A.07.24_Amendment_0004.pdf

PDF 604 KB Posted

Attached to
Fort Leonard Wood POCA -US&R Requirement
Solicitation number
W912DQ17R4037
Issued by

About this file

Amendment 0004 changes in Scope of Work, and Wage Rates

View the file

Other files

File Type Posted
Site_Visit_Log_combined_04_Oct-_12_Oct.pdf PDF
Amendment_0003.pdf PDF
10-3-2017_Amendment_2.pdf PDF
Amendment_0001.pdf PDF
FY18_FLW_Base_POCA_and_Bldg_5415_Task_Order.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

FLW POCA,

The purpose of this amendment is sending updated changes in section 00 10 00 in Scope of Work and attach updated Wage Rates.

---------------------------------------------------SEE CONTINUATION PAGE--------------------------------------------------------

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Oct-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ17R4037

X 9B. DATED (SEE ITEM 11)

22-Sep-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Oct-2017

CODE

USACE, KANSAS CITY +

FEDERAL BLDG. CT-M RM 647; 601 E 12TH ST

KANSAS CITY MO 64106-2896

W912DQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DQ17R4037

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

CONTINUATION PAGE 3

a. NECESSITY FOR THE CHANGE: To amend Amend the specifications and include prevailing wage rates.

b. THE CHANGE: Changes are made as outlined below:

1. To amendment the specifications for SECTION 01 10 00 (See below)

2. To amendment the specifications for SECTION 01 30 00 Administrative Requirements and

SECTION 01 30 01 Administrative Requirements – Design Build (See below)

3. To include previaling wage rates.

c. WAGE DETERMINATION: See below.

d. PROPOSAL DUE DATE: No Change.

e. TERMS AND CONDITIONS: All other terms and conditions remain the same.

1. SPECIFICATIONS:

SECTION 01 10 00 the following changes are made:

a. Paragraph 1.1 “General” is changed to read as follows:

1.1 GENERAL. Design and renovate Building 5415, complying with the specifications and requirements contained in this Statement of Work (SOW). The criteria contained in this SOW establish minimum standards for design and construction quality. The objective of this project is to update the existing building to meet the current mission requirement of Homeland Defense.

Building 5415 will be occupied and in use during the execution of the work under this task order. The contractor shall develop the project schedule in coordination with the building occupant and the ACO so as to accommodate the mission requirements of the building occupant, in so far as it is reasonable to do so, and without incurring additional cost, and given the inherent construction constraints.

This facility was built in 1999 and has had minor renovations completed. The purpose of the facility is to equip and train student in both simulated activities and classroom environment. Functional spaces for the renovation areas with the facility can be found in Paragraph 2 – Functional and Area Requirements.

b. Paragraph 2.1 CORRIDOR 107:

Construct a new partition wall on column line 3 between column lines D and E. Place a doorway in this wall to provide access between Corridor 107 and the existing Administration Area not to include where

New Office 125 will be. Construct a new partition wall with a doorway across Corridor 107 on column line D. These two doorways shall be keyed for the building users and not for NEC. The existing exterior door 05 and both Communication Rooms (RM 109 A/B) shall be keyed so that NEC can gain access but not to any other part of the building. Replace existing communication room door (RM109A), which currently houses a cypher lock, salvage cypher lock and provide to the Government. Door shall match

Project Finish Requirements listed below. Relocate on light fixture, four supply air diffusers, one fire alarm device, provide one new return air diffuser, and reconfigure the suspended ceiling grid and tiles to accommodate the new wall configuration. Modify the lighting, mechanical and fire protection systems due to the wall construction. Provide new light switches for corridor lighting. Refer to Appendix B for door placements.

c. Paragraph 2.2 ADMINISTRATION AREA:

The open office area adjacent to the vestibule and lobby entry shall accommodate (1) supply storage room and the maximum number of workstation to meet the mission. Provide a minimum of (6) typical workstations. Provide power and telecommunication LAN to all typical workstations. The supply storage room shall be a lockable workstation configuration located adjacent to Corridor 107. Provide, at a minimum, (2) 4-high metal storage cabinets, (2) hybrid metal storage hinge/lateral files cabinet, and (6) lateral file cabinets. Provide new resilient flooring (VCT) and new transition strips at each interior threshold of the within the Administration Area and existing Private Offices (RM103-104). Both existing

Private Offices shall maintain existing carpet:

d. Paragraph 2.3 PRIVATE OFFICE (new RM 125):

Construct a new private office perpendicular to the new wall on column line 3. Construct a partition wall that is 9’-8” from column line E. Partition shall align with existing private office (RM 104) construction.

