Zone C.pdf

PDF 2 MB Posted

Attached to
Kansas City District Seasonal Park Attendants
Solicitation number
W912DQ20R1012
Issued by

View the file

Other files

File Type Posted
Zone J.pdf PDF
Zone D.pdf PDF
B.01.01 Combined Synopsis.pdf PDF
Zone L.pdf PDF
Zone A.pdf PDF
Zone K.pdf PDF
Zone F.pdf PDF
Zone B.pdf PDF
Zone H.pdf PDF
Zone N.pdf PDF
Zone I.pdf PDF
Zone M.pdf PDF
A.07.23 Past Performance Questionnaire.pdf PDF
A.07.23 Related Experience Form.pdf PDF
Zone G.pdf PDF
Zone E.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B – Supplies or Services and Prices

Lightfoot Park Services

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Season Park Attendant & Custodian – Base Period

FFP

The contractor shall furnish all park attendant/custodian services for Lightfoot Park At Pomme de Terre Lake as defined in the Performance Work Statement (PWS) Located in Section C of this contract. The period of performance (POP) for the work to be performed is 16 April 2020 through 30 September 2020.

FOB: Destination

NET AMT

PARK ATTENDANT (WITH CUSTODIAL)

POMME DE TERRE LAKE PROJECT

Notice to Vendors

1. Vendors may quote Lightfoot Park service. All vendors must be registered through the System for Award Management (SAM) at www.sam.gov prior to contract award and during performance.

2. This is a flood control project. Occasional retention of floodwaters may inundate portions of the public use areas, other areas, or access roads thereto, being serviced by this contract. In the event that inundation materially affects the scope of work, the Contractor will be requested to submit a pricing proposal covering the unserviceable or affected portion of his work in order that an equitable adjustment to contract price can be negotiated and an adjustment made in accordance with the appropriate contract clause entitled "Changes." Payment for services not performed as a result of conditions stated above will be initially withheld until execution of an equitable adjustment can be made by contract modification.

3. The following Performance Work Statement applies to Lightfoot Park on Pomme de Terre Lake.

4. Quoters are urged, but not required, to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Quoters should be aware that the first cleanings (after facilities have been closed for a period of time) might require more time and effort than services performed at other times.

5. U.S. Department of Labor Wage Rates are attached and applicable to this acquisition.

6. The Government will award a contract resulting from this solicitation to the responsible quoter whose quote, conforming to the solicitation, will be most advantageous to the Government, price and other factors considered.

The following factors shall be used to evaluate offers: (1) Past Performance/Experience; (2) References; (3) Price;

(4) Equipment. Past performance/experience and references will be evaluated with most importance; price will be evaluated for reasonableness and will be considered in the final selection decision; equipment will be of least importance but verification of adequate equipment will be required for quote to be considered.

PERFORMANCE WORK STATEMENT (PWS)

PARK ATTENDANT (WITH CUSTODIAL)

LIGHTFOOT PARK

1 General Information

1.1 Background Park attendant (with custodial) procurements utilized by the Pomme de Terre Lake Project, Kansas City District, Corps of Engineers, encompass gatekeeping, selling camping and day-use permits, providing information to visitors, handing out survey cards, general surveillance, cleaning of facilities, restocking of consumables and miscellaneous duties.

1.2 Scope of Work The Contractor shall provide labor, material, supplies, and equipment as specified to perform park attendant (with custodial) duties as described in this Performance Work Statement (PWS) and elsewhere in the contract. The Contractor shall perform the specific tasks listed in Section 5. Acceptable performance standards and current regulations are provided for each task.

1.3 Period of Performance The contract shall begin April 16 and continue through 30 September. The contractor must remain at the work site six days a week during the period of performance.

1.4 Required Insurance The contractor shall obtain and maintain during the period of performance, at least the kinds and minimum amounts of insurance required in accordance with applicable State statutes (Missouri Division of Insurance 573-751-4126). Proof of insurance shall be provided to the Contracting Officer’s Representative prior to commencement of duties.

1.5 Required Surety Bond The contractor shall obtain and furnish a surety bond for the protection of the Government in an amount equal to $5,000 to cover funds not received by the designated government agent as provided for in the specification before starting work. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other cashier’s check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States.

1.6 Post Award Conference /Training The contractor shall attend the post-award conference and computer/credit card training sessions held at the Pomme de Terre Project Office. The meetings will be used to discuss contract requirements and to train on computer use. The training will take approximately two days (8 hours each). The Government will give written notification of the scheduled dates for the post-award conference and computer training. Failure to attend both days of the conference/training will result in a termination of the contract.

1.7 Quality Control/Activity Hazard Analysis The Contractor shall develop a Quality Control Plan designed to demonstrate how the Contractor will meet contract requirements. The Quality Control Plan shall document how the Contractor will identify and correct performance shortfalls. Complete records of all inspection work performed by the contractor must be maintained and made available to the government during contract performance. The Contractor shall also develop an Activity Hazard Analysis (EM 385-1-1 Section 01.A.13) identifying potential safety and health hazards and controls for such hazards. Quality Control Plan and Activity Hazard Analysis shall be delivered to the Contracting Officer’s Representative for approval.

1.8 Quality Assurance

1.8.1 A Quality Assurance Surveillance Plan (QASP) will be used during the life of the contract to ensure that the Contractor is performing the services required by this PWS in an acceptable manner. The Government develops the QASP and administers the Plan through Quality Assurance Evaluators (QAE)s.

1.8.2 The government reserves the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The government will perform inspections and tests in a manner that will not unduly delay the work.

1.8.3 If any of the services do not conform to contract requirements, the government will request the contractor to perform the services again, where appropriate, in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by re-performance, the government may (1) require the contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.

1.8.4 If the contractor fails to promptly re-perform the services or to take the necessary action to ensure future performance in conformity with contract requirements, the government may by contract, or otherwise: (1) perform the services and charge to the Contractor any cost incurred by the government that is directly related to the performance of such service or (2) terminate the contract in whole or in part.

