About this file
This document contains responses to bidder inquiries regarding a federal construction contract solicitation. The solicitation is for levee repair work along the Union Township Levee in Missouri due to 2019 flood damage. Repair work may include earthwork, borrow material import, haul road development, debris removal, erosion and rutting repairs, levee surface repairs, stone placement, drainage structure rehabilitation, and turf establishment. The U.S. Army Corps of Engineers Kansas City District is the contracting agency. The responses clarify that flood debris removal, road maintenance, borrow area topsoil handling and disposal areas are sponsor or contractor responsibilities as specified.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Contracting Officers Report All Inquiries
Project: Union Township Review: Union Township Bidder Inquiry (00001) (sorted by CommentID ) Displaying 7 inquiries.
Id Discipline Sheet Detail Spec 8613399 Site Plan Plan Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
1. PLEASE CLARIFY WHO IS RESPONSIBLE FOR THE REMOVAL AND DISPOSAL OF THE FLOOD DEBRIS LAYING ON THE LEVEE WHERE WORK IS CALLED OUT TO BE PERFORMED UNDER THIS CONTRACT.
ESI via email
By: Thareth Casey; NWK Kansas City District; (816-389-2216). On: Jun 01 2020. Forward request by email.
1-0 Evaluation Concurred. Debris removal is Sponsor responsibility. By: Thareth Casey; NWK Kansas City District; (816-389-2216) On: Jun 03 2020 Current Request Status: Request Working
Information for this report is procurement sensitive.
8613405 Civil Plan Plan Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
3. PLEASE CLARIFY WHO IS RESPONSIBLE FOR THE MAINTENANCE AND ROAD ROCK REPLACEMENT ON
THE COUNTY ROAD'S TO BE USED AS HAUL ROUTES FOR THIS PROJECT.
ESI via email
By: Thareth Casey; NWK Kansas City District; (816-389-2216). On: Jun 01 2020. Forward request by email.
1-0 Evaluation Concurred. Contractor is responsible for road repairs resulting from contractor operations only By: Thareth Casey; NWK Kansas City District; (816-389-2216) On: Jun 03 2020 Current Request Status: Request Working
Information for this report is procurement sensitive.
8613406 Civil Plan Plan Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
4. DO ALL OF THE BORROW AREAS GET STRIPPED OF TOPSOIL?
ESI via email - by Hemanth Sai Moduga, Project Engineer
By: Thareth Casey; NWK Kansas City District; (816-389-2216). On: Jun 01 2020. Forward request by email.
1-0 Evaluation Concurred. No By: Thareth Casey; NWK Kansas City District; (816-389-2216) On: Jun 03 Current Request Status: Request Working
Information for this report is procurement sensitive.
8613411 Civil Spec Spec Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
5. DO ALL BORROW AREAS NEED TO HAVE 6 IN OF TOPSOIL PLACED ON THEM WHEN COMPLETED?
ESI via email by Hemanth Sai Moduga, Project Engineer
By: Thareth Casey; NWK Kansas City District; (816-389-2216). On: Jun 01 2020. Forward request by email.
1-0
Page 1 of 3ProjNet: Logged In User
6/3/2020https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll...
Evaluation Concurred. No By: Thareth Casey; NWK Kansas City District; (816-389-2216) On: Jun 03 Current Request Status: Request Working
Information for this report is procurement sensitive.
8613416 Civil Plan Plan Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
7. PLEASE CLARIFY IF THE SLOPE EROSION AREA AS PROPOSED NEEDS TO BE GRUBBED BEFORE PLACING EMBANKMENT MATERIALS FOR THE PROPOSED REPAIRS. IN ADDITION, IF GRUBBING IS REQUIRED, WHERE IS THE GOVERNMENT SUPPLIED DISPOSAL AREA LOCATED AT FOR THIS GRUBBED
MATERIALS?
ESI via email by Hemanth Sai Moduga, Project Engineer
By: Thareth Casey; NWK Kansas City District; (816-389-2216). On: Jun 01 2020. Forward request by email.
1-0 Evaluation Concurred. All materials removed by clearing and grubbing activities shall be stockpiled 750 feet from the excavation. By: Thareth Casey; NWK Kansas City District; (816-389-2216) On: Jun 03 Current Request Status: Request Working
Information for this report is procurement sensitive.
8613419 Civil Plan Plan Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
8. PLEASE CLARIFY THERE IS NOT RIPRAP REQUIRED AT EITHER END OF THE OUTLET STRUCTURE TO BE
REPAIRED
ESI via email by Hemanth Sai Moduga, Project Engineer
By: Thareth Casey; NWK Kansas City District; (816-389-2216). On: Jun 01 2020. Forward request by email.
1-0 Evaluation Concurred. Not required. By: Thareth Casey; NWK Kansas City District; (816-389-2216) On: Jun 03 2020 Current Request Status: Request Working
Information for this report is procurement sensitive.
8613423 Civil Plan Plan Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
9. PLEASE CLARIFY IF ALL DESTROYED / LOST SOD COVER AREAS ARE REQUIRED TO BE MOWED AND DISCED AND REGRADED PRIOR TO SEEDING. PLEASE CLARIFY IF THESE AREAS, ONCE THEY ARE SEEDED
ARE TO BE MULCHED.
ESI via email by Hemanth Sai Moduga, Project Engineer
By: Thareth Casey; NWK Kansas City District; (816-389-2216). On: Jun 01 2020.
Requires Amendment.
Forward request by email.
1-0 Evaluation Concurred. Per paragraph 3.4 of Section 32 92 19 Do not till pre-existing turf areas. Use an appropriate herbicide application to treat for weeds or apply a pre-emergent as necessary. Allow time for weed kill. In accordance with 35 41 00 3.11.8 The contractor shall be required to undertake the necessary measures to ensure a suitable seed bed prior to seeding operations. Removal of heavy growth herbaceous vegetation, including possible small sprouts, within certain reaches will be necessary. Mulch is not required for Overseeding. (Attachment: Amendment_0002_SF_30_Pg2.docx) By: Thareth Casey; NWK Kansas City District; (816-389-2216) On: Jun 03 2020 Current Request Status: Request Working
Information for this report is procurement sensitive.
Report Complete
Page 2 of 3ProjNet: Logged In User
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Patent 11/892,984 ProjNet property of ERDC since 2004.
Page 3 of 3ProjNet: Logged In User
File details come from the government source that posted it. Updated .