Provide (1) desk for testing administrator and (3) 4-high lockable lateral files along back wall. Provide new resilient flooring (VCT). Provide new light switches for office lighting.

e. Paragraph 2.7 OPEN OFFICE (RM116/115):

Open office area shall accommodate (18) instructors workstations, (1) multifunctional copy printer (GFGI) and (1) countertop printer (GFGI). This room shall function as an area where the instructor prepare for courses, complete paper work, and decompress from student interaction. Provide minimum (18) typical workstations and (1) 3’-high hinged door cabinet with laminate top, deep enough to house countertop printer. Workstations and printers require power and LAN connections. Refer to Electrical section for more detail. Provide new VCT to match existing floor tile to fill in flooring at demolished wall location.

Confirm attic stock prior to ordering VCT and use instead of new VCT, if possible.

f. Paragraph 2.8 ISSUE ROOM (RM114):

Issuing room shall allow for a natural flow for students to enter and exit from Corridor 117. After students enter the room they will proceed to the left and retrieve all items required clockwise around the room. All items are storage in hinged storage cabinets. Provide a minimum of (15) industrial lockable storage cabinets. Storage shall fill the perimeter to the maximum extent possible, excluding doors and windows.

All storage shall be keyed alike with the exception of one designated for supply managers printer paper and print cartridges.

g. Paragraph 2.9 CLASSROOM #1 (RM118):

Classroom shall accommodate (50) students and (2) instructors between both sides of the existing operable partition. The front of the classrooms shall be the South classroom wall. Provide new A/V connections and equipment to accommodate new presentation location. Presentation display shall be through interactive collaborative monitors. Provide (2) monitors (similar to SmartBoards), one per classroom side, with (2) wall mounts. Refer to interactive collaborative monitor technical requirements and A/V section for more detail. Provide (2) instructors desk, (26) training tables, and (52) training chairs. Instructor desk shall be located near the presentation control panel in the back corner of each classroom side. Training tables shall house two students per table. Classroom shall have manual blackout roller shades at each window in accordance with section 3.3.

h. Paragraph 2.11.1 Paint

Contractor shall repair any walls damaged during demolition and paint to match existing wall. Walls to be patched shall be painted the full extent of the wall from edge to edge, only painting the repair area is not acceptable. Paint all walls in the following rooms.

A. Administration Area (existing RM 105)

B. Classrooms

C. Issuing Room

D. Open Office

E. Storage

F. Break Room

G. Corridor 107

H. Private Offices (new RM 125)

i. Paragraph 2.11.2 Resilient Flooring

Design and install VCT within the Front Administration Area and new Private Offices. Finish selected shall not attempt to match existing VCT. Provide flooring transition if necessary.

j. Paragraph 2.11.3 Doors

New doors shall be solid core wood doors with hollow metal frames. Doors, and frame, and hardware finish and types shall match existing doors. Reference FLW Design Guide for lock requirements. Provide door closers for each new corridor door.

k. Paragraph 2.11.7 Signage

Provide signage for all new rooms and doors. Signage shall match in both aesthetics and quality of existing room signs. Room number for the new private office shall be 105. Adjust As-Built drawings to reflect room numbering changes.

l. Paragraph 3.1.2.2. Furniture Fixtures and Equipment (FF&E). Paragraph A “Furnishing Groups”, Subparagraph a “Government Furnished Government Installed (GFGI) is changed to read as follows:

A. Furnishing Groups

a. Government Furnished Government Installed (GFGI)

The Contractor shall provide power/data/plumbing/mechanical requirements for these items.

General office equipment and miscellaneous building equipment shall be GFGI, including, but not limited to, computers, copy machines, printers, fax machines, phone systems, coffee machines, vending machines, and other appliances that do not require Contractor installation.

m. Paragraph 3.2.1 “Administrative Area RM 105 is changed to read as follows:

3.2.1 Administrative Area RM 105

Remove and recycle existing carpet except where New Office RM 125 will be ant existing Private

Offices RM 103 & 104.

n. ADD New Paragraph 3.2.5 as follows:

3.2.5 Existing Workstations

Deconstruct and remove all existing workstations and power polls.

o. Paragraph 3.3.2 Wall Base

Provide rubber wall base conforming to ASTM F1861, Type TS (vulcanized thermoset rubber) or

Type TP (thermoplastic rubber), Style A (straight – installed with carpet and resilient flooring).

