A.01.23__Argentine_Pump_Station_Webinar_22_April_2019.pdf
PDF 3 MB Posted
- Attached to
- Argentine Pump Station
- Solicitation number
- W912DQ-19-R-1003
About this file
Power Point Slides From Webinar Held on 22 April 2019.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.07.24_Solicitation_Amendment_W912DQ19R1003_0001.pdf | ||
| A.07.23_W912DQ19R1003_ARGENTINE_LEVEE_20190412_Finalc.pdf_(003).pdf | ||
| A.07.23_Copy_of_Key_Personnel_matrix_(005).xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
.59
Prepared by Kansas City District April 22, 2019
KANSAS CITY LEVEES PROGRAM
ARGENTINE PUMP STATIONS
WEBINAR
AGENDA
• Overview of Kansas City Levees Program
• Overall Scope
• Pump Stations Background and Proposed
Facilities
• Solicitation Review & Submission
Requirements
PROGRAM INFORMATION: SUPPLEMENTAL
FUNDING
Argentine, Armourdale, and Central Industrial District levees have recently been identified to receive emergency supplemental funds through the Bipartisan Budget Act of 2018, Public Law 115-123 enacted February 9, 2018.
All three levee units are broken into pump station and levee raise project delivery teams. Both exist under the Kansas City Levees Program.
OVERVIEW OF PLANNED CONTRACT ACTIONS
Construction - Argentine Levee Unit
Description Owner Station Recommendatio n
Projected Award Magnitude Range
Pump Station Design Build Contract Turner PS (KVDD) Argentine Main PS (KVDD) Strong Ave PS (UG)
60+40 253+14 273+41
Unrestricted 4QTR FY19 $25 to $100 M
Levee/Floodwall Raise Contract KVDD 00+00 to 289+40 Unrestricted 4QTR FY20 $25 to $100 M
Construction - Armourdale/CID Levee Unit
Description Owner Station Recommendatio n
Projected Award Magnitude Range
Armourdale Pump Station Replacement Design Build Contract
12th Street PS (UG) Mill Street PS (UG)
129+20 156+75 Unrestricted 1QTR FY20 $25 to $100 M
Armourdale Underseepage Improvments KVDD 62+00 to 82+00 Small Business 2QTR FY20 $10 to $25 M
CID Underseepage Improvements KVDD
32+50 to 38+00 63+00 to 74+75 77+00 to 94+50 107+00 to 130+00
Small Business 2QTR FY20 $10 to $25 M
Armourdale CID Levee/Floodwall Raise Design Build Contract KVDD 0+05 to 42+50 Unrestricted 3QTR FY20 $100 to $250 M
Armourdale Pump Station Repair Contract
Osage Ave. (KCK #14) 5th Street (KCK #11) PBI Gordon National Beef (KCK #8)
76+83 185+70 286+59 295+52
Small Business 3QTR FY20 $1 to $5 M
CID Pump Station Repair Contract
Ohio Ave (UG) Stock Yard #3 (KVDD) Stockyards #1/Field pump house
(KVDD)
83+52 74+21 98+05
Small Business 3QTR FY20 $1 to $5 M
CID Upstream Closure Structure KVDD 137+00 Small Business TBD $1 to $5 M
ARGENTINE PUMP STATION DESIGN BUILD
TURNER PUMP STATION MODIFICATIONS
BACKGROUND: Constructed in 1950 OBJECTIVE: Prepare Turner Pump Station for the future Levee Raise Contract
1. Raise gatewell
2. Perform structural analysis and strengthen the gatewell as necessary
3. Raise two pump discharge pipes
STRONG AVENUE BACKGROUND
• Parts of the PS are over 100 years old
• At least 2 modifications since original construction
• Combined Sewer Overflow
Strong Avenue Pump Station
PROPOSED FACILITIES – STRONG AVENUE
• Design and construct new pump station on UG-owned property landside of BNSF Railyard
• Maintain operation of the existing pump station during construction of the new pump station
• Tie in to 48-inch combine sewer that runs parallel to
BNSF railyard
• Construct pump discharge line(s) to tie into Ruby Avenue
Drainage Structure
• Modify existing pump station, including demolition of superstructure
• Base Pump Station Capacity = 17,000 gpm
• Option to Increase Pump Station Capacity = 52,000 gpm
Existing 48’’ Combined Sewer
New Strong Avenue Pump Station – tie into existing 48’’ sewer
Ruby Avenue Storm Sewer
Pump Discharge Line(s) into Ruby
Drainage Structure
Modify Existing Pump Station
STRONG AVENUE PUMP STATION
ARGENTINE MAIN BACKGROUND
• Parts of the PS are over 100 years old
• At least 2 modifications since original construction
• No record drawings
• KVDD maintenance building adjacent to PS
Argentine Main Pump Station
PROPOSED FACILITIES – ARGENTINE MAIN
• Design and construct the new pump station integral with the line of protection positioned on the river side of the levee crown
• Maintain operation of the existing pump station during construction
• Construct new levee and soil founded floodwall
• Design and construct temporary flood protection with minimal impact to the Kansas River.
