Amendment_0001_SF_30_Pg2.pdf
PDF 14 KB Posted
- Attached to
- Tuttle Creek Stilling Basin
- Solicitation number
- W912DQ-17-B-1005
About this file
SF 30 PG 2 WAS AMENDED!!!
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Unofficial_Bid_Abstract1.xlsx | XLSX spreadsheet | |
| A.07.24_Solicitation_Amendment_0003.pdf | ||
| A.07.24_Solicitation_Amendment_0002.pdf | ||
| A.07.24_Solicitation_Amendment_0001.pdf | ||
| A.07.20_Site_Visit_Sheet.pdf | ||
| 17_B_1005_Updated_5_23.pdf | ||
| 17-B-1005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tuttle Creek Stilling Basin Wall Repair Manhattan, Kansas
2 -- Amdt. 0001
The SOLICITATION is amended as follows:
NOTE: Deleted text is shown with strikethrough. Added text is shown with underline.
1. SPECIFICATIONS: Narrative Changes
a. Section 01 78 00, paragraph 1.4 Submittals
SD-08 Manufacturer's Instructions
Posted Instructions; G, RO
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals; G, DO
SD-11 Closeout Submittals
As-Built Record of Equipment and Materials; G, RO Preventative Routine Maintenance; G, RO
b. Section 01 78 00, paragraph 3.2.2
3.2.3 As-Built Record of Equipment and Materials
Furnish one copy of preliminary record of equipment and materials used on the project 15 days prior to final inspection. This preliminary submittal will be reviewed and returned 2 days after final inspection with Government comments. Submit Two sets of final record of equipment and materials 10 days after final inspection. Key the designations to the related area depicted on the contract drawings. List the following data:
RECORD OF DESIGNATED EQUIPMENT AND MATERIALS DATA
Description Specification Manufacturer Composition Where Section and Catalog, and Size Used Model, and Serial Number
c. Section 01 78 00, paragraph 3.3
3.3 OPERATION AND MAINTENANCE MANUALS
Provide project operation and maintenance manuals as specified in Section 01 78 23 OPERATION AND MAINTENANCE MANUALS DATA. Provide four electronic copies of the Operation and Maintenance
Tuttle Creek Stilling Basin Wall Repair Manhattan, Kansas
3 -- Amdt. 0001
Manual files. Submit to the Contracting Officer for approval 30 days prior to transfer of the completed facility.
d. Section 01 78 00, paragraph 3.4
3.4 CLEANUP
Leave premises "broom clean." Clean interior and exterior glass surfaces exposed to view; remove temporary labels, stains and foreign substances; polish transparent and glossy surfaces. Clean equipment and fixtures to a sanitary condition. Clean debris from gutters, downspouts and drainage systems. Sweep paved areas and rake clean landscaped areas. Remove waste and surplus materials, rubbish and construction facilities from the site.
Paved areas shall be swept and landscaped areas shall be raked clean. The site shall have waste, surplus materials, and rubbish removed. The project area have temporary structures, barricades, project signs, and construction facilities removed. A list of completed clean-up items shall be submitted on the day of final inspection.
e. Section 01 78 00, paragraph 3.5
3.5 PREVENTATIVE ROUTINE MAINTENANCE
Provide a preventative routine maintenance list that includes information for preventive and scheduled maintenance to minimize repairs. Provide manufacturer's schedule for routine preventive maintenance, inspections, testing, condition monitoring and adjustments required to ensure proper and economical operation and to minimize repairs. Provide manufacturer's projection of preventive maintenance work-hours on a daily, weekly, monthly, and annual basis including craft requirements by type of craft.
Include anticipated frequency of maintenance and repair needs. Include list of products installed, location installed, warranty expiration date, manufacturer, model, and serial number where applicable.
f. Section 01 78 23, OPERATION AND MAINTENANCE DATA, is deleted in its entirety.