Provide 4 inch high and a minimum 1/8 inch thick wall base. Utilize and reference UFGS 09 65 00 for additional requirements.

p. Paragraph 3.3.7 Roller Shades

Roller blackout shades shall be install with appropriate bracket for an inside mount. Shades shall be controlled by crank operated gear box with steel rods. Manual operated chain drive with a #10 stainless steel chain rated 90 lb. minimum breaking strength. Provide chain length to allow average height individuals the ability to close and open the shades, windows are clearstory. Shade cloth shall be canvas duck cloth laminated to vinyl. Field verify window dimensions prior to purchasing.

a. Blackout shade cloth shall be PVC-free polyester yarns with an opaque acrylic backing or opaque vinyl material with fiberglass yarns.

b. General shade cloth shall be 5% open and woven thermoplastic olefin (TPO).

q. Paragraph 3.4.2. Building Services Coordination

The Contractor shall refer to the construction drawings to ensure that the installation of systems furniture is coordinated with electrical trades before installation takes place and ensure proper locations, power requirements, and connection devices related to electrical connections to the powered panels are provided. A maximum 6-foot flexible conduit shall be used to hardwire connect the panels to the electrical source at the wall. The Contractor shall verify, before ordering or installing the systems furniture and before interior building construction takes place, that the location of system furniture panels does not interfere with proposed locations of thermostats, light switches, or other wall mounted items provided by other trades. Conflicts shall be brought to the attention of the Government Contract Representative as soon as possible for immediate resolution.

r. Paragraph 3.4.5 Warranty

Manufacturer's performance guarantees or warranties shall be for single-shift service and shall include parts, labor and transportation. Minimum warranties for all FF&E products shall be five

(5) years, unless otherwise noted.

s. Paragraph 3.4.9.2 “Training Table”

Provide laminate training tables with metal powder-coated bases and casters. Table top shape shall be rectangular, square corners, and vinyl T-mold edge and minimum of 12.5 lineal feet each. Top shall be flip-top; capable of flipping with modesty panel attached.

t. Paragraph 3.4.10.2 Task Chair, Subparagraph A is changed to read as follows:

A. Construction

a. Textured plastic arm pads

b. 5-star aluminum base

c. 2-inch black hooded dual wheel carpet hard surface caster

d. Minimum 100,000 DR fabric seat

u. Paragraph 3.4.10.4 Training Chair, Subparagraph A is changed\to read as follows:

A. Construction

a. Textured plastic arm pads

b. 5-star aluminum base

c. 2-inch black hooded dual wheel carpet hard surface caster

d. Minimum 100,000 DR fabric seat

v. ADD New Paragraph 3.4.13.5 Phones as follows:

3.4.13.5 Phones

Provide one phone per private office similar or equal to Avaya 9641Gs. Provide one phone per workstation and classroom similar or equal to Avaya 9611Gs. Phone shall be approved by the Joint

Interoperability Test Command (JITC) and shall be purchased through Computer Hardware Enterprise

Software and Solutions (CHESS). Finish shall be black.

A. Salient Characteristics.

a. VoIP phone; RJ-45

b. Min. 2 network ports

c. LCD Screen

d. Min. 5 Multifunction Keys

e. Speed Dialing keys

f. Last Number Redial

g. Caller ID and call duration display

h. Date and Time Display

i. Dedicated function keys: conference, transfer, drop, hold, speaker monitoring mute, volume, voice mail, headset

j. Message waiting LED indication

k. Dedicated headset port

l. UL Listed

m. SIP and SDP communication protocols

n. Desktop and wall mountable

w. ADD New Paragraph 3.4.14 Accessories as follows:

3.4.14 Accessories

3.4.14.1 Waste Receptacle / Recycle Receptacle

Desk Receptacle shall hold 28 quart capacity. Recycle receptacle shall be blue with recycling decal. Provide both waste and recycle receptacles at each workstation, office, and classroom.

A. Salient Characteristics.

a. Plastic leak-proof construction

b. Soft radius corners, rolled edges

c. Dent and crush resistant

x. Change the following paragraph numbers in Pargraph 4 Plumbing:

DELETE 7. PLUMBING and CHANGE to 4. PLUMBING

DELETE 7.1 FIXTURES and CHANGE to 4.1 FIXTURES

DELETE 7.1.1 and change to 4.1.1

DELETE 7.1.2 and change to 4.1.2

y. Paragraph 5 – Electrical Systems. Change all Paragraph numbers starting with “8” to “5”

For example change paragraph 8. ELECTRICAL SYSTEMS to paragraph

5. ELECTRICAL SYSTEMS and renumber subsequent paragraphs.

SECTION 01 30 00 Administrative Requirements and SECTION 01 30 01 Administrative Requirements – Design

Build”, Paragraph 1.5.4 “OPSEC Training” is changed to read as follows:

1.5.4 OPSEC Training

New contractor employees must complete Level I OPSEC training within 30 calendar days of their reporting for duty in accordance with AR 530-1. All contractors shall complete annual OPSEC Awareness training if the contract duration is longer than 30-days. Proof of training, including a detailed listing of attendees, shall be provided to the KO. The burden to complete this training is approximately 1-hour per training evolution.

There are no restrictions to number of attendees in a given training evolution.

All costs associated with employee training and review must be included in the CLIN prices bid/offered for the underlying requirement. No other payments are authorized.

