Argentine Levee RFP.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.07.24_Solicitation_Amendment_W912DQ19R1003_0001.pdf | ||
| A.01.23__Argentine_Pump_Station_Webinar_22_April_2019.pdf | ||
| A.07.23_Copy_of_Key_Personnel_matrix_(005).xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This project consists of replacing Strong Avenue Pump Station and Argentine Main Pump Station, and performing modifications to Turner Pump Station. All three pump stations are on the Argentine Levee Unit, which is located in Wyandotte County, Kansas on the right bank of the Kansas River. Work includes the construction of temporary flood protection; construction of new pump stations; demolition of existing structures; tie-in to existing infrastructure; strengthening and raising the discharge chamber. The overall purpose of replacing or modifying the three pump stations is to improve levee safety by reducing the risk of failure of the line of protection at the three pump station locations.
Magnitude: $25,000,000.00-$100,000,000.00
This solicitation and resulting contract is using a 2 Phase Design-Build procurement method as described in FAR Part 36.301.
WILLIE E HODGES 816-389-3469
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
12-Apr-2019
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within _______ 10 calendar days and complete it within ________ 744 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________ 52.211.10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ 5 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ 16 May 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 120 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USACE, KANSAS CITY +
FEDERAL BLDG, CT-C
601 E 12TH ST RM 647
KANSAS CITY MO 64106-2896
W912DQ
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
04:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
816-389-2029/2030 FAX: TEL: 816-389-3812 TEL: FAX:
W912DQ19R1003 97
20B. SIGNATURE
(REV. 4-85) STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE 27. PAYMENT WILL BE MADE BY: 26. ADMINISTERED BY
(Include ZIP Code) 14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14) 16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.
governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this 28. NEGOTIATED AGREEMENT
(Must be fully completed by offeror) OFFER
W912DQ19R1003
Section 00 11 00 - Solicitation/Contract Form
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Factor 1-2 Key Personnel
Matrix
12-APR-2019
THIS IS A DRAFT CLIN SCHEDULE.
Draft CLIN Schedule Only - Preliminary For Information Only – Final CLIN Schedule to be Provided in Phase Two.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Construction & Design Argentine
FFP
PHASE 1 -DRAFT CLIN SCHEDULE - DO NOT PRICE
FOB: Destination
NET AMT
Construction & Design Strong
FFP
Construction & Design Turner
FFP
Section 00 21 00 - Instructions, Conditions and Notices to Offeror
PHASE1 PRE-PROPOSAL WEBNINAR
A Phase One Pre-Proposal webinar for Prime Contractors will be conducted April 22, 2019. Please contact Willie Hodges at Willile.E.Hodges@usace.army.mil or 816-389-3469 as soon as possible, and no later than April 19, 2019 to obtain webinar logon instructions and details.
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-1 Alt I Instructions to Offerors--Competitive Acquisition (Jan 2017) -
Alternate I
OCT 1997
52.236-28 Preparation of Proposals--Construction OCT 1997 252.223-7001 Hazard Warning Labels DEC 1991
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
(End of provision)
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
12.7% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is to be performed, in the State of Kansas, County of Wyandotte, and City of Kansas City].
52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER
TRADE AGREEMENTS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be ___20_____ percent of the bid price or $3,000,000.00 , whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from David Walsh Contracting Officer 635 Federal Building 601 E. 12th Street Kansas City, Missouri 64106
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
TBD in Phase 2
(c) Participants will meet at--
TBD in Phase 2
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/vmfara.htm
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any DFARS (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
SCR_CT_007 MAGNITUDE OF PROJECT—CONSTRUCTION (Jul 2002)
The magnitude of this project is represented by the following estimated price range (contracting officer mark as appropriate):
_____Less than $25,000
_____Between $25,000 and $100,000
_____Between $100,000 and $250,000
_____Between $250,000 and $500,000
_____Between $500,000 and $1,000,000
_____Between $1,000,000 and $5,000,000
_____Between $5,000,000 and $10,000,000
_____Between $10,000,000 and $25,000,000
___X__Between $25,000,000 and $100,000,000
_____Between $100,000,000 and $250,000,000
_____Between $250,000,000 and $500,000,000
_____Over $500,000,000
(End)
TPL_NWK_002 PROPOSALS TO BECOME PART OF THE CONTRACT
1. When an offeror submits its proposal in response to a Request For Proposals, and a staffing plan including the names and qualifications of key personnel who are proposed to work on the project is required to be submitted, those personnel who are offered will be the same personnel who will actually perform on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute personnel for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute employee. The Contracting Officer shall have the right to review the qualifications of the proposed substitute employee and to approve or disapprove his or her qualifications. If the proposed substitute employee's qualifications are disapproved by the Contracting Officer, the contractor will propose another employee who does possess equivalent qualifications.
