UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Contracting Officers Report All Inquiries
Project: Turkey Creek Review: MO Interceptor B,C & D (00008) (sorted by CommentID ) Displaying 85 inquiries.
Id Discipline Sheet Detail Spec 7110124 Civil All Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Could you please provide electronic files for the CADD drawings, existing condition grading files and proposed final grade grading files for this project to assist with accurate quantity estimations?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 16 2017. Forward request by email.
1-0 Evaluation For Information Only. The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. By: Dan Newman; ED-G Geotechnical Branch; (816-389-3843) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7110126 General All All Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Would the USACE be willing to extend the bidder inquiry period and deadline for questions being asked date?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 16 2017. Forward request by email.
1-0 Evaluation For Information Only. The bidder inquiry period will not be extended. By: Craig
Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7111384 Civil Sheet B-CG203 Sheet B-CG203 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
How did you anticipate the storm water from the 54" arch line at station 28+00 being temporarily bypassed when the line is cut during the installation of the three 96" RCP that have to be jacked and bored?
By: Robert Radmacher; Radmacher Brothers Excavating Co., Inc.; (8165403614). On: Aug 17 2017.
Forward request by email.
1-0 Evaluation For Information Only. This item is construction means and methods and the items listed below are for information only. The bypass could occur by using an inverted syphon under the permanent jack and bore, pumping, phasing considerations in constructing the upstream portion of the interceptor first, all determined by contractor means and methods, etc. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 30 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7111385 Civil Sheet B-CG203 Sheet B-CG203 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Could a temporary pipe be jacked and bored to the south of the three 96" RCP prior to the installation for bypassing?
By: Robert Radmacher; Radmacher Brothers Excavating Co., Inc.; (8165403614). On: Aug 17 2017.
Forward request by email.
1-0 Evaluation For Information Only. Yes, if the offeror coordinates with Union Pacific railroad for the proposed work. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 17 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
Page 1 of 19ProjNet: Logged In User
8/30/2017https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportA...
7111386 Civil Sheet B-CG203 Sheet B-CG203 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
If a temporary bore is acceptable and more right of way is required, will you take care of it?
By: Robert Radmacher; Radmacher Brothers Excavating Co., Inc.; (8165403614). On: Aug 17 2017.
Forward request by email.
1-0 Evaluation For Information Only. No, the offeror would have to coordinate with Union Pacific railroad for the proposed work. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 30 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7111388 Civil Sheet B-CG203 Sheet B-CG203 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Will utility companies relocate both overhead and buried lines when in conflict and who will be responsible for utility relocation costs, if there are changes?
By: Robert Radmacher; Radmacher Brothers Excavating Co., Inc.; (8165403614). On: Aug 17 2017.
Forward request by email.
1-0 Evaluation For Information Only. For private utility within public right-of-way the information is found in Specification 01 30 00 paragraph 1.4.2 b. last sentence that states "Note that private utilities within public street right-of-way that is in conflict with the work is to be coordinated with that utility and relocated at the private utility owner's expense." By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 Current Request Status: Request Working
Information for this report is procurement sensitive.
7113141 General All All Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Would USACE be willing to extend the bidder inquiry period past August 18th?
By: Robert Radmacher; Radmacher Brothers Excavating Co., Inc.; (8165403614). On: Aug 18 2017.
Forward request by email.
1-0 Evaluation For Information Only. The bidder inquiry period will not be extended. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7113697 Civil B-SE400 C Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On Sheet B-SE400 Section C, Note #3 states that the granular fill shall be compacted to 90% relative density. With the granular fill being placed between the 10'x9' RCB's with a width of 6 to 8 inches but a height of over 10', please elaborate on an acceptable compaction procedure for compacting the granular fill in the gap between the RCB.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. Section C is an optional cross-section. If used, it is incumbent on the contractor to develop the means and methods necessary to achieve the requirements of the specifications.
