W912DQ18R4018
US Army Corps of Engineers Kansas City District Building Strong
HOSPITAL REPLACEMENT
PN 91884
Fort Leonard Wood, Missouri
Design-Build Solicitation and Specifications
Phase One of Two
April 2018
This page was intentionally left blank for duplex printing.
W912DQ18R4018
TC-1
DEPARTMENT OF THE ARMY
Kansas City District, Corps of Engineers 757 Federal Building
Kansas City, Missouri 64106
SPECIFICATIONS FOR CONSTRUCTION OF
Hospital Replacement
PN 91884
Fort Leonard Wood, Missouri
TABLE OF CONTENTS
COVER
BIDDING REQUIREMENTS, CONTRACT FORMS AND CONTRACT CONDITIONS
Section Title
00 10 00 Solicitation 00 21 00 Instructions 00 21 16 Instructions to Proposers 00 22 16 Supplementary Instructions to Proposers 00 45 00 Representations and Certifications 00 72 00 General Conditions 00 73 00 Supplementary Conditions
DIVISION 1 - GENERAL REQUIREMENTS
Section Title
01 10 00 Statement of Work 01 30 00 Administrative Requirements 01 32 17.00 20 Cost-Loaded Network Analysis Schedule (NAS) 01 33 00 Submittal Procedures (KCD) 01 33 16.00 10 Design Data (Design After Award) 01 33 29 Sustainability Reporting 01 35 26 Governmental Safety Requirements 01 42 00 Sources for Referenced Publications 01 45 00.00 10 Quality Control 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) 01 50 00 Temporary Construction Facilities and Controls 01 57 19 Temporary Environmental Controls 01 74 19 Construction and Demolition Waste Management 01 78 00 Closeout Submittals 01 78 10.00 23 Geospatial Deliverables Created as part of Military Design and Construction Projects 01 78 23 Operation and Maintenance Data
-End of Table of Contents-
This page was intentionally left blank for duplex printing.
HOSPITAL REPLACEMENT FORT LEONARD WOOD MISSOURI - CONSTRUCTION
PROJECT DESCRIPTION: The general scope of the requirement is to replace the General Leonard Wood Army Community Hospital (GLWACH) facilities. This procurement includes a Hospital building (256,397 SF); Health Clinic (188,935 SF); an Ambulance Garage; a Central Utility Plant;
Helipad; an Emergency Generator; Site Grading; and Primary Utilities, and installed building equipment (as an option).
The requirement is Unrestricted/Full and Open competitive acquisition; both small and large businesses are eligible to respond. This solicitation w ill use a 2 Phase Design-Build procurement methodology as described in FAR Part 36.3. NAICS CODE: 236220 (Size Standard: $36.5M). In accordance w ith FAR 36.204 and DFARS 236.204, the estimated magnitude of this project is betw een $250,000,000 and $500,000,000.
Funds are not presently available for this acquisition. No contract aw ard w ill be made until funds are appropriated and made available. There is no legal liability on the part of the Govt for any payment until funds are made available to the Contracting Officer, including proposal costs.
This solicitation provides payment of a stipend of $390,000 for each unsuccessful Phase 2 offeror.
CARMEN E HOPKINS 816-389-3264
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
24-Apr-2018
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________1460 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________8 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________08 Jun 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USACE, KANSAS CITY +
FEDERAL BLDG. CT-M RM 647; 601 E 12TH ST
KANSAS CITY MO 64106-2896
W912DQ
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
816-389-2030FAX:TEL: 816-389-3976 TEL: FAX:
W912DQ18R4018 117
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 10 00 - Solicitation
THIS IS A DRAFT CLIN SCHEDULE
Draft CLIN Schedule Only - Preliminary For Information Only – Final CLIN Schedule to be Provided in Phase 2.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Job
FY18 - DESIGN
FFP
Construction Cost Limit is still TBD FOB: Destination
NET AMT
0002 Job
FY18 - CONSTRUCTION
FFP
Construction Construction Cost Limit is still TBD
0003 Job OPTION Installed Building Equipment
FFP
TBD - Installed Building Equipment will not be subject to the CCL
CLAUSES INCORPORATED BY FULL TEXT
SCR_CT_007 MAGNITUDE OF PROJECT—CONSTRUCTION (Jul 2002)
The magnitude of this project is represented by the following estimated price range.
