Raise Levee R471-460 South of US 36 and Construct Relief Wells
Solicitation number
W912DQ-19-B-1018
Issued by

About this file

This document provides information regarding a forthcoming solicitation for construction services. The U.S. Army Corps of Engineers, Kansas City District, will issue a solicitation on or around August 29, 2019 via www.fbo.gov to raise Levee R471-460 South of US Highway 36 in Kansas and Missouri. The scope of work involves raising segments of the levee between 6 inches to 3 feet and 6 inches to 1 foot between stations, constructing seepage berms, strengthening three gatewells, and extending seven culverts between 25 to 1,130 feet with related earthwork. The purpose is to mitigate flood risk from the Missouri River. The solicitation will be an Invitation for Bid for a firm fixed-price construction contract with an estimated value between $10-25 million and a North American Industry Classification System code of 237990. The estimated period of performance is noted in the solicitation. The solicitation and any amendments must be obtained from FBO, with bids due approximately 30 days after issuance. The award will be made to the lowest responsive and responsible bidder.

Amendment 0002

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Block14 Continuation Page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Oct-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ19B1018

X 9B. DATED (SEE ITEM 11)

19-Sep-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Oct-2019

CODE

USACE, KANSAS CITY +

FEDERAL BLDG, CT-C

601 E 12TH ST RM 647

KANSAS CITY MO 64106-2896

W912DQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DQ19B1018

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

The SOLICITATION is amended as follows:

NOTE: Deleted text is shown with strikethrough. Added text is shown with underline.

1. SPECIFICATIONS:

a. Section 01 11 00 Paragraph 1.1.1 Project Description

The identified sections of levee R471-460 are to be raised between mainstem levee station 426+44 and 728+00. An additional option includes the installation of 27 relief wells between mainstem levee stations 292+00 and 326+00 and the stabilization of existing relief wells in the same area. A future contract will be let while the R471-460 South of Highway 36 Levee Raise and Relief Wells Contract is underway for a R471-460 levee raise between mainstem levee station 0+00 and 421+00. Several of the more significant tasks to be performed in connection with this contract include the levee raise, stability berm construction, seepage berm construction, construction of new manholes and pipe extensions, abandonment of two 12 inch diameter pipes and construction of a new 24 inch diameter outlet pipe through the levee, reinforcement of three gatewells using fiber reinforced polymer, and the option to install 27 new relief wells and stabilize the existing relief wells. Finally it should be noted that due to work that will take place in the floodplain the anticipated adverse weather days have been increased in Section 01 30 00. The work associated with this project includes a levee raise, the construction of seepage berms, the addition of stability berms, modifications and repairs of gatewell structures, the abandonment of conduits, the extension of conduits, the modification of ditches, repairs due to flood damage, and other incidental work necessary to complete the project.

Options include the installation of relief wells and the stabilization of existing relief wells at all locations identified within the construction documents. A future contract will be let while the R471-460 South of Highway 36 Levee Raise and Relief Wells Contract is underway for a R471- 460 levee raise generally North of Highway 36. Finally it should be noted that due to work that will take place in the floodplain, the anticipated adverse weather days have been increased in Section 01 30 00.

b. Section 01 11 00 Paragraph 1.2. Occupancy of Premises

b. A future contract shall take place concurrently with this project. This project consists of a levee raise between stations 0+00 and 421+00. The Contractor shall coordinate schedule and site access with the Contractor performing this future contract. It is currently projected that this future contract will be awarded in September of 20192020.

c. The contractor shall coordinate with the levee district sponsor during flood events for their access in deploying pumps and discharge lines at existing gatewell structures. Extended pumping time may be required in which case the contractor shall provide protection over discharge lines for access across the levee during construction operations.

c. Section 01 22 00.00 10 to be replaced in entirety

d. Section 01 30 00 Paragraph 1.2 SUBMITTALS

Add Kansas Department of Transportation (Kdot) Information; G, RO to SD-01 Preconstruction Submittals

e. Section 01 30 00 Attachments

2. Union Pacific Grant of Easement and Agreement Kansas Department of Transportation Highway Permit Use of Right of Way

f. Section 01 50 00 Paragraph 3.5.1 Resident Engineer’s Office Removed. Paragraph 3.5.2 Trailer- Type Mobile Office renumbered to 3.5.1.

