AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Hospital Demolition Fort Riley, KS.
The purpose of this amendment is to:
1. Delete and add text in Section 00 10 00 Solicitation
Bids are due September 18, 2017 at 10:30 AM Central Time.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Sep-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ17B4010
X 9B. DATED (SEE ITEM 11)
18-Aug-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Sep-2017
CODE
USACE, KANSAS CITY +
FEDERAL BLDG. CT-M RM 647; 601 E 12TH ST
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DQ17B4010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
CHANGES
The Solicitation is amended as follows:
Deleted text is shown with a strikethrough. Added text is shown with underline.
1. Section 00 10 00 “Solicitation”. The following note is changed to read as follows:
***Please note*** CLIN 00043 Decommissioning shall include:
• Removal and disposal of all liquids including water, diesel, Liquid Oxygen (LOX), all refrigerant, oils, and metals from amalgam separators, etc.
• Removal of all associated piping and equipment for the two underground fuel tanks.
All associated fuel piping and utilities shall be removed and disposed.
• Purge medical gas system throughout.
• Remove eye laser vent and monitoring system.
• Drain decontamination holding tank in accordance with applicable standards and regulation.
• Remediate drains and P-traps in Laboratory for mercury contamination as necessary.
• Drain lines and canisters to fire suppression equipment i.e. sprinkler system and exhaust hood extinguishing systems.
• Drain the LOX tanks and lines.
• Drain the cooling towers and lines.
2. DELETE the Table of Contents in its entirety and replace with the revised one that accompanies this amendment.
3. DELETE the Submittal Register in its entirety and replace with the revised one that accompanies this amendment.
4. SPECIFICATION CHANGES:
a. DELETE Section 01 11 00 “Summary of Work” in its entirety and replace with the revised one that accompanies this amendment.
b. Section 01 30 00 “Administrative Requirements”, Paragraph “Fort Riley Construction Demolition (C/D) Landfill Operations is changed to read as follows:.
Fort Riley Construction Demolition Debris (C/D) Landfill Operations
The Fort Riley Construction Demolition Debris (CD) landfill is not available for use on this projectis located on Campbell Hill Road approximately one mile north of
Camp Funston. Contact the Fort Riley Solid Waste Program Manager for costs associated in landfill use. Delivery vehicles shall be identified with contractor signs on both sides of the vehicle and must provide the contract number. The CD landfill will have an attendant on duty and be open for normal operations (excluding Federal Holidays) Monday-Friday, 0730-1600. Only construction demolition debris materials will be accepted. Acceptable materials are posted on a board at the entrance. Asbestos materials deliveries require a call for an appointment 24 hours in advance of delivery. Telephone 785-717-2935. All transformers and light ballasts shall be turned in to Building 339 within the PW maintenance yard on Main Post.
Light ballasts shall have all wires cut off. POC can be reached at telephone (785) 239-3832. Any salvageable items shall be turned in to the Directorate of Environment and Safety (DES) Recycle Center, Building 1980, in Camp Funston.
POC is the Solid Waste Program Manager, DES, telephone (785) 239-2385.
c. Section 01 57 19 “Temporary Environmental Controls”, Paragraph 1.2.7 “Hazardous
Materials”. First sentence is changed to read as follows:
Hazardous materials as defined in 49 CFR 171, and listed in 49 CFR 172, and Appendix A.13 Hazardous Materials Inventory, 21 OCT 2010.
d. DELETE Section 02 61 13 “Excavation and Handling of Contaminated Materials in its entirety.
e. Section 02 81 00 “Transportation and Disposal of Hazardous Materials”, Paragraph 1..2.1 “Hazardous Material” is changed to read as follows:
1.2.1 Hazardous Material
A substance or material which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce, and which has been so designated pursuant to the Hazardous Materials Transportation Act, 49 U.S.C. Appendix Section 1801 et seq. The term includes materials designated as hazardous materials under the provisions of 49 CFR 172, Sections .101 and .102, Appendix A.13 Hazardous Materials Inventory, 21 OCT 2010, and materials which meet the defining criteria for hazard classes and divisions in 49 CFR 173. EPA designated hazardous wastes are also hazardous materials.