There are hand-held devices available to provide the required compaction. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 30 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7113706 Civil B-SE400 B Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On Sheet B-SE400 Section B, the Dual RCB does not show granular fill between the boxes when entering the Triple 96" Jack and Bore Junction Box. Is the Dual RCB entering the Jack and Bore Junction Box to be Cast-In-Place?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0
Page 2 of 19ProjNet: Logged In User
Evaluation Non-concurred. An amendment will be issued to clarify this item. By: Lytreese Lee; ED-D Design Branch; (816-389-3241) On: Aug 25 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7113710 Civil B-SE400 B Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On Sheet B-SE400 Section B, the Dual RCB does not show granular fill between the boxes when entering the Triple 96" Jack and Bore Junction Box. How long shall the Cast-In-Place Dual RCB be entering the Junction Box?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation Concurred. An amendment will be issued to address this issue. By: Lytreese Lee; ED-D
Design Branch; (816-389-3241) On: Aug 25 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7113712 Civil B-SE400 B Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On Sheet B-SE400 Section B, is there a rebar layout drawing for the Cast-In-Place Dual RCB structure?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation Concurred. No. By: Lytreese Lee; ED-D Design Branch; (816-389-3241) On: Aug 25
2-0 Evaluation For Information Only. Follow notes on sheet B-SE400 and Specification Section 03 45 33 for precast structural concrete or 03 31 01.00 10 for cast-in-place structural concrete. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 30 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7113735 Civil B-SE400 A, B Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On Sheet B-SE400 Detail A and B, a note shows that 24" to 36" is recommended on top of and beneath the Triple 96" RCPs and the Dual RCBs. Please provide a minimum dimension for the space above and beneath the pipes taking into consideration the outer dimensions of the 10'x9' RCB and 96" RCP pipes.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation Concurred. The dimensions to the edges are as shown on B-SE400. By: Lytreese
Lee; ED-D Design Branch; (816-389-3241) On: Aug 25 2017 2-0 Evaluation For Information Only. The minimum dimension required is 24" as referenced on Sheet
B-SE400 Detail A and B. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 30 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7113819 Civil B-SE400 C Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On Sheet B-SE400 Section C, the detail shows a Cast-In-Place concrete closure area with 4 - #4 bars as shown.
How is the Contractor to place the rebar in the the gap between the RCBs and then place the concrete in that gap without dropping the concrete over the specified USACE drop distance? Will the USACE placement specification be omitted for this concrete placement in the concrete closure section for the Dual RCB detail?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation Non-concurred. No. By: Lytreese Lee; ED-D Design Branch; (816-389-3241) On: Aug 25
2-0 Evaluation For Information Only. An amendment will be issued to address removing this item. By:
Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 30 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
Page 3 of 19ProjNet: Logged In User
7114005 Civil All
Please advise that the Contractor is not responsible for designing and installing a temporary bulkhead of any kind on this project.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. By: Dan Newman; ED-G Geotechnical Branch; (816-389-3843) On: Aug 24 2017
2-0 Evaluation For Information Only. There are no "temporary bulkheads" called out in the contract documents, however plan sheet C-CG201 note 2 calls out for blocking or knockout panel be provided in J.B. #1-15. If construction phasing dictates blocking or providing a "temporary bulkhead," then the contractor shall provide such structure. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114019 Civil 03 20 00.00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
What rebar on the project shall be epoxy-coated as per this specification? Is all rebar to be used on the project epoxy-coated?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation Concurred. Yes. By: Lytreese Lee; ED-D Design Branch; (816-389-3241) On: Aug 25
2-0 Evaluation For Information Only. An amendment will be issued to address this item the requirement in
Specification Section 03 20 00.00 10 By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 30 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114025 Contracting 01 35 26 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Can the project SSHO have more roles on the project? For example, may the SSHO also act as the project superintendent as long as he or she meets the project specifications? May the SSHO act as the QCM?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. No, SSHO may not have multiple roles. The information is located in
Specification section 01 35 26, paragraph 1.6.1.1.1. By: Dan Newman; ED-G Geotechnical Branch; (816- 389-3843) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114029 Civil B-CG201, B-CG202 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The proposed interceptor line appears to run through the railroad unloading yard for Beelman Companies and there appears to be a large amount of granite and stone in various stockpiles and rows along the proposed project right of way. Please provide who is responsible for moving those piles?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The information is located in drawing sheet B-CD101/SHEET NOTE, 1B-CD102/SHEET NOTE 1B-CD103/SHEET NOTE 1, B-CD104/SHEET NOTE 1B-CD105/SHEET NOTE
2. By: Dan Newman; ED-G Geotechnical Branch; (816-389-3843) On: Aug 24 2017
2-0 Evaluation For Information Only. The contractor is responsible for moving the aggregate stockpiles. The information is located in drawing sheet B-CD101/SHEET NOTE, 1B-CD102/SHEET NOTE 1B- CD103/SHEET NOTE 1, B-CD104/SHEET NOTE 1B-CD105/SHEET NOTE 2. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Page 4 of 19ProjNet: Logged In User
Information for this report is procurement sensitive.
