B.08.03 B223 Ph2 Amendment 0003.pdf
PDF 837 KB Posted
- Solicitation number
- W912DQ20R4023
About this file
This pre-solicitation notice announces an upcoming solicitation for renovations to Building 223 located at Fort Riley, Kansas. The U.S. Army Corps of Engineers, Kansas City District intends to issue a request for proposal on an unrestricted basis using a two-phase design-build procurement methodology. The requirement is for furnishing all labor, materials, equipment and transportation to perform a whole building renovation of the historic barracks, replacing all mechanical, electrical and communications systems, and conducting exterior masonry repairs. The estimated contract value is between $10-25 million. The NAICS code is 236220 and the small business size standard is $39.5 million in average annual receipts. Small businesses are encouraged to consider teaming arrangements. The performance period for construction is 730 calendar days from notice to proceed. The solicitation will be available on or about June 26, 2020 on the SAM website. Questions should be directed to the points of contact provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.08.03 W912DQ20R40230002 Amendment 0004.pdf | ||
| B.08.03 W912DQ20R40230001 Amendment 0001.pdf | ||
| B.08.03 W912DQ20R40230002_Amendment 0002.pdf | ||
| Site Visit Sign in Sheet 223.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912DQ20R4023
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
BLDG 223 RENOVATION FORT RILEY, KS - CONSTRUCTION
--See Continuation Page for Solicitation Instructions related to Phase 2 of the BLDG 223 RENOVATION FT RILEY KS PROPOSAL DUE DATE FOR PHASE 2 IS: September 12, 2020 at 2:00PM Local Time
1. CONTRACT ID CODE PAGE OF PAGES
J 1 26
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ20R4023
X 9B. DATED (SEE ITEM 11)
30-Jun-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Aug-2020
CODE
USACE, KANSAS CITY +
FEDERAL BLDG. CT-M RM 647; 601 E 12TH ST
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT 0003
THE SOLICITATION IS AMENDED AS FOLLOWS:
Deleted text is shown with a strikethrough. Added text is shown with underline.
1. This amendment is to update the Solicitation Provision – 52.236-27 SITE VISIT (CONSTRUCTION)
(FEB 1995) – ALTERNATE I (FEB 1995)
2. This amendment is to delete the Solicitation Provision - 52.204-24, REPRESENTATION REGARDING
CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT
in its entirety and replace it
3. This amendment is to delete the Solicitation Clause - 52.204-25, PROHIBITION ON CONTRACTING
FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR
EQUIPMENT in its entirety and replace it
4. This amendment is to update the Bid Schedule in Section 00 10 00 - Solicitation
5. This amendment is to add verbiage to RFP SECTION 00 22 16: PHASE 2 OF 2 PHASE SELECTION
PROCEDURES
6. Propoosal Due Date for Phase 2 is September 12, 2020 at 2:00 p.m. local Kansas City time.
7. Offeror is required to acknowledge receipt of this amendment. Failure to acknowledge this amendment may cause rejections of the proposal.
8. All other terms and conditions remain unchanged and in full force.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation.
Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--Thursday, August 20, 2020.
To be determined at Phase 2
(c) Participants will meet at--(c) Participants planning on attending are to meet on the south side (courtyard side) of building 223, at 1:30 PM, local time. Site visit POC is Kyle Street, 816-389-3050 (office).
To be determined at Phase 2
(d) This building is currently being used as a quarantine facility (not positive tested) so attendees must be escorted. All participants shall wear face masks. No one will be allowed on the site visit without a face mask.
(End of provision)
52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.
As prescribed in 4.2105(a), insert the following provision:
REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR
EQUIPMENT (AUG 2020)
The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it “does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument” in the provision at 52.204-26, Covered Telecommunications Equipment or Services—Representation, or in paragraph (v) of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items.
(a) Definitions. As used in this provision-
Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Prohibition. (1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to—
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to—
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for “covered telecommunications equipment or services.”