_X___ Between $250,000,000 and $500,000,000
(End)
TPL_NWK_001 Points of Contact
CONTRACT
SPECIALIST:
Carmen E. Hopkins
PHONE:
816-389-3264
E-MAIL:
Carmen.e.hopkins@usace.army.mil
PROJECT
MANAGER:
Casey J. Bolich
PHONE:
816-389-3077
E-MAIL:
Casey.j.bolich@usace.army.mil
PROGRAM
MANAGER: Kelly B. Miller PHONE: 816-389-3317 E-MAIL: kelly.b.miller@usace.army.mil
TPL_NWK_002 PROPOSALS TO BECOME PART OF THE CONTRACT
1. When an offeror submits its proposal in response to a Request For Proposals, and a staffing plan including the names and qualifications of key personnel who are proposed to work on the project is required to be submitted, those personnel who are offered will be the same personnel who will actually perform on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute personnel for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute employee. The Contracting Officer shall have the right to review the qualifications of the proposed substitute employee and to approve or disapprove his or her qualifications. If the proposed substitute employee's qualifications are disapproved by the Contracting Officer, the contractor will propose another employee who does possess equivalent qualifications.
2. When an offeror submits its proposal in response to a Request For Proposals, and the name of a specific subcontractor is a required submittal, then that subcontractor who is offered will be the same subcontractor who will actually perform the specified work on the project. If, during performance of the contract, it becomes necessary for the contractor to substitute a subcontractor for one of those whose qualifications were the basis for evaluation of the offer and award of the contract, the contractor shall submit to the Contracting Officer the same information that was required in the initial proposal regarding the proposed substitute subcontractor. The Contracting Officer shall have the right to review the qualifications of the proposed substitute subcontractor and to approve or disapprove its qualifications. If the proposed substitute subcontractor's qualifications are disapproved by the Contracting Officer, the contractor will propose another subcontractor who does possess equivalent qualifications.
3. When an offeror submits its proposal in response to a Request For Proposals, and a schedule for the performance of the work on the project is a required submittal, the terms of the proposed schedule will become the schedule that will be utilized for completion of the project, adjusted as necessary to reflect the actual issue date of the Notice to Proceed.
4. When an offeror submits its proposal in response to a Request For Proposals and that proposal contains any work, materials, methods or other type of betterment that provides an advantage to the Government that is above the minimum requirements contained in the RFP, the terms of the proposal will be the basis for evaluation and, if successful, will become the terms of the contract upon award. If a change in one of those terms is made to one that is less favorable to the Government than the one on which the award of the contract was based, a credit to the Government will be negotiated by the contractor. Only the Contracting Officer has the authority to negotiate a waiver of the terms of the contract.
(End)
Section 00 21 00 - Instructions
NOTICE
A Phase 1 Pre-Proposal Conference for Prime Contractors will be conducted via webinar on May 4, 2018 @ 1330 Central Standard Time. Please contact Lacy Kay at lacy.kay@usace.army.mil or 816-389-3509 as soon as possible, and no later than May 2, 2018, to obtain webinar logon instructions and information.
Additional Information Regarding Offer Standard Form 1442, Block 13.D.
Offers providing less than 120 calendar days for Government acceptance of their Phase 1 proposal after the date offers are due will not be considered and will be rejected.
The 120 calendar days for the Government acceptance period starts over in Phase 2. Offers providing less than 120 calendar days for Government acceptance of their Phase 2 proposal after the date Phase 2 offers are due will not be considered and will be rejected.
During Phase 2 discussions, the 120 calendar days for the Government acceptance period starts over for each proposal revision. Offers providing less than 120 calendar days for Government acceptance of their Phase 2 proposal revisions after established cut-off date will not be considered and will be rejected.
