARE 1 20 A 52
49 2494 VA 1000 VA SPARE 1 20 A 50
47 2494 VA 915 VA 48
20 A 3 MAKE-UP-AIR UNIT #3: MAU-3
2494 VA 915 VA DESTRATIFICATION PUMP: DSP-3 (1.0 HP).
SERVES MAU-2
2 20 A
43 25 A 1 EXHAUST FAN: EF-10: DYNO ROOM (3/4 HP) 1656 VA 1656 VA EXHAUST FAN: EF-11: DYNO ROOM (3/4 HP) 1 25 A 44
41 20 A 1 RCPTS: LOWBAY - NORTH DYNAMOMETER WALL 1200 VA 41 VA PROP FAN: PF-9 (DYNO ROOM) 1 15 A 42
39 20 A 1 CORD REEL: LOW BAY E101 EAST 1800 VA 1200 VA RCPTS: LOWBAY - NORTH DYNAMOMETER WALL 1 20 A 40
37 20 A 1 INFRARED HEATERS AND CONTROL PANEL: DYN... 320 VA 1400 VA RCPTS: LOWBAY - EAST SIDE/EXTERIOR 1 20 A 38
35 20 A 1 CORD REEL: LOW BAY E101 WEST 1800 VA 1400 VA RCPTS: LOWBAY - EAST SIDE/EXTERIOR 1 20 A 36
33 20 A 1 CORD REEL: LOW BAY E100 WEST 1800 VA 3120 VA 34
31 20 A 1 INFRARED HEATER & CONTROL PANEL: TOOL... 120 VA 3120 VA
DYNAMOMETER MACHINE 2 40 A
29 2250 VA 1800 VA CORD REEL: LOW BAY E100 EAST 1 20 A 30
30 A 2
SPECIAL RCPT: L6-30R
(TOOL/EQUIPMENT E104 - WEST WALL)
G
2250 VA 2500 VA 28
25 3750 VA 2500 VA 26
50 A 2
SPECIAL RCPT: L6-50R
(TOOL/EQUIPMENT E104 - WEST WALL)
G
3750 VA 2500 VA
G
SPECIAL RCPT: L14-30R
(TOOL/EQUIPMENT E104 - WEST WALL)
3 30 A
21 2500 VA 3750 VA 22
19 2500 VA 3750 VA
G
SPECIAL RCPT: L6-50R
(LOW BAY D102 - NORTH WALL)
2 50 A
30 A 3
SPECIAL RCPT: L14-30R
(LOW BAY D102 - NORTH WALL)
G
2500 VA 2250 VA 18
15 961 VA 2250 VA
G
SPECIAL RCPT: L6-30R
(LOW BAY D102 - NORTH WALL)
2 30 A
13 961 VA 961 VA 14
15 A 3
OVERHEAD DOOR - LOW BAY DYNAMOMETER
E103 - EAST
961 VA 961 VA 12
9 20 A 1 QUAD RCPT: TOOL/EQUIPMENT (LOW BAY) 1200 VA 961 VA
OVERHEAD DOOR - LOW BAY E102 - WEST 3 15 A
7 20 A 1 QUAD RCPT: TOOL/EQUIPMENT (LOW BAY) 1200 VA 1400 VA QUAD & EXT RCPT: TOOL/EQUIPMENT (LOW BAY) 1 20 A 8
5 20 A 1 QUAD & EXT RCPT: TOOL/EQUIPMENT (LOW BAY) 1400 VA 1200 VA QUAD RCPT: TOOL/EQUIPMENT (LOW BAY) 1 20 A 6
3 20 A 1 QUAD RCPTS: DYNAMOMETER E103 1200 VA 1200 VA QUAD RCPT: TOOL/EQUIPMENT (LOW BAY) 1 20 A 4
1 20 A 1 QUAD RCPTS: DYNAMOMETER E103 1400 VA 1800 VA QUAD RCPTS: DYNAMOMETER E103 1 20 A 2
CCT AMP P DESCRIPTION
RE
M
A B C A B C
RE
M
DESCRIPTION P AMP CCT
MOUNTING: Surface
WIRES: 4
PHASE: 3
VOLTAGE: 208/120 Wye
MAINS: 300 A - MCB - 2-SECTION PANEL (30 POLES EACH) - SUB-FEED LUGS AIC RATING: 10,000
PANEL LN3
A
M E
N D
M E
N T
A
P R
IL
G = GFCI BREAKER R = RED LOCKABLE HANDLE
REMARKS:
Spare 6000 VA 50.00% 3000 VA Total Est. Demand Current: 107 A
Other 1500 VA 80.00% 1200 VA Total Conn. Current: 131 A
Power 17426 VA 100.00% 17426 VA Total Est. Demand: 38606 VA
Receptacle 20600 VA 74.27% 15300 VA Total Conn. Load: 47206 VA
Mechanical 1680 VA 100.00% 1680 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
41 0 VA 0 VA -- SPACE ONLY -- -- 42
39 0 VA 0 VA -- SPACE ONLY -- -- 40
30 A 3 SURGE PROTECTION DEVICE
0 VA 0 VA -- SPACE ONLY -- -- 38
35 20 A 1 SPARE 1000 VA 1000 VA SPARE 1 20 A 36
33 20 A 1 SPARE 1000 VA 1000 VA SPARE 1 20 A 34
31 20 A 1 SPARE 1000 VA 1000 VA SPARE 1 20 A 32
29 20 A 1 FIRE ALARM NAC PANEL R 1500 VA 504 VA FAN COIL: FC-10 - LOW BAY OFFICE 1 15 A 30
27 20 A 1 RCPT: TIRE REPAIR D101 1200 VA 1500 VA RCPT: LAPTOP CART (LOW BAY OFFICE) 1 20 A 28
25 20 A 1 RCPT: TIRE REPAIR D101 1200 VA 1200 VA RCPT: TIRE REPAIR D101 1 20 A 26
23 20 A 1 RCPT: TIRE REPAIR D101 1200 VA 2090 VA 24
21 20 A 1 RCPT: SMALL TIRE SPREADER: (TIRE REPAIR... 1200 VA 2090 VA 22
19 1664 VA 2090 VA
LARGE TIRE SPREADER: (TIRE REPAIR D101) 3 30 A
20 A 2
LARGE TIRE BALANCER RCPT: L6-20R
(TIRE REPAIR D101)
G
1664 VA 1664 VA 18
15 20 A 1 RCPT: SMALL TIRE BALANCER (TIRE REPAIR D101) 1200 VA 1664 VA
G
LARGE TIRE BALANCER RCPT: L6-20R
(TIRE REPAIR D101)
2 20 A
13 20 A 1 QUAD RCPT: OUTSIDE OF LOW BAY OFFICE 1200 VA 1176 VA EXHAUST FAN: EF-3, 1/2 HP (NORTH... 1 20 A 14
11 20 A 1 QUAD RCPT: OUTSIDE OF LOW BAY OFFICE 1200 VA 200 VA RCPT: HAND WASH BASIN - CORRIDOR B112/113 1 20 A 12