If the Contractor cannot obtain the Level I OPSEC training by a qualified Level II trained OPSEC Officer, the MSCoE OPSEC Officer can provide the required training. Coordination of training shall be through the

U.S. Army Corps of Engineers COR.

Contractor shall reimburse the Government for classroom OPSEC training conducted by the MSCoE OPSEC

Officer. The established fee is $30 per face-to-face training session conducted. Contractor personnel may all attend the same training session; however, in the event of new hires, additional session(s) shall be required.

Contractor shall submit payment to the US Treasury, Attention: Budget Officer, MSCoE G-8, 14000

MSCOE Loop, Suite 335, Fort Leonard Wood, MO 65473.

OPSEC Standard Operating Procedure/Plan (SOP): The KO will ensure the contractor (after selected) is aware of the MSCoE OPSEC Plan and is in compliance with the MSCoE OPSEC Plan during contract performance.

WAGE RATES

General Decision Number: MO170019 08/25/2017 MO19

Superseded General Decision Number: MO20160019

State: Missouri

Construction Type: Building

County: Pulaski County in Missouri.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.

The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/06/2017

1 03/03/2017

2 03/31/2017

3 04/14/2017

4 04/21/2017

5 04/28/2017

6 06/02/2017

7 08/11/2017

8 08/25/2017

ASBE0063-002 11/01/2015

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 25.47 11.25

BRMO0011-009 03/01/2017

TILE SETTER......................$ 29.76 17.39

CARP0012-002 05/07/2017

CARPENTER (Including Drywall

Hanging & Form Work).............$ 36.67 16.25

* CARP1310-003 05/01/2017

CARPENTER (Floor Layer)

(Resilient & Vinyl Flooring

Only)............................$ 32.33 16.25

ELEC0453-003 09/01/2015

ELECTRICIAN......................$ 29.80 14.83

ENGI0513-001 05/01/2016

POWER EQUIPMENT OPERATOR:

Backhoe/Excavator/ Trackhoe.$ 28.86 24.98

Bulldozer...................$ 28.86 24.98

Grader/Blade................$ 28.86 24.98

Loader......................$ 28.86 24.98

Paver.......................$ 28.86 24.98

Roller......................$ 28.86 24.98

* IRON0396-017 08/02/2017

IRONWORKER, STRUCTURAL...........$ 29.49 25.11

LABO0840-003 03/01/2017

LABORER

Brick Mason Tender..........$ 26.46 12.74

Common or General &

Landscape...................$ 24.56 12.74

PAIN1265-002 07/01/2013

PAINTER: Drywall

Finishing/Taping.................$ 26.64 13.27

PAIN1265-008 07/01/2013

PAINTER

Brush & Roller Only.........$ 25.64 13.27

PLAS0527-006 06/01/2017

CEMENT MASON/CONCRETE FINISHER...$ 32.44 18.07

PLUM0562-011 07/01/2017

PIPEFITTER, Includes HVAC

Pipe Installation

Mechanical Contracts including all piping and temperature control work

$7.0 million & under........$ 37.91 21.69

Mechanical Contracts including all piping and temperature control work over $7.0 million...........$ 39.25 27.18

PLUMBER, Excludes HVAC Pipe

Installation

Mechanical Contracts including all piping and temperature control work

$7.0 million & under........$ 37.91 21.69

Mechanical Contracts including all piping and temperature control work over $7.0 million...........$ 39.25 27.18

ROOF0020-012 09/19/2016

ROOFER...........................$ 29.30 15.19

SFMO0669-003 04/01/2017

SPRINKLER FITTER (Fire

Sprinklers)......................$ 34.79 15.85

* SHEE0036-010 02/01/2017

SHEET METAL WORKER (HVAC Duct

& System Installation Only)......$ 41.55 21.70

SUMO2010-018 03/08/2010

BRICKLAYER.......................$ 23.65 7.92

GLAZIER..........................$ 29.87 1.47

IRONWORKER, REINFORCING..........$ 20.90 8.88

LABORER: Asbestos Abatement

(Removal from Floors, Walls, & Ceilings)......................$ 24.90 0.00

PAINTER: Spray..................$ 18.79 8.12

SHEET METAL WORKER, Excludes

HVAC Duct and Unit

Installation.....................$ 23.65 4.50

TRUCK DRIVER: Dump Truck........$ 25.57 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or

"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

The following have been deleted:

CONTINUATION PAGE 2

(End of Summary of Changes)

Renovate Building 5415 W912DQ-17-R-4016 Fort Leonard Wood, Missouri Amendment 0004

01 10 00-1

S E C T I O N 0 1 1 0 0 0

S T A T E M E N T O F W O R K

T A B L E O F C O N T E N T S

PARAGRAPH 1 - DESIGN OBJECTIVES

PARAGRAPH 2 - FUNCTIONAL AND AREA REQUIREMENTS

PARAGRAPH 3 - ARCHITECTURAL DESIGN

PARAGRAPH 4 - PLUMBING

PARAGRAPH 5 - ELECTRICAL SYSTEMS

01 10 00-2

This page intentionally left blank

01 10 00-3

PARAGRAPH 1 - DESIGN OBJECTIVES

1. DESIGN OBJECTIVES

1.1. GENERAL. Design and renovate Building 5415, complying with the specifications and requirements contained in this Statement of Work (SOW). The criteria contained in this SOW establish minimum standards for design and construction quality. The objective of this project is to update the existing building to meet the current mission requirement of Homeland Defense.