1.9 Personnel

1.9.1 Only U.S. citizens, lawful resident aliens, and persons holding a valid work visa are permitted to work on this contract. The contractor shall submit to the Corps the names of each foreign national proposed for performance under this contract, along with documentation to verify that he/she was legally admitted into the United States and has authority to work in the U.S. All contractor employees and subcontractors will also submit to the COR information for a background check investigation prior to beginning work. Background checks must be conducted by the Missouri State Highway Patrol and will be at the government expense. No employee shall be permitted to work on the contract if he/she has been convicted or had suspended imposition of sentence for a felony of any type or any crime involving larceny, theft, robbery, or assault.

1.9.2 Contractor personnel shall exercise tact, diplomacy, and courtesy and present a neat appearance when dealing with the public. A government-furnished nametag must be worn while on duty. Contractor personnel shall not display or offer for sale on Government property personal property items, crafts, or like items, nor conduct service for profit.

1.9.3 Contractor personnel shall be fully clothed, at all times, while performing these services. Clothing shall be clean and neat in appearance.

1.9.4 The contractor must log in and hold all lost and found articles at the fee booth for a period of two weeks. Any article unclaimed after the two-week period must be turned over to the Contracting Officer’s Representative.

1.9.5 The contractor must not consume any alcohol or drugs (except prescription drugs) during duty hours or when meeting the public.

1.10 Payment will be made monthly by the Disbursing Officer, U.S. Army Engineer District, Millington, Tennessee, in accordance with the Prompt Payment Act (Public Law 100-496). As stated in this law, the Government has 30 days after the date of invoice receipt in the correct office, or after constructive acceptance whichever of the two dates is last, to issue payment. Under the terms of this contract, invoices and receiving reports are to be submitted monthly through Wide Area Workflow (WAWF) in accordance with DFAS 252.232-7003 when this system becomes available. Monthly invoices shall be submitted to the U.S. Army Corps of Engineers, Pomme de Terre Project, 23697 County Road 218, Hermitage, Missouri, 65668-9509 until WAWF is available.

1.11 Other Contractors The Government may undertake or award other contracts for additional work, and the Contractor shall fully cooperate with such other contractors and Government employees. All work shall be carefully planned and fitted not to interfere with such other work. The Contractor shall not commit or permit any act that will interfere with the performance of work by other contractors or by Government employees.

1.12 Safety

The Contractor will be expected to take a vital interest in safety hazards, and educate their employees to work, and plan their work safely, and comply with all pertinent provisions of the Federal, State, and local regulations. Proper driving techniques and defensive driving will be practiced to prevent vehicle accidents and property damage.

Mowers and trimming equipment (if utilized) shall be equipped and maintained with discharge-deflection devices and/or other approved safety devices to prevent accidental damage or injury from objects thrown by such equipment.

The contractor shall immediately report any situation that could affect the health or safety of visitors to a park ranger, including maintenance needs, utility problems, accidents, or violations of laws and regulations.

1.12.1 The contractor shall report all disturbances that cannot be diplomatically resolved to a park ranger. The contractor will be given an after-hours phone number (at the post award conference) for use by himself and his staff only.

1.12.2 The contractor shall display a sign reading "CLOSED FOR CLEANING" at the entrance of all facilities during cleaning operations.

1.12.3 The contractor agrees to provide only personnel able to perform the services required under this contract and to notify the COR of any personnel using prescription drugs that might impair the contractor’s ability to perform the requirements of this contract.

2 Definitions and Acronyms The following definitions and descriptions apply wherever the word, phrase, or acronym is used in this performance work statement.

Clean: As used generally, means free of all foreign matter, film, spots, streaks, dirt or impurities. As used for acceptance of work means gleaming, free from dirt, contamination, or impurities, unsoiled, unstained, neat and tidy.

Contracting Officer’s Representative (COR): An individual designated and authorized in writing by the contracting officer to perform specific technical or administrative functions.

Debris: Any articles, or parts thereof, such as paper, gum, litter, strings, cigarette butts, leaves, and sand.

Dirt: Particles of sand, soil, grit, or pebbles; mud, dust, tar, liquid stains, vomit, feces and/or ashes.

Foreign Matter: Any articles, or parts thereof, not belonging to the place found.

Fully Clothed: Deemed to mean that a sleeved shirt (or T-shirt), trousers/shorts, and shoes shall be worn at all times.

R1S: Recreation One Stop Reservation Service

The Hub: Recreation Management Reservation Website

Quality Control (QC): A method used by the Contractor to control the quality of goods and services provided.

Quality Assurance (QA): A method used by the Government to provide some measure of control over the quality of services received.

3 Government-Furnished Materials and Supplies Government-Furnished materials and supplies are provided to the Contractor only for use in performing work specified in this Contract.

3.1The Government will provide a campsite for the Contractor’s camper, and utilities hookups, during the service period, consisting of water, electricity, and sewer. In addition, the campsite will include a storage building, picnic table, and fire ring. Refuse collection service is provided at the park dumpster. The site will be provided free of charge for a period of 7 days prior and 7 days after the period of performance. The Contractor shall maintain these facilities in accordance with Park rules. All costs for moving onto and from the location shall be borne by the Contractor. The Contractor shall remove all personal property from Government furnished campsite not later than seven days after checkout. Park attendant campsites are for use by one camping unit only. Water service may be terminated anytime after the end of the service period.

3.2 Government – Furnished Property - The Government will furnish to the Contractor the following identified property to be used in performing the contract. When the property is delivered, the Contractor must verify its quantity and condition in writing on Memorandum Receipt. Damage or loss while in the Contractor's possession shall be reported in writing to the COR within 24 hours.

Item (description) Quantity

(1) Annual Day Use Permits As needed

(2) America The Beautiful Senior Pass As needed & Access Pass

(3) Computer, monitor, printer, keyboard, surge 1 each protector, back-up battery, satellite receiver

(3) Telephone for the Booth 1 each

(4) Credit card scanner/printer 1 each

(5) Adding Machine 1 each

(6) Keys 1 set

3.3 Government – Furnished Consumable Items - The following consumable items, will be furnished to the Contractor by the Government. The Government will retain control of expendables, to be dispensed on an as-needed basis for use in performance of the contract.

