This document contains a pre-solicitation announcement and solicitation for a construction project. The U.S. Army Corps of Engineers, Kansas City District, will issue a solicitation on or around August 29, 2019 via FedBizOps to raise Levee R471-460 south of US 36 in Kansas and Missouri. The scope of work will require raising sections of the levee between 6 inches to 3 feet, performing related earthwork, strengthening three gate wells, extending seven culverts between 25 to 1,130 feet, and constructing seepage berms between 150 to 500 feet from the landside levee toe. Bids are due approximately 30 days after issuance. The estimated performance period for completion will be included in the solicitation. The project is estimated between $10-25 million and is classified under NAICS 237990. The solicitation will be unrestricted and follow FAR Part 14 for evaluation and award to the lowest responsive and responsible bidder.
Copy of Amendment 0004.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Please See Block 14 Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Nov-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ19B1018
X 9B. DATED (SEE ITEM 11)
19-Sep-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Nov-2019
CODE
USACE, KANSAS CITY +
FEDERAL BLDG, CT-C
601 E 12TH ST RM 647
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DQ19B1018
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
R471-460 Levee Raise W912DQ19B1018 Doniphan County, KS and Buchanan County, MO
The SOLICITATION is amended as follows:
NOTE: Deleted text is shown with strikethrough. Added text is shown with underline.
1. SPECIFICATIONS:
a. Section 35 41 00.01 23 Paragraph 3.5 Dewatering and Diversion
Surface water and groundwater control shall be accomplished in coordination with the required excavation and fill construction. Groundwater shall be maintained at least 3 feet below excavations required for construction of levee features. Surface and/or groundwater control may necessitate the use of temporary diversion ditches, cofferdams and/or dewatering. Methods for care of surface water and for controlling the surface and groundwater levels will be subject to approval of the Contracting Officer. It is anticipated the groundwater elevation will be approximated by the water surface elevation of the Missouri River adjacent to the project area.
Historical river elevations and stage-duration curves for the Missouri River gage at St. Joseph are provided in the construction drawings.
It is anticipated the groundwater elevation will be approximated by the water surface elevation of the Missouri River adjacent to the project area. Historical river elevations and stage-duration curves for the Missouri River gage at St. Joseph are provided in the construction drawings. The need for dewatering and surface water diversion for required excavations and excavation backfill will vary seasonally with river levels and the contractors sequencing of work. Surface water and groundwater control shall be accomplished in coordination with the required excavation and fill construction to ensure groundwater is maintained at least 3 feet below the bottom of required excavations at levee features (not required for borrow excavations). Surface and/or groundwater control may necessitate the use of temporary diversion ditches, cofferdams and/or dewatering. Methods for care of surface water and for controlling the surface and groundwater levels will be subject to approval of the Contracting Officer.
b. Section 35 41 00.01 23 Paragraph 3.16.3 Compaction of Fill
After a layer of fill material has been dumped and spread, it shall be harrowed to break up and blend the fill materials and to obtain uniform moisture distribution. Each lift of impervious, pervious, and random fill will be compacted by not less than 4 passes of compaction equipment suitable to the type of material being placed as specified in paragraph Compaction Equipment.
Each lift of berm random fill will be compacted by evenly distributing the travel paths of equipment used to place the material. Dumping, spreading, sprinkling, and compacting may be performed at the same time at different points along a section when there is sufficient area to
W912DQ19B1018
permit these operations to proceed simultaneously. Compaction equipment shall be operated such that the strip being traversed by the roller shall overlap the rolled adjacent strip by not less than 3 feet.
Each lift of impervious fill, pervious fill, or random fill to be placed on the levee embankment or stability berm will be roller compacted to 95 percent of ASTM D 698. Fill must be within the range of -1 to +3 percent of optimum moisture content at the time of compaction. Fill placed adjacent to structures will meet this same compaction requirement.
Each lift of berm random fill will be compacted by evenly distributing the travel paths of equipment used to place the material, with a minimum of 4 passes per lift required.
c. Section 35 41 00.01 23 Paragraph 3.16.4 Additional Rolling Coverages for Compaction
If the Contracting Officer determines that the desired compaction of the berm random fill is not achieved by the number of coverages specified, additional complete coverages shall be made over the surface area as directed by the Contracting Officer. Payment for additional coverages rolling directed by the Contracting Officer shall be made if specified in the contract documents;
however, no payment will be made for additional rolling coverages not specifically directed by the Contracting Officer.
2. DRAWINGS – No Change
3. Offerors are required to acknowledge receipt of all amendments. Failure to acknowledge all amendments may cause your bid to be rejected.
4. All other terms and conditions remain unchanged and in full force.