(d) Representations. The Offeror represents that—
(1) It [ ] will, [ ] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds “will” in paragraph (d)(1) of this section; and
(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that—
It [ ] does, [ ] does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds “does” in paragraph (d)(2) of this section.
(e) Disclosures. (1) Disclosure for the representation in paragraph (d)(1) of this provision. If the Offeror has responded “will” in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment—
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the original equipment manufacturer (OEM) or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(ii) For covered services—
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the Product Service Code (PSC) of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(2) Disclosure for the representation in paragraph (d)(2) of this provision. If the Offeror has responded “does” in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment—
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(ii) For covered services—
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the PSC of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(End of provision)
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES
OR EQUIPMENT (AUG 2020)
(a) * * *
Backhaul means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network (e.g., connecting cell phones/towers to the core telephone network).
Backhaul can be wireless (e.g., microwave) or wired (e.g., fiber optic, coaxial cable, Ethernet).
Interconnection arrangements means arrangements governing the physical connection of two or more networks to allow the use of another's network to hand off traffic where it is ultimately delivered (e.g., connection of a customer of telephone provider A to a customer of telephone company B) or sharing data and other information resources.
Reasonable inquiry means an inquiry designed to uncover any information in the entity's possession about the identity of the producer or provider of covered telecommunications equipment or services used by the entity that excludes the need to include an internal or third-party audit.
Roaming means cellular communications services (e.g., voice, video, data) received from a visited network when unable to connect to the facilities of the home network either because signal coverage is too weak or because traffic is too high.
(b) Prohibition. (1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. The Contractor is prohibited from providing to the Government any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract, or extending or renewing a contract, with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph
(c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract.
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
AMOUNT
0001 Job
RENOVATION B 223
FFP
CONSTRUCT/RENOVATION OF B223
FOB: Destination
PSC CD: Z1FC
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 Job
RENOVATION B 223
FFP
CONSTRUCT/RENOVATION OF B223
0003 Job
SPOT REPOINTING
FFP
UNIT PRICE ITEM, SPOT REPOINTING
0004 Job
STONE PATCHING
FFP
UNIT PRICE ITEM, STONE PATCHING
0005 Job
STONE CRACK INJECTION
FFP
0006 Job
STONE REPLACEMENT
FFP
UNIT PRICE ITEM, STONE REPLACEMENT
CONCRETE PATCHING
FFP
UNIT PRICE ITEM, CONCRETE PATCHING
0008 Job
CMRA FFP
Contractor Manpower Reporting (CMR) is required. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Army via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. The Unit Identification Code (UIC) required for input of information for this contract is: W07105. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil.
0009 Job
OPTION OPTION: FFE
FFP
FURNITURE, FIXTURE AND EQUIPMENT
Section 00 22 16 - Supplementary Instructions to Proposers
RFP SECTION 00 22 16: PHASE 2 OF 2 PHASE SELECTION PROCEDURES
1. OVERVIEW
a. In Phase 2 of the two-phase design-build selection procedure, the firms or joint venture entities (referred to as "Offerors") that were selected in Phase 1 will submit project-specific proposals, including pricing information, for the Building 223 renovation project, located at Fort Riley, Kansas.
b. At the beginning of Phase 2, an amendment will be issued to only the selected offerors from Phase 1 inviting them to submit a technical approach, key personnel, small business participation plan, subcontracting plan (if applicable) and price proposals for consideration. In addition, Corporate Experience and Performance Confidence from Phase 1 will be weighted in Phase 2. The amendment will request additional information needed to complete the submission of Phase 2 proposals. In Phase 2, the Contracting Officer will award a single firm fixed price contract for the design and construction of the Fort Riley BUILDING 223 Renovation project to the offeror whose proposal offers the Best Value - Trade Off proposal to the Government, considering the price and non-price factors described in Section 00 22 16.
c. Offerors must submit a complete Phase 2 proposal to be considered for award. Failure to submit a complete proposal may result in the entire proposal being rejected.
d. The proposal should be prepared simply and economically, providing straightforward, concise delineation of capabilities to perform the contract. The proposal should be practical, legible, clear and coherent.
e. The technical proposal shall address the Offeror’s proposed approach to fully perform the requirements of the Request for Proposal (RFP). Offerors are discouraged from providing information not required by the RFP.