OVERVIEW
This Request for Proposal (RFP) solicits for the design and construction of the Hospital Replacement, Fort Leonard Wood Missouri.
In Phase 1, the Government intends to select up to a maximum of three most highly rated offerors to compete in Phase 2.
PROGRAM DESCRIPTION
The Replacement Hospital Program is required to replace mission essential facilities at Ft. Leonard Wood that have exceeded their service life. The existing hospital facilities have major deficiencies in key building systems and components including wall assemblies and mechanical, electrical and plumbing systems. The existing hospital facilities are also deficient in environmental and code compliance, do not meet Uniform Federal Accessibility Standards, and do not have the capacity to accommodate ongoing stationing actions. The project requirement is to construct a modern hospital providing state of the art patient care to the Ft Leonard Wood beneficiary population.
The Hospital Replacement program requirements will include the following:
1) Hospital Building (256,397 SF)
2) Health Clinic (188,935 SF)
3) Optical Fabrication Lab (9,979 SF) (excluded from DB project)
4) Ambulance Garage
5) Central Utility Plant
6) Emergency Generator
7) Site Grading and Primary Utilities: Supporting facilities include site utilities (gas, electric, water sewer);
paving, walks, curbs, and gutters, storm drainage, site improvements, minor demolition, special foundations, information technology systems, connection to Energy Monitoring and Control Systems (EMCS), installation of Intrusion Detection System (IDS), and incorporation of Anti-Terrorism/Force Protection (AT/FP) measures (partially excluded from DB project)
8) Helipad
9) Installed Building Equipment
10) Demolition for Old Hospital (excluded from DB Project)
The Government will evaluate the performance capability of offerors in accordance with the criteria described in the solicitation and the contract will be awarded based upon a Best Value Trade-Off process. The mailto:lacy.kay@usace.army.mil solicitation will include a detailed list of Evaluation Factors and will provide instructions for Proposal Requirements and the Basis for Award.
The objective of this source selection is to evaluate and award one contract to a qualified offeror whose proposal represents the “Best Value” to the Government. This source selection will be conducted in accordance with procedures described in the Federal Acquisitions Regulation (FAR), Defense FAR Supplement (DFARS), Army FAR Supplement (AFARS, the DoD Source Selection Procedures (1 April 2016), and the Army Source Selection Supplement (AS3, November 2017 ).
FAR 9.507-1 Provisions
POTENTIAL ORGANIZATION CONFLICTS OF INTEREST
(a) The Contracting Officer has determined that the proposed contract may contain a potential organizational conflict of interest. Offerors are directed to FAR Subpart 9.5 for detailed information concerning organizational conflicts of interest.
(b) The firms listed below may have prepared, participated, or assisted the Government in the preparation of the specifications, requirements or a work statement that will be used in this competitive acquisition.
(1) Identified potential conflicts of interest in the Phase 1 RFP:
Leo A Daly
EDI
Crawford Consulting Foodesign Associates Inc.
IMEDCO
Laundour Innova Group
(2) Identified potential conflicts of interest in the Phase 2 RFP:
Leo A Daly
EDI
Crawford Consulting Foodesign Associates Inc.
IMEDCO
Laundour Innova Group
(c) If a potential offeror prepared, participated, or assisted the Government in the preparation of the specifications, requirements, or work statement in this acquisition, they may not be eligible for award as a prime contractor or subcontractor.
(d) If an offeror requests an exception to the prohibition of paragraph (c) of this provision, the offeror shall submit with its offer a detailed request establishing a factual basis to support the position that an organizational conflict of interest does not exist. If an apparently successful offer has submitted a request for exception, the Contracting Officer will review the request. If no conflict is determined to exist, the offer will be allowed to proceed to award.
(End of provision)
USE OF NON-GOVERNMENT ADVISORS - POTENTIAL ORGANIZATIONAL CONFLICTS OF
INTEREST (Applicable to Phase 2 RFP Only)
(a) During Phase 2, selected employees of contracted firms may serve as non-government technical advisors to the Source Selection Evaluation Board (SSEB). If used, the selected employees’ firms will be identified in the Phase 2 RFP. The Contracting Officer has determined that this is a potential organizational conflict of interest. Offerors are directed to FAR 9.5 for detailed information concerning this potential organizational conflicts of interest.