(1) Trash bags

(2) Toilet tissue

(3) Wax bags for sanitary receptacle

(4) Brochures

(5) Contractor identification tag

(6) Computer paper

(7) Self-registration day use supplies

(8) Authorized forms

(9) Office Supplies

(10) Water for cleaning

(11) Contractor Daily Worksheets

(12) Wood chips for compost toilet

4 Contractor-Furnished Equipment and Supplies The Contractor shall furnish all equipment and supplies not identified in section 3 of this PWS as Government-Furnished supplies and equipment. Specifically, the Contractor shall furnish:

4.1 A mobile travel trailer, motor home or approved equal, containing sanitary facilities and all equipment necessary for habitation, contractor personnel are required to reside on-site. Tents or ‘pop-up’ style type campers are not permitted. If self-propelled units are used, they must remain on jacks or be blocked up for the duration of the contract and not be used for transportation. The Contractor shall maintain the area where the unit is parked in a clean manner at all times. No animal pens will be allowed. The Contractor’s pets shall be confined on a leash of six feet or less in length. Flower or vegetable gardens will be allowed in the immediate area, as approved by the COR.

4.2 A vehicle, other than the one in 4.1 above, to be used for local transportation to perform the requirements of this contract. ATVs are not permitted. Utility vehicles or golf carts will be permitted with the following conditions; (1) Display long orange bicycle flag, (2) Slow moving vehicle sign posted on back, (3) Display Government provided “Park Attendant” sign on both sides, (4) Operate during daylight hours only, (5) Use as utility vehicle for fulfillment of park attendant duties only.

4.3 A pressure water pump and tank for water supply that is approved by the COR. The pump shall be capable of delivering an adequate stream of water at 1200 psi minimum to flush/rinse facilities being serviced. NOTE: The use of a pressure water pump is not mandatory if the Contractor is able to obtain satisfactory results by hand. The government reserves the right to require the use of a pressure water pump, at any time, if it becomes apparent that satisfactory results are not being maintained.

4.4 The Contractor shall furnish all necessary equipment and supplies such as brooms, brushes, squeegees, cleansers, sign reading "CLOSED FOR CLEANING," and all other equipment necessary to accomplish the required work.

4.5 Telephone and installation at the campsite or cell phone.

5 Specific Tasks The Contractor shall perform park attendant (with custodial) duties 6-days per week, including weekends and Federal Holidays as described in this section and elsewhere in the contract. The contractor shall be required to render service on the days noted in paragraph 5.2.1 Schedule. At least one person on the Contractor’s staff shall remain in the park at all times on days service is required except between the morning and afternoon shifts on Monday, Tuesday, and Thursday. The contractor shall not leave the park for more than 24 consecutive hours during the day/time service is not required as noted in paragraph 5.2.1 Schedule. The contractor shall establish a schedule indicating the hours to be away from the park on a regular basis. The schedule shall be submitted in writing to the COR for approval no later than the first week of work. Changes in the approved absence schedule shall be submitted for approval prior to implementing the change. If the contractor needs to be absent from the park any other time the COR shall be notified as soon as possible. The contractor shall retain a qualified substitute park attendant to cover such absences. The substitute shall be approved by the COR. Cleanup of facilities is directly related to public health and sanitation; therefore, it is essential that all facilities be serviced as specified. In the event that an area or facilities within an area are missed, or are not properly cleaned, the Contractor shall re-clean the area or affected facilities immediately upon receipt of such notice from the COR. Equipment breakdown shall not relieve the Contractor of the responsibility of performing the work as specified. The Contractor shall assure that he has, or can obtain on short notice, sufficient backup equipment to continue the services as specified without interruption in the event of mechanical failure of his primary equipment.

5.1 Recreation One Stop Reservation Service (R1S) The contractor shall perform specific daily duties to implement the Recreation One Stop Reservation Services (R1S), according to established procedures (addressed during post-award training). Duties include, but are not limited to, maintaining current records, posting reserved sites, checking site availability, processing camper registrations and receiving daily arrival reports. “Walk-up” reservations shall be accepted.

5.2 Fee Booth Operations During booth hours, the contractor shall keep an open telephone line of communication.

The contractor shall remain in close proximity of the booth (with the exception of the evening tour park requirement, paragraph 5.3.3) to be able to answer the telephone at anytime the fee booth is open. The contractor shall be available at all times (except approved time away from the park) to receive and deliver emergency messages.

5.2.1 Schedule.

The fee booth shall be open for business and occupied during the following hours on days service is required. The Contractor is required to render services on 16 April and 30 September regardless of the day of week.

April 16 - September 30 Sunday, Monday, Tuesday, Thursday 8:00 a.m. - 9:00 a.m. and 6:00 p.m. - 8:00 p.m.

Friday, Saturday 8:00 a.m. – 9:00 a.m. and 6:00 p.m. – 9:00 p.m.

Final reconciliation of fee collection and government furnished property will be within 4 days of the last day of the service period.

5.2.2 Work Time Frames All work shall be accomplished within the time frames specified above. Services rendered outside the time periods specified will not be compensated.

5.2.3 Receive Payments The contractor shall register visitors/campers and collect the required fees according to project policy. The Contractor shall determine and have on hand sufficient change for this purpose.

5.2.3.1 Self-Pay Fee Vault- The contractor shall replenish the blank payment envelopes as necessary. The contractor shall be available to total and verify fee receipts with a park ranger prior to submission of receipts.

5.2.3.2 Credit Card and Personal Check Payments The contractor shall follow project policy when accepting credit cards and personal checks.

5.2.3.3 Safeguard Collections The contractor shall take all reasonable precautions to safeguard collections, permits, and other government-furnished property. All collections shall be deposited in the fee safe provided, outside entrances to the fee booth shall be kept locked, and visitors must not be allowed in the booth.