9 20 A 1 RCPTS: LOW BAY OFFICE D100 400 VA 1600 VA RCPTS: CORRIDORS B112 & B113 1 20 A 10
7 20 A 1 QUAD RCPT: COMM WALL CABINET (LOW BAY... 1500 VA 1200 VA QUAD RCPTS: LOW BAY OFFICE D100 1 20 A 8
5 20 A 1 RCPT: CLOTHES WASHER 1200 VA 2250 VA 6
3 20 A 1 RCPTS: LUBE B120 1800 VA 2250 VA
G RCPT: CLOTHES DRYER 2 30 A
1 20 A 1 RCPTS: WOMEN B119 & JANITOR B117 800 VA 800 VA RCPTS: MEN B116 & MEN LOCKER RM B115 1 20 A 2
CCT AMP P DESCRIPTION
RE
M
A B C A B C
RE
M
DESCRIPTION P AMP CCT
MOUNTING: Surface
WIRES: 4
PHASE: 3
VOLTAGE: 208/120 Wye
MAINS: 225 A - MCB AIC RATING: 10,000
PANEL LN6
APPLY TO ALL FIRE ALARM SHEETS
HEAT DETECTOR - COMBINATION
FIRE ALARM SPEAKER - WALL MOUNTED
HEAT DETECTOR - FIXED TEMPERATURE
FIRE ALARM MANUAL STATION
FIRE ALARM COMBINATION HORN/VISUAL - WALL MOUNTED
FIRE ALARM VISUAL SIGNAL - WALL MOUNTED
FIRE ALARM BELL - WALL MOUNTED
FIRE ALARM HORN - WALL MOUNTED
SMOKE DETECTOR
FIRE ALARM COMBINATION SPEAKER/VISUAL - WALL MOUNTED
R/T
F
FIRE ALARM SPEAKER - CEILING MOUNTED
FIRE ALARM COMBINATION HORN/VISUAL - CEILING MOUNTED
FIRE ALARM VISUAL SIGNAL - CEILING MOUNTED
FIRE ALARM HORN - CEILING MOUNTED
FIRE ALARM COMBINATION SPEAKER/VISUAL - CEILING MOUNTED
F
FDM
SMOKE DETECTOR - DUCT MOUNTED
DUCT DETECTOR REMOTE ALARM INDICATOR
FAN SHUT-DOWN RELAY
MAGNETIC DOOR HOLDER
FLOW SWITCH
TAMPER SWITCH
HD
HD
SD
SD
F
F
F R
F
MASS NOTIFICATION VISUAL SIGNAL - WALL MOUNTEDMN
MASS NOTIFICATION VISUAL SIGNAL - CEILING MOUNTEDMN
FIRE ALARM SYMBOLS LEGEND
(AS APPLICABLE)
MASS NOTIFICATION VISUAL SIGNAL - CEILING MOUNTEDMN
TRANSMITER
BT-XM LOC
FA -
FA-GLP
FA-NACP
FA/MN-CP
COMBINATION FIRE ALARM & MASS NOTIFICATION CONTROL PANEL
BAT. &
FIRE ALARM BATTERY CABINET & DOCUMENT CABINET
MONACO
MONACO TRANSCEIVER PANEL (MONACO - SOLE SOURCED BY BASE)
(BASE PREFERRED MANUFACTURER: MONACO)
FAAP
FIRE ALARM ANNUNCIATOR PANEL
FIRE ALARM - NOTIFICATION APPLIANCE CIRCUIT PANEL
FIRE ALARM - GRAPHIC LAYOUT PANEL WITH LED INDICATORS PER DEVICE
MASS NOTIFICATION - LOCAL OPERATORS CONSOLE
DOC. CAB.
CO CARBON MONOXIDE DETECTOR
GENERAL FIRE ALARM NOTES
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
FG101
F
IR
E A
L A
R M
S Y
M B
O L S
L E
G E
N D
A N
D G
E N
E R
A L
N O
T E
S
W H
IT
E
M A
N A
F B
M
IS
S
O U
R I
K A
N S
A S
C
IT
Y D
IS
T
R
IC
T E
A S
T
T
H S
T K
A N
S A
S C
IT
Y
M
O
F A
R R
IS
E
N G
IN
E
E R
IN
G
P
S T
R E
E T
S
U
IT
E
L
IN
C O
L N
N
E
R D
M
R D
M
M D
W
J A
N U
A R
Y
W -X
X -X
-X X
X X
W -X
X -X
-X X
X X
C O
N S
O L
ID
A T
E D
V E
H
IC
L E
M A
IN
T
E N
A N
C E
F A
C
IL
IT
Y
P N
Y W
H G
A. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF ROUGH-IN ABOVE FINISHED FLOOR (AFF).
B. INSTALL ALL CONDUCTORS IN CONTINUOUS RACEWAY.
C. PAINT SURFACE CONDUIT IN FINISHED AREAS, WHEN ALLOWED, TO MATCH SURROUNDING SURFACES.
D. INSTALL EXPOSED OR CONCEALED RACEWAY NEAR METAL CORRUGATED SHEET ROOF DECKING SO NEAREST OUTER RACEWAY SURFACE IS AT
MINIMUM 6 INCHES FROM THE BOTTOM OF THE ROOF DECKING.
E. PATCH, PAINT, REPAIR OR REPLACE ALL WALLS, CEILINGS, OR OTHER BUILDING ELEMENTS DISTURBED DURING INSTALLATION OF ELECTRICAL WORK.
F. USE ROOM NUMBERS LISTED ON DRAWINGS FOR LABELING OF PANELBOARD DIRECTORIES, FIRE ALARM PANEL PROGRAMMING, ETC. INCLUDE A DESCRIPTION OF LOAD SUCH AS LIGHTS, RECEPTACLES, MECHANICAL UNIT LOCATIONS, ETC. ON TYPED PANELBOARD DIRECTORIES.
G. CONNECT SMOKE AND FIRE/SMOKE DAMPERS TO 120V POWER AND CONTROL WITH FIRE ALARM SYSTEM. VERIFY EXACT QUANTITY AND LOCATION OF
DAMPERS WITH MECHANICAL DRAWINGS.
H. CONNECT ALL FIRE SPRINKLER SYSTEM FLOW, TAMPER, AND SITE PIV SWITCHES TO THE FIRE ALARM SYSTEM. COORDINATE EXACT LOCATION AND
QUANTITY OF DEVICES WITH FIRE PROTECTION DRAWINGS AND FIRE SPRINKLER INSTALLER.
A
M E
N D
M E
N T
A
P R
IL
T
FIRE
W A
T E
R
T
6 7 8
CORR.
A101
MECHANICAL
A111
442ND SECT.
CHIEF
B108
ELECTRICAL
B133
LACT.