2. When an offeror submits its proposal in response to a Request For Proposals, and the name of a specific subcontractor is a required submittal, then that subcontractor who is offered will be the same subcontractor who will actually perform the specified work on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute a subcontractor for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute subcontractor. The Contracting Officer shall have the right to review the qualifications of the proposed substitute subcontractor and to approve or disapprove its qualifications. If the proposed substitute subcontractor's qualifications are disapproved by the Contracting Officer, the contractor will propose another subcontractor who does possess equivalent qualifications.
3. When an offeror submits its proposal in response to a Request For Proposals, and a schedule for the performance of the work on the project is a required submittal, the terms of the proposed schedule will become the schedule that will be utilized for completion of the project, adjusted as necessary to reflect the actual issue date of the Notice to Proceed
4. When an offeror submits its proposal in response to a Request For Proposals and that proposal contains any work, materials, methods or other type of betterment that provides an advantage to the Government that is above the minimum requirements contained in the RFP, the terms of the proposal will be the basis for evaluation and, if successful, will become the terms of the contract upon award. If a change in one of those terms is made to one that is less favorable to the Government than the one on which the award of the contract was based, a credit to the Government will be negotiated by the contractor. Only the Contracting Officer has the authority to negotiate a waiver of the terms of the contract.
(End)
Section 00 22 10 - Phase 1 of a 2 Phase Selection Procedures
RFP SECTION 00 22 10: PHASE 1 OF 2 PHASE SELECTION PROCEDURES
1. Overview
a. This Request for Proposal (RFP) solicits for the design and construction of the Argentine Pump Station
Kansas City, KS.
b. This two phase solicitation is to award a stand-alone Firm Fixed-Price contract to furnish all labor, equipment, materials, transportation, and perform all required work in accordance with the plans and specifications for the Argentine Levee Unit pump stations project. This project consists of replacing Strong Avenue Pump Station and Argentine Main Pump Station, and performing modifications to Turner Pump Station. All three pump stations are on the Argentine Levee Unit, which is located in Wyandotte County, Kansas on the right bank of the Kansas River. The pump stations replacements (Strong Avenue and Argentine Main) include construction of temporary flood protection, construction of new pump stations, demolition of existing structures, and tie-in to existing infrastructure. The modification at Turner pump station includes modifications to strengthen and raise the discharge chamber. The overall purpose of replacing or modifying the three pump stations is to improve levee safety by reducing the risk of failure of the line of protection at the three pump station locations.
c. Firms formally organized as design-build entities, design firms and construction contractors that have associated specifically for this project, consortia of firms, or any other interested parties may submit proposals. A design firm or construction contractor may offer more than one proposal by entering into more than one association. Associations may be joint ventures or include key team subcontractors. Any legally organized Offeror may submit a proposal.
d. Contractor Team Arrangements. Contractor Team Arrangements are considered an arrangement in which
(1) two or more companies form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program. In accordance with FAR Subpart 9.6, the Government will recognize the integrity and validity of contractor team arrangements; provided, the arrangements are identified and company relationships are fully disclosed in the offer. The Offeror shall identify the major or critical aspects of the requirement to be performed by those identified in the Contractor Team Arrangement.
e. Any Offeror submitting an offer in the name of a joint venture, shall include a fully executed copy of the joint venture agreement with the offer. Joint venture agreements which require SBA approval may be submitted absent the requisite SBA Servicing Agency approving authorities’ signature; however, the Offeror shall submit evidence from the Offeror’s SBA Servicing Agency that the Offeror has notified and discussed the proposed joint venture for this project with the appropriate SBA personnel.
f. In Phase 1 of the two phase selection procedure, Offerors will submit certain specified performance capability proposals, demonstrating their capability to successfully execute design build construction work under the contract resulting from this solicitation. The Government will evaluate the proposal and intends to invite a maximum of three most highly rated Phase 1 offerors who submitted proposals to compete for the design build construction of the Argentine Pump Station.
