A.02.11_PWS_Attachments.pdf

PDF 2 MB Posted

Attached to
Pomme de Terre Mowing West
Solicitation number
W912DQ19R1050
Issued by

About this file

Attachments

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment No. 1

Attachment No. 2

AREAS, ACREAGES, QUANTITIES, TIME ALLOWED

MOWING AND TRIMMING SERVICES

POMME DE TERRE LAKE

MININUM MAXIMUM TIME ALLOWED

ESTIMATED NUMBER OF NUMBER OF TO COMPLETE

AREA ACRES MOWINGS MOWINGS REQUIRED SERVICES

Outlet Park 17 11 16 1 Day

Wheatland Park 33 11 16 1 ½ Day

Wheatland Lagoon 1 4 7 1 Hour

Lightfoot Park 20 11 16 1 Day

Lightfoot Group Camp 1 5 8 1 Hour

Lightfoot Lagoon 1 4 7 1 Hour

Bolivar Boat Ramp / Fishing Dock Areas 6 11 16 1 Day

Number of mowings ordered will be determined by seasonal conditions not to exceed the maximum number.

The term “required services” as applied to time allowed shall be deemed to include all trimming and debris removal services.

Acreages shown above are estimated and include areas within the park boundaries. Much of this area is composed of roads, campsite, and facilities. The Contractor shall be responsible for determining all acreages and conditions affecting the performance of the work.

Attachment No. 3

Attachment No. 4

Mowing and Trimming Service Worksheet Pomme de Terre Project

Contract No.

Mowing Order Number _____________

DATE/TIME DATE/TIME NUMBER OF

AREA SERVICED WORK BEGAN WORK COMPLETED EMPLOYEES

OUTLET PARK __________________ ___________________ ____________

WHEATLAND PARK __________________ ___________________ ___________

LIGHTFOOT PARK __________________ ___________________ ___________

BOLIVAR AREA __________________ ___________________ ___________

Contractor Comments: _______________________________________________________________________

(signature) Contractor's Representative

Attachment No. 5

Performance Requirements Summary (PRS)

ALP = Acceptable Level of Performance Section (Para)

Contract Requirement

Performance Standard Lot Description

ALP

Method of Surveillance

Ordering of Services

Timely completion and sequence of ordered services

Individual Scheduled

Orders

100% compliant

Random

Surveillance

Mowing and Trimming

Turf area presents even appearance free of un-mowed strips and ruts.

Area free of debris.

Acre

98% compliant

Random

Surveillance & Validated Customer

Complaint

File details come from the government source that posted it.