Building 5415 will be occupied and in use during the execution of the work under this task order. The contractor shall develop the project schedule in coordination with the building occupant and the ACO so as to accommodate the mission requirements of the building occupant, in so far as it is reasonable to do so, and without incurring additional cost, and given the inherent construction constraints.

This facility was built in 1999 and has had minor renovations completed. The purpose of the facility is to equip and train student in both simulated activities and classroom environment. Functional spaces for the renovation areas with the facility can be found in Paragraph 2 – Functional and Area Requirements.

1.1.1. Demolition Considerations and Requirements. Minimal demolition will be performed as a part of the contract, however there will be some utility relocations. Specific demolition description can be found within each discipline sections. Refer to Appendix A, for 1999 building floor plan, power, and telecommunication drawings. Refer to Appendix B for current condition layout and demolition considerations.

1.2. DESIGN QUALITY. The main objective of this solicitation is to renovate the building as described in the Statement of Work (SOW) and purchase Furniture, Fixtures, and Equipment (FF&E) for Ft. Leonard Wood Homeland Defense. Design quality will be achieved through the strict adherence to mission enabling functional requirements, and an overall balance of aesthetics and functionality. All additions and refurbishment of the facility shall consider the long-term durability and minimal maintenance requirement for quality.

1.3. APPLICABLE CRITERIA. Criteria shall be taken from the most current references as of the date of the solicitation of the Request for Proposal (RFP). Referenced codes and standards are minimum acceptable criteria. Administrative, contractual, and procedural features of the contract are described in other sections of this SOW. Additional codes/standards include applicable UFC, IBC, NFPA, AFI, AFMAN and ASCE criteria. For any discrepancies between the various codes/standards, the most stringent requirements will apply.

1.3.1. National Standards

Air Conditioning and Refrigeration Institute ARI Air Conditioning and Refrigeration Institute Standard

ANSI/BIFMA International (ANSI/BIFMA) ANSI/BIFMA X5.5 American National Standards For Office Furnishings - Desk Products ANSI/BIFMA X5.6 American National Standards For Office Furnishings - Panel Systems

01 10 00-4

ANSI/BIFMA X5.9 American National Standards For Office Furnishings - Storage Units

ARCHITECTURAL WOODWORK INSTITUTE (AWI)

Section 400 Architectural Cabinets

American Society of Heating, Refrigerating and Air-Conditioning ASHRAE 55 Thermal Environmental Conditions for Human Occupancy ASHRAE 62.2 Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings ASHRAE 62.1 Ventilation for Acceptable Indoor Air Quality ASHRAE 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings

Accessibility Guidelines ADAAG Americans with Disabilities Act Accessibility Guideline ABA Architectural Barriers Act

Architectural Woodwork Institute AWS Architectural Woodwork Standards

Gypsum Association GA-216-10 Application and Finishing of Gypsum Panel Products

International Code Council IBC International Building Code IPC International Plumbing Code

National Electrical Contractors Association NECA 568 Standard for Installing Building Telecommunications Cabling

MPI Master Painters Institute

National Electrical Manufactures Association (NEMA)

NEMA WD 1 General Color Requirements for Wiring Devices NEMA WD 6 Wiring Devices - Dimensional Requirements NEMA LD 3.1 Performance, Application, Fabrication, and Installation of High-Pressure Decorative

Laminates

National Fire Protection Association (NFPA) Standards NFPA 1 Uniform Fire Code NFPA 10 Standard for Portable Fire Extinguisher NFPA 54 National Fuel Gas Code NFPA 70 National Electrical Code

01 10 00-5

NFPA 70E Standard for Electrical Safety in the Workplace NFPA 101 Life Safety Code

Natural Resources Conservation Service TR-55 Urban Hydrology for Small Watersheds

Telecommunications Industry Association ISEC 13A Technical Criteria Standard

Tile Council of America ANSI A137.1 American National Standard Specifications for Ceramic Tile, Version 1

UNDERWRITERS LABORATORIES (UL)

UL 1286 Office Furnishings UL 723 Test for Surface Burning Characteristics of Building Materials