g. Offerors must submit a complete Phase 1 proposal to be considered for Phase 2. PHASE 1 DOES NOT
INVOLVE PRICING SUBMISSION.
h. At the beginning of Phase 2, an amendment will be issued to only the selected offerors from Phase 1 inviting them to submit a design build technical solution, small business participation plan, and price proposals for consideration. The amendment will request additional information needed to complete the submission of Phase 2 proposals. In Phase 2, the Contracting Officer will award a single firm fixed price contract for the design and construction of the Argentine Pump Station to the offeror whose proposal offers the best value - Trade Off proposal to the Government, considering the price and non-price factors described in Phase 2. The Government intends to announce the names of Offerors selected for Phase 2 on the FEDBIZOPPS website.
i. Offerors must submit a complete Phase 2 proposal to be considered for award. Failure to submit a complete proposal may result in the entire proposal being rejected.
2. GENERAL PROPOSAL SUBMISSION INSTRUCTIONS
All offerors shall be required to submit a proposal with the minimum content as specified herein. Proposals without the minimum content may be rejected. Proposals will be received until the date and time indicated on Standard Form 1442 at the following address:
U.S. Army Engineer District, Kansas City Federal Building Room 647 ATTN: CECT-NWK-M/Willie Hodges 601 East 12th Street Kansas City, Missouri 64106-2896
3.0 PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS
In order to be considered for award of a contract for the requirements of this solicitation, the offeror must submit a proposal with its offer. Failure to submit a complete proposal may result in the entire offer being rejected. The proposals shall be submitted in Volumes as follows:
Proposal Characteristics - PHASE 1
Submit the proposal in tabbed, three-ring binders identified by the Solicitation Number (W912DQ-19-R-1003), project title (Argentine Pump Station Kansas City, KS), name, address, and telephone number of the offeror.
Arrange the proposal as follows:
Phase 1 - Volume 1, Technical Proposal:
Cover letter - Solicitation number; Name, address, email, and telephone number of the offeror;
Names, title, email, and telephone numbers of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this RFP. Name, title and signature of the person authorized to sign the proposal.
A statement specifying agreement with all terms, conditions and provisions included in the RFP; CAGE Codes and DUNS number for the offeror, and all teaming partners who participated in the Factor 1-1 – Corporate Experience.
Table of Contents - Each volume of the proposal should contain a detailed table of contents all pages of each factor should be sequentially numbered. If more than one binder is used, the complete table of contents shall be included in each.
TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror, include the offeror’s DUNS number in block 14.
Acknowledgement of all amendments to the RFP in accordance with the instructions on the Standard Form 30 (amendment form).
Offers submitting proposals using a teaming arrangement shall submit a fully executed copy of the teaming arrangement signed both by the subcontractor/teaming partner and the offeror and the narrative described in 00 22 10 paragraph 1.d above.
Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal, including letters of commitment from the joint venture firms. See 00 22 10 paragraph 1.e above.
Letters of commitment for subcontractor or teaming partners as identified in section 6.0 below.
Bond Surety Letter. Offeror must provide a letter or other documentation from a surety appearing on the Department of Treasury Circular 570 (list of approved sureties) stating that the Offeror is able to provide a bid bond for Phase 2 and obtain performance and payment bonds should they win the contract. FAILURE TO PROVIDE THIS INFORMATION WILL RESULT
IN INELIGIBILITY FOR AWARD.
Financial statement and bank letter that verify that sufficient funds will be available to perform the work.
TAB B – Section 00 45 00 – Representations and Certifications, Printed Entity Record from
System for Award Management (SAM).
TAB C – Teaming Agreement, if applicable. See paragraph 1-d (above)
Joint Venture Agreement, if applicable. See paragraph 1-e (above).
TAB D - Factor 1-1: Corporate Experience
TAB E - Factor 1-2: Key Personnel and Matrix provided (excel)
TAB F - Factor 1-3: Management Approach
TAB G - Factor 1-4: Performance Confidence
Information submitted about any company other than the Offeror, whether a predecessor company, affiliated company, major subcontractor, or other associated business, WILL NOT be evaluated for any factor unless the proposal contains a detailed narrative explaining why this submitted information is relevant for performance of this contract. The Government will consider the adequacy of this explanation in deciding the relevance and weight of the information to this procurement. Information about major subcontractors may not be given much weight unless the proposal contains some evidence that this subcontractor is committed to perform the work. See UAI 5152.236-9001 in section 00 73 00.