(b) Offerors are advised that selected employees of Leo A. Daly, IMEDCO, and Innova Group may serve as non-government technical advisors to the SSEB in the source selection process for Phase 2 evaluation Factor 2-1, Technical Design Solution. Non-government technical advisors used during source selection have the potential to gain access to proprietary information of other companies in performing this service.
This is considered a potential organizational conflict of interest in accordance with FAR 9.505-4(b). Non- Government technical advisors will not have access to non-technical price proposal documents.
(c) Selected employees working for these firms may be authorized access to limited portions of the proposal data as necessary to provide an advisory role, if requested, by the SSEB during the Phase 2 evaluation of Factor 2-1, Technical Design Solution. In accordance with FAR 9.505-4(b)., a contractor that gains access to proprietary information of other companies in performing advisory and assistance services for the Government must agree with the other companies to protect their information from unauthorized use or disclosure for as long as it remains proprietary and refrain from using the information for any purpose other than that for which it was furnished. The contracting officer shall obtain copies of these agreements and ensure that they are properly executed. A sample agreement is provided after paragraph (d) below.
(d) In accomplishing their duties, the aforementioned firms may require access to proprietary information contained in the Offeror's proposals. Therefore, pursuant to FAR 9.505-4 – if access to proprietary information is required, these firms must execute an agreement with each Offeror that states that they will
(1) protect the Offeror's information from unauthorized use or disclosure for as long as it remains proprietary and (2) refrain from using the information for any purpose other than that for which it is furnished.
(e) The following is a sample format for the consent form:
Contractor Confidentiality and Nondisclosure Agreement
Whereas we have reviewed FAR 9.505 regarding organizational conflicts of interest. To our knowledge, no organizational conflict of interest exists for this procurement between our company and the Offeror. Whereas Offerors were advised that employees of our firm may serve as technical advisors to the Source Selection Evaluation Board in the source selection process or have served in the conceptual development of this project, the development of the RFP and/or have been involved in the value engineering process of this project. Whereas in accomplishing our duties, our firm, may require access to proprietary information contained in your proposal. Pursuant to FAR 9.505-4, we must execute an agreement with each Offeror that states that we will (1) protect the Offeror's information from unauthorized use or disclosure for as long as it remains proprietary and (2) refrain from using the information for any purpose other than that for which it is furnished.
Therefore, we, ___________________________________, agree that we will:
(1) protect _______________________________________’s information from unauthorized use or disclosure for as long as it remains proprietary
And
(2) refrain from using the information for any purpose other than that for which it is furnished.
Signature of Requesting Company Official Date
Signature of Offering Company Official Date
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-1 Alt I Instructions to Offerors--Competitive Acquisition (Jan 2017) -
Alternate I
OCT 1997
52.236-28 Preparation of Proposals--Construction OCT 1997
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a FIRM-FIXED PRICE (FFP) contract resulting from this solicitation.
(End of provision)
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
2.3%
Pulaski County, MO 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Fort Leonard Wood, Pulaski County, Missouri.
52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER
TRADE AGREEMENTS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be Twenty (20%) percent (Phase 2 Only) of the bid price or $3 Million (Phase 2 Only), whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
USACE, Kansas City District Attn: Lacy Kay Federal Building, RM 647 601 E. 12th Street Kansas City, MO 64106
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for-- To be determined at Phase 2
(c) Participants will meet at-- To be determined at Phase 2
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any DFARS (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
Section 00 21 16 - Instructions to Proposers
RFP SECTION 00 21 16: PHASE 1 OF 2 PHASE SELECTION PROCEDURES
1. Overview
a. This Request for Proposal (RFP) solicits for the design and construction of the Hospital Replacement program located at Fort Leonard Wood, MO.