5.2.4 Transmit Fees and Remittance Registers The contractor shall transmit all collected fees and remittance registers to R1S. At a minimum, fees shall be transmitted once per week or when collections total $5,000.00, whichever occurs first. Postage costs and cashier check fees are the responsibility of the Contractor.

5.2.5 Booth Maintenance The contractor must maintain the fee booth in a clean condition at all times. Pens, corrals, cages, and other animal confinement facilities are not permitted. Smoking and un-authorized visitors are not permitted in the park entrance booth.

5.3 Park Operations

5.3.1 Provide Information to Visitors The contractor shall provide informational brochures and pamphlets and explain or clarify policy and regulations for park visitors.

5.3.2 Campground Rules and Policies The contractor shall tactfully provide information to campers for all campground rules and project policies in performing their duties, including quiet hours (10 p.m. to 6 a.m.), check out times, and maximum 14 day stay limitations, etc.

5.3.3 Tour Park The contractor shall make daily tours of the park between 7:00 and 8:00 a.m. and again an hour before the evening shift ends.

5.3.4 Identify Non-Registered Visitors The Contractor shall identify campers who may have arrived during hours when the fee booth was closed. These individuals shall be contacted and advised to register at the booth and pay required fees.

5.3.5 Check For and Report Vandalism, Equipment Malfunction and Cleanliness During both morning and evening tours, the contractor shall monitor all self-pay fee vaults, post shelter and camping reservations, and check facilities for vandalism, equipment malfunction, and cleanliness. The Contractor shall advise COR if problems exist.

5.3.6 Conduct Park Surveys as Directed by the COR or in Accordance With Park Rules The contractor will hand out survey cards in accordance with a designated schedule and keep a log in accordance with survey requirements.

5.4 Park Custodial Duties

5.4.1 Scheduled Services

5.4.1.1 All scheduled services, daily or bi-weekly, shall begin on April 16 regardless of the day of the week and shall be performed on September 30 regardless of the day of the week. All facilities will require a minimum of once daily cleaning. Facilities requiring cleaning once daily shall be completed by 2 p.m. Facilities requiring cleaning two times per day shall be completed by approximately 8:00 a.m. and at 3:00 p.m.

5.4.1.2 Final cleanings of the Shower/Toilet shall be completed after 6:00 p.m. on September 30. Unused supplies and keys will be returned to the COR at checkout.

5.4.1.3 All work shall be accomplished within the timeframes specified above. Services rendered outside the time periods specified shall not be compensated unless specifically approved in writing by the COR.

5.4.2 Schedule of Duties

5.4.2.1 Daily Perform cleanup each day services are required to include all facilities. All facilities shall be checked daily and cleaned (See Section 2. Definitions) as necessary. Some facilities shall require twice per day cleanings as noted in park specific section.

5.4.2.2 Bi-Weekly

Provide services bi-weekly on Monday and Friday. Bi-Weekly cleanings are in addition to daily cleanings and are construed to be more in depth, detailed cleanings as opposed to the daily cleaning service. The bi-weekly cleaning will be the first scheduled service on the designated days.

5.4.3 Service Facilities /Areas

5.4.3.1 Showers, vault and flush toilets:

Ceilings - Clean ceilings on inside and overhang on outside of buildings to remove spider webs, dust, bird and insect nests, dirt, and insect spots. If soap or disinfectant is used, rinse with clean water.

Walls, shower stalls, benches, partitions, stools (flush-type), wash basins, doors and refuse containers – Clean and disinfect to ensure free of all dirt, oil, lotions, soap residue, calcium deposits or other foreign matter. All surfaces including soap trays, faucets, stool lids, handicap bars, etc. shall be present a dried polished appearance free of cleaning solution, disinfectant, water spots, etc. Exterior walls shall have spider webs, dust, bird and insect nests, debris and foreign matter removed.

Floors and floor drain plates – Shall be disinfected and free of all foreign matter, trash, and excess water.

Mirrors – Shall be free of dirt, dust, smudges and streaks.

Stools – Vault-type - Risers inside and outside, seats and lids shall be cleaned and disinfected to provide a surface free of foreign matter. Seats shall present a dry appearance free of disinfectant and water spots.

Stools – Compost-type - Risers outside, seats and lids shall be cleaned and disinfected to provide a surface free of foreign matter. Seats shall present a dry appearance free of disinfectant and water spots. Risers inside shall be cleaned with water only or a biocompatible cleaner. Extreme care shall be taken not to let any cleanser or disinfectant into the compost toilet units. Non-bio-compatible elements allowed in the composter will destroy the composting process.

Electric and Light Fixtures - Remove all dirt, dust, bugs, cobwebs, smudges, and streaks from fixtures, bulbs and covers. Reinstall covers. Care shall be taken to avoid wetting of hand dryers, and electrical fixtures during cleaning.

Toilet Paper Dispensers - All toilet paper dispensers on structures serviced under this contract shall be kept fully supplied. All paper shall be protected to prevent wetting during cleaning operations.

5.4.3.2 Group Shelters Note: Pressure water pump and/or garden hose will be needed to obtain satisfactory results at picnic shelters. Ceiling, beams, trusses, and overhang shall be clean and free of all dirt, spider webs, dust, bird and insect nests, and foreign matter and provide a clean condition. Table tops, seats, and floor slabs shall be cleaned and disinfected to ensure a condition free of all dirt, food particles, foreign matter, and excess water.

5.4.3.3 Refuse and litter handling (facilities): All trash, litter, debris or residue (including but not limited to cigarette butts, bottle caps, snap tabs and paper) within or immediately adjacent to the facility being services shall be removed. At no time shall trash or debris be swept or washed out of a facility and left. Refuse containers (excluding dumpsters) placed at various locations throughout the park area shall be cleaned and emptied and the refuse placed in centrally located dumpsters. A new plastic liner shall be installed in containers (as needed) and the lids reinstalled on the containers. Exterior refuse containers and holders shall present a clean odor free condition. When odor becomes prevalent in trash containers or they become full prior to regular scheduled servicing the Contractor shall empty and wash containers and holders as needed to provide sanitary conditions for the public.

5.4.3.4 Refuse and litter handling (park areas, roadways, playgrounds, courtesy dock, boat ramp, parking areas): All mowed park areas, on and adjacent to roadways, and parking areas, and on and adjacent roadways and parking areas, ball field area, and on and adjacent to boat ramp areas (including boat ramp riprap areas) shall be free of litter and debris. Litter and debris shall be placed in the nearest refuse container. The contractor shall ensure that campsites are free of all trash and debris left on or near the site.

5.4.3.5 Sidewalks: All sidewalks shall be free of debris, stains, and residue (any) excess water shall be removed.

Cracks between sidewalk sections, and along buildings and/or graveled or paved areas within 10 feet of facility being serviced shall be kept free of grass and weeds.

5.4.3.6 Water fountains: Shall be cleaned and disinfected to remove all residue and stains.

5.4.3.7 Water hydrants: Shall be cleaned to remove all cobwebs and debris from the fixtures and from the immediate vicinity.

5.4.3.8 Charcoal grills, fire rings, and picnic tables: Grills, fire rings, and cooking surfaces shall be cleaned of debris, ashes, food particles, and other foreign matter. Remove all debris, litter, ashes and coals on the ground in the immediate vicinity of grills and fire rings. Grills, and fire rings containing live ashes or warm coals shall be left undisturbed and shall be cleaned at the next regularly scheduled cleaning. Picnic tables on unoccupied campsites and unoccupied tables in visitor areas shall be checked each day services are performed to ensure that clean conditions exist. Tables shall be cleaned by removing all foreign matter including cleaning solution residue.

5.4.3.9 Park benches, bleachers, playground equipment, and bulletin boards: Shall be kept clean and free from cobwebs, bird droppings, insect nests foreign matter, and debris. The outside glass of visitor bulletin boards glass shall be free of dust, smudges and streaks.

5.4.3.10 Dump station: Shall be cleaned and disinfected.

PARK SPECIFIC REQUIREMENTS

LIGHTFOOT PARK

1. Lightfoot Park Facilities / Areas To Be Serviced:

Facilities Quantity Group Shelters (tables) 1 (6) Compost Toilet 1 Flush Toilet 1 Shower/Toilet 1 Refuse Containers (cans)* 8 Water Fountains/Hydrants 6 Litter Pickup 39.5 acres** Grills, Fire Rings & Tables* 37 Sidewalks 2,237 sq ft** Bulletin Board 3 Playground 1 Dump Station 1 Courtesy Dock/Boat Ramp 1

*Total number of grills, fire rings, and refuse containers shall be subject to a variation of +/- 10% at no change in contract price.

**Quantities are estimated. The Contractor shall be responsible for determining quantities and conditions affecting the performance of this contract.

2. Twice Daily Service: The Shower/Toilet Building and Flush Toilets shall be cleaned twice daily for the period 16 May through 15 September.

3. Miscellaneous Duties: To insure proper operation of the composting toilet the contractor shall add wood chips (government furnished) and water to the compost toilet as directed by the COR.

Applicable Publications and Forms Information on Pomme de Terre Lake can be found on the Internet at http://www.nwk.usace.army.mil/

Section H - Performance Requirements Summary Section I – Contract Clauses Section J – Attachments – Location Map, Jobsite Diagram, Contractor Daily Worksheet, Department of Labor Wage Rates

Section H Performance Requirements Summary (PRS)

Section 5.1

Contract Requirement: Implement R1S Performance Standard: In accordance with required post award training Lot Description: Daily Acceptable Level of Performance: 5% Method of Surveillance: Validated Customer Complaint

Section 5.2 Contract Requirement: 5.2.1 Booth Schedule Performance Standard: Staff booth during scheduled hours Lot Description: 20 hours per week Acceptable Level of Performance: 0% Method of Surveillance: Random Sampling and Validated Customer Comment

Contract Requirement: 5.2.3 Receive Payments Performance Standard: Payments are correctly collected and safeguarded Lot Description: Daily Receipts Acceptable Level of Performance: 2% Method of Surveillance: 100% Ranger-Contractor Inspection

Contract Requirement: 5.2.4 Transmit Fees and Remittance Registers Performance Standard: Submit fees weekly or at $5000 Lot Description: Weekly Acceptable Level of Performance: 0% Method of Surveillance: 100% Verification

Section 5.3

Contract Requirement: 5.3.1 Provide Information Performance Standard: Provide informational brochures and clarify policies and park regulations Lot Description: Daily Acceptable Level of Performance: 4% Method of Surveillance: Validated Customer Complaint

Contract Requirement: 5.3.3 Tour Park Performance Standard: During specified times, check for maintenance needs and unregistered guests Lot Description: Daily

Method of Surveillance: Random Sample

Section 5.4

Contract Requirement: 5.4.2.1 Daily Cleanup Performance Standard: Clean/service all facilities to “clean” definition in Section 2 Lot Description: 24-27 services per month

Method of Surveillance: Random Sample, Validated Customer Complaint

Contract Requirement: 5.4.2.2 Bi-Weekly Cleanup Performance Standard: Clean/service Shower/Toilet, toilets, shelter, litter pickup, water fountains, grill/fire rings and refuse containers to “clean” definition in Section 2 Lot Description: 8-9 services per month

Contract Requirement: 5.4.3.1 Showers and Toilets Performance Standard: Clean ceilings, walls, partitions, stools, wash basins, doors, refuse containers, floors, mirrors, light fixtures, toilet paper dispensers to “clean” definition in Section 2 Lot Description: 24-43 services per month Acceptable Level of Performance: 4% Method of Surveillance: Random Sample, Validated Customer Complaint

Contract Requirement: 5.4.3.2 Group Shelters Performance Standard: Clean all shelter elements to “clean” definition in Section 2 Lot Description: 24-27 services per month Acceptable Level of Performance: 4% Method of Surveillance: Random Sample, Validated Customer Complaint