7114031 Civil B-CG201, B-CG202 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The proposed interceptor line appears to run through the railroad unloading yard for Beelman Companies and there appears to be a large amount of granite and stone in various stockpiles and rows along the proposed project right of way. Please provide who is doing the coordination with Beelman to move the piles off the right of way?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation Concurred. See response to Inquiry ID 7114029. The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. By: Dan Newman; ED-G Geotechnical Branch; (816-389-3843) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114033 Civil B-CG201, B-CG202 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Does the right of way for the proposed project have to be fenced on both sides during construction? If so, what type of fence shall be installed?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. Entire limits of Right-of-Way does not need to be fenced. Areas within right-of-way may require fencing depending on construction phasing and/or in accordance with safety requirements in EM385-1-1. By: Dan Newman; ED-G Geotechnical Branch; (816-389-3843) On: Aug 24
2-0 Evaluation For Information Only. Entire limits of Right-of-Way does not need to be fenced. Areas within right-of-way may require fencing depending on construction phasing in active construction areas and/or in accordance with safety requirements in EM385-1-1. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 30 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114086 Civil 01 35 26 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Can the project SSHO have more roles on the project? For example, may the SSHO also act as the project superintendent as long as he or she meets the project specifications? Can the SSHO be the QCM?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. No, SSHO may not have multiple roles. The information is located in
Specification section 01 35 26, paragraph 1.6.1.1.1. By: Dan Newman; ED-G Geotechnical Branch; (816- 389-3843) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114090 Civil 01 45 00.00 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Can the QCM be the Project Superintendent as well if the individual meets all requirements?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. No, QCM may not have multiple roles. By: Dan Newman; ED-G
Geotechnical Branch; (816-389-3843) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114096 Civil 01 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify the coordination required by the successful contractor for this project in regards to tying in the Dual RCB pipe with the previous phase contractor's Dual RCB pipe.
Page 5 of 19ProjNet: Logged In User
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. See amendment for revised language on coordinating with existing
Contract A work. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 30 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114098 Civil B-SE400 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify what granular backfill the USACE is specifying to use for the RCB.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The requirements for granular fill/bedding material are specified in specifications 03 30 53, 33 40 00, 33 40 00.02, and 33 40 00.01 as required by local municipal restrictions and contract drawings. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114101 Civil 01 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Will the Unified Government wave all permit fees for the project?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. By: Dan Newman; ED-G Geotechnical Branch; (816-389-3843) On: Aug 24 2017
2-0 Evaluation For Information Only. The Unified Government will wave all permit fees.
The City of Kansas City, Missouri will not wave permit fees. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114105 Civil 01 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Will railroad protective insurance be required to be supplied for the contractor on this project?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. Yes, the information is located in Specification section 01 30 00, ATTACHMENTS for BNSF and Union Pacific. By: Dan Newman; ED-G Geotechnical Branch; (816-389- 3843) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114115 Civil 01 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify if it is the contractor's responsibility to secure the work site at the end of each day given that other concurring contractors could be in progress at the work site.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The contractor shall secure the work for which he is responsible. By:
Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114120 Civil 01 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Are there any restrictions regarding the Contractor's access to the road over the levee? Please clarify.
