Attachment_2_LEED_v4_Checklist.pdf
PDF 107 KB Posted
- Solicitation number
- W912DQ19R4006
About this file
Attachment 2
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project: Renovation of AIT Barracks (1012, 1013, 1014 and 1015) Attachment 2 Date: April 2019 / RTA Submittal Burns & McDonnell Rating: Silver LEED-NC v4
Yes ? No Ph AE GC Yes ? No Ph AE GC Project Summary + Integrative Process Materials and Resources Y Project Summary Details D X 1 Integrative Process D X
Location and Transportation 16 LEED for ND Location D X
1 Sensitive Land Protection D X 2 High Priority Site D X
5 Access to Quality Transit D X 1 Bicycle Facilities D X
1 Reduced Parking Footprint D X 1 Green Vehicles D X
Sustainable Sites
1 Site Assessment D X Indoor Environmental Quality Y Minimum IAQ Performance D X Y Tobacco Smoke Control D X
1 Open Space D X 2 Enhanced IAQ Strategies D X 3 Rainwater Management D X 3 Low-Emitting Materials C X
2 Heat Island Reduction C X 1 Construction IAQ Mgmt Plan C X 1 Light Pollution Reduction D X 2 IAQ Assessment C X
1 Thermal Comfort D X Water Efficiency 2 Interior Lighting D X Y Outdoor Water Use Reduction D X 3 Daylight D X Y Indoor Water Use Reduction D X 1 Quality Views D X Y Building-Level Water Metering D X 1 Acoustic Performance D X 2 Outdoor Water Use Reduction D X 4 1 1 Indoor Water Use Reduction D X Innovation
2 Cooling Tower Water Use D X Exemplary: Low-Emitting 1 Water Metering D X Materials, 100%
1 Innovation: Purchasing, Lamps C X Energy and Atmosphere 1 Innovation: LEED O&M Starter C X
1 Innovation: LEED O&M Starter C X 1 Pilot: TBD C X
Y Minimum Energy Performance D X 1 LEED AP BD+C C X Y Building-Level Energy Metering D X
Regional Priority x Renewable Energy (1 pt) D X
5 1 Enhanced Commissioning C X 1 Optimize Energy (8 pts) D X 13 1 4 Optimize Energy Performance D X 1 Sensitive Land Protection (1 pt) D X
1 Advanced Energy Metering C X x High Priority Site (2 pts) D X 2 Demand Response C X 3 Renewable Energy Production D X
1 Enhanced Refrigerant Mgmt D X 1 Rainwater Management (2 pts) D X 2 Green Power & Carbon Offsets C X
Yes ? No
Certified 40-49 pts Silver 50-59 pts Gold 60-79 pts Platinum 80-110 pts
X
X
Legend: Ph = Review Phase (D: Design Review; C: Construction Review);
AE = Documentation by Arch/Eng; GC = Documentation by Contractor
53 16 41 Project Totals
Building Life-Cycle Impact Reduction (3 pts)
C
Y Fundamental Refrigerant Management
D X
Y Fundamental Commissioning and Verification
C X
1 C
Site Development: Protect or Restore Habitat
C X
X Y
Construction Activity Pollution Prevention
C X
Construction and Demolition Waste Management
C
X
1 1 Building Product Disclosure & Optimization: Material
C X
1 1 Building Product Disclosure & Optimization: Sourcing of Raw Materials
C
2 3 Surrounding Density and Diverse Uses
D X 1 1
Building Product Disclosure & Optimization: Environmental Product Declarations
C X
2 3 Building Life-Cycle Impact Reduction
C X
Y Construction and Demolition Waste Management Planning
C X
Y Storage and Collection of Recyclables
D X
File details come from the government source that posted it.