1.3.2. Military Criteria

Public Laws EISA Energy Independence and Security Act EPAcT Energy Policy Act

Unified Facilities Criteria UFC 1-200-01 General Building Requirements UFC 3-101-01 Architecture UFC 3-120-10 Interior Design UFC 3-190-06 Protective Coatings and Paints UFC 3-401-01 Mechanical Engineering UFC 3-420-01 Plumbing Systems UFC 3-501-01 Electrical Engineering UFC 3-520-01 Interior Electrical Systems UFC 3-530-01 Interior and Exterior Lighting Systems and Controls UFC 3-580-01 Telecommunications Interior Infrastructure Planning and Design

01 10 00-6

PARAGRAPH 2 - FUNCTIONAL AND AREA REQUIREMENTS

2. FUNCTIONAL AND AREA REQUIREMENTS

This facility shall consist of administrative offices, station training areas, storage areas, instructor open offices, and training rooms. Facility will house a total of twenty two instructors, supply manager, analyst, and a rotation of students (solders). A generic floor plan diagram is shown in Appendix B. This diagram identifies areas of work, and shall be used for reference only. Contractor shall design and submit, plans and construction documents for approval. The Contractor’s design shall meet the requirements listed.

The descriptions below identify requirements for each space with this contract.

2.1. CORRIDOR 107:

Construct a new partition wall on column line 3 between column lines D and E. Place a doorway in this wall to provide access between Corridor 107 and the existing Administration Area not to include where New Office 125 will be. Construct a new partition wall with a doorway across Corridor 107 on column line D. These two doorways shall be keyed for the building users and not for NEC. The existing exterior door 05 and both Communication Rooms (RM 109 A/B) shall be keyed so that NEC can gain access but not to any other part of the building. Replace existing communication room door (RM109A), which currently houses a cypher lock, salvage cypher lock and provide to the Government. Door shall match Project Finish Requirements listed below. Relocate on light fixture, four supply air diffusers, one fire alarm device, provide one new return air diffuser, and reconfigure the suspended ceiling grid and tiles to accommodate the new wall configuration. Modify the lighting, mechanical and fire protection systems due to the wall construction. Provide new light switches for corridor lighting. Refer to Appendix B for door placements.

2.2. ADMINISTRATION AREA:

The open office area adjacent to the vestibule and lobby entry shall accommodate (1) supply storage room and the maximum number of workstation to meet the mission. Provide a minimum of (6) typical workstations. Provide power and telecommunication LAN to all typical workstations. The supply storage room shall be a lockable workstation configuration located adjacent to Corridor 107. Provide, at a minimum, (2) 4-high metal storage cabinets, (2) hybrid metal storage hinge/lateral files cabinet, and (6) lateral file cabinets. Provide new resilient flooring (VCT) within the Administration Area and existing Private Offices (RM103-104).

2.3. PRIVATE OFFICE (new RM 125):

Construct a new private office perpendicular to the new wall on column line 3. Construct a partition wall that is 9’-8” from column line E. Partition shall align with existing private office (RM 104) construction.

Provide (1) desk for testing administrator and (3) 4-high lockable lateral files along back wall. Provide new resilient flooring (VCT). Provide new light switches for office lighting.

2.4. BREAK ROOM (RM102):

Break room shall accommodate a minimum of five instructors or students. Provide (1) 48” round table, minimum (5) side chairs, refrigerator, and microwave. Provide new casework to include, double stainless steel sink, kitchen faucet with sprayer, food waste disposer, upper cabinets, and base cabinets with the

01 10 00-7 under counter trash compactor. Provide a continuous solid surfacing countertop across all base casework.

Provide a refrigerator left of the sink and base cabinets. Contractor shall not provide upper cabinets above the refrigerator. Contractor shall insure all equipment fits within identified locations prior to purchasing.

Provide new tiled backsplash to extend the full length of the countertop and up to bottom of upper cabinets.

2.5. HIGH BAY AREA (RM106):

This area shall accommodate (9) training stations. Stations are existing and spaced around the room. Area will have ten flat screen TVs (Samsung DB40E) with ten wall mount brackets (Monoprice 3900), and nine small DVD shelves, all Government-furnished, Contractor-installed (GFCI). Each station will have a TV and DVD player (GFCI). Additionally, provide a wall mounted built-in bar height counter with duplex outlets and LAN receptacles above the counter, accommodating a minimum of (6) students in the Southeast corner for students to rest between training. Provide (6) stools. Install one TV (GFCI) at the bar height waiting area. TV shall have CATV connection. Provide a centered duplex outlet located behind each TV and an empty electrical box with conduit running to the top of the wall for each location. This passive electrical box shall have a blank face plat cover; cover to match wall color as close as possible.

2.6. STORAGE ROOM (RM112):

Storage room shall be used for equipment storage and laydown space. Approximately (15) students and instructors could be utilizing this room at a time. Provide minimum (10) industrial shelving units laid out in five rows. Maintain a clear path between both sets of double doors (interior and exterior).