2. GENERAL PROPOSAL SUBMISSION INSTRUCTIONS
INSTRUCTIONS FOR SUBMITTING ELECTRONIC PROPOSALS:
DoD SAFE (Secure Access File Exchange) is a web-based tool that provides authenticated DoD CAC users and guests (unauthenticated users) the capability to securely send and receive large files, including files that are too large to be transmitted via email. Guests can receive files from CAC users and (only if CAC users requested files) send files to CAC users. Notification is achieved via email.
In an effort to reduce paperwork and cost, all proposals shall be submitted electronically through the SAFE site. Submission shall be in Adobe PDF format. You are limited to five (5) maximum files per upload (total size cannot exceed 2GB). If you have a large number of files, recommend that you combine or ZIP your files before uploading to the SAFE site. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
SAFE INSTRUCTIONS
The Offeror’s proposal shall be submitted electronically, as described below. The Offeror’s proposal shall not contain classified data. The use of hyperlinks within a proposal is prohibited.
NOTE: The only authorized transmission method for proposals in response to this solicitation is electronically via SAFE online submission. NO OTHER TRANSMISSION METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.
The Offeror’s proposal must be received by the Government by the date/time specified in the solicitation. Offerors shall electronically submit their proposals using the following link:
https://safe.apps.mil/
Failure to properly submit a proposal by the due date and time specified in the solicitation will render it late, and late proposals will be rejected. As this is an electronic submission subject to internet connectivity and other potential network traffic issues, offerors are cautioned to plan accordingly.
REQUEST FOR UPLOAD CODE: In order to electronically submit a proposal through DoD SAFE, offerors must email Contract Specialist Stephanie Kretzer at Stephanie.R.Kretzer@usace.army.mil and Contracting Officer David Walsh at david.j.walsh@usace.army.mil no later than five (5) working days prior to the proposal due date to receive a request code which will allow for file uploads via the SAFE site. Offerors that fail to email for request a code five (5) working days before proposal submission date may not receive a request code in time to upload their submission. For larger submissions that require multiple sessions to upload, multiple codes may need to be requested. Please plan accordingly when requesting a code(s) for uploads in order to have sufficient time to upload prior to the proposal due date.
FILE DESCRIPTION: Include a “File Description” for each file(s) you upload. The “File Description” will be included in the email notice to each of the recipients you choose to have access your file(s).
Title the files(s):
Solicitation#_COMPANY NAME_TAB A Solicitation#_COMPANY NAME_TAB B-C Solicitation#_COMPANY NAME_TAB D Solicitation#_COMPANY NAME_TAB E
NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.) Submission shall be in Adobe PDF format.
INSTRUCTIONS FOR USING THE SAFE WEBSITE:
Once at the SAFE website select the “Drop-off” icon. This allows users without a Common Access Card (CAC) or users whose computer is not configured to read a CAC the option to access the SAFE site as a guest.
After selecting the “Click Here” link you will be prompted to add your personal information, file information, recipient (Government representative) information and email settings.
When completing your file information for transmittal via the SAFE website, you will be required to enter the email address for all recipients. For this solicitation, the recipients are the Contract Specialist and the Contracting Officer.
The email address for the Contract Specialist for this solicitation is Stephanie.R.Kretzer@usace.army.mil AND the Contracting Officer is david.j.walsh@usace.army.mil.