Offerors shall limit Phase 1 Proposal, to the following page limits.
Factor 1-1: Corporate Experience, to a maximum of 15 pages.
Factor 1-2: Key Personnel, to a maximum of 14 pages plus up to 3 pages for the matrix.
Factor 1-3: Management Approach, to a maximum of 10 pages.
Factor 1-4, Performance Confidence, no page limit for this
Volumes shall be submitted in the following quantities:
Volume 1 – Technical Proposal Original & 3 copies
Electronic copies shall also be provided on one CD/DVD in PDF format and be *Optical Character Recognition (OCR) compatible. The CD/DVD must be clearly labeled by solicitation number, project name, installation, and Offeror’s name. In the event of any conflict between the electronic submission and the hard copy submission, the hard copy submission will govern and will be the material upon which the Government bases its evaluation and ultimately, its decision.
The information for each tab should be submitted as an individual file in a PDF format.
All text must be legible and easily read. The page size of the offeror’s proposal shall not exceed 8-1/2 by 11 inches. Diagrams, charts and tables shall conform to the paper size. All text shall be typed single-spaced with a minimum size 10 font. Margins (1-inch) shall be clean and clear. If fold-out charts are unavoidable, and are to be utilized, all sheets shall be reproduced on 11 by 17 inch, and folded to 8-1/2 by 11 inch size.
A page is defined as text or information on one side of the paper. If it is printed double sided, each face will be counted as a page.
*OCR is a common method of digitizing printed texts so that they can be electronically searched, stored more compactly, displayed on-line, and used in machine processes such as machine translation, text-to-speech, key data extraction and text mining.
4.0 INQUIRIES/QUESTIONS
Technical inquiries and questions relating to this solicitation shall be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org). To submit and review inquiry items, prospective offerors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective offeror who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective offeror once the reply is available for viewing.
***Please Note: Offerors shall only submit one question per inquiry. All inquiries containing multiple questions shall be rejected.
The Solicitation Number is: W912DQ-19-R-1003 The Bidder Inquiry Key is: 7R7H2R-NU7GPK The Plan Room Key is: TBD in PHASE 2
Instructions for first-time ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. Select agency USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Instructions for future ProjNet Bid Inquiry Access:
https://www.projnet.org/
1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. Select agency USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
The Bidder Inquiry System will be unavailable for new inquiries ten calendar days before proposal due date in order to ensure adequate time is allotted to form an appropriate response to inquiries and amend the solicitation if necessary.
Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago) or by appointment for OCONUS. The telephone number for the Call Center is 1-800-428-HELP. Email to staff@rcesupport.com.
5.0 JOINT VENTURES
Joint Ventures shall submit the following additional documentation regarding their business entities:
1) A copy of their Joint Venture agreement.
2) A detailed statement outlining the following in terms of percentages, where appropriate.
a. The relationship of the joint venture parties in terms of business ownership, capital contribution, and profit distribution or loss sharing.
b. The management approach of the joint venture in terms of who will conduct, direct, supervise and control the project and have custody and control of the assets of the Joint Venture and perform the duties necessary to complete the work.
c. The structure of the joint venture and decision-making responsibilities of the Joint Venture parties in terms of who will control the manner and method of performance of the work.
d. The bonding responsibilities of the Joint Venture parties.
e. Identification of the key personnel having authority to legally bind the Joint Venture to subcontracts and state who will provide or contract for the labor and materials for the Joint Venture.
f. Identification of party maintaining the Joint Venture bank accounts for the payment of all expenses and the deposits of all receipts, keep the books and records, and pay applicable taxes for the Joint Venture.
g. Identification of party furnishing the facilities, such as office supplies and telephone service.
h. Identification of party having overall control of the Joint Venture.
mailto:staff@rcesupport.com
Other sections of the proposal shall identify, where appropriate, whether key personnel are employees of the individual Joint Venture parties and identify the party, or hired as employees of the Joint Venture.
6.0 SUBCONTRACTOR/TEAMING PARTNERS
If an offeror wishes to receive credit for the corporate experience or past performance of a subcontractor or teaming partner, the offeror must submit a letter of commitment to use the proposed firm on the project, signed both by the subcontractor/teaming partner and the offeror. The commitment letter must be submitted even if the subcontractor/teaming partner is in some way affiliated with the offeror (for example, the subcontractor/teaming partner is a subsidiary of a joint venture partner, or a subsidiary of a firm to which the joint venture partner is also a subsidiary). Include the subcontractor/teaming partner letters of commitment in Volume 1, TAB A.
SAMPLE LETTER OF COMMITMENT to
USE SUBCONTRACTOR/TEAMING PARTNER
[COMPANY LETTERHEAD]
TO: Contracting Officer, Kansas City District, United States Army Corps of Engineers
SUBJECT: Letter of Commitment for Proposed [insert project name]
Dear Sir or Madam:
[Insert name of offeror] and [insert name of subcontractor] hereby make the unequivocal commitment that, in the event that the company receives award of the Contract for [insert project name], [insert name of subcontractor] will perform the following work required by the Contract.
[Insert list of tasks to be performed by the subcontractor]
Sincerely, [Authorized Official]
[Legal Name of Offeror]
Date: __________
[Subcontractor]
[Legal Name of Subcontractor]
Date: ______
7.0 BASIS FOR AWARD
The agency will use Two-phase Design-Build Selection Procedures authorized by FAR 36.301.
In Phase 1, the Government intends to select a target of three up to a maximum of five most highly rated offerors to compete in Phase 2. The selection will be based on evaluation of technical factors. There are four non-price (technical) factors in Phase 1:
Factor 1-1, Corporate Experience Factor 1-2, Key Personnel Factor 1-3, Management Approach Factor 1-4, Performance Confidence
Only those offerors selected in Phase 1 will be invited to submit a proposal for Phase 2, and they will be the only offerors eligible to compete in Phase 2.
If an offeror is selected as one of the most highly rated offerors to compete in Phase 2, Any unavoidable changes or substitutions to the key personnel proposed in Factor 1-1 shall be considered for approval in accordance with clause UAI 5152.236-9001 “Personnel, Subcontractors, and Outside Associates and Consultants” in Section 00 73 00.
The Government will select a target of three up to a maximum of five offerors based on their overall merit after consideration of the evaluation factors described above. The relative weight given to the evaluation factors is described in the Phase 1 table below.
The Technical Factors are not all of equal importance.
RELATIVE WEIGHT OF EVALUATION FACTORS
Phase 1
Location Factor Number Description Relative Importance
Phase 1 Factor 1-1 Corporate Experience This factor is the most important factor
Phase 1 Factor 1-2 Key Personnel This factor is slightly less important than Factor 1-1, equal to Factor 1-3, and more important than Factor 1-4
Phase1 Factor 1-3 Management Approach This factor is slightly less important than Factor 1-1, and equal to Factor 1-2, and more important than Factor 1-4.
Phase 1 Factor 1-4 Performance Confidence This factor is the least important factor
8.0 SOURCE SELECTION PROCESS
The Source Selection Evaluation Board (SSEB) will be established to conduct the evaluation of proposals received in response to this solicitation. The evaluation will be based on the content of the proposal, proposal corrections and any information obtained from other sources, e.g. past performance information. The SSEB will not consider any documents incorporated by reference, except as expressly allowed by this solicitation.
Each member of the SSEB will independently consider the information for their assigned factor team. Once these individual analyses are completed, the SSEB will assign a consensus rating for each evaluation factor. It is the responsibility of each member of the SSEB to provide and document sufficient strengths, weaknesses, and/or deficiencies to support the assigned rating for each factor.
The results of the SSEB evaluations will be presented to the Source Selection Authority (SSA) who will review the evaluations conducted by the SSEB. The SSA will provide their evaluation and recommendations to the Procuring Contracting Officer (PCO), who will determine the most highly qualified offerors in Phase 1.
The SSA will determine whether it is appropriate to engage in clarifications, communications or discussions.
The ratings on individual factors, to include all support documentation, will be provided to the SSA. The SSA, independently exercising prudent business judgment, will determine which Offerors will participate in Phase 2 of the solicitation. In no case will more than five (5) proposals be included in the Phase 2 process.
Offerors are cautioned to put forth their best efforts for the Phase 1 submission, and to furnish all information clearly to allow the Government to determine their performance capability. Offerors should not assume that they will have an opportunity to clarify or correct anything in the proposal after submitting it in response to Phase 1.
9.0 TECHNICAL RATING
The Source Selection Team (SST) will use a combined technical/risk rating system that includes consideration of risk in conjunction with the strengths, weaknesses, and deficiencies in determining technical ratings.
Assessment of technical risk, which is manifested by the identification of weakness(es), considers potential for disruption of schedule, increased costs, degradation of performance, the need for increased Government oversight, and/or the likelihood of unsuccessful contract performance. Combined technical/risk evaluations shall utilize the combined technical/risk ratings listed in Table 2 and the risk descriptions set forth in Table 3.
Table 2. Combined Technical/Risk Ratings
Color Rating Description
Blue
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Purple
Good
Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Green
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow
Marginal
Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red
Unacceptable
Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
Table 3. Technical Risk Rating Method
Rating Description
Low Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Moderate
Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High
Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
Unacceptable
Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.
Ratings will be assigned for each of the Phase 1 technical evaluation factors for each offeror. No overall rating will be assigned.
10.0 DEFINITIONS
Rating: The rating for the Technical factor will be expressed as an adjectival assessment of Outstanding, Good, Acceptable, Marginal, or Unacceptable.
Deficiency: A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.
Strength: Any aspect of an offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
Weakness: A flaw in the proposal that increases the risk of unsuccessful contract performance.
Significant Weakness: A flaw that appreciably increases the risk of unsuccessful contract performance.
11.0 DEBRIEFING OFFERORS
Offerors may request a debriefing in accordance with FAR 15.505 Pre-award Debriefing of Offerors, and FAR
15.506 Post-award Debriefing of offerors.
Phase 1 is conducted in accordance with FAR part 36 and the offerors are not entitled to a debriefing in accordance with FAR 15.505 and FAR 15.506, however at the discretion of the SSA the offeror may be provided with feedback in reference to the strengths and weakness of the submitted proposal.
TECHNICAL FACTORS TO BE EVALUATED IN PHASE 1
PHASE 1, TAB D – FACTOR 1-1 – Corporate Experience
Submission Requirements
Submit a minimum of three example projects and a maximum of five example projects completed within the last ten years demonstrating the offeror’s recent, relevant corporate experience. If more than five projects are submitted, only the first five will be evaluated. The projects submitted shall be limited to no more than 3 pages each and any project information beyond the 15 page limit will not be evaluated.
Multiple Award Task Order Contracts (MATOCs) or any other type of task-order contracts that provide for the issuance of task orders for the performance of tasks will not be considered projects for the purposes of this evaluation. Only individual task orders issued under such contracts will be evaluated as projects. A phased project for a single customer with multiple inter-dependent facilities on a single site may be considered a project for the purposes of this evaluation. Project descriptions that do not clearly describe the offeror’s or team member’s experience, the scope of the project, or the periods of project performance will not be considered.
Provide the following information for each project:
(a) Project Title
(b) Location
(c) Contract Number
(d) Project Delivery Method:
Indicate Design/Build; Design/Bid/Build; Integrated Design; Design Only; etc.
(e) Role of Offeror:
Indicate type and percentage of work performed by the offeror or offeror’s team member.
(f) Total Dollar Amount:
Indicate if for design only, construction only or both design and construction.
(g) Construction Start and Completion Dates:
Project construction must be identified as complete or substantially complete. If an Offeror presents a project that is substantially complete, the proposal must include an explanation of why that project should be considered.
(h) Brief Description of Project:
Address how the project experience is relevant to the Argentine Levee Unit Pump Stations project described in this solicitation’s Statement of Work. Provide a narrative that provides details on each of the above topics in order for the board to evaluate the relevancy of each project.
(i) Customer Primary Point of Contact:
Name, relationship to project, agency/firm, phone number, and e-mail address. The Government may contact and interview project references. Reference information will not be revealed to other parties.
(j) Procuring Activity Point of Contact:
Name, relationship to project, agency/firm, phone number, and e-mail address. The Government may contact and interview project references. Reference information will not be revealed to other parties.
If the offeror represents the combining of two or more companies, state if the example project represents a joint venture of the listed parties.
Evaluation Criteria
The Government will evaluate the extent of recent, relevant corporate experience of the prime contractor and team members and will assign one combined technical and risk rating for this factor.
The Government will evaluate the extent of experience for strengths and weaknesses in the following areas: (criteria below are not listed in order of importance. The Government desires proposals that offer the best combination of experience considering all criteria):
1. Projects that are recent and similar in magnitude (dollar amount and/or scope) to the Argentine Levee Unit