A108
GT BREAK
A106
HWP
CWP
AHU
CWB
GFS
B
B
B
CWP
HWP
ET
-1
ET-2
BP
BP
BP
ACC
EF
RAL-1
O A
L-
52/20 OA
Ø
S A
52/20 EA
52/20 EA
Ø
S A
16 Ø SA
/2
R A
36/20 RA 34/20 RA98
/2
R
A
10/8 EA10/8 EA
Ø
S A
Ø
S A
/2
R
A
8/6 EA
8/8 EA
SS
SS
CU
CU
442ND OFFICE
B109
COMPRESSOR
ROOM
B132
WELDING SHOP
B131
CORR.
A112
CORR.
B107
DETAIL
BAY/STORAGE
A104
GWH
CU
FCU
VFD
HWP-1
VFD
HWP-2
VFD
CWP-1
VFD
CWP-2
FCU
N
T
Q
6" FLUE
6" INTAKE
6" FLUE
6" INTAKE
10/8 EA
52/20
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
6" FLUE
3" FLUE
3" FLUE
3" INTAKE
M
A
B C
D
E
KEY PLAN
NORTH
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M-401
M E
C H
A N
IC
A
L L
A R
G E
-S C
A L E
P L A
N S
W H
IT
E
M A
N A
F B
M
IS
S
O U
R I
K A
N S
A S
C
IT
Y D
IS
T
R
IC
T E
A S
T
T
H S
T K
A N
S A
S C
IT
Y
M
O
F A
R R
IS
E
N G
IN
E
E R
IN
G
P
S T
R E
E T
S
U
IT
E
L
IN
C O
L N
N
E
B J K
H D
S
J M
M
J A
N U
A R
Y
W -X
X -X
-X X
X X
W -X
X -X
-X X
X X
C O
N S
O L
ID
A T
E D
V E
H
IC
L E
M A
IN
T
E N
A N
C E
F A
C
IL
IT
Y
P N
Y W
H G
SCALE: 1/4" = 1'-0"
1 HVAC LARGE SCALE PLAN
SEE SHEET MG100 FOR
MECHANICAL SYMBOLS LEGEND
AND GENERAL NOTES
KEYNOTES
1 FOR CONTINUATION SEE SHEET MH101.
2 FOR CONTINUATION SEE SHEET MH102.
3 SEE LOUVER DETAIL 1/M-504.
4 SEE DUCTWORK HANGERS DETAIL 2/M-501.
5 SEE CEILING HUNG FAN COIL DETAIL 1/M-502.
6 PROVIDE WALL CAP FOR FLUE PER MANUFACTURER'S RECOMMENDATIONS.
7 INTAKE THROUGH ROOF. SEE INTAKE/RELIEF ROOF PENETRATION DETAIL 4/M-504.
8 SEE INLINE FAN DETAIL 2/M-504.
9 BOTTOM OF LOUVER TO BE MOUNTED AT 16' - 9" ABOVE FINISHED FLOOR ON
EXTERIOR WALL ABOVE THE MECHANICAL ROOM ROOF.
10 PROVIDE PRESSURE RELIEF DAMPER IN AHU CABINET AT RETURN PLENUM
LOCATION. SET AT 4.0"W.C. NEGATIVE PRESSURE.
11 PROVIDE PRESSURE RELIEF DAMPER IN AHU CABINET AT SUPPLY PLENUM
LOCATION. SET AT 4.0"W.C. POSITIVE PRESSURE.
A
M E
N D
M E
N T
A
P R
IL
EXHAUST AIR IS TAKEN FROM THE FLOOR LEVEL OF THE VEHICLE
REPAIR PIT TO REMOVE THE POTENTIAL OF ANY CLASS I LIQUIDS
OR LP-GAS FROM SETTLING DOWN LOW IN THIS PIT AND CAUSING
A POTENTIAL FIRE CONDITION. THIS EXHAUST SYSTEM IS SERVED
BY EXHAUST FAN EF-12. THIS OPERATION OF THIS FAN SHALL BE
CONTROLLED BY THE DDC CONTROL SYSTEM AND SHALL
OPERATE ON A CONTINUOUS BASIS. THE STAFF IN THE REPAIR
GARAGE WILL NOT HAVE ACCESS TO AN ACTIVATION SWITCH.
PROVIDE A STOP/START CONTROL POINT, A STATUS/ALARM
CONTROL POINT, AND A DISCHARGER DAMPER CONTROL SIGNAL.
UPON START-UP THE DDC CONTROLLER SHALL OPEN THE
AUTOMATIC CONTROL DAMPER, UPON THE DAMPER REACHING A
FULL OPEN POSITION THROUGH A DAMPER END SWITCH, THE DDC
CONTROLLER SHALL START THE FAN. UPON THE FAN SHUTTING
DOWN, THE DISCHARGE AUTOMATIC CONTROL DAMPER SHALL
CLOSE. IF THIS FAN SHUTS DOWN DUE TO MOTOR FAILURE, THEN
THE STATUS ALARM SHALL SEND AN ALARM CONDITION TO THE
DDC CONTROL SYSTEM TO HAVE THE MAINTENANCE STAFF GET
THE FAN RUNNING AGAIN DUE TO THE IMPORTANT SAFETY
FUNCTION OF THIS FAN.
VEHICLE PIT EXHAUST
SYSTEM CONTROL SEQUENCE:
THE GAS FIRED INFRARED HEATING SYSTEMS SHALL BE CONTROLLED BY THE BUILDING DDC
SYSTEM. THE CONTRACTOR HAS THE OPTION OF CONTROLLING THE INFRARED HEATING SYSTEMS
FROM A STANDARD DDC CONTROLLER OR PURCHASING THE HEATING SYSTEM CONTROLLER FROM
THE INFRARED HEATER SUPPLIER. IF THE INFRARED HEATING SUPPLIER PROVIDES THE
CONTROLLER, THE HEATING EQUIPMENT CONTROLLER SHALL BE PROVIDE WITH A BACnet INTERFACE
DEVICE FOR CONNECTION TO THE BUILDING DDC CONTROL SYSTEM.
PROVIDE A TEMPERATURE SENSOR IN THE SPACE TO ACTIVATE THE INFRARED HEATING SYSTEMS.
UPON A CALL FOR HEAT FROM THE SPACE TEMPERATURE SENSOR, THE DDC CONTROLLER SHALL
ACTIVATE THE VACUUM PUMP FIRST. UPON A PROOF OF AIR FLOW TO THE VACUUM PUMP, THE DDC
CONTROLLER SHALL ACTIVATE THE INFRARED HEATER'S BURNER TO PROVIDE HEAT TO THE SPACE.
THE DDC CONTROLLER SHALL MODULATE THE FLOW RATE OF THE VACUUM PUMP THROUGH THE
BRANCH CONTROLLER. AS THE FLOW OF AIR THROUGH THE VACUUM PUMP INCREASES, THE
CAPACITY OF THE HEATING BURNER WILL ALSO INCREASE TO MAINTAIN SPACE TEMPERATURE
SETPOINT. THE DDC CONTROLLER SHALL ALSO HAVE THE ABILITY TO PROVIDE A NIGHT
TEMPERATURE SETBACK OPTION FOR ENERGY CONSERVATION PURPOSES. AS THE SPACE
TEMPERATURE SENSOR REACHES SETPOINT, THE DDC CONTROLLER SHALL SHUT THE BURNER
DOWN FIRST AND THEN SHUT DOWN THE VACUUM PUMP.
TEMPERATURE CONTROL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE INTERLOCK
WIRING BETWEEN THE VACUUM PUMP, VACUUM PROVING SWITCH, AND THE BURNERS.
1ST B
RANCH ZONE 2
VACUUM FAN
CONDENSATE TEE
NETWORKING CABLE
SHIELDED PAIR
BELDON 9841 OR
EQUIVALENT
BRANCH CONTROLLER
ZONE SENSOR
115/1/60 MAINS SUPPLY
IN-LINE BRUNER (TYP.)
OUTSIDE AIR
SENSOR
INFRARED HEATING CONTROL SEQUENCE:
THE PROPELLER FANS WILL BE CONTROLLED THROUGH A SINGLE
CONTROL PANEL LOCATED IN THE HANGAR ITSELF. THIS
CONTROL PANEL WILL ALLOW THE PROPELLER FANS TO BE
INDIVIDUALLY CONTROLLED, REVERSE ROTATION, SPEED UP OR
SPEED DOWN AND HAVE A TIME CLOCK SCHEDULING CAPABILITY.
THE CONTROL PANEL WILL ALSO HAVE AN ENERGY MANAGEMENT
SYSTEMS CONNECTION. THIS CONNECTION WILL ENABLE DIRECT
COMMUNICATION BETWEEN THE BUILDINGS DDC SYSTEM FOR
ALARM STATUS INDICATION.
DE-STRATIFICATION FANS
(HVLS FANS) CONTROL SEQUENCE:
PROVIDE A COMBINATION CARBON MONOXIDE/NITROGEN DIOXIDE
MONITORING SYSTEM IN BOTH THE HIGH BAY AND LOW BAY
VEHICLE MAINTENANCE WINGS. THE MONITORING AND CONTROL
SYSTEMS SHALL BE A MODEL GVU SERIES CONTROLLER AS
MANUFACTURED BY TOXALERT INTERNATIONAL OR APPROVED
EQUAL. THESE CONTROL SYSTEMS SHALL CONTINUOUSLY
MONITOR A SERIES OF REMOTE CARBON MONOXIDE AND
NITROGEN DIOXIDE SENSORS. WHEN AN ALARM CONDITION IS
DETECTED THE CONTROLLER SHALL DELAY THE VEHICLE
EXHAUST FAN CONTACT CLOSURE FOR 30 SECOND. IF THE HIGH
GAS LEVEL CONDITION PERSISTS FOR MORE THAN 30 SECONDS
THE EXHAUST FAN CONTACTS SHALL CLOSE. THE MINIMUM FAN
“ON” TIME SHALL BE FIELD SETTABLE FROM 5 TO 55 MINUTES, IN
5-MINUTE INCREMENTS. SHOULD THE ALARM CONDITION REMAIN
CLOSED (ON) AND A SECOND “ALARM” SET OF CONTACTS SHALL
CLOSE. THE SECOND SET OF “ALARM CONTACTS SHALL ACTIVATE
AN AUDIBLE ALARM AND ALARM LIGHTS SHALL BE LIT.
THE CONTROLLER SHALL BE POWERED BY 120-VOLT, 60 HZ
POWER AND SHALL PROVIDE LOW VOLTAGE POWER TO THE
REMOTE SENSORS (CO AND NO2). AUXILIARY RELAY CONTACTS
SHALL BE 24 VOLT, 2 AMP RESISTIVE, OR 1.5 AMP INDUCTIVE FOR
REMOTE CONTROL OF THE EXHAUST FANS (EF-6, EF-7, EF-8, EF-10,
EF-11) AND MAKE-UP AIR UNITS (MAU-1,MAU-2, MAU-3).
1. PROVIDE CLEARLY LABELED LIGHT EMITTING DIODES (LED'S)
ON THE FACE OF THE CONTROLLER PANEL TO INDICATE THE
FOLLOWING:
a. POWER “ON” TO SYSTEM-GREEN LED
b. RED LED FOR EACH SENSOR TO INDICATE HIGH GAS
LEVEL CONDITIONS (WARNING AND ALARM LEVELS).
c. AMBER LED TO INDICATE FAN ON.
d. RED LED TO INDICATE ALARM CONDITION.
2. PROVIDE AN AUDIBLE ALARM WITH A MINIMUM SOUND
INTENSITY OF 68 DB, ON THE FACE OF THE CONTROL PANEL.
PROVIDE AN “AUDIBLE RESET” PUSH BUTTON SWITCH TO
SILENCE THE AUDIBLE. AUDIBLE SILENCE CIRCUIT SHALL BE
SELF-RESETTING SO THAT AFTER AN ALARM IS CLEARED THE
AUDIBLE ALARM WILL AUTOMATICALLY RESOUND ON THE
NEXT ALARM ACTIVATION.
3. PROVIDE A REMOTE ALARM PANEL AND MOUNT WHERE
INDICATED ON THE DRAWINGS. THE REMOTE ALARM PANEL
SHALL INCLUDE A RED LED ALARM INDICATOR AND AN
AUDIBLE ALARM, WITH A MINIMUM SOUND INTENSITY OF 68
DB. PROVIDE AN “AUDIBLE RESET” MOMENTARY PUSH
SWITCH TO SILENCE THE AUDIBLE. THE ALARM LED MUST
STAY LIGHTED AS LONG AS THE ALARM CONDITION PERSIST.
CARBON MONOXIDE
MONITORING SYSTEM CONTROL SEQUENCE:
T1
VAV SYSTEM CONTROL:
TS
CD
H C
V /V
ROOM TEMP SENSOR
MOUNT AT 48" A.F.F.
O-10Vdc (AI)
FLOOR/ROOF
CEILING
FLOOR
OFFICE/ROOM
70°F 75°F 85°F55°F
30%
60%
100%
P E
R C
E N
T A
IR
F
L O
W T
H R
O U
G H
V A
V T
E R
M
IN
A L
ROOM TEMPERATURE
IN SELECT ROOMS. SEE PLANS
FOR LOCATION.
DEAD BAND
TERMINAL UNIT CONTROL: THE VAV TERMINAL UNITS SHALL
BE CONTROLLED BY THE SPACE TEMPERATURE SENSORS, AND
THE DDC CONTROLLER. THE TERMINAL UNITS SHALL PROVIDE
BOTH HEATING AND COOLING, WITH THE EXCEPTION OF THE
COOLING-ONLY TERMINALS. TERMINAL UNITS SHALL BE
FURNISHED WITH 2-ROW HEATING COILS.
TERMINAL UNITS SHALL MAINTAIN A MINIMUM AIR FLOW AS
SHOWN ON THE VAV SUPPLY TERMINAL UNIT SCHEDULE. IF
THE TEMPERATURE IN THE SPACE EXCEEDS THE SET POINT,
THE DDC CONTROLLER SHALL OPEN THE DAMPER AND
PROVIDE ADDITIONAL COOL AIR AS NECESSARY TO MAINTAIN
SPACE TEMPERATURE.
AS COOLING LOAD INCREASES, TERMINAL DAMPER SHALL
MODULATE OPEN TO FULL FLOW CONDITION. AS HEATING
LOAD INCREASES, TERMINAL DAMPER SHALL OPEN TO 60%
OPEN TO ENSURE ADEQUATE VELOCITY, AT THE DIFFUSER
AND OPEN THE REHEAT 2-WAY/3-WAY VALVE TO PROVIDE HEAT
TO THE SPACE.
LOSS OF POWER: IF THE RESPECTIVE AIR HANDLER IS SHUT
DOWN, OR THERE IS A BUILDING LOSS OF POWER, TERMINAL
UNIT 2-WAY/3-WAY VALVES SHALL FAIL
IN PLACE AND DAMPERS SHALL FAIL IN PLACE.
FINNED TUBE CONTROL: AS A ROOM'S VAV IS IN HEATING
MODE, THE ROOMS FINNED TUBE (IF THERE IS FINNED TUBE)
SHALL ALSO BE TURNED ON TO TEMPER ROOM. THE TERMINAL
UNIT, REHEAT VALVE, AND FINTUBE HEATING VALVE SHALL
OPEN/CLOSE SIMULTANEOUSLY.
BUILDING NO.
HARDWARE SOFTWARE
WHITEMAN AFB VEHILCE
MAINTENANCE STORAGE
OUTPUT INPUT ALARMS
APPLICATION PROGRAMS
DIGITAL ANALOG DIGITAL ANALOG DIGITAL ANALOG
SYSTEM(S)
C O
N T
R O
L R
E L A
Y
V A
C U
U M
P U
M P
S T
A R
T /S
T O
P
H A
N D
O
F F
A
U T
O
O F
F A
U T
O
S T
A R
T /S
T O
P
C O
N T
R O
L P
O
IN
T A
D J U
S T
M E
N T
B A
C N
E T
C O
N N
E C
T
IO
N
B U
R N
E R
M O
D U
L A
T
IO
N
F A
N S
P E
E D
C O
N T
R O
L
V A
C U
U M
P R
O V
IN
G
S W
IT
C
H
D
IF
F E
R E
N T
IA
L
P R
E S
S U
R E
S W
IT
C
H
F L O
W S
W
IT
C H
A U
X
IL
IA
R
Y C
O N
T A
C T
V F
D S
T A
T U
S
M O
IS
T
U R
E S
E N
S O
R
R O
O M
T E
M P
E R
A T
U R
E
D E
G R
E E
S F
S U
P P
L Y
A
IR
T E
M P
E R
A T
U R
E
C U
R R
E N
T T
R A
N S
F O
R M
E R
A
IR
F L
O W
R A
T E
W A
T E
R T
E M
P E
R A
T U
R E
W A
T E
R U
S A
G E
C
U F
T
E L
E C
U
S A
G E
K
W H
R
E L E
C D
E M
A N
D
K W
F A
N F
A
IL
U R
E
H
IG
H W
A T
E R
L E
V E
L A
L A
R M
W A
T E
R D
E T
E C
T
IO
N
R O
O M
T E
M P
E R
A T
U R
E D
E V
IA
T
IO
N
H
IG
H W
A T
E R
C O
N D
IT
IO
N
H
IG
H R
O O
M T
E M
P E
R A
T U
R E
L O
W L
IM
IT
R U
N T
IM
E
S C
H E
D U
L E
D S
T A
R T
S
T O
P
O P
T
IM
U M
S T
A R
T S
T O
P
D U
T Y
C Y
C L
IN
G
D E
M A
N D
L
IM
IT
IN
G
D A
Y N
IG
H
T S
E T
B A
C K
E C
O N
O M
IZ
E
R
V E
N T
IL
A
T
IO
N R
E C
IR
C
U L
A T
IO
N
H O
T C
O L D
D E
C K
R E
S E
T
R E
H E
A T
C O
IL
R
E S
E T
S T
E A
M B
O
IL
E R
S E
L E
C T
IO
N
H O
T W
A T
E R
B O
IL
E
R S
E L E
C T
IO
N
H W
O A
R E
S E
T
C H
IL
L
E R
S E
L E
C T
IO
N
C H
IL
L
E D
W A
T E
R R
E S
E T
C O
N D
E N
S E
R W
A T
E R
R E
S E
T
C H
IL
L E
R D
E M
A N
D L
IM
IT
L
IG
H T
IN
G
C O
N T
R O
L
R E
M O
T E
B O
IL
E
R M
O N
IT
O
R
IN
G C
O N
T R
O L
FANS AND RADIANT HEATERS
OCCUPANCY TIME
GRAPHIC DISPLAY •
POINT DESCRIPTION
PROPELLOR FANS • • • • • •
RADIANT HEATERS • • • • • • • • •
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M-603
M E
C H
A N
IC
A
L C
O N
T R
O L S
W H
IT
E
M A
N A
F B
M
IS
S
O U
R I
K A
N S
A S
C
IT
Y D
IS
T
R
IC
T E
A S
T
T
H S
T K
A N
S A
S C
IT
Y
M
O
F A
R R
IS
E
N G
IN
E
E R
IN
G
P
S T
R E
E T
S
U
IT
E
L
IN
C O
L N
N
E
B J K
H D
S
J M
M
J A
N U
A R
Y
W -X
X -X
-X X
X X
W -X
X -X
-X X
X X
C O
N S
O L
ID
A T
E D
V E
H
IC
L E
M A
IN
T
E N
A N
C E
F A
C
IL
IT
Y
P N
Y W
H G
A
M E
N D
M E
N T
A
P R
IL
0-10Vdc
(AI)
0-10Vdc
(AI)
0-10Vdc
(AI)
0-10Vdc
(AI)
H
DPT1
L
H
DPT1
L
H
DPT1
L
H
DPT
L
H
DPT
L
H D
P T
L
H
DPT
L
H
DPT
L
FE
HWS HWS
T4T3
T1
T5
HWSHWS HWS
HWS
HWR
T2
0-10Vdc
(AI)
HWR
HWR HWR
HWR
INDOORSOUTDOORS
10.0 PSI (ADJ) 10.0 PSI (ADJ)
10 PSI
10.0 PSI (ADJ) 10.0 PSI (ADJ)
HEATING HOT WATER HYDRONIC SYSTEM :
VFD
VFD
SECONDARY PUMP
HWP-1
225 GPM
SECONDARY
PUMP
HWP-2
225 GPM
CONTROL
PANEL
CONTROL
PANEL
FM1 (AI)
4-20 mA
PRIMARY PUMP
BP-2
65 GPM
PRIMARY PUMP
BP-1
65 GPM
ENABLE (DO)
STATUS ALARM (DI)
4-20 mA
BOILER FIRING RATE
(AO)
ENABLE (DO)
STATUS ALARM (DI)
4-20 mA
BOILER FIRING RATE
(AO)
ENABLE (DO)
STATUS (DI)
0-20 mA
ENABLE (DO)
STATUS (DI)
0-20 mA
B-2
BOILER
B-1
BOILER
CONTROL
PANEL
4-20 mA
BOILER FIRING RATE
(AO)
ENABLE (DO)
STATUS ALARM (DI)
BOILER FIRING RATE
(AO)
B-3
BOILER
PRIMARY PUMP
BP-3
65 GPM
S T
S
SP
OUTSIDE AIR
TEMPERATURE SENSOR
A H
U -1
(H C
-1
6.