g. Section 33 26 00.00 23 Attachment – Additional boring information in relief well area between station 295+80 to Station 330+00.

h. Section 35 41 00.01 23 Paragraph 1.5.1 Lines and Grades

The fill will be constructed to the lines, grades, and cross sections indicated on the drawings, unless otherwise directed by the Contracting Officer. The Government reserves the right to increase or decrease fill widths and slopes or to make such other changes in the fill or backfill sections as may be deemed necessary to produce a safe structure. Increases in height of section, made to compensate for settlement or consolidation of the fill material subsequent to the completion of the fill will not exceed 5 percent of the height above the foundation at the levee centerline indicated. The end slopes and side slopes of partial fill sections must not be steeper than one vertical on three horizontal unless otherwise noted.

i. Section 35 41 00.01 23 Paragraph 3.5 Dewatering and Diversion

Surface water and groundwater control shall be accomplished in coordination with the required excavation and fill construction. Groundwater shall be maintained at least 3 feet below excavations required for construction of levee features. Surface and/or groundwater control may necessitate the use of temporary diversion ditches, cofferdams and/or dewatering by the use of pumping. Methods for care of surface water and for controlling the surface and groundwater levels will be subject to approval of the Contracting Officer. It is anticipated the groundwater elevation will be approximated by the water surface elevation of the Missouri River adjacent to the project area. Historical river elevations and stage-duration curves for the Missouri River gage at St. Joseph are provided in the construction drawings.

j. Section 35 41 00.01 23 Paragraph 3.6 Excavation

Excavation consists of removal of material in preparing the foundations to the lines and grades shown on the drawings, removal of material from ditches and channels to the lines and grades shown on the drawings, removal of objectionable materials and obtaining required fill materials from borrow areas. Blasting will not be permitted. Overexcavation will be backfilled to grade with similar overexcavated material or satisfactory material and compacted to a density of at least that of the surrounding material. The Contractor shall not excavate if river levels are, or are projected to be, within 3 feet of the bottom of the excavation.

2. DRAWINGS:

a. G-005 – Removed an entrance at Borrow Area 1 & 3, Corrected Detail Reference in General Note 5.

b. G-006 – Removed an entrance from Borrow Area 1 & 3

c. GC101 – Removed an entrance from Borrow Area 1

d. GC103 – Removed an entrance from Borrow Area 3

e. GC104 – Plan point callouts Added. Boundaries not revised.

f. GC105 – Revised points for Material Storage Area 4 Boundary, Plan Point Callouts Added.

g. C-102 – Revised Construction Limit Points for Borrow Area 3. Plan Point added for clarification.

h. C-104 – Revised Construction Limit Points for Borrow Area 1

i. CS101 – Revised note for riverside rock and landside aggregate thickness

j. CS201 – Revised note with thickness of aggregate

k. CS306-CS312, CS314, CS315 – Note added.

l. CS501 – A8/CS504 updated

m. CS502 – Detail E1 updated

n. CS504 – Ramp added to table F7/CS504

o. CS506 – Detail F4: Added Freeboard Gage Data at Station 420+80

p. CG102 – CG104 – Ditch centerline added to plan view for clarity

q. CG502 – Revised Primary Coarse Filter Pack on Detail A7/CG502

r. LS101 – Revised Seeding to show requirements from Station 420+00 to 428+00 and revised at station 468+00 to 490+00 to remain within construction limits. Construction limits turned off for clarity.

s. LS102 & LS104 – Seeding updated at Borrow 1 and 3 for removed entrances

3. Offerors are required to acknowledge all amendments. Failure to acknowledge all amendments may cause your bid to be rejected.

4. A copy of the updated Davis Bacon wage rates for KS and MO have been provided.

5. Contractors can review responses to questions that were submitted in Projnet.

6. All other terms and conditions remain unchanged and in full force. Currently, there are two amendments to this solicitation. As a final note the updates for this amendment will be on Projnet.

(End of Amendment 0002)

SECTION 00 72 00 - GENERAL CONDITIONS

The following have been added by reference:

52.204-24 52.204-25

(End of Summary of Changes)

File details come from the government source that posted it. Updated .