b. The construction contract for the Hospital Replacement acquisition will utilize a Design- Build delivery method. The selected design-build contractor must have the demonstrated capability to manage a complex design effort; plan, and execute large scale projects (with hundreds of workers per day on site and placement in the range of millions of dollars per month); and meet construction deadlines on a confined site. The entire program will require extensive coordination using an Integrated Master Schedule (IMS). Work for the project will involve site development, general construction, excavation and grading, drainage, mechanical, electrical, plumbing, fire protection work, building automation, building security systems, data cabling of secure and non-secure networks, engineering controls, telecommunications systems, and utility systems. All work will be accomplished in compliance with the RFP criteria, contractor prepared design documents, local, state, and Federal codes applicable to the construction of a hospital facility.
c. Firms formally organized as design-build entities, design firms and construction contractors that have associated specifically for this project, consortia of firms, or any other interested parties may submit proposals. A design firm or construction contractor may offer more than one proposal by entering into more than one association. Associations may be joint ventures or include key team subcontractors. Any legally organized Offeror may submit a proposal.
d. Contractor Team Arrangements. Contractor Team Arrangements are considered an arrangement in which (1) two or more companies form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program. In accordance with FAR Subpart 9.6, the Government will recognize the integrity and validity of contractor team arrangements, provided the arrangements are identified and company relationships are fully disclosed in the offer. The Offeror shall identify the major or critical aspects of the requirement to be performed by those identified in the Contractor Team Arrangement.
e. Any Offeror submitting an offer in the name of a joint venture, shall include a fully executed copy of the joint venture agreement with the offer. Joint venture agreements which require SBA approval may be submitted absent the requisite SBA Servicing Agency approving authorities’ signature; however, the Offeror shall submit evidence from the Offeror’s SBA Servicing Agency that the Offeror has notified and discussed the proposed joint venture for this project with the appropriate SBA personnel.
f. In Phase 1 of the two phase selection procedure, Offerors will submit certain specified performance capability proposals, demonstrating their capability to successfully execute design build construction work under the contract resulting from this solicitation. The Government will evaluate the proposals and intends to invite a maximum of three most highly rated Phase 1 offerors to compete in Phase 2 for the design build construction of the Hospital Replacement facility.
g. Offerors must submit a complete Phase 1 proposal to be considered for Phase 2. PHASE 1 DOES NOT
REQUEST OR REQUIRE A PRICING SUBMISSION.
h. At the beginning of Phase 2, an amendment will be issued to only the selected offerors from Phase 1 inviting them to submit a design build technical solution, key sub-contractors/consultants, small business participation plan, and price proposals for consideration.
In addition, Key Personnel ratings from Phase 1 will be brought forward to Phase 2. The amendment will request additional information needed to meet the solicitation requirements for Phase 2 proposals. At the conclusion of Phase 2, the Contracting Officer will award a single firm fixed price contract for the design and construction of the Hospital Replacement to the offeror whose proposal offers the Best Value to the Government under a trade-off source selection approach, considering the price and non-price factors described in Phase 2. The Government intends to publicly announce the names of Offerors selected for Phase 2 on the FEDBIZOPPS website.
j. Offerors must submit a complete Phase 2 proposal to be considered for award. Failure to submit a complete proposal may result in the entire proposal being rejected.
k. This solicitation uses the Two-Phase Design-Build selection procedures, as described in FAR Sub Part 36.3, and provides for payment of a stipend to the unsuccessful Phase 2 Offerors who were not selected for award of the resulting Design-Build contract. To be eligible for a stipend, the unsuccessful Phase 2 offerors’ technical proposals must be rated acceptable in all technical evaluation criteria, meeting this solicitation’s Government furnished criteria. Payment of the stipend will be initiated ten (10) calendar days after contract award, provided the award has not been protested, or after any protest has been fully resolved. The stipend amount is $390,000.00 for each offeror.
l. Based on lessons learned from previous Hospital projects, a critical aspect of the Hospital
Replacement project is ensuring a single source of responsibility for construction and Initial Outfitting of the Installed Building Equipment prior to Beneficial Occupancy.
2. GENERAL PROPOSAL SUBMISSION INSTRUCTIONS
All offerors shall be required to submit a proposal with the minimum content as specified herein. Proposals without the minimum content may be rejected. Proposals will be received until the date and time indicated on Standard Form 1442 at the following address:
U.S. Army Engineer District, Kansas City Federal Building Room 647
ATTN: CECT-NWK-M/
Carmen Hopkins 601 East 12th Street Kansas City, Missouri 64106-2896
3. PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS
In order to be considered for award of a contract for the requirements of this solicitation, the offeror must submit a complete proposal which follows the submittal requirements below. Failure to submit a complete proposal may result in the entire offer being rejected. The proposals shall be submitted in Volumes as follows:
Proposal Characteristics - PHASE 1 Submit the proposal in tabbed, three-ring binders identified by the Solicitation Number (W912DQ- 18-R- 4018), project title (Hospital Replacement, Fort Leonard Wood, MO), name, address, and telephone number of the offeror. Arrange the proposal as follows:
Phase 1 - Volume 1, Technical Proposal: The cover letter, Tab A, Tab B, Tab C, TAB D, TAB E, TAB F, and TAB G shall be submitted in one original hard copy and electronically. 8 Copies of TABs D, E, F, and G shall also be provided as required by the solicitation.
Cover letter - Solicitation number; Name, address, email, and telephone number of the offeror;
Names, titles, emails, and telephone numbers of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this RFP. Name, title and signature of the person authorized to sign the proposal.
A statement specifying agreement with all terms, conditions and provisions included in the RFP; CAGE Codes and DUNS number for the offeror, and all teaming partners who participated in the Factor 1-3 – Corporate Experience.
Table of Contents - Each volume of the proposal should contain a detailed table of contents. All pages of each factor should be sequentially numbered. If more than one binder is used, the complete table of contents shall be included in each.
TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror, include the offeror’s DUNS number in block 14.
Acknowledgement of all amendments to the RFP in accordance with the instructions on the Standard Form 30 (amendment form).
Bond Surety Letter. Offeror must provide a letter or other documentation from a surety appearing on the Department of Treasury Circular 570 (list of approved sureties) stating that the Offeror is able to provide a bid bond for Phase 2 and obtain performance and payment bonds should they win the contract. FAILURE TO
PROVIDE THIS INFORMATION WILL RESULT IN INELIGIBILITY FOR
AWARD.
Financial statement and bank letter that verify sufficient funds will be available to perform the work.
TAB B – Section 00 45 00 – Representations and Certifications, Printed Entity Record from System for Award Management (SAM).
TAB C – If applicable, Offers submitting proposals using a teaming arrangement shall submit a fully executed copy of the teaming arrangement signed both by the subcontractor/teaming partner and the offeror and the narrative described in 00 21 16 paragraph 1.d above.
If applicable, Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal, including letters of commitment from the joint venture firms. See 00 21 16 paragraph 1.e above and paragraph 5 below.
TAB D - Factor 1-1: Key Personnel
TAB E - Factor 1-2: Performance Confidence
TAB F - Factor 1-3: Corporate Experience
Letters of commitment for subcontractor or teaming partners as identified in section
6.0 below.
TAB G - Factor 1-4: Technical Approach Narrative
Information submitted about any company other than the Offeror, whether a predecessor company, affiliated company, major subcontractor, or other associated business, WILL NOT be evaluated for any factor unless the proposal contains a detailed narrative explaining why this submitted information is relevant for performance of this contract. The Government will consider the adequacy of this explanation in deciding the relevance and weight of the information to this procurement. Information about major subcontractors may not be given much weight unless the proposal contains some evidence that this subcontractor is committed to perform the work. See
UAI 5152.236-9001.
Offerors shall limit Phase 1 Proposal, to the following page limits.
Factor 1-1: Key Personnel, to a maximum of 22 pages plus up to 5 pages for the matrix.
Factor 1-2: Performance Confidence. No page limit for this factor.
Factor 1-3: Corporate Experience, to a maximum of 30 pages.
Factor 1-4, Technical Approach Narrative, to a maximum of 8 pages.
Volumes shall be submitted in the following quantities:
Volume 1 – Technical Proposal Original & 8 copies
Electronic copies shall also be provided on one CD/DVD in PDF format and be *Optical Character Recognition (OCR) compatible. The CD/DVD must be clearly labeled by solicitation number, project name, installation, and Offeror’s name. In the event of any conflict between the electronic submission and the hard copy submission, the hard copy submission will govern and will be the material upon which the Government bases its evaluation and ultimately, its decision.
All text must be legible and easily read. The page size of the offeror’s proposal shall not exceed 8-1/2 by 11 inches. Diagrams, charts and tables shall conform to the paper size. All text shall be typed single-spaced with a minimum size 10 font. Margins (1-inch) shall be clean and clear. If fold-out charts are unavoidable, and are to be utilized, all sheets shall be reproduced on 11 by 17 inch, and folded to 8- 1/2 by 11 inch size. A page is defined as text or information on one side of the paper. If it is printed double sided, each face will be counted as a page.
*OCR is a common method of digitizing printed texts so that they can be electronically searched, stored more compactly, displayed on-line, and used in machine processes such as machine translation, text-to-speech, key data extraction and text mining.
4.0 INQUIRIES/QUESTIONS
Technical inquiries and questions relating to this solicitation shall be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org). To submit and review inquiry items, prospective offerors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access.
A prospective offeror who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective offeror once the reply is available for viewing.
***Please Note: Offerors shall only submit one question per inquiry. All inquiries containing multiple questions shall be rejected.
The Solicitation Number is: W912DQ18R4018 The Bidder Inquiry Key is: E49NU4-QP59TE The Plan Room Key is: RA4Z9Y-GHVFS9 Instructions for first-time ProjNet Bid Inquiry Access:
From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
1. Identify the Agency. Select agency USACE.
2. Key. Enter the Bidder Inquiry Key listed above.
3. Email. Enter the email address you would like to use for communication.
4. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
5. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
6. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Instructions for future ProjNet Bid Inquiry Access:
https://www.projnet.org/
1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. Select agency USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Click Continue. A page will then open asking you to enter the answer to your Secret
Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
The Bidder Inquiry System will be unavailable for new inquiries ten calendar days before proposal due date in order to ensure adequate time is allotted to form an appropriate response to inquiries and amend the solicitation if necessary.
Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago) or by appointment for OCONUS. The telephone number for the Call Center is 1-800-428-HELP. Email to staff@rcesupport.com.
5.0 JOINT VENTURES
Joint Ventures shall submit the following additional documentation regarding their business entities in Volume 1 Tab C:
1) A copy of their Joint Venture agreement:
2) A detailed statement outlining the following in terms of percentages, where appropriate.
a. The relationship of the joint venture parties in terms of business ownership, capital contribution, and profit distribution or loss sharing.
b. The management approach of the joint venture in terms of who will conduct, direct, supervise and control the project and have custody and control of the assets of the Joint Venture and perform the duties necessary to complete the work.
c. The structure of the joint venture and decision-making responsibilities of the Joint Venture parties in terms of who will control the manner and method of performance of the work.
d. The bonding responsibilities of the Joint Venture parties.
e. Identification of the key personnel having authority to legally bind the Joint Venture to subcontracts and state who will provide or contract for the labor and materials for the Joint Venture.
f. Identification of party maintaining the Joint Venture bank accounts for the payment of all expenses and the deposits of all receipts, keeping the books and records, and paying applicable taxes for the Joint Venture.
g. Identification of party furnishing the facilities, such as office supplies and telephone service.
h. Identification of party having overall control of the Joint Venture.
Other sections of the proposal shall identify, where appropriate, whether key personnel are employees of the individual Joint Venture parties and identify the party, or hired as employees of the Joint Venture.
mailto:staff@rcesupport.com
6.0 SUBCONTRACTOR/TEAMING PARTNERS
If an offeror wishes to receive credit for the corporate experience or past performance of a subcontractor or teaming partner,…