Accommodate and maintain clear path to ice machine and (2) freezers (GFGI), which will be located on the East wall adjacent to existing mop sink.

2.7. OPEN OFFICE (RM116/115):

Open office area shall accommodate (18) instructors workstations, (1) multifunctional copy printer (GFGI) and (1) countertop printer (GFGI). This room shall function as an area where the instructor prepare for courses, complete paper work, and decompress from student interaction. Provide minimum (18) typical workstations and (1) 3’-high hinged door cabinet with laminate top, deep enough to house countertop printer. Workstations and printers require power and LAN connections. Refer to Electrical section for more detail. Provide new VCT to match existing floor tile to fill in flooring at demolished wall location.

Confirm attic stock prior to ordering VCT and use instead of new VCT, if possible.

2.8. ISSUE ROOM (RM114):

Issuing room shall allow for a natural flow for students to enter and exit from Corridor 117. After students enter the room they will proceed to the left and retrieve all items required clockwise around the room.

All items are storage in hinged storage cabinets. Provide a minimum of (15) industrial lockable storage cabinets. Storage shall fill the perimeter to the maximum extent possible, excluding doors and windows.

All storage shall be keyed alike with the exception of one designated for supply managers printer paper and print cartridges.

2.9. CLASSROOM #1 (RM118):

01 10 00-8

Classroom shall accommodate (50) students and (2) instructors between both sides of the existing operable partition. The front of the classrooms shall be the South classroom wall. Provide new A/V connections and equipment to accommodate new presentation location. Presentation display shall be through interactive collaborative monitors. Provide (2) monitors (similar to SmartBoards), one per classroom side, with (2) wall mounts. Refer to interactive collaborative monitor technical requirements and A/V section for more detail. Provide (2) instructors desk, (26) training tables, and (52) training chairs.

Instructor desk shall be located near the presentation control panel in the back corner of each classroom side. Training tables shall house two students per table. Classroom shall have manual blackout roller shades at each window in accordance with section 3.3.

2.10. CLASSROOM #2 (RM119):

This classroom shall not be a part of this scope, except for the installation of manual blackout roller shades at each window in accordance with section 3.3.

2.11. PROJECT FINISH REQUIREMENTS

2.11.1. Paint

Contractor shall repair any walls damaged during demolition and paint to match existing wall. Walls to be patched shall be painted the full extent of the wall from edge to edge, only painting the repair area is not acceptable. Paint all walls in the following rooms.

A. Administration Area (existing RM 105)

B. Classrooms

C. Issuing Room

D. Open Office

E. Storage

F. Break Room

G. Corridor 107

H. Private Offices

2.11.2. Resilient Flooring

Design and install VCT within the Front Administration Area and Private Offices. Finish selected shall not attempt to match existing VCT. Provide flooring transition if necessary.

2.11.3. Doors

New doors shall be solid core wood doors with hollow metal frames. Doors, frame, and hardware finish and types shall match existing doors. Reference FLW Design Guide for lock requirements. Provide door closers for each new corridor door.

2.11.4. Casework

Provide laminate clad casework.

01 10 00-9

2.11.5. Countertop

Provide solid surface countertops.

2.11.6. Rubber Base

Provide rubber base for the full North wall and casework within the Break room. Provide rubber base at all locations new flooring is being applied.

2.11.7. Signage

Provide signage for all new rooms and doors. Signage shall match in both aesthetics and quality of existing room signs. Room number for the new private office shall be 105. Adjust As-Built drawings to reflect room numbering changes.

01 10 00-10

PARAGRAPH 3 - ARCHITECTURAL DESIGN

3. ARCHITECTURAL DESIGN

3.1. DESIGN GOALS.

A. Maintain existing building layout except where identified.

B. Repair and finish existing walls where work has been identified.

3.1.1. Interior Design Objectives. Arrange spaces in an efficient, functional manner. The required program elements, areas, and functions are provided in PARAGRAPH 2 – FUNCTIONAL AND AREA REQUIREMENTS of this section. Space relationships and overall facility organization are delineated in the drawings in Appendix B - Diagrams. Required adjacencies, finishes, built-in and equipment are located in PARAGRAPH 2 – FUNCTIONAL AND AREA REQUIREMENTS of this section. Use durable materials and finishes that can be easily maintained and provide a long service life without replacement. Materials and finishes that must be periodically replaced shall be avoided. Use interior surfaces that are easy to clean.

Provide classic color schemes/patterns with enduring appeal. Structure interior spaces to allow maximum flexibility for arrangement of furnishings and allow for future modifications that may require reconfigurations of spaces. Non-combustible wall and ceiling construction is preferable, even where combustible materials are allowed by code.

3.1.2. Comprehensive Interior Design (CID): CID includes the Structural Interior Design (SID) and the Furniture, Fixtures and Equipment (FF&E) Design. SID requires the design, selection and coordination of interior finish materials that are integral to or attached to the building structure. Completion of the SID involves the selection and specification of applied finishes for the building’s interior features including, but not limited to walls, floors, ceilings, trims, doors, windows, window treatments, built-in furnishings, and installed equipment, lighting and signage. The SID package includes finish schedules, finish samples and any supporting interior elevations, details, or plans necessary to communicate the building finish design and build out. The SID also provides basic space planning for the anticipated FF&E requirements in conjunction with the functional layout of the building and design issues such as life safety, privacy, acoustics, lighting, ventilation and accessibility.

3.1.2.1. Structural Interior Design (SID). SID includes all interior building related elements and components identified throughout the SOW, such as wall finishes, floor coverings, window shades, built in casework, and all building finishes. Refer to specification 01 33 16.00 10 for all SID package requirements.

3.1.2.2. Furniture Fixtures and Equipment (FF&E). FF&E shall be designed to meet user requirements.

FF&E shall be coordinated with other disciplines to insure a fully functional install. Refer to Specification 01 33 16.00 10 for all FF&E requirements.

A. Furnishing Groups

a. Government Furnished Government Installed (GFGI)

The Contractor shall provide power/data/plumbing/mechanical requirements for these items.

General office equipment and miscellaneous building equipment shall be GFGI, including, but not

01 10 00-11 limited to, computers, copy machines, printers, fax machines, coffee machines, vending machines, and other appliances that do not require Contractor installation.

b. Government Furnished Contractor Installed (GFCI)

Furniture and equipment existing or procured by the Government but requires Contractor Installation (GFCI).

i. TV/Brackets/DVD Shelves

Install TVs, mount brackets, and DVD shelves at the locations identified, with the exact locations to be determined in the field by the government. The mounting hardware supplied with the wall mount bracket is not designed for installation to a steel stud wall; the contractor shall provide proper mounting hardware for this application. Install the brackets at a height so that the top edges of the TVs are 22 inches below the ceiling. Install the shelves so that they are 12 inches below the bottom edges of the TVs. Center all electrical boxes within training stations 26 inches below the ceiling.

c. Contractor Furnished Contractor Installed (CFCI)

Equipment that shall be CFCI, including, but are not limited to, equipment required for lighting and power distribution systems, grounding systems, telecommunications systems, plumbing and HVAC systems, and provisions and connections of such systems.

i. Any room with exterior windows shall have window shades for each window.

ii. Furniture Fixtures and Equipment (FF&E) shall be CFCI including, but not limited to workstations, desks, chairs, tables, storage, waste/recycling bins, and accessories.

3.2. DEMOLITION

3.2.1. Administrative Area RM 105

Remove and recycle existing carpet.

3.2.2. Break Room

Remove all existing countertop, casework, and stainless steel sink system. Remove backsplash below upper cabinets. Remove existing rubber base on North wall.

3.2.3. Classroom

Remove all existing power poles. Remove existing projector screens and projector mounts.

3.2.4. Office (RM 115/116)

Remove existing wall partition and all associated utility connections between Room 115 and 116. Remove existing workstations.

3.2.5. Existing Workstations

Deconstruct and remove all existing workstations and power polls.

3.3. TECHNICAL REQUIREMENTS

01 10 00-12

3.3.1. Casework

Provide laminate clad architectural casework all high pressure laminate (HPDL). Casework shall meet Architectural Woodwork Standards (AWI) custom with plywood substrate. Utilize and reference UFGS 06 41 16.00 10 for additional requirements.

3.3.2. Wall Base

Provide rubber wall base conforming to ASTM F1861, Type TS (vulcanized thermoset rubber) or Type TP (thermoplastic rubber), Style A (straight - installed resilient flooring). Provide 4 inch high and a minimum 1/8 inch thick wall base. Utilize and reference UFGS 09 65 00 for additional requirements.

3.3.3. Porcelain Tile

Provide porcelain tile backsplash, where indicated, with epoxy stain resistant grout. Utilize and reference UFGS 09 30 13 for additional requirements.

3.3.4. Countertop

Provide solid surface countertops for both casework counter and built-in bar height counter. Solid surface shall be 100 % Acrylic Polymer. Utilize and reference UFGS 06 61 16 for additional requirements.

3.3.5. Paint

Provide contractor qualifications for selected applicator per the UFGS 09 90 00 specification. All paints shall be a minimum MPI gloss level G3 (Eggshell), G1 (Flat) shall not be accepted. Requirements for Preparation of Surfaces with Existing Coatings:

a. Wipe previously painted surfaces to receive solvent-based coatings, except stucco and similarly rough surfaces clean with a clean, dry cloth saturated with mineral…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .