Attachment_2_LEED_v4_Checklist.pdf

PDF 107 KB Posted

Attached to
AIT Reno & Modern Construction Ft. Leonard Wood MO
Solicitation number
W912DQ19R4006
Issued by

About this file

Attachment 2

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project: Renovation of AIT Barracks (1012, 1013, 1014 and 1015) Attachment 2 Date: April 2019 / RTA Submittal Burns & McDonnell Rating: Silver LEED-NC v4

Yes ? No Ph AE GC Yes ? No Ph AE GC Project Summary + Integrative Process Materials and Resources Y Project Summary Details D X 1 Integrative Process D X

Location and Transportation 16 LEED for ND Location D X

1 Sensitive Land Protection D X 2 High Priority Site D X

5 Access to Quality Transit D X 1 Bicycle Facilities D X

1 Reduced Parking Footprint D X 1 Green Vehicles D X

Sustainable Sites

1 Site Assessment D X Indoor Environmental Quality Y Minimum IAQ Performance D X Y Tobacco Smoke Control D X

1 Open Space D X 2 Enhanced IAQ Strategies D X 3 Rainwater Management D X 3 Low-Emitting Materials C X

2 Heat Island Reduction C X 1 Construction IAQ Mgmt Plan C X 1 Light Pollution Reduction D X 2 IAQ Assessment C X

1 Thermal Comfort D X Water Efficiency 2 Interior Lighting D X Y Outdoor Water Use Reduction D X 3 Daylight D X Y Indoor Water Use Reduction D X 1 Quality Views D X Y Building-Level Water Metering D X 1 Acoustic Performance D X 2 Outdoor Water Use Reduction D X 4 1 1 Indoor Water Use Reduction D X Innovation

2 Cooling Tower Water Use D X Exemplary: Low-Emitting 1 Water Metering D X Materials, 100%

1 Innovation: Purchasing, Lamps C X Energy and Atmosphere 1 Innovation: LEED O&M Starter C X

1 Innovation: LEED O&M Starter C X 1 Pilot: TBD C X

Y Minimum Energy Performance D X 1 LEED AP BD+C C X Y Building-Level Energy Metering D X

Regional Priority x Renewable Energy (1 pt) D X

5 1 Enhanced Commissioning C X 1 Optimize Energy (8 pts) D X 13 1 4 Optimize Energy Performance D X 1 Sensitive Land Protection (1 pt) D X

1 Advanced Energy Metering C X x High Priority Site (2 pts) D X 2 Demand Response C X 3 Renewable Energy Production D X

1 Enhanced Refrigerant Mgmt D X 1 Rainwater Management (2 pts) D X 2 Green Power & Carbon Offsets C X

Yes ? No

Certified 40-49 pts Silver 50-59 pts Gold 60-79 pts Platinum 80-110 pts

X

X

Legend: Ph = Review Phase (D: Design Review; C: Construction Review);

AE = Documentation by Arch/Eng; GC = Documentation by Contractor

53 16 41 Project Totals

Building Life-Cycle Impact Reduction (3 pts)

C

Y Fundamental Refrigerant Management

D X

Y Fundamental Commissioning and Verification

C X

1 C

Site Development: Protect or Restore Habitat

C X

X Y

Construction Activity Pollution Prevention

C X

Construction and Demolition Waste Management

C

X

1 1 Building Product Disclosure & Optimization: Material

C X

1 1 Building Product Disclosure & Optimization: Sourcing of Raw Materials

C

2 3 Surrounding Density and Diverse Uses

D X 1 1

Building Product Disclosure & Optimization: Environmental Product Declarations

C X

2 3 Building Life-Cycle Impact Reduction

C X

Y Construction and Demolition Waste Management Planning

C X

Y Storage and Collection of Recyclables

D X

File details come from the government source that posted it.