The file's text, extracted by GovTribe without its formatting.
Sheet1
Construct Maintenance Facility Bid Schedule
| CLIN # | Description | Quantity | Unit | Unit Price | | Amount |
| PRIMARY FACILITY | | | | | | |
| 0001 | Primary Facility Construction | 1 | Job | - | $ | |
| Includes all costs related to construction of the MUNS Maintenance Facility per the contract documents. | | | | | |
| 0002 | Supporting Facilities | 1 | Job | - | $ |
| Includes all costs related to site work at the approved site of the MUNS Maintenance Facility per the contract documents. | | | | |
| 0003 | Contractor Manpower Reporting | 1 | Job | - | $ |
| Contractor Manpower Reporting is required. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Air Force via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. The Unit Identification Code (UIC) required for input of information for this contract is: W07105. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil. | | | | |
| | | | TOTAL Base CLINs | $ |
| 0004 (Option) | Asphalt/Concrete on Exterior Drive | 1 | Job | - | $ |
| Includes the additional cost to put partial concrete and partial asphalt instead of gravel on the exterior drive per contract documents. | | | | |
| 0005 (Option) | Concrete on Exterior Drive | 1 | Job | - | $ |
| Includes the additional cost to put concrete instead of gravel on the exterior drive per contract documents. | | | | |
| 0006 (Option) | Asphalt on Parking Lot | 1 | Job | - | $ |
| Includes the additional cost to put asphalt instead of gravel on the parking lot per contract documents. | | | | |
| 0007 (Option) | Concrete on Parking Lot | 1 | Job | - | $ |
| Includes the additional cost to put concrete instead of gravel on the parking lot per contract documents. | | | | |
| 0008 (Option) | Seamless Resinous Flooring in Bay Area | 1 | Job | - | $ |
| Includes the addition of seamless resinous flooring instead of sealed concrete in the bay area room per contract documents. | | | | |
| 0009 (Option) | Seamless Resinous Flooring in Maintenance | 1 | Job | - | $ |
| Includes the addition of seamless resinous flooring instead of sealed concrete in the maintenance room per contract documents. | | | | |
| 0010 (Option) | Seamless Resinous Flooring in Storage | 1 | Job | - | $ |
| Includes the addition of seamless resinous flooring instead of sealed concrete in the storage room per contract documents. | | | | |
| 0011 (Option) | Furniture Procurement and Installation | 1 | Job | - | $ |
| Includes the addition of procuring furniture and installing it inside the Maintenance Facility per contract documents. | | | | |
| 0012 (Option) | Fencing and Gates | 1 | Job | - | $ |
| Includes the addition of fencing and gates per contract documents. | | | | |
| | | | TOTAL Base CLINs plus Options | $ |
Note: Any work not specifically noted shall be priced with the most closely related CLIN.