Page 6 of 19ProjNet: Logged In User
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation Concurred. The Levee Extension is under "Package A" currently under construction. Any access will need to coordinated with the contractor constructing that portion of the project. As stated in specification 01 11 00, all existing work shall be returned to an "equal or better" condition upon completion of this contract. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114122 Civil 01 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Does the Contractor have permission to dig test holes at the project site prior to the bid date?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. No. The information is located in Specification section 33 05 23.19, ATTACHMENTS: Test Pit Photos at approximate jack and pit bore locations. By: Dan Newman; ED-G Geotechnical Branch; (816-389-3843) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114127 Civil 01 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Are there any proposed services for the ring levee being built by the concurrent contractor?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The information is located in Drawing sheet B-CG201. No utility services in vicinity of ring levee. By: Dan Newman; ED-G Geotechnical Branch; (816-389-3843) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114140 Civil B-SE400 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Does the contractor have to provide any shoring designs to BNSF or Union Pacific Railroad on the shoring of the pits for the triple 96" RCP Jack and Bores?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. Yes, the information is located in Specification section 01 30 00, ATTACHMENTS agreements for BNSF and Union Pacific. By: Dan Newman; ED-G Geotechnical Branch;
(816-389-3843) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114146 Civil B-CG201 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Note states approximate location of temporary ring levee to be removed by package A/Contract A contractor. When will the Contractor have the temporary ring levee removed so that the package B,C,D/Contract B,C,D contractor can begin construction?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. This information is located in Drawing sheet B-CG201. By: Dan
Newman; ED-G Geotechnical Branch; (816-389-3843) On: Aug 24 2017 2-0 Evaluation For Information Only. See amendment for revision to language for regarding coordination with Contract A. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 30 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114149 Civil 01 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 7 of 19ProjNet: Logged In User
Please confirm that the excavation of material on site will be acceptable to be used as impervious fill material and does not need to be taken off the site for the Levee.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. There is no levee construction/reconstruction in the scope of this project. By: Dan Newman; ED-G Geotechnical Branch; (816-389-3843) On: Aug 24 2017 2-0 Evaluation For Information Only. There is no levee construction/reconstruction in the scope of this project. Testing for excavation and backfill is required depending on how the material is used and/or disposed as necessary. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 30 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114150 Civil 01 22 00.00 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify what dewatering is required on this project?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. Dewatering may be required as field as conditions necessitate, this information is located in drawing sheets B100 to B209 and sticklogs in profiles on sheets B-CG210 to B-CG203, B-CU201 to B-CU202. By: Dan Newman; ED-G Geotechnical Branch; (816-389-3843) On:
Aug 24 2017
2-0 Evaluation For Information Only. Dewatering may be required as field as conditions necessitate, water table information shown at time of sampling is shown as provided on drawing sheets B100 to B209 and sticklogs in profiles on sheets B-CG210 to B-CG203, B-CU201 to B-CU202. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114155 Civil GI-005 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Note 6 under General states the contractor is to remove and dispose of all debris, rubbish, and other materials resulting from demolition or construction operations. Disposal shall be in accordance with all local, state, and/or federal regulations governing such operations and the project specifications. Please provide the specific locations where the debris, rubbish, and other materials are located at on the project site that this note refers to.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. By: Dan Newman; ED-G Geotechnical Branch; (816-389-3843) On: Aug 24 2017
2-0 Evaluation For Information Only. Based upon previous jobsites in the general vicinity of this project, debris, rubbish, bricks, etc. is anticipated to be encountered with this project and should be hauled off of the project as necessary. The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 30 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114168 Civil GI-005 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Note 1 under utilities states contractor shall coordinate with individual utility companies and COR prior to removal, conducting specified potholing, or relocation of any utility. The contractor shall pay all costs in connection with the relocations as stated in specification section 01 30 00. Two relocations are listed as examples in the specifications.
Are these examples or are these utility relocations to be actually constructed on site? Are there any other utility relocations? If so, please provide the station and current location as well as the relocation location and the person/company responsible for the utility.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The two examples listed in the referenced section are examples. The last statement in specification section 01 30 00 paragraph 1.4.2 b. last sentence states "Note that private
Page 8 of 19ProjNet: Logged In User utilities within public street right-of-way that is in conflict with the work is to be coordinated with that utility and relocated at the private utility owner's expense." Also utility contact information applicable to the project can be found on drawing sheet GI005. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114186 Civil GI-005 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Note 2 under Utilities states Contractor is responsible for control of storm water for the duration of the project. A temporary storm water connection shall be made on a daily basis to provide adequate drainage for existing storm water facilities. What is the proposed contractor's responsibility with regards to this note? What is the coordination between the Contract A contractor and the new contractor on this project?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114204 Civil GI-005 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Note 3 under Utilities states utilities exposed during construction shall not be left uncovered overnight. Temporary measures shall be made to protect the utility from damage and theft.
Please further define the temporary measures to be used to protect the utility from damage and theft?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114216 Civil 01 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is there any Hushpuckney shale present on the project site? If so, is the contractor to overexcavate the Hushpuckney shale and replace with suitable material? How will the contractor be compensated?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The information is located in drawing sheets B100 through B209. By:
Dan Newman; ED-G Geotechnical Branch; (816-389-3843) On: Aug 24 2017 2-0 Evaluation For Information Only. The information is located in drawing sheets B100 through B209, drawing sheet B-CG201 and specification section 35 41 00 paragraph 3.10.6.4. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114219 Civil 01 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is the contractor to provide railroad protective insurance to both BNSF and Union Pacific?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. Yes, the information is located in Specification section 01 30 00, ATTACHMENTS for BNSF and Union Pacific. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
Page 9 of 19ProjNet: Logged In User
7114225 Civil 01 35 26
Can the superintendent of the project be the SSHO?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. No, the superintendent may not have multiple roles. The information is located in Specification section 01 35 26, paragraph 1.6.1.1.1. By: Craig Weltig; ED-D Design Branch;
(816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114227 Civil 01 50 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify if there are any permit required from KDOT to construct this project?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. No permit from KDOT is required to construct this project. By: Craig
Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114241 Civil GI-005 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Note 5 under Utilites states private utilities such as gas and fiber optic shown in conflict with storm culverts on project are to be coordinated with the individual utility companies for them to relocate.
Please clarify that any relocations required under that plan notes will be paid for under Specification Section 01 30 00 Paragraph 1.4.2 A and B.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The last sentence in the paragraph referenced, 1.4.2 b states "Note that private utilities within public street right-of-way that is in conflict with the work is to be coordinated with that utility and relocated at the private utility owner's expense." By: Craig Weltig; ED-D Design Branch;
(816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114243 Civil 01 50 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify the locations where temporary surfacing is required.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The information is located in Specification section 01 50 00, paragraph
3.4 as stated: "such as temporary crossings and temporary routes of ingress and egress to adjacent residences and businesses." By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114249 Civil GI-005 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Note 1 under Existing Landowner Information and Precautions:
Please provide all bidders with a list of the names and phone numbers of the property owners affected.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017
Page 10 of 19ProjNet: Logged In User
Current Request Status: Request Working
7114251 Civil 01 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify any and all permits that are to be obtained by the Contractor in this project.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. By: Dan Newman; ED-G Geotechnical Branch; (816-389-3843) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114255 Civil 01 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify any and all permits that are to be paid for by the Contractor on this project.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation Concurred. The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. By: Dan Newman; ED-G Geotechnical Branch; (816-389-3843) On: Aug 24 2017
2-0 Evaluation For Information Only. The contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 30 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114259 Civil 01 30 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify if the Contractor is to supply Union Pacific railroad insurance in addition to BNSF railroad insurance.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. Yes, the information is located in Specification section 01 30 00, ATTACHMENTS for BNSF and Union Pacific. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114261 Civil 01 50 10 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify the location and quantity of temporary fencing as described in this paragraph.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The information is located in Drawing sheet B-CD101 to B-CD105 for existing chain-link fence. Temporary fencing shall be provided per EM 385-1-1. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 30 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114266 Civil 01 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify which stormwater construction permitting the contractor is required to obtain.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0
Page 11 of 19ProjNet: Logged In User
Evaluation For Information Only. The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. By: Dan Newman; ED-G Geotechnical Branch; (816-389-3843) On: Aug 24 2017
2-0 Evaluation For Information Only. The contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 30 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114269 Civil 01 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify what MDNR permits the contractor is required to obtain.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. By: Dan Newman; ED-G Geotechnical Branch; (816-389-3843) On: Aug 24 2017
2-0 Evaluation For Information Only. The contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 30 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114331 Civil Solicitation Page 7 of 105 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On CLLIN 0006, the bid item is in Cubic Yards. Most landfills in this area charge by the Ton for disposal. Would the USACE be willing to change the quantity and unit of measure to Tons in order to keep consistency with measuring the items?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation Concurred. An Amendment will be issued to address this item. By: Craig Weltig; ED-D
Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114339 Civil Solicitation Page 7 of 105 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On CLIN 0007, the CLIN is listed with a unit price but in the Measurement and Payment section under Paragraph
1.2.6.2 it appears that the bid item is an allowance $100,000. Is the contractor to write in CLIN 0007 the $100,000?
In regards to $100,000, what if it costs the Contractor over $100,000 to treat the water and will modification be issued to pay the additional cost?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation Concurred. An Amendment will be issued to address this item adding the $100,000 allowance. Any additional amount will result in a modification to the contract. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114351 Civil Solicitation Page 7 of 105 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On CLIN 0007, is the treatment of water for hazardous or nonhazardous water? Would both fall under this one item?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0
Page 12 of 19ProjNet: Logged In User
Evaluation For Information Only. The information is located in Specification section 02 61 13, paragraph
1.2.2 for petroleum contaminated groundwater. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114364 Civil 02 61 13 Paragraph 1.2.3 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
How is the Contractor to be compensated for the removal, transportation and disposal of the asbestos contaminated materials if the Contractor does not know the quantity? What is the quantity of asbestos material that the Contractor is bidding on?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114368 Civil 02 41 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify exactly what city of Kansas City permits are required to construct this project and the contractor will be required to obtain.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. By: Dan Newman; ED-G Geotechnical Branch; (816-389-3843) On: Aug 24 2017
2-0 Evaluation For Information Only. The contractor can contact KCMO as necessary for permit information.
The contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 30 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114371 Civil All Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please provide the Pre-Bid Meeting Minutes to all bidders.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The sign-in sheet has been provided on FBO. The project was described as shown on the project plans and specifications and it was directed that all contractor questions be provided on www.projnet.org under this project listing. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 30 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114374 Civil 02 41 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify which utilities will be disconnected during this project as stated in this paragraph.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
Page 13 of 19ProjNet: Logged In User
7114377 Civil All
On the prior Turkey Creek Missouri Interceptor project, USACE had a rock excavation bid item on the job. Would the USACE be willing to add in a rock excavation bid item for this contract?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. Rock information is located in drawing sheets B100 to B209 and sticklogs in profiles on sheets B-CG210 to B-CG203, B-CU201 to B-CU202. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114391 Civil 35 41 00 Paragraph 2.3 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please supply all contractors with the exact location of the Geofoam Compressible Materials as stated in this paragraph section.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The information is located in drawing sheets B100 through B209, drawing sheet B-CG201 and specification section 35 41 00 paragraph 3.10.6.4 for expansive shale. By:
Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114395 Civil 35 41 00 Paragraph 2.3.9 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Paragraph calls for use of Minova's Tekflex. Please provide the location to all bidder's where it is required to use this material.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The information is located in drawing sheets B100 through B209, drawing sheet B-CG201 and specification section 35 41 00 paragraph 3.10.6.4. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114396 Civil 35 41 00 Paragraph 2.4.6 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
This paragraph calls for the use of AASHTO M 43 Size No. 8. This material is not readily available in the Kansas City area. Please advise if ASTM C33 57 Stone is an acceptable replacement to be used in lieu of Size No 8 fine drainage gravel.
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. This paragraph will be deleted. An Amendment will be issued to address this item. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 25 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114398 Civil 35 41 00 Paragraph 3.1.i Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
How is the contractor to be compensated for rock excavation under this paragraph?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Page 14 of 19ProjNet: Logged In User
7114400 Civil 35 41 00 Paragraph 3.10.6.2 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
How is the contractor to be compensated for the overexcavation of unyielding material?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The offeror shall make their own determination based on the solicitation and any means and methods shall be determined by the contractor. By: Craig Weltig; ED-D Design Branch; (816 389 3091) On: Aug 24 2017 Current Request Status: Request Working
Information for this report is procurement sensitive.
7114401 Civil 35 41 00 Paragraph 3.10.6.3 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
How is the contractor to be compensated for unsuitable materials if it is at no fault to the contractors in regards to the unsuitable material?
By: Dirk Hudson; ESI Contracting; (816-352-5526). On: Aug 18 2017. Forward request by email.
1-0 Evaluation For Information Only. The offeror shall make their own determination based on the solicitation and any means and methods shall be…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .