Question and Answers
W91DQ21Q1031
August 10, 2021 – August 19, 2021
1. In the Statement of Work (issued with Amendment #1), Electric Service and Fixture Installation Item E states that there are to be 4 Cree LS8 light fixtures installed per bay, but the supporting drawing E-103 only shows 3 Cree LS8 light fixtures per bay. Can you please confirm that the intent is to provide the lighting as shown on E-103?
Government Response: Confirmed, utilize E-103, only three light fixtures per bay.
2. In the Statement of Work (issued with Amendment #1), Electric Service and Fixture Installation Items E, F, and G state to provide the Cree LS8, Cree LS4, and Cree OSQ light fixtures with multi-level occupancy sensors using passive infrared (PIR). That said, sheet E-103 is calling for these same light fixtures to wire into (2) 2 pole single throw switches and does not indicate the occupancy sensors or their locations. Please advise if the occupancy sensors will be required or if the intent is to function these lights with the use of the 2 pole single throw switches.
Government Response: Confirmed, the intent is to function these lights with the use of the 2 pole single throw switches
3. We see on the SF 1442, there is a requirement to furnish an offer guarantee, but noted that there is not a requirement to furnish a Performance and Payment Bond. Can you please confirm that a Performance and Payment Bond is not required for this project?
Government Response: Yes, Performance and Payment Bonds are required for this project. Please see Amendment 0003.