The email address of the Government Employee who initiated the request code will be automatically populated. The Offeror must enter the email address for both the Contracting Officer and Specialist. The Offeror can enter an additional email address if desired. After entering an email address, click the ADD button to add the person(s) email to the “Recipients List” of your response. When your proposal is submitted, a notification will be sent to the recipients you added.
NOTE: Do NOT send the SAFE site packages to group email accounts.
Even if you successfully upload your proposal to the SAFE site, notification will not be sent to the government recipients until you verify your email address. Entering an incorrect email may result in the rejection of your submission for lateness. Successful file submission will be confirmed by the ‘Drop-Off Completed” screen which generates once a file is uploaded.
NOTE: It has been reported that documents are more quickly uploaded into the SAFE website when using the Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser.
RECEIPT OF SUBMISSIONS:
For the purposes of determining whether a proposal submission is timely, the government shall utilize the date and time the submission is completely uploaded into the SAFE website as indicated by the SAFE system time stamp. For proposals larger than the 2GB capacity of the SAFE website and require multiple submissions will require multiple requests for codes, the Government will utilize the system generated date and time stamp of the last submission. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases.
The government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.
Because uploaded documents expire in DoD SAFE, the submission of proposals should only occur during a limited window of time proposals should be submitted no earlier than 5 days before the proposal due date, in order to ensure that the submitted proposals doesn’t expire before the proposal due date.
Offerors are responsible for ensuring that the submitted proposal does not expire prior to proposal due date.
There is a SAFE User Guide available at https://dl.dod.cyber.mil/wp-content/uploads/dcs/pdf/unclass- DOD_SAFE_User_Guidev0_2d1.pdf
If an Offeror needs help, the SAFE helpdesk will not be able to help you. The Contract Specialist listed above will need to open a ticket for them to address system or user help issues.
3. PHASE 2 PROPOSAL: PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS
Proposal Characteristics - PHASE 2
In order to be considered for award of a contract for the requirements of this solicitation, the offeror must submit a proposal with its offer. Failure to submit a complete proposal may result in the entire offer being rejected. The proposals shall be submitted as follows:
Submit the proposal in a tabbed file identified by the Solicitation Number, project title, name, address, and telephone number of the Offeror(s).
Arrange tabs as follows:
Phase 2 – File 1, Standard Form 1442:
Cover Letter – Solicitation number, Name, address, email, and telephone number of the offeror, Names, title, email, and telephone numbers of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this RFP. Name, title, and signature of the person authorized to sign the proposal. A statement specifying agreement with all terms, conditions, and provisions including in the RFP.
TAB A - Consists of an original signed Standard Form 1442 “Solicitation, Offer, and Award” and acknowledgment of all amendments to the solicitation, copy of Bid Guarantee.
Bid Guarantee. See FAR 52.228-1. Copy of Bid Guarantee.
The originals of the Bid Guarantee must be provided by close of business within 2 business days of the proposal submission deadline at the following address:
U.S. Army Corps of Engineers, Kansas City District Federal Building Room 647 ATTN: CECT-NWK-M/Sandy Collier 601 East 12th Street
Kansas City. Missouri 64106-2896
The completed Section 00 45 00 of the RFP (Representations and Certifications) Printed Entity Record from System for Award Management (SAM) Financial statement and bank letter that verify that sufficient funds will be available to finance the work. Identify if this proposal is being submitted by a HUBZone entity.
Contract Duration and Compliance Statement. The Offeror is required to certify that all items submitted in the technical proposal comply with the RFP requirements and any differences, deviations or exceptions must be stated and explained in this section. Offerors are required to complete the statement and submit it with their technical proposal. Even if there are no differences, deviations or exceptions, the Offeror must submit the Compliance Statement stating that no differences, deviations or exceptions exist.
Sample: Statement of Compliance: This Offeror hereby certifies this proposal is in compliance with the solicitation and its requirements. There are no exceptions, deviations or differences.
Phase 2 – File 2, Technical Proposal:
Cover Letter – Solicitation number, Name, address, email, and telephone number of the offeror
TAB B – Factor 2-1 – Technical Approach TAB C – Factor 2-2 – Key Personnel
Phase 2 - File 3, Small Business Participation Plan
Cover Letter – Solicitation number, Name, address, email, and telephone number of the offeror.
TAB D: Factor 2-3 - Small Business Participation Plan
Phase 2 – File 4, Price Proposal:
Cover Letter – Solicitation number, Name, address, email, and telephone number of the offeror.
TAB E: Factor 2-4 – PRICE The Offeror shall submit a price schedule for this factor. Section 00 11 00:
Solicitation/Contract Form
Offerors shall limit Phase 2 Proposal, to the following page limits:
Factor 1-1: Corporate Experience (From Phase 1 no submission required in Phase 2) Factor 1-2: Past Performance (From Phase 1 no submission required in Phase 2) Factor 2-1: Technical Approach – 8 Pages Factor 2-2: Key Personnel – 10 Pages Factor 2-3: Small Business Participation Plan – (excluded from page limits) Factor 2-4: Price (excluded from page limits)
All text must be legible and easily read. The page size of the offeror’s proposal shall not exceed 8-1/2 by 11 inches. Diagrams, charts and tables shall conform to the paper size. All text shall be typed single-spaced with a minimum size 10 font. Margins (1-inch) shall be clean and clear. A page is defined as text or information on one side of the paper. If it is printed double sided, each face will be counted as a page.
*OCR is a common method of digitizing printed texts so that they can be electronically searched, stored more compactly, displayed on-line, and used in machine processes such as machine translation, text-to-speech, key data extraction and text mining.
Table of Contents - Each volume of the proposal should contain a detailed table of contents. All pages of each factor should be sequentially numbered. The complete table of contents shall be included in each tab.
4. INQUIRIES/QUESTIONS
Technical inquiries and questions relating to this solicitation shall be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org). To submit and review inquiry items, prospective offerors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective offeror who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective offeror once the reply is available for viewing.
***Please Note: Offerors shall only submit one question per inquiry. All inquiries containing multiple questions shall be rejected.
The Solicitation Number is: W912DQ20R4023 The Bidder Inquiry Key is: CC9D99-CIMQFK The Plan Room Key is: PAJ98W-Z4WEZF
Instructions for first-time ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. Select agency USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Instructions for future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. Select agency USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Click Continue. A page will then open asking you to enter the answer to your Secret
Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
The Bidder Inquiry System will be unavailable for new inquiries ten calendar days before proposal due date in order to ensure adequate time is allotted to form an appropriate response to inquiries and amend the solicitation if necessary.
Offerors are requested to review the specification in its entirety and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago) or by appointment for OCONUS. The telephone number for the Call Center is 1-800-428-HELP. Email to staff@rcesupport.com.
5. BASIS FOR AWARD
The agency will use Two-Phase Design-Build Prequalification of Sources Selection Procedures authorized by FARS 36.301. In Phase 1, the Government selected a target of three most highly rated offerors to compete in Phase 2. Phase 2 Basis of Award FAR Part 15.101-1 Best-Value, Trade-Off Process.
In Phase 2, all non-price factors, when combined, are significantly more important than Price. The selection will be based on evaluation of technical factors. There are five non-price (technical) factors in Phase 2, including Phase 1 Factor 1-1 and Factor 1-2.
The Government will select one offeror for award based on their overall merit after consideration of the evaluation factors described below. The relative weight given to the evaluation factors is described in the Phase 2 Table 1 below.
The Technical Factors are not of equal importance.
In Phase 2, the Government intends to select for award, the offeror whose proposal(s) conforms to the solicitation and is determined to be the Best Value to the Government in accordance with the following relationship between price and technical merit. The non- price technical factors from Phases 1 and 2, when combined, are much greater in importance than price. The closer the total evaluated technical ratings are to one another, the greater importance of the price evaluation in making the Best Value determination. The closer the final price evaluations are to one another, the greater the importance of the total evaluated technical ratings in making the Best Value determination.
The relative weight given to the evaluation factors is described in the table below.
Factor 1-1, Corporate Experience (From Phase 1) Factor 1-2, Past Performance (From Phase 1) Factor 2-1, Technical Approach Factor 2-2, Key Personnel Factor 2-3, Small Business Participation Plan Factor 2-4, Price
PHASE TWO – RELATIVE WEIGHT OF EVALUATION FACTORS
Table 1. Relative Weight of Evaluation Factors
Location Factor Number Description Relative Importance Phase 1 & 2 Factor 1-1 Corporate Experience This Factor is the most important
Factor
Phase 1 & 2 Factor 1-2 Performance Confidence This Factor is less important than Factor 1-1, equal to Factor 2-1, more important than Factor 2-2 and Factor 2-3
Phase 2 Factor 2-1 Technical Approach This Factor is less important than factor 1-1, equal to Factor 1-2, more important than Factor 2-2 and Factor 2-3.
Phase 2 Factor 2-2 Key Personnel This Factor is less important than Factor 1-1, Factor 1-2 and Factor 2-1 and more important than Factor 2-3.
Phase 2 Factor 2-3 Small Business Participation Plan
This Factor is less important than Factor 1-1, Factor 1-2, Factor 2-1, Factor and Factor 2-2.
Phase 2 Factor 2-4 Price All non-price Factors, when combined, are significantly more important than Price.
6. SOURCE SELECTION PROCESS
The Source Selection Evaluation Board (SSEB) will be established to conduct the evaluation of proposals received in response to this solicitation. The evaluation will be based on the content of the proposal, proposal revisions and any information obtained from other sources, e.g. past performance information. The SSEB will not consider any documents incorporated by reference, except as expressly allowed by this solicitation.
Members of the SSEB will independently consider the information provided in the Phase 2 proposal.
Once these individual analyses are completed, the SSEB will deliberate and assign a consensus rating for each evaluation factor. It is the responsibility of each member of the SSEB to provide and document sufficient strengths, weaknesses, and/or deficiencies to support the assigned rating for each factor.
The results of the SSEB evaluations will be presented to the SSA. The SSA will determine whether it is appropriate to engage in clarifications, communications, or discussions. The ratings on individual factors, to include all support documentation, will be provided to the SSA. The SSA, independently exercising prudent business judgment, will determine which offeror presents the best overall value to the Government and will be selected for award.
7. TECHNICAL RATING
The SST will use a combined technical/risk rating system that includes consideration of risk in conjunction with the strengths, weaknesses, and deficiencies in determining technical ratings.
Assessment of technical risk, which is manifested by the identification of weakness(es), considers potential for disruption of schedule, increased costs, degradation of performance, the need for increased Government oversight, and/or the likelihood of unsuccessful contract performance.
Combined technical/risk evaluations shall utilize the combined technical/risk ratings listed in Table 2.
Table 2. Combined Technical/Risk Ratings
Color Rating Description
Blue
Outstanding
Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Purple
Good
Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Green
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow
Marginal
Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red
Unacceptable
Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
Ratings will be assigned for each of the Phase 2 technical evaluation factors for each offeror. No overall rating will be assigned.
8. DEFINITIONS
Rating: The rating for the Technical factor will be expressed as an adjectival assessment of Outstanding, Good, Acceptable, Marginal, or Unacceptable.
Deficiency: A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.
Strength: Any aspect of an offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
Weakness: A flaw in the proposal that increases the risk of unsuccessful contract performance.
Significant Weakness: A flaw that appreciably increases the risk of unsuccessful contract performance.
9. DEBRIEFING OFFERORS
Offerors may request a debriefing in accordance with FAR 15.505 Pre-award Debriefing of Offerors, and FAR 15.506 Post-award Debriefing of offerors.
10. TECHNICAL FACTORS TO BE EVALUATED IN PHASE 2
PHASE 2 – File 2 - TAB B - Factor 2-1 –TECHNICAL APPROACH
SUBMISSION REQUIREMENTS:
Technical Approach. Offerors shall submit a narrative not to exceed eight (8) pages that addresses the items below.
1. Identify the offeror’s risks of executing this project and describe specific plans to mitigate those risks. Minimum submission requirements include the identification of at least 3 significant project risks for this project and a discussion of the specific plans to mitigate those risks. Identify any project from Factor 1 that used the same risk mitigation strategy successfully.
2. Offeror shall clearly communicate their technical/management approach to the Building 223 renovation project and support the approach with past experiences and lessons learned from similar type projects. Offeror should also include topics in addition to the list below that would demonstrate their overall knowledge and experience in projects of similar size, magnitude and criteria. Identify any project from Factor 1 that used the same technical approach successfully.
Topics should include the following at a minimum and should thoroughly demonstrate how the Offeror’s experience and lessons learned support their planned approach, to the Building 223 renovation project. Offeror shall include enough details to communicate their knowledge/experience in each area.
Just mentioning a topic shall not suffice as demonstration of their knowledge or experience.
1. Technical aspects of a project built within all DoD, UFGS, and Installation requirements.
2. Construction and management of a historic renovation project meeting the requirements of the
Secretary of the Interior’s Standards for the Treatment of Historic Properties.
3. Schedule management to ensure compliance with the required period of performance.
EVALUATION CRITERIA
Based on the submission provided, the Government will evaluate the Offerors overall technical approach to this construction project and its capability to execute an awarded contract with a cohesive and collaborative team effort. The Government will evaluate the strengths, weaknesses and any deficiencies in the submission and assign one combined technical and risk rating for this factor.
Additional consideration will be given to those offerors whose proposed technical approach:
1. Demonstrates experience using the same technical approach for projects submitted for Factor 1.
2. Clearly demonstrates a thorough understanding of the application of the Secretary of the Interior’s Standards for the Treatment of Historic Properties to construction and management of a historic renovation project.
3. Clearly communicates thorough knowledge, application and planning of technical approach items.
PROPOSED CONTRACT DURATION AND SAMPLE
STATEMENT OF COMPLIANCE
(Not included in the page limit.)
Date:
[Insert name of the Offeror] hereby proposes that the period of performance for all construction is calendar days from receipt of Notice to Proceed, inclusive of Government review periods, to final acceptance by the Government.
[Insert name of the Offeror] hereby certifies that the offer of this performance period is at no additional cost to the Government over the performance period specified as the minimum Government requirements.
[Insert name of the Offeror] hereby certifies this proposal is in compliance with the solicitation and its requirements. There are no exceptions, deviations or differences.
Name (printed)
Title
Signature (Must be that of individual signing offer)
PHASE 2 – File 2 - TAB C - FACTOR 2-2 – KEY PERSONNEL
Submission Requirements
Submit resumes for the key personnel listed below to demonstrate and highlight the strength and expertise of the proposed team, only one resume shall be submitted per discipline:
1. Architect
2. Historic Architect
3. Mechanical Engineer
4. Fire Protection Engineer
5. Commissioning Specialist
Limit resumes for each key personnel to two (2) pages. Resumes similar in format to those used in SF 330s are acceptable. Each resume must be accompanied by a signed commitment from the proposed individual to work on this project if awarded to the offeror. Commitment letters are excluded from page counts.
The resumes must include the following qualification information:
• Proposed Role
• Relevant education (Degrees)
• Certifications, professional positions or other relevant professional qualifications/training
• Years of experience with current firm
• Years of experience in proposed role
• Example projects of a similar nature to this solicitation
The resumes shall also describe the proposed key personnel’s experience on projects. Include the following information:
• Project name, location, beginning and completion date, and final contract cost.
• The individual’s role on the project in enough detail to demonstrate level of involvement.
• What project submitted in Factor 1-1 Corporate Experience, if any, the individual participated in and what role they held.
Evaluation Criteria
The Government will evaluate the key personnel proposed for this project. The proposal will be rated Unacceptable for this factor if the minimum requirements are not met.
Minimum requirements:
Licensed or registered (commissioning specialist can be certified commissioning professional or equivalent in lieu of licensed);
Minimum 5 years of experience in the proposed role.
Fire protection engineer shall meet the qualifications of a Qualified Fire Protection Engineer, as defined in UFC 3-600-01, meeting one of the following conditions:
o A registered professional engineer (P.E.) who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveys (NCEES).
o A registered P.E. in a related engineering discipline with a minimum of 5 years of experience, dedicated to fire protection engineering that can be verified with documentation.
The evaluators will determine strengths and weaknesses based on the following:
Education, professional registration and relevant certifications, professional positions and other relevant qualifications.
Years of experience with the offeror.
Years of experience in the proposed role.
Experience working on projects listed in the proposal for Factor 1-1.
Experience with projects similar to that identified in this solicitation.
PHASE 2 – File 3 - TAB D – FACTOR 2-3 - SMALL BUSINESS COMMITMENT
DOCUMENT
Submission Requirements:
All offerors, both small and large businesses, are required to submit Small Business Commitment Document in accordance with DFARS 215.304. Offerors will be evaluated on their level of commitment to small business participation and should provide support for an aggressive level of small business participation in the performance of the acquisition.
1) TAB D: The required Small Business Commitment Document shall include the following:
a) Small Business Commitment Document shall be Two (2) Pages:
i) A short narrative describing the process that will be utilized to inform and educate the small business community of the subcontracting opportunities associated with this project.
ii) Check the applicable size and categories for the PRIME offeror only -- Check all applicable boxes:
X Prime Contractor Status
Large Business
Small Business
X Small Business Classifications (If Small Business is selected above, select all that apply)
Small Disadvantaged Business (SDB) Woman-Owned Small Business (WOSB) Historically Underutilized Zone (HUB Zone) Small Business Veteran Owned Small Business (VOSB) Service Disabled Veteran Owned Small Business (SDVOSB)
iii) Submit the total combined percentage of work to be performed by both large and small businesses (include the percentage of work to be performed both by Prime and Subcontractors):
Percentage Dollar Value Total Percentage of work planned for large business(es)
Total Percentage of work planned for small business(es)
Total contract value 100%
Example: If Prime proposes a price of $1,000,000 (including all options), and small business(es) will provide $500,000 in services/supplies as a prime or subcontractor, the % planned for small businesses is 50%; and 50% for large business equaling 100%.
iv) Indicate the total percentage of participation (based on total subcontracted dollars planned for Small Business) to be performed by each type of subcategory small business. The percentage of work performed by Small Businesses that qualify in multiple small business categories may be counted in each category:
Small Business Participation (as a percentage of total subcontracted dollars)
Small Business Socioeconomic Categories
Percentage of total subcontracted dollars
Subcontracted Dollars to each Small Business Category
Small Disadvantaged Business (SDB) Woman-Owned Small Business (WOSB) Historically Underutilized Business Zone (HUBZone) Small Business
Veteran Owned Small Business (VOSB) Service-Disabled Veteran Owned Small Business (SDVOSB)
When combined, Large and Small Business totals must equal
100%.
Total Small Business Participation
Example: Victory Prop Mgt (WOSB and SDVOSB) performing 2%; and Williams Group (SDB, HubZ and WOSB) performing 3%. Results equate to: SDB 3%; HubZone 3%; WOSB 5%; SDVOSB 2%; VOSB 2%;). SDVOSBs are also VOSBs automatically; however VOSBs are not automatically SDVOSBs.
v) List principle sub-contracting requirements to be performed by Small Businesses:
Name of Company Sub-contracting…
This is the start of the file's text. The full file is on GovTribe.