• Demolish the pump station, above-grade maintenance building, and existing floodwall
• Base Pump Station Capacity = 77,000 gpm
• Option to Increase Pump Station Capacity = 154,000 gpm
Existing 9’x9’ RCB
Demolish Existing Maintenance Building
Demolish Existing Pump Station;
Maintain Operation during
Construction
Construct New Pump Station; Maintain Temporary
Flood Protection during Construction
Demolish Existing Pump Structure
Construct New Inlet Sewer
Construct New Outlet Structure
Construct New Levee and Soil Founded Floodwall
Construct New Levee and Soil Founded Floodwall
ARGENTINE MAIN
*Maintain levee access during construction
SOLICITATION REVIEW &
SUBMISSION REQUIREMENTS
• Award One Design-Build Contract to replace Argentine Main and Strong Avenue Pump Stations and modify Turner Pump Station.
• Two-Phase Design-Build Selection Procedures:
Phase 1: Down-select a target of three up to a maximum of five most highly rated offerors to compete in Phase 2.
-Note: Amend #1 correction to Sect. 00 22 10, para.1(f) -Submit Letter from Surety (No Bid Bond)
Phase 2: Only the down-selected offerors will be invited to submit technical & priced proposals -CLINs & 00 22 20 is a draft, final prior to issuing Phase 2 -Submit Bid Bond
SOLICITATION MILESTONE
SCHEDULE
Issue FBO Pre-solicitation Synopsis March 14, 2019
Issue Phase 1 Requests for Proposals April 12, 2019
Receive Phase 1 Proposals May 16, 2019
Selection of Phase 2 Offerors June 2019
Issue Phase 2 Requests for Proposals June 2019
Receive Phase 2 Proposals July 2019
Award Sept 2019
SUBMISSION REQUIREMENTS
Carefully Review Section 00 22 10 “3.0 Proposal Format and Submission Requirements”
PHASE I – EVALUATION FACTORS
FACTOR 1-2 – KEY PERSONNEL
Download and submit the .xls spreadsheet
THANK YOU FOR PARTICIPATING TODAY
PHASE I PROPOSALS DUE MAY 16, 2019!
| Kansas city levees Program �Argentine Pump stations webinar |
| agenda |
| Program Information: Supplemental Funding |
| OVERVIEW OF PLANNED Contract actionS |
| Argentine pump station design build |
| Turner Pump Station Modifications |
| Strong Avenue Background |
| Proposed Facilities – Strong Avenue� |
| Strong Avenue pump station |
| ARGentine main Background |
| Proposed Facilities – Argentine Main |
| ARGENTINE MAIN |
| SOLICITATION REVIEW & SUBMISSION REQUIREMENTS |
| solicitation Milestone Schedule |
| SUBMISSION REQUIREMENTS |
| Phase I – Evaluation factors |
| Factor 1-2 – Key Personnel |
| Thank you for participating today��Phase I proposals due May 16, 2019! |