G P
M M
E C
H A
V A
V
V A
V
V A
V
V A
V
VAV-1-23
0.5 GPM
MEN A126
DESTRAT. PUMP
DSP-1
65.0 GPM
FC
F C
F C
V A
V
V A
V
F C
F C
F C
FC-11
0.9 GPM
PAINT
STORE B128
M A
U -2
G
P M
LO
W
B A
Y
DESTRAT. PUMP
DSP-3
40.0 GPM
F C
M A
U -3
.6
G P
M
LO
W B
A Y
DESTRAT. PUMP
DSP-4
5.0 GPM
V A
V
V A
V
FC
V A
V
V A
V
V A
V
VAV-4-27
2.0 GPM
MAINTENANCE
CONTROL
OFFICE B101
F C
F C
MAU-1
68.0 GPM
HIGH BAY
DESTRAT. PUMP
DSP-2
58.0 GPM
GENERAL: THE VARIABLE FREQUENCY DRIVES (VFD) FOR THE SECONDARY
HEATING HOT WATER PUMPS HWP-1 AND HWP-2 SHALL BE CONTROLLED BY
THE DDC CONTROL SYSTEM. PROVIDE A START/STOP DIGITAL OUT (DO)
CONTROL POINT, A 4 - 20 MA ANALOG OUT (A0) CONTROL POINT, AND A
STATUS ALARM DIGITAL IN (DI) CONTROL POINT FOR EACH VFD.
HAND-OFF-AUTO: WHEN THE SWITCH ON THE VFD IS IN THE "OFF" POSITION,
THE PUMP SHALL BE SHUT OFF. WHEN THE SWITCH ON THE VFD IS IN THE
"HAND" POSITION, THE PUMP SPEED SHALL BE ADJUSTED MANUALLY
THROUGH A POTENTIOMETER. WHEN THE SWITCH IS IN THE "AUTO"
POSITION, THE PUMP SHALL OPERATE AS DIRECTED BY THE DDC
CONTROLLER.
SECONDARY HEATING HOT WATER PUMP CONTROL: AS THE OUTSIDE AIR
TEMPERATURE DROPS DOWN TO 55 DEG F (ADJUSTABLE), OR IF THERE IS A
NEED FOR REHEAT WATER AS CALLED FOR BY VAV TERMINAL ROOM
TEMPERATURE SENSOR, THE DDC CONTROLLER SHALL START A HOT
WATER HEATING SECONDARY PUMP. THE DDC CONTROLLER SHALL SEND A
4 - 20 MA SIGNAL TO THE VFD TO MAINTAIN A 10.0 PSI ADJUSTABLE
DIFFERENTIAL PRESSURE AT THE DIFFERENTIAL PRESSURE SENSORS IN
THE HOT WATER PIPING IN THE NORTH END OF THE FIRST AND SECOND
FLOOR. THE DDC CONTROLLER SHALL ALSO MAINTAIN 17.5 PSI AT A
DIFFERENTIAL PRESSURE SENSOR NEAR THE AHU HEATING COILS. THE
DDC SHALL DISCRIMINATE BETWEEN THE DIFFERENTIAL PRESSURE
SENSORS.
THREE WAY CONTROL VALVES SHALL BE PROVIDED AS SHOWN ON THE
DRAWINGS TO MAINTAIN A MINIMUM FLOW RATE IN THE SYSTEM, AND KEEP
THE WATER IN THE PIPES HOT. PUMPS HWP-1 AND HWP-2 ARE EACH SIZED
FOR 100% OF THE SYSTEM FLOW RATE.
PRIMARY HEATING HOT WATER PUMP CONTROL: THE PRIMARY HEATING
HOT WATER PUMPS BP-1, BP-2 AND BP-3 SHALL BE CONTROLLED BY THE
BOILER CONTROL PANEL.
PRIMARY PUMP BP-1 SHALL BE INTERLOCK WITH HOT WATER BOILER B-1.
PRIMARY PUMP BP-2 SHALL BE INTERLOCK WITH HOT WATER BOILER B-2.
PRIMARY PUMP BP-3 SHALL BE INTERLOCK WITH HOT WATER BOILER B-3.
HEATING HOT WATER TEMPERATURE CONTROL: PROVIDE A TEMPERATURE
SENSOR T1 IN THE HEATING HOT WATER SUPPLY HEADER, AND A
TEMPERATURE SENSOR T2 IN THE HEATING HOT WATER RETURN HEADER.
PROVIDE A WATER FLOW METER FM1 IN THE HEATING HOT WATER RETURN
HEADER UPSTREAM OF THE BOILERS.
PROVIDE TEMPERATURE SENSORS T3, T4 AND T5 ON THE HOT WATER
SUPPLY LINE LEAVING EACH BOILER FOR INDICATION PURPOSES.
PROVIDE A START/STOP (DO), A STATUS ALARM CONTROL POINT (DI), AND A
4 - 20 MA CONTROL SIGNAL (AO) TO THE BOILER CONTROL PANEL FOR
CONTROLLING THE FIRING RATE OF EACH BOILER BURNER.
WHEN THE OUTSIDE AIR TEMPERATURE DROPS DOWN TO 55 (ADJUSTABLE)
DEG F AS CALLED OUT ABOVE OR THE SECONDARY HEATING PUMP WILL
START THROUGH THE DDC CONTROLLER. THE DDC CONTROLLER UPON A
PROOF OF WATER FLOW THROUGH FLOW METER FM1 SHALL START BOILER
B-1, AND PRIMARY HEATING HOT WATER PUMP BP-1. THE DDC CONTROLLER
SHALL MODULATE THE BOILER TO PROVIDE A HEATING HOT WATER SUPPLY
TEMPERATURE OF 140 DEG F AT T1. AS THE FIRING RATE OF B-1 REACHES
THE MAXIMUM CONDITION, AND THE HEATING HOT WATER TEMPERATURE
AT T1 IS NOT SATISFIED, THE DDC CONTROLLER SHALL ACTIVATE BOILER
B-2, AND PRIMARY HEATING HOT WATER PUMP BP-2. AS THE FIRING RATE
OF B-2 REACHES THE MAXIMUM CONDITION, AND THE HEATING HOT WATER
TEMPERATURE AT T1 IS NOT SATISFIED, THE DDC CONTROLLER SHALL
ACTIVATE BOILER B-3, AND PRIMARY HEATING HOT WATER PUMP BP-3. THE
DDC CONTROLLER THEN SHALL MODULATE ALL THREE BOILERS IN
PARALLEL TO MAXIMIZE THE EFFICIENCY OF THE BOILER OPERATION. DDC
SHALL CONTROL FIRING RATE THROUGH THE BOILER CONTROLLER BASED
ON SECONDARY LOOP TEMPERATURE.
AS THE HEATING HOT WATER FLOW RATE DECREASES, AND THE FIRING
RATE OF THE BOILERS ALSO DECREASES, THE DDC CONTROLLER SHALL
SHUT DOWN ONE BOILER. AS THE OUTSIDE AIR TEMPERATURE EXCEEDS 55
(ADJUSTABLE) DEG F, THE DDC CONTROLLER SHALL SHUT THE WHOLE
SYSTEM DOWN.
EMERGENCY BOILER SHUTDOWN SWITCHES: BOILER MANUFACTURER
SHALL PROVIDE CONTROL WIRING SCHEMATIC FOR BOILER SHUTDOWN
SWITCHES LOCATED AT ALL BOILER ROOM EXIT DOORS. SHUTDOWN
CONTROL SYSTEM SHALL COMPLY WITH ASME-CSD-1, LATEST EDITION
"CONTROLS AND SAFETY DEVICES FOR AUTOMATICALLY FIRED BOILERS".
DIVISION 15 CONTRACTOR SHALL PROVIDE THE SWITCHES AND ALL
REQUIRED CONTROL WIRING. ALL WIRING SHALL BE IN CONDUIT. A CLEAR
POLYCARBONATE HINGED COVER SHALL BE PROVIDED TO PREVENT
ACCIDENTAL OPERATION OF SWITCHES. SWITCHES SHALL HAVE ENGRAVED
NAMEPLATES TO IDENTIFY SWITCH AS "BOILER EMERGENCY SHUTDOWN".
LOSS OF POWER: WHEN THERE IS A LOSS OF POWER, EMERGENCY POWER
WILL BE PROVIDED TO HWP-1 OR HWP-2, B-1, B-2, B-3, BP-1, BP-2 AND BP-3
TO PROVIDE HEAT TO THE BUILDING. BUILDING LOSS OF POWER SHALL BE A
CRITICAL ALARM.
IF HWP-1, B-1, BP-1 WERE OPERATING PRIOR TO LOSS OF POWER, THEY
WILL SHUT DOWN, AND REDUNDANT EQUIPMENT START UP.
HOT WATER TEMPERATURE RESET SCHEDULE: THE HOT WATER HEATING
SYSTEM SHALL OPERATE SUPPLY TEMPERATURE RESET SCHEDULE AS
FOLLOWS: WHEN THE OUTSIDE AIR TEMPERATURE REACHES 55 DEG F, THE
HOT WATER SUPPLY TEMPERATURE SHALL BE 100 DEG F. AS THE OUTSIDE
AIR TEMPERATURE DROPS DOWN TO 20 DEG F, THE HOT WATER SUPPLY
TEMPERATURE SHALL BE SET UP TO 140 DEG F (ADJUSTABLE).
HOT WATER HEATING SYSTEM ENERGY METER:
THE HOT WATER FLOOR METER IN CONJUNCTION WITH THE T1 AND T2
SHALL PROVIDE AN ENERGY USE TREND FOR THE HEATING SYSTEM.
STATIC PRESSURE SENSOR: PROVIDE A STATIC PRESSURE SENSOR IN THE
HOT WATER SUPPLY LINE UPSTREAM OF THE SECONDARY PUMPS TO
MONITOR THE FILL PRESSURE OF THE SYSTEM. THE HOT WATER HEATING
SYSTEM SHALL BE PRESSURIZED TO 20 PSIG (ADJUSTABLE). THE DDC
SYSTEM SHALL MONITOR THIS PRESSURE AND SEND AN ALARM CONDITION
AS THE PRESSURE DROPS DOWN TO 15 PSIG TO ALERT THE MAINTENANCE
STAFF OF A LOSS OF GLYCOL. THE MAINTENANCE STAFF CAN ADD GLYCOL
THROUGH GFP-2 MANUALLY.
BUILDING NO.
HARDWARE SOFTWARE
WHITEMAN AFB VEHICLE
MAINTENANCE STORAGE OUTPUT INPUT ALARMS
APPLICATION PROGRAMS
DIGITAL ANALOG DIGITAL ANALOG DIGITAL ANALOG
SYSTEM(S)
C O
N T
R O
L R
E L A
Y
S O
L E
N O
ID
S T
A R
T /S
T O
P
V F
D
-2 m
A m p S ig n a l
C O
N T
R O
L V
A L
V E
-2 m
A m p F
IR
IN
G R
A T
E
P R
E S
S U
R E
S W
IT
C
H
D
IF
F E
R E
N T
IA
L
P R
E S
S U
R E
S W
IT
C
H
F L O
W S
W
IT
C H
C O
N T
A C
T C
L O
S U
R E
C U
R R
E N
T T
R A
N F
O R
M E
R
V F
D S
T A
T U
S
T E
M P
E R
A T
U R
E
D E
G R
E E
S F
D
IF
F E
R E
N T
IA
L
P R
E S
S U
R E
L O
N W
O R
K S
C O
N N
E C
T
IO
N
P R
E S
S U
R E
W A
T E
R F
L O
W R
A T
E
R U
N N
IN
G
L O
A D
A M
P S
R L A
E M
E R
G E
N C
Y B
O
IL
E R
S H
U T
O F
F
P U
M P
F A
IL
U
R E
B O
IL
E
R F
A
IL
U R
E
L O
W G
L Y
C O
L L
E V
E L
F A
N F
A
IL
U R
E
H
IG
H L
IM
IT
L O
W L
IM
IT
R U
N T
IM
E
S C
H E
D U
L E
D S
T A
R T
S
T O
P
O P
T
IM
U M
S T
A R
T S
T O
P
D U
T Y
C Y
C L
IN
G
D E
M A
N D
L
IM
IT
IN
G
D A
Y N
IG
H
T S
E T
B A
C K
E C
O N
O M
IZ
E
R
V E
N T
IL
A
T
IO
N R
E C
IR
C
U L
A T
IO
N
H O
T C
O L D
D E
C K
R E
S E
T
R E
H E
A T
C O
IL
R
E S
E T
S T
E A
M B
O
IL
E R
S E
L E
C T
IO
N
H O
T W
A T
E R
B O
IL
E
R S
E L E
C T
IO
N
H W
O A
R E
S E
T
C H
IL
L
E R
S E
L E
C T
IO
N
C H
IL
L
E D
W A
T E
R R
E S
E T
C O
N D
E N
S E
R W
A T
E R
R E
S E
T
C H
IL
L E
R D
E M
A N
D L
IM
IT
L
IG
H T
IN
G
C O
N T
R O
L
R E
M O
T E
B O
IL
E
R M
O N
IT
O
R
IN
G C
O N
T R
O
LHEATING HOT WATER SYSEM
OCCUPANCY TIME
GENERAL DISPLAY •
CRITICAL ALARM DISPLAY C
POINT DESCRIPTION
HWP-1 • • • • • •
HWP-2 • • • • • •
BP-1 • • •
BP-2 • • •
BP-3 • • •
HWS • • •
HWR •
B-1 • • C • • • B-2 • • C • • • B-3 • • • • •
EMERGENCY BOILER SHUT OFF • C
SSP-1 (SIDESTREAM PUMP) • • • •
SSP-2 (SIDE STREAM PUMP) • • • •
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M-605
M E
C H
A N
IC
A
L C
O N
T R
O L S
W H
IT
E
M A
N A
F B
M
IS
S
O U
R I
K A
N S
A S
C
IT
Y D
IS
T
R
IC
T E
A S
T
T
H S
T K
A N
S A
S C
IT
Y
M
O
F A
R R
IS
E
N G
IN
E
E R
IN
G
P
S T
R E
E T
S
U
IT
E
L
IN
C O
L N
N
E
B J K
H D
S
J M
M
J A
N U
A R
Y
W -X
X -X
-X X
X X
W -X
X -X
-X X
X X
C O
N S
O L
ID
A T
E D
V E
H
IC
L E
M A
IN
T
E N
A N
C E
F A
C
IL
IT
Y
P N
Y W
H G
A
M E
N D
M E
N T
A
P R
IL
VEHICLE EXHAUST & MAKE-UP AIR UNITS CONTROL SEQUENCE:
T1
H L
DPT
H L
DPT
AFS
4-20MA (AO)
STATUS (DI)
ENABLE (DO)
0-10Vdc
(AI)
T2
T3
H W
S
H W
R
ENABLE (DO)
STATUS (AI)
DSP-3
DSP-2
DSP-4
ECM
MS
H L
DPT
V1
ECM
MOD
MOD
O U
T S
ID
E
A
IR
O.A.
D2
M.A.
D1
O-10Vdc
(AI)
O-10Vdc
(AI)
H C
L O
W L
IM
IT
T E
M P
S E
N S
O R
SAF
F S
D
PRE-
FILTER
FINAL
FILTER
O-10Vdc
(AI)
RETURN AIR
S
OCC
S
START/STOP
T
START/STOP
F S
D
EAF-6
EAF-7
EAF-8
EAF-10
STATUS/ALARM
VEHICLE EXHAUST FAN SCHEMATIC MAKE-UP AIR UNITS SCHEMATIC
THERE ARE FOUR VEHICLE EXHAUST FANS SERVING THIS BUILDING. EXHAUST FANS EF-6 AND EF-7 SERVES THE NORTH LOW BAY MAINTENANCE AREA WHERE THERE ARE TWO OVERHEAD VEHICLE EXHAUST DISTRIBUTION SYSTEMS.
MAKE-UP AIR IS PROVIDED TO THIS AREA FROM MAKE-UP AIR UNIT MAU-2 TO REPLENISH THE AIR EXHAUSTED FROM THE SPACE. EXHAUST FAN EF-8 SERVES THE EAST HIGH BAY MAINTENANCE AREA WHERE THERE IS A
UNDERGROUND VEHICLE EXHAUST DISTRIBUTION SYSTEM. MAKE-UP AIR IS PROVIDED TO THIS AREA FROM MAKE-UP AIR UNIT MAU-1. EXHAUST FAN EF-10 SERVES THE DYNAMOMETER ROOM WHERE THERE IS A DEDICATED
OVERHEAD VEHICLE EXHAUST SYSTEM FOR A SINGLE VEHICLE IN THIS SPACE.
THE FOUR VEHICLE EXHAUST FANS SHALL EACH HAVE AN ACTIVATION SWITCH FOR THE MAINTENANCE STAFF TO USE WHEN VEHICLE EXHAUST IS NEEDED IN THOSE SPACES. INTERLOCK EXHAUST FANS EF-6 AND EF-7 WITH MAKE-UP
AIR UNIT MAU-2. INTERLOCK EXHAUST FAN EF-8 WITH MAKE-UP AIR UNIT MAU-1. INTERLOCK EXHAUST FAN EF-10 WITH MAKE-UP AIR UNIT MAU-3. UPON ACTIVATION OF ANY ONE OF THE FOUR EXHAUST FANS, THEIR RESPECTIVE
MAKE-UP AIR UNITS SHALL START UP, THE OUTSIDE AIR DAMPERS SHALL OPEN, AND THE HOT WATER REHEAT COIL SHALL BE ACTIVATED.
PROVIDE OCCUPANCY SENSORS IN THESE THREE AREAS OF THE BUILDING TO MONITOR WORKER ACTIVITY. AS LONG AS THESE SPACES ARE OCCUPIED WITH VEHICLES RUNNING THE VEHICLE EXHAUST SYSTEMS SHALL REMAIN IN
OPERATION. DURING THE NIGHT OR DURING THE WEEKENDS WHENEVER THESE SPACES BECOME DORMANT WITH NO ACTIVITY OR VEHICLES RUNNING, THESE DDC SYSTEM SHALL SHUT DOWN THE VEHICLE EXHAUST FANS AND STOP
THE MAKE-UP AIR SYSTEMS FROM RUNNING SHOULD THE STAFF FORGET TO MANUALLY SHUT THESE SYSTEMS DOWN WHEN LEAVING THE WORK DAY.
PROVIDE A START/STOP CONTROL POINT, A STATUS/ALARM CONTROL POINT, AND A DISCHARGE AUTOMATIC CONTROL DAMPER CONTROL POINT FOR EACH EXHAUST FAN THROUGH THE DDC CONTROL SYSTEM. EACH EXHAUST FAN
WILL ALSO HAVE A MANUAL START/STOP CONTROL POINT OUT IN THE SPACES. UPON ACTIVATION OF THE EXHAUST FANS THE DDC CONTROL SYSTEM SHALL OPEN THE AUTOMATIC CONTROL DAMPER, UPON THE DAMPER REACHING
FULL OPEN THROUGH THE DAMPER END SWITCH, THE DDC CONTROLLER SHALL THEN ACTIVATE THE FAN. THESE EXHAUST FANS SHALL RUN AT A CONSTANT SPEED WHEN ACTIVATED AND FOLLOW THE FAN CURVE AS THE MANY
VEHICLE EXHAUSTS ARE CONNECTED TO THE EXHAUST SYSTEM. THESE FANS TYPICALLY HAVE A STEP FAN CURVE AS IS CHARACTERISTIC OF THE…