f. Section 02 81 00 “Transportation and Disposal of Hazardous Materials”, Paragraph
3.2.5 “Treatment and Disposal of Hazardous Waste” is changed to read as followsL
3.2.5 Treatment and Disposal of Hazardous Wastes
The hazardous waste shall be transported to an approved hazardous waste treatment, storage, or disposal facility within 90 days of the accumulation start date on each container. Ship hazardous wastes only to facilities which are properly permitted to accept the hazardous waste or operating under interim status. Ensure wastes are treated to meet land disposal treatment standards in 40 CFR 268 prior to land disposal. Propose TSD facilities via submission of the Hazardous Waste Management Plan, subject to the approval of the Contracting Officer's Representative. Submit Certificates of Disposal documenting the ultimate disposal, destruction or placement of hazardous wastes, CERCLA remediation waste, polychlorinated biphenyls(PCBs),mercury contaminated sewer lines, lead-lined walls, lead-based paint, silver processing recovery lines, incinerator ash, and/or asbestos within 180 days of initial shipment. Receipt of these certificates will be required for final payment.
5. All other terms and conditions remain unchanged and in full force.
W912DQ-17-B-4010
Amendment 0003
TC-1
DEPARTMENT OF THE ARMY
Seattle District, Corps of Engineers and Kansas City District, Corps of Engineers
SPECIFICATIONS FOR CONSTRUCTION OF
DEMOLISH HOSPITAL
FORT RILEY, KANSAS
TABLE OF CONTENTS
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
01 10 00 SOLICITATION
00 21 00 INSTRUCTIONS
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 72 00 GENERAL CONDITIONS
00 73 00 SUPPLEMENTAL CONDITIONS
DIVISION 1 – GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 17.01 23 CONSTRUCTION PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 10.00 23 GEOSPATIAL DELIVERABLES CREATED AS PART OF MILITARY
CONSTRUCTION PROJECTS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02 65 00 UNDERGROUND STORAGE TANK REMOVAL
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 82 13.00 10 ASBESTOS ABATEMENT
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs AND
MERCURY
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
W912DQ-17-B-4010
TABLE OF CONTENTS
(Continued)
TC-2
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 16 13 CONCRETE CURBS AND GUTTERS
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 11 23 NATURAL GAS PIPING
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
APPENDICES
APPENDIX A HAZMAT REFERENCE DOCUMENTS
A.1 INSPECTION REPORT, DATE UNKNOWN
A.2 MAPS ON LEAD, MERCURY, ASBESTOS & SILVER
A.3 PART 1 - NOV 1992
A.4 PART 2 - NOV 1992
A.5 PART 3 - NOV 1992
A.6 1997 ABATEMENTS
A.7 FEB-APRIL 1998 ABATEMENTS
A.8 SEP 1998 ABATEMENTS
A.9 AUG 1999 ABATEMENTS
A.10 FEB-APRIL 2005 ABATEMENTS
A.11 GENERATOR ROOM INSPECTION, 2005
A.12 ASBESTOS REPORT BUILDING 600, 05 NOV 2008
A.13 HAZARDOUS MATERIALS INVENTORY, 21 OCT 2010
A.14 INSPECTION MEMO, 4 JUNE 2010
A.15 ACM SUMMARY, MEMORANDUM OF RECORD 9 JUNE 2010
A.16 BUILDING 600 RE-INSPECTION REPORT, 20 MAY 2010
A.17 NESHAP FACT SHEET
APPENDIX B EXISTING BUILDING REFERENCE DOCUMENTS (Provided Under Separate Cover)
-- End of Project Table of Contents --
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 10 PAGES
Fort Riley Hospital Demolition
01 32 17.01 23 SD-01 Preconstruction Submittals
1.5 G ROQualifications
1.3 G ROBaseline Schedule
SD-07 Certificates
1.7.1 G ROMonthly
SD-11 Closeout Submittals
1.7.2 G ROAs-Built Schedule
01 33 00 SD-01 Preconstruction Submittals
1.10 G ROSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.7 G ROAccident Prevention Plan (APP)
SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports
1.12.2 G ROAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates 1.6.1.4Crane Operators/Riggers
1.7.2.2 G ROStandard Lift Plan
1.7.2.3 G ROCritical Lift Plan
1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance
01 45 00.00 10 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 10 PAGES
01 45 00.00 10 3.2 G ROContractor Quality Control (CQC) Plan
01 50 00 SD-01 Preconstruction Submittals
1.3 G ROConstruction Site Plan
3.4.1 G ROTraffic Control Plan
01 57 19 SD-01 Preconstruction Submittals 1.6.1Preconstruction Survey 1.6.2Regulatory Notifications 1.7Environmental Protection Plan
1.7.8.1 G RODirt and Dust Control Plan
1.6.5Employee Training Records
1.6.4 G ROEnvironmental Manager
Qualifications 3.2.1.2Stormwater Notice Of Intent
SD-06 Test Reports 3.7.1.1.2Laboratory Analysis 3.2.1.3Inspection Reports
3.7.2.1 G ROSolid Waste Management Report
SD-07 Certificates 1.6.5Employee Training Records 1.6.5Erosion and Sediment Control
Inspector SD-11 Closeout Submittals
3.2.1.4 G ROStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 G ROStormwater Notice of Termination
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 10 PAGES
01 57 19 3.7.1Waste Determination Documentation
3.7.3.6 G RODisposal Documentation for
Hazardous and Regulated Waste
1.6.5Assembled Employee Training Records
3.7.2.1Solid Waste Management Report 3.7.3.1Hazardous Waste/Debris
Management 1.6.2Regulatory Notifications 3.7.2.1Sales Documentation
01 74 19 SD-01 Preconstruction Submittals
1.5 G ROWaste Management Plan
SD-11 Closeout Submittals 1.6Records
01 78 00 SD-03 Product Data 1.6.1Warranty Management Plan
SD-11 Closeout Submittals
3.1 G ROAs-Built Drawings
3.3 G RORecord Drawings
3.6As-Built Record of Equipment and Materials 3.4Final Approved Shop Drawings 3.5Construction Contract
Specifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 10 PAGES
01 78 00 2.3 G ROCertification of EPA Designated Items
3.8 G ROInterim DD FORM 1354
3.8 G ROChecklist for DD FORM 1354
02 41 00 SD-01 Preconstruction Submittals
1.2.1 G RODemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.6 G RONotification
SD-11 Closeout Submittals 3.3.2Receipts
02 65 00 SD-01 Preconstruction Submittals 1.5.2Work Plan 1.5.2.1Site Safety and Health Plan 1.5.2.2Excavation and Material Handling
Plan Field Sampling and Laboratory Testing Plan
1.5.2.3Tank and Piping Removal And Disposal Plan
1.5.2.4Spill and Discharge Control Plan 1.5Qualifications
Laboratory Services 3.12.3State Licensed Hazardous Waste
Transporter SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 10 PAGES
02 65 00 3.10.1Laboratory and Field Testing Reports
2.1Backfill Material 3.2Tank Contents Verification 3.5.2Contaminated Water Disposal 3.10Soil Examination, Testing, and
Analysis 3.11Backfilling
SD-11 Closeout Submittals 3.12.4Salvage Rights 3.15Tank Closure Report
02 81 00 SD-03 Product Data
3.1 G ROOnsite Hazardous Waste
Management 3.2Notices of Non-Compliance and
Notices of Violation 2.1.1Packaging Notifications
SD-06 Test Reports 3.7Recordkeeping 3.8Spill Response 3.7Exception Report
SD-07 Certificates 1.4.3Certification 3.2.4Security Plan 1.4.1Transportation and Disposal
Coordinator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 10 PAGES
02 81 00 1.4.2Training 3.2.2EPA Offsite Policy 3.2.5Certificates of Disposal 3.2.3Shipping Documents and
Packagings Certification 3.6Waste Minimization
02 82 13.00 10 SD-02 Shop Drawings 1.3Detailed Drawings
SD-03 Product Data 3.11.3.1Asbestos Waste Shipment
Records 3.11.3.1Weight Bills and Delivery Tickets 2.1Encapsulants 1.8.1Respiratory Protection Program 3.11Cleanup and Disposal 1.5.1Qualifications 1.10Training Program 1.7.1Licenses, Permits and
Notifications 3.11.3.2Asbestos Management Plan
SD-06 Test Reports 3.9Exposure Assessment and Air
Monitoring 1.6.3Local Exhaust System
SD-07 Certificates 1.6.3Local Exhaust System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 10 PAGES
02 82 13.00 10 2.1Encapsulants 1.8Medical Surveillance
Requirements 02 84 16 SD-07 Certificates
1.8.1Qualifications of CIH 1.8.1Training Certification 1.8.2PCB and Lamp Removal Work
Plan 1.8.3PCB and Lamp Disposal Plan
SD-11 Closeout Submittals 3.5.2Transporter certification 3.2.4Certification of Decontamination 3.5.2.1Certificate of Disposal and/or recycling 3.3.1Testing results
03 30 00 SD-01 Preconstruction Submittals 1.6.3.1Concrete Curing Plan
1.6.5 G ROQuality Control Plan
1.6.6 G ROQuality Control Personnel
Certifications 1.6.6Quality Control Organizational
Chart
1.6.8 G ROLaboratory Accreditation
SD-02 Shop Drawings
1.6.2.1 G ROReinforcing Steel
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 10 PAGES
03 30 00 2.4.7Joint Sealants 2.4.6Joint Filler 2.1Materials for Forms 2.4.1Cementitious Materials 2.3.3Concrete Curing Materials 2.5Reinforcement 2.4.5Admixtures 2.5.2Mechanical Reinforcing Bar
Connectors 2.2.1Waterstops
SD-05 Design Data
2.3.1 G ROMix Design
SD-06 Test Reports
1.6.1.1 G ROConcrete Mix Design
1.6.4.1Fly Ash 2.4.3Aggregates
3.12.2.3 G ROCompressive Strength Tests
3.12.2.4Air Content 3.12.2.1Slump Tests 2.4.2Water
SD-07 Certificates 2.5.1Reinforcing Bars 1.6.6.2Field Testing Technician and
Testing Agency SD-08 Manufacturer’s Instructions
2.3.3Curing Compound
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 10 PAGES
31 00 00 SD-03 Product Data
3.8 G ROUtilization of Excavated Materials
3.4Opening of any Excavation or
Borrow Pit SD-06 Test Reports
2.1Borrow Site Testing SD-07 Certificates
3.13Testing 31 11 00 SD-03 Product Data
3.3.1 G RONonsaleable Materials
SD-04 Samples
2.1.1Tree Wound Paint 32 05 33 SD-03 Product Data
2.1 G ROFertilizer
SD-07 Certificates
3.3.1Maintenance inspection report 32 16 13 SD-03 Product Data
2.1Concrete SD-06 Test Reports
3.6Field Quality Control 32 92 19 SD-03 Product Data
2.3Fertilizer SD-06 Test Reports
2.2.3Topsoil Composition Tests SD-07 Certificates
2.1seed
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 10 PAGES
32 92 19 SD-08 Manufacturer’s Instructions 2.6Erosion Control Materials
33 11 00 SD-03 Product Data
2.2 G ROPipe, Fittings, Joints and
Couplings
2.2.2 G ROPipe Anchorage
SD-06 Test Reports
3.2.3 G ROBacteriological Samples
SD-07 Certificates 2.2Pipe, Fittings, Joints and
Couplings 2.2.1.1Lining 3.2.3Disinfection Procedures
SD-08 Manufacturer’s Instructions 3.2.1Manufacturer's Instructions
33 11 23 SD-07 Certificates 1.3.1Welder's qualifications 1.3.1Welder's identification symbols
33 40 00 SD-07 Certificates 2.1.4.1Oil Resistant Gasket
33 71 02 SD-06 Test Reports 3.3.1Field Acceptance Checks and
Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
Demolish Hospital W912DQ-17-B-4010 Fort Riley, Kansas Amendment 0003
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
1.1.2 Location
1.2 OCCUPANCY OF PREMISES
1.3 BOILER OPERATIONS
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
01 11 00 - 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The work includes the complete demolition of the old Fort Riley hospital building, energy plant, related smaller structures, roads, parking lots, and incidental related work. The site will be restored to green space.
Facility demolition will include buildings identified as numbers 600, 601, 604, 612, 613, and 615. Structures and contents are to be removed in their entirety.
Building 600: The existing hospital building is a 7-story, cast-in-place reinforced concrete structure with brick veneer. The foundation consists of concrete piers and pile caps, with some areas of the building having a crawl space below the basement floor. All furniture, fixtures, and equipment which remain in the building will become the property of the contractor, with the exception of the roof mounted windsock. Windsock should be removed and turned over to the Contracting Officer. The project includes demolition and removal of all subsurface elements of the project, except for portions of the piles below the foundation.
Building 601: A small metal and glass bus shelter on concrete pad, located in the north parking lot of Building 600.
Building 604: A small metal and glass smoking shelter on concrete pad, located just west of Building 600.
Building 612: This is a wood framed structure located north of Building 600, currently used as a storage building.
Building 613: The cooling tower structure north of Building 615.
Building 615: The energy plant, located just north of Building 600.
Building 615 is a cast-in-place concrete structure, containing boilers and other equipment related to the main hospital, Building
600. Foundations for this structure are undetermined. Included in the scope is a utility tunnel extending from 615 south to 600, identified as a confined space. Equipment related to Building 615 includes, but is not limited to, the following:
-Two York electric chillers, R-123
-Two Tecochil natural gas engine driven chillers, R-22; 340 tons -Two dual fuel boilers, 34,000 lbs/hr -Fuel oil pumps, accessories, and piping from two underground fuel oil tanks.
-Domestic water softening system consisting of large water storage/treatment tanks.
-Underground brine storage tank -Accessory items
01 11 00 - 2
Site demolition will include removal of all parking associated with the hospital and removal of utilities within the site. Utilities will be capped at the site boundary.
The site shall be filled with clean fill suitable for new construction.
The site is to be graded to facilitate drainage and seeded.
Hazardous material abatement will be required.
Asbestos-containing materials (ACM) are expected to be encountered. Refer to Appendix A.13 Hazardous Materials Inventory, 21 OCT 2010, which lists known locations and quantities for ACM in the hospital (Building 600). All ACM must be disposed of in an appropriate landfill capable of receiving asbestos waste. A KDHE-licensed abatement contractor is to perform removal when required.
Sink drain traps and floor drain trap in the laboratory are potentially contaminated with elemental mercury from spills and broken components. The traps shall be removed and packaged for disposal. Removal of the floor drain will require cutting of the floor. All visible mercury shall be collected separately and recycled. Prior to disposal, properly categorize the waste through Toxicity Characterization Leaching Procedure (TCLP) sampling performed in accordance with SW 846 protocol identified in EPA's RCRA regulations.
Lead-lined walls and doors are to be removed and disposed of by recycling.
Lead-based paint is generally not considered hazardous material unless removed from walls and concentrated. When removed as part of demolition, generally disposed of as normal waste based on TCLP concentrations. Prior to disposal, properly categorize the waste through TCLP sampling performed in accordance with SW 846 protocol identified in EPA's RCRA regulations.
Plastic piping used for silver processing recovery are present in the basement below the X-ray Department. The lines were used for direct waste from the X-ray photograph processes on the first floor to a recovery system in the basement. The recovery system has been removed. The capped process lines shall be removed and packaged for disposal. Prior to disposal, properly categorize the waste through TCLP sampling, performed in accordance with SW 846 protocol identified in EPA's RCRA regulations.
Ash in the incinerator is potentially contaminated with cadmium or other metals. The ash should be removed and packages for disposal. Prior to disposal, properly categorize the waste through TCLP sampling, performed in accordance with SW 846 protocol identified in EPA's RCRA regulations.
Medical vacuum/Suction lines are present in the various surgery areas of the hospital. These lines should be removed by properly trained and protected workers during interior demolition. Biological hazards associated with these lines are similar to demolition of sanitary sewer lines.
Medical gas storage tanks and distribution lines are present throughout the hospital building. These tanks and lines should be properly disposed of by recycling.
All elements of the buildings and associated site features and utilities as described are to be removed from the site. Only abandoned utility conduits directly under paved areas are to be retained, to avoid road disturbance.
01 11 00 - 3
1.1.2 Location
The work is located at the the intersection of Huebner Rd. and Caisson Hill Rd., approximately as indicated.
1.2 OCCUPANCY OF PREMISES
Adjacent building(s) will be occupied during performance of work under this Contract. Maintain access and parking for all occupied buildings for the duration of work.
The helipad located next to building 600 must remain operational and accessible for the duration of work and after work is concluded. The helipad is FAA certified for larger aircraft that need to serve the new Irwin Army Hospital to the northeast of the work site. The helipad is used infrequently but must remain free of debris and operational.
Before work is started, arrange with the Contracting Officer's Representative a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.3 BOILER OPERATIONS
If the boilers are used after turnover of the facilities to the contractor, the contractor must ensure certified boiler operators are running the plant.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
01 11 00 - 4