Contract Requirement: 5.4.3.3 & 5.4.3.4 Reuse and Litter Handling Performance Standard: Clean all facilities and areas per definition in Section 2 Lot Description: 24-27 services per month Acceptable Level of Performance: 4% Method of Surveillance: Random Sample, Validated Customer Complaint

Contract Requirement: 5.4.3.5 Sidewalks Performance Standard: Clean all elements per definition in Section 2 Lot Description: 24-27 services per month Acceptable Level of Performance: 4% Method of Surveillance: Random Sample, Validated Customer Complaint

Contract Requirement: 5.4.3.6 thru 5.4.3.10 Water fountains, hydrants, grills, fire rings, picnic tables, benches, playground equipment, bulletin boards, dump station, and miscellaneous duties Performance Standard: Clean all elements per definition in Section 2 Lot Description: 24-27 services per month

Attachment Location Map

Jobsite Diagram Lightfoot Park

Contractor Daily Worksheet

Park Custodian Daily Worksheet Lightfoot Park Pomme de Terre Lake

Contract No. Week of : _______________

16 Apr – 15 May and 16 – 30 Sep 16 May - 15 Sep

Day Service Time In Time Out Mon 1st Daily 2nd Daily Tues 1st Daily 2nd Daily Thur 1st Daily 2nd Daily Fri 1st Daily 2nd Daily Sat 1st Daily 2nd Daily Sun 1st Daily 2nd Daily

Service Facilities Daily Service Facilities 2nd Daily Shower/Toilet Shower/Toilet Flush Toilets Flush Toilets Compost Toilet Group Shelters (tables) Litter Pickup Sidewalks Refuse Containers Water Fountains Grills and Fire Rings Water Hydrants Parking Lots Bulletin Board Playground Courtesy Dock/Boat Ramp Dump Station

(signature) Contractor’s Representative

Day Service Time In Time Out Mon Daily Tues Daily Thur Daily Fri Daily Sat Daily Sun Daily

"REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary of Labor | WAGE AND HOUR DIVISION

| WASHINGTON D.C. 20210

| Wage Determination No.: 2015-5093

Daniel W. Simms Division of | Revision No.: 11

Director Wage Determinations| Date Of Last Revision: 07/16/2019

Note: Under Executive Order (EO) 13658 an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Service Contract

Act for which the contract is awarded (and any solicitation was issued) on or after January 1 2015. If this contract is covered by the EO the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination if it is higher) for all hours spent performing on the contract in calendar year 2019. The EO minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

State: Missouri

Area: Missouri Counties of Benton Camden Dent Hickory Laclede Maries

Miller Morgan Phelps Pulaski St Clair

**Fringe Benefits Required Follow the Occupational Listing**

OCCUPATION CODE - TITLE FOOTNOTE RATE

beta.SAM.gov https://beta.sam.gov/wage-determination/2015-5093/11/document

1 of 18 12/17/2019, 3:58 PM

01000 - Administrative Support And Clerical Occupations

01011 - Accounting Clerk I 13.36

01012 - Accounting Clerk II 15.00

01013 - Accounting Clerk III 16.78

01020 - Administrative Assistant 23.31

01035 - Court Reporter 15.66

01041 - Customer Service Representative I 11.49

01042 - Customer Service Representative II 12.93

01043 - Customer Service Representative III 14.11

01051 - Data Entry Operator I 13.83

01052 - Data Entry Operator II 15.09

01060 - Dispatcher Motor Vehicle 17.27

01070 - Document Preparation Clerk 13.85

01090 - Duplicating Machine Operator 13.85

01111 - General Clerk I 12.54

01112 - General Clerk II 13.68

01113 - General Clerk III 15.36

01120 - Housing Referral Assistant 17.46

01141 - Messenger Courier 11.87

01191 - Order Clerk I 13.38

01192 - Order Clerk II 14.60

01261 - Personnel Assistant (Employment) I 15.45

01262 - Personnel Assistant (Employment) II 17.29

01263 - Personnel Assistant (Employment) III 19.27

01270 - Production Control Clerk 21.30

01290 - Rental Clerk 13.88

01300 - Scheduler Maintenance 14.00

01311 - Secretary I 14.00

01312 - Secretary II 15.66

01313 - Secretary III 17.46

01320 - Service Order Dispatcher 15.43

01410 - Supply Technician 23.31

01420 - Survey Worker 14.95

01460 - Switchboard Operator/Receptionist 11.76

01531 - Travel Clerk I 12.96

01532 - Travel Clerk II 14.00

01533 - Travel Clerk III 15.03

01611 - Word Processor I 12.47

01612 - Word Processor II 14.00

2 of 18 12/17/2019, 3:58 PM

01613 - Word Processor III 15.66

05000 - Automotive Service Occupations

05005 - Automobile Body Repairer Fiberglass 24.45

05010 - Automotive Electrician 16.87

05040 - Automotive Glass Installer 15.95

05070 - Automotive Worker 15.95

05110 - Mobile Equipment Servicer 14.19

05130 - Motor Equipment Metal Mechanic 17.73

05160 - Motor Equipment Metal Worker 15.95

05190 - Motor Vehicle Mechanic 17.73

05220 - Motor Vehicle Mechanic Helper 13.33

05250 - Motor Vehicle Upholstery Worker 15.36

05280 - Motor Vehicle Wrecker 15.95

05310 - Painter Automotive 16.86

05340 - Radiator Repair Specialist 15.95

05370 - Tire Repairer 11.40

05400 - Transmission Repair Specialist 17.73

07000 - Food Preparation And Service Occupations

07010 - Baker 12.02

07041 - Cook I 10.82

07042 - Cook II 12.50

07070 - Dishwasher 9.00

07130 - Food Service Worker 9.29

07210 - Meat Cutter 15.66

07260 - Waiter/Waitress 9.30

09000 - Furniture Maintenance And Repair Occupations

09010 - Electrostatic Spray Painter 15.84

09040 - Furniture Handler 10.52

09080 - Furniture Refinisher 15.84

09090 - Furniture Refinisher Helper 12.95

09110 - Furniture Repairer Minor 14.06

09130 - Upholsterer 14.97

11000 - General Services And Support Occupations

11030 - Cleaner Vehicles 10.86

11060 - Elevator Operator 11.71

11090 - Gardener 16.68

11122 - Housekeeping Aide 11.71

11150 - Janitor 11.71

11210 - Laborer Grounds Maintenance 12.56

11240 - Maid or Houseman 9.58

3 of 18 12/17/2019, 3:58 PM

11260 - Pruner 11.41

11270 - Tractor Operator 15.29

11330 - Trail Maintenance Worker 12.56

11360 - Window Cleaner 13.11

12000 - Health Occupations

12010 - Ambulance Driver 16.46

12011 - Breath Alcohol Technician 17.71

12012 - Certified Occupational Therapist Assistant 24.30

12015 - Certified Physical Therapist Assistant 22.02

12020 - Dental Assistant 15.71

12025 - Dental Hygienist 31.34

12030 - EKG Technician 27.69

12035 - Electroneurodiagnostic Technologist 27.69

12040 - Emergency Medical Technician 16.46

12071 - Licensed Practical Nurse I 15.83

12072 - Licensed Practical Nurse II 17.71

12073 - Licensed Practical Nurse III 19.75

12100 - Medical Assistant 13.08

12130 - Medical Laboratory Technician 17.90

12160 - Medical Record Clerk 17.70

12190 - Medical Record Technician 19.80

12195 - Medical Transcriptionist 16.92

12210 - Nuclear Medicine Technologist 38.92

12221 - Nursing Assistant I 10.74

12222 - Nursing Assistant II 12.08

12223 - Nursing Assistant III 13.18

12224 - Nursing Assistant IV 14.80

12235 - Optical Dispenser 12.94

12236 - Optical Technician 15.83

12250 - Pharmacy Technician 13.59

12280 - Phlebotomist 14.19

12305 - Radiologic Technologist 23.85

12311 - Registered Nurse I 22.69

12312 - Registered Nurse II 27.76

12313 - Registered Nurse II Specialist 27.76

12314 - Registered Nurse III 33.58

12315 - Registered Nurse III Anesthetist 33.58

12316 - Registered Nurse IV 40.25

12317 - Scheduler (Drug and Alcohol Testing) 21.94

12320 - Substance Abuse Treatment Counselor 18.25

4 of 18 12/17/2019, 3:58 PM

13000 - Information And Arts Occupations

13011 - Exhibits Specialist I 18.13

13012 - Exhibits Specialist II 22.20

13013 - Exhibits Specialist III 24.99

13041 - Illustrator I 18.13

13042 - Illustrator II 22.20

13043 - Illustrator III 24.99

13047 - Librarian 22.63

13050 - Library Aide/Clerk 12.51

13054 - Library Information Technology Systems 20.44

Administrator

13058 - Library Technician 16.36

13061 - Media Specialist I 14.75

13062 - Media Specialist II 16.49

13063 - Media Specialist III 18.38

13071 - Photographer I 13.79

13072 - Photographer II 15.47

13073 - Photographer III 19.91

13074 - Photographer IV 24.34

13075 - Photographer V 30.59

13090 - Technical Order Library Clerk 15.50

13110 - Video Teleconference Technician 18.05

14000 - Information Technology Occupations

14041 - Computer Operator I 14.31

14042 - Computer Operator II 16.01

14043 - Computer Operator III 17.85

14044 - Computer Operator IV 19.84

14045 - Computer Operator V 21.96

14071 - Computer Programmer I (see 1) 19.31

14072 - Computer Programmer II (see 1) 23.93

14073 - Computer Programmer III (see 1)

14074 - Computer Programmer IV (see 1)

14101 - Computer Systems Analyst I (see 1)

14102 - Computer Systems Analyst II (see 1)

14103 - Computer Systems Analyst III (see 1)

14150 - Peripheral Equipment Operator 14.31

14160 - Personal Computer Support Technician 19.84

14170 - System Support Specialist 23.43

15000 - Instructional Occupations

15010 - Aircrew Training Devices Instructor (Non-Rated) 28.62

5 of 18 12/17/2019, 3:58 PM

15020 - Aircrew Training Devices Instructor (Rated) 34.61

15030 - Air Crew Training Devices Instructor (Pilot) 39.95

15050 - Computer Based Training Specialist / Instructor 28.62

15060 - Educational Technologist 27.51

15070 - Flight Instructor (Pilot) 39.95

15080 - Graphic Artist 20.17

15085 - Maintenance Test Pilot Fixed Jet/Prop 37.48

15086 - Maintenance Test Pilot Rotary Wing 37.48

15088 - Non-Maintenance Test/Co-Pilot 37.48

15090 - Technical Instructor 18.49

15095 - Technical Instructor/Course Developer 22.61

15110 - Test Proctor 14.92

15120 - Tutor 14.92

16000 - Laundry Dry-Cleaning Pressing And Related Occupations

16010 - Assembler 9.92

16030 - Counter Attendant 9.92

16040 - Dry Cleaner 12.77

16070 - Finisher Flatwork Machine 9.92

16090 - Presser Hand 9.92

16110 - Presser Machine Drycleaning 9.92

16130 - Presser Machine Shirts 9.92

16160 - Presser Machine Wearing Apparel Laundry 9.92

16190 - Sewing Machine Operator 13.72

16220 - Tailor 14.67

16250 - Washer Machine 10.91

19000 - Machine Tool Operation And Repair Occupations

19010 - Machine-Tool Operator (Tool Room) 18.16

19040 - Tool And Die Maker 21.34

21000 - Materials Handling And Packing Occupations

21020 - Forklift Operator 14.95

21030 - Material Coordinator 20.98

21040 - Material Expediter 20.98

21050 - Material Handling Laborer 11.96

21071 - Order Filler 11.62

21080 - Production Line Worker (Food Processing) 14.95

21110 - Shipping Packer 15.18

21130 - Shipping/Receiving Clerk 15.18

21140 - Store Worker I 13.14

21150 - Stock Clerk 18.53

21210 - Tools And Parts Attendant 14.95

6 of 18 12/17/2019, 3:58 PM

21410 - Warehouse Specialist 14.95

23000 - Mechanics And Maintenance And Repair Occupations

23010 - Aerospace Structural Welder 25.86

23019 - Aircraft Logs and Records Technician 21.02

23021 - Aircraft Mechanic I 24.44

23022 - Aircraft Mechanic II 25.86

23023 - Aircraft Mechanic III 27.19

23040 - Aircraft Mechanic Helper 18.84

23050 - Aircraft Painter 23.16

23060 - Aircraft Servicer 21.02

23070 - Aircraft Survival Flight Equipment Technician 23.16

23080 - Aircraft Worker 22.26

23091 - Aircrew Life Support Equipment (ALSE) Mechanic 22.26

I

23092 - Aircrew Life Support Equipment (ALSE) Mechanic 24.44

II

23110 - Appliance Mechanic 20.74

23120 - Bicycle Repairer 16.06

23125 - Cable Splicer 33.24

23130 - Carpenter Maintenance 17.82

23140 - Carpet Layer 21.72

23160 - Electrician Maintenance 21.58

23181 - Electronics Technician Maintenance I 28.24

23182 - Electronics Technician Maintenance II 30.12

23183 - Electronics Technician Maintenance III 32.38

23260 - Fabric Worker 20.04

23290 - Fire Alarm System Mechanic 23.29

23310 - Fire Extinguisher Repairer 18.67

23311 - Fuel Distribution System Mechanic 23.29

23312 - Fuel Distribution System Operator 18.22

23370 - General Maintenance Worker 16.19

23380 - Ground Support Equipment Mechanic 24.44

23381 - Ground Support Equipment Servicer 21.02

23382 - Ground Support Equipment Worker 22.26

23391 - Gunsmith I 18.67

23392 - Gunsmith II 21.33

23393 - Gunsmith III 23.88

23410 - Heating Ventilation And Air-Conditioning 19.45

Mechanic

23411 - Heating Ventilation And Air Contidioning 20.94

7 of 18 12/17/2019, 3:58 PM

Mechanic (Research Facility)

23430 - Heavy Equipment Mechanic 24.90

23440 - Heavy Equipment Operator 22.52

23460 - Instrument Mechanic 23.88

23465 - Laboratory/Shelter Mechanic 22.76

23470 - Laborer 13.72

23510 - Locksmith 22.81

23530 - Machinery Maintenance Mechanic 24.25

23550 - Machinist Maintenance 21.27

23580 - Maintenance Trades Helper 16.70

23591 - Metrology Technician I 23.88

23592 - Metrology Technician II 24.88

23593 - Metrology Technician III 25.89

23640 - Millwright 23.88

23710 - Office Appliance Repairer 17.16

23760 - Painter Maintenance 17.47

23790 - Pipefitter Maintenance 26.04

23810 - Plumber Maintenance 24.28

23820 - Pneudraulic Systems Mechanic 23.88

23850 - Rigger 23.88

23870 - Scale Mechanic 21.33

23890 - Sheet-Metal Worker Maintenance 23.97

23910 - Small Engine Mechanic 18.80

23931 - Telecommunications Mechanic I 24.09

23932 - Telecommunications Mechanic II 25.11

23950 - Telephone Lineman 26.30

23960 - Welder Combination Maintenance 17.03

23965 - Well Driller 23.88

23970 - Woodcraft Worker 23.88

23980 - Woodworker 18.62

24000 - Personal Needs Occupations

24550 - Case Manager 13.98

24570 - Child Care Attendant 9.35

24580 - Child Care Center Clerk 13.26

24610 - Chore Aide 10.75

24620 - Family Readiness And Support Services 13.98

Coordinator

24630 - Homemaker 15.27

25000 - Plant And System Operations Occupations

25010 - Boiler Tender 23.88

8 of 18 12/17/2019, 3:58 PM

25040 - Sewage Plant Operator 17.93

25070 - Stationary Engineer 23.88

25190 - Ventilation Equipment Tender 17.17

25210 - Water Treatment Plant Operator 17.93

27000 - Protective Service Occupations

27004 - Alarm Monitor 15.33

27007 - Baggage Inspector 13.13

27008 - Corrections Officer 18.04

27010 - Court Security Officer 17.21

27030 - Detection Dog Handler 16.84

27040 - Detention Officer 18.04

27070 - Firefighter 17.21

27101 - Guard I 13.13

27102 - Guard II 16.84

27131 - Police Officer I 18.60

27132 - Police Officer II 20.68

28000 - Recreation Occupations

28041 - Carnival Equipment Operator 13.06

28042 - Carnival Equipment Repairer 14.22

28043 - Carnival Worker 9.68

28210 - Gate Attendant/Gate Tender 13.14

28310 - Lifeguard 10.83

28350 - Park Attendant (Aide) 14.70

28510 - Recreation Aide/Health Facility Attendant 10.73

28515 - Recreation Specialist 18.21

28630 - Sports Official 11.71

28690 - Swimming Pool Operator 17.18

29000 - Stevedoring/Longshoremen Occupational Services

29010 - Blocker And Bracer 21.59

29020 - Hatch Tender 21.59

29030 - Line Handler 21.59

29041 - Stevedore I 20.19

29042 - Stevedore II 22.85

30000 - Technical Occupations

30010 - Air Traffic Control Specialist Center (HFO) (see 2) 39.09

30011 - Air Traffic Control Specialist Station (HFO) (see 2) 26.95

30012 - Air Traffic Control Specialist Terminal (HFO) (see 2) 29.68

30021 - Archeological Technician I 16.03

30022 - Archeological Technician II 18.51

30023 - Archeological Technician III 22.93

9 of 18 12/17/2019, 3:58 PM

30030 - Cartographic Technician 22.93

30040 - Civil Engineering Technician 21.41

30051…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .