35 41 00 GOE2 Levee Site Maps-Amended.pdf
PDF 3 MB Posted
- Attached to
- Levee Rehab-Garden of Eden Section 2&3, Missouri
- Solicitation number
- W912DQ20B1008
About this file
This document package includes site maps and drawings for levee rehabilitation work along with the corresponding federal contract solicitation. The site maps depict damage locations along the Garden of Eden Drainage District levee system in Missouri and designate borrow areas for material to repair slides, breaches, and slope failures. The drawings illustrate typical repair sections involving excavation of failed material and construction of stability berms. The federal solicitation is for the levee rehabilitation work depicted in Items 139, Section 2 and Section 3. The Army Corps of Engineers is seeking bids to address deficiencies at multiple sites through in-place repairs, landward levee setbacks, and slope stabilization. The response due date is not provided though award timing is unspecified.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dean Lake
Railroad
Highway M
Potter
Slough
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
Garden of Eden Drainage District - Item No. 139 Section 2 B-1 Site Map
In-Place Repair Landside Slope Failure (Slide)
Station 88+15 to 93+90 Excavation of Failed Material
& Construction of Stability Berm
0 0.15 0.30.075 Miles
Borrow "A"
Borrow "B"
BORROW AREAS "A" & "B"
Borrow "A" will be utilized for repairs at Station 48+40 to 51+40 & 73+00 to 76+65.
Borrow will only be taken within the designated flagged area located in the borrow field not to impact any standing timber. (Approximate overall size of borrow field is 157 AC).
Borrow "B" will be utilized for repairs at Station 88+15 to 93+90.
Borrow will only be taken within the designated flagged area located in the borrow field not to impact any standing timber. (Approximate overall size of borrow field is 323 AC).
In-Place Repair Landside Slope Failure (Slide)
Station 48+40 to 51+40 Excavation of Failed Material
& Construction of Stability Berm
In-Place Repair Breach
Station 73+00 to 76+65 W/ Construction of Stability Berm
GENERAL NOTES:
Contractor will access from State road and travel on dirt farm road to construction site.
REPAIR DESCRIPTIONS:
Staging Area Will Be
Within The Limits Of 200' Landward From The
Construction Site
Bosworth River
Access
88+95 R/S Ramp
163+58 Ramps
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
Garden of Eden Drainage District - Item No. 139 Section 2 B-2 Site Map
IN-PLACE
BREACH REPAIR
Station 125+00 to
Station 126+65
In-Place Repair Landside Slope Failure (Slide)
Station 149+00 to 154+50 Excavation of Failed Material
& Construction of Stability Berm
Borrow "B" Borrow "B" will be utilized for repairs at Station 125+00 to Station 126+65 Breach
Repair.
Borrow will only be taken within the designated flagged area located in the borrow field not to impact any standing timber. Borrow utilized evenly over designated area.
(Approximate overall size of borrow field is 323 AC)
Borrow "C" Borrow "C" will be utilized for repairs at Station 125+00 to Station 126+65 Landside
Slope Failure Borrow will only be taken within the designated flagged area located in the borrow field
Borrow utilized evenly over designated area.
(Approximate overall size of borrow field is 73 AC)
REPAIR DESCRIPTIONS:
Staging Area Will Be
Within The Limits Of 200' Landward From The
Construction Site
GENERAL NOTES:
Contractor will access from State
Road and travel on farm roads to both construction sites.
BORROW NOTES:
Material will be removed in a manner that no ponding areas remain.
Ca tta il L n
Highway M
Grand River
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
Garden of Eden Drainage District - Item No. 139 Section 2 B-3 Site Map
Breach Statioin 333+75 to 337+00
IN-PLACE REPAIR:
Intermittent Riverside
Slope Erosion Station 259+00 to 321+25
0 0.1 0.20.05 Miles
REPAIR:
Landward Levee Setback
Station 321+25 = Station 0+00 Station 336+75 = Station 15+50
BORROW AREAS:
The hatched area indicates borrow materials located riverward of the newly constructed landward levee setback. Material will be removed in a manner that encourages positive drainage away from newly constructed levee. (Approx. 2.5 AC) Remaining riverward segments of the existing levee embankment will also be utilized in a manner that utilizes all remaining portions of the levee and maintaining positive drainage.
(Approx. 2.0 AC)
BORROW AREA:
The Cross-hatched area indicates borrow materials to be utilized for repairs from Station 259+00 to
Station 321+25 to be utilized by proximity to the repairs.
Material will be utilized in an even manner ensuring no ponding areas will remain.
(Approx. 40.0 AC)
REPAIR DESCRIPTIONS:
Staging Area Will Be
Within The Limits Of 200' Landward From The
Construction Site
GENERAL NOTES:
Contractor will access from State Road and travel on dirt farm road to the construction site.
BORROW NOTES:
Material will be removed in a manner that no ponding areas remain.
Excavate Failed Levee Embankment Slope
Existing Grade Lines
Existing Applicable Levee Slope (No Damage)
Re-Construct Levee Embankment With Stability Berm At Ends of Berms
Construction will Be 1'V. on 3' H Slopes
20'
C/L
Drawing Not To Scale
1' V. on 20' H.
Levee Embankment Slope Failure (Slide)
Damage Line
1' V. on 3' H.
1' V. on 3' H.
DAMAGE LOCATIONS
Landside Slope Failure (Slide)
Sta. 48+40 to 51+40 Sta. 88+15 to 93+90
Sta. 149+00 to 154+50
*Match Crown Width of Existing Levee Crown at
Undamaged End Sections
Lanside Riverside
TYPICAL REPAIR SECTION
Landside Slope Failure (Slide)
Garden of Eden Drainage District - Section 2 C-1 Drawing
General Note:
Contractor discretion to displace water by fill placement or pumping activities
12'
C/L
1' V. on 3' H. 1' V. on 3' H.
Natural Ground Approx. Elev.
Scoured Area Scour Line
1' V. on 50' H. to Toe-Out
Natural Ground Approx. Elevation
Riverside LandsideText
TYPICAL REPAIR SECTION
Breach Station 73+00 to 76+65 Breach Station 125+00 to 126+65
Drawing Not To Scale
Approx. E. 100.0
Approx. Water Surface Elevation
Garden of Eden Drainage District - Section 2 C-2 Drawing
General Note:
Contractor discretion to displace water by fill placement or pumping activities
C/L Existing LeveeC/L Landward Levee Setback
Maximum Setback 200'
Landside Riverside
New Landward Levee Setback Repair
(12' Crown 1 on 3 Slopes)
Existing Grade Line
Drawing Not To Scale
In-Place Repair Line
Water Surface Grand River
Stone Fill Revetment Structure
Existing Grade Line
Breach w/ Foundation Scouring Station 333+75 to Station 337+00
Garden of Eden - Item No. 139 Section 2 ATT C-3 Drawing
| B-1 Site Map Revised 16 Dec |
| B-2 Site Map |
| B-3 Site Map Revised 16 Dec |
| C-1 Drawing |
| C-2 Drawing |
| C-3 Drawing |