A.07.24_Solicitation_Amendment_0002.pdf
PDF 211 KB Posted
- Attached to
- Tuttle Creek Stilling Basin
- Solicitation number
- W912DQ-17-B-1005
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Unofficial_Bid_Abstract1.xlsx | XLSX spreadsheet | |
| A.07.24_Solicitation_Amendment_0003.pdf | ||
| Amendment_0001_SF_30_Pg2.pdf | ||
| A.07.24_Solicitation_Amendment_0001.pdf | ||
| A.07.20_Site_Visit_Sheet.pdf | ||
| 17_B_1005_Updated_5_23.pdf | ||
| 17-B-1005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Update to Specifications, Submittal Register, and Extend IFB date unti June 22, 2017.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jun-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ-17-B-1005
X 9B. DATED (SEE ITEM 11)
17-May-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jun-2017
CODE
USACE, KANSAS CITY +
FEDERAL BLDG, CT-C
601 E 12TH ST RM 647
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DQ-17-B-1005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 11 00 - SOLICITATION/CONTRACT FORM
The standard size code $36,500,000 has been added.
The required response date/time has changed from 21-Jun-2017 02:00 PM to 22-Jun-2017 02:00 PM.
The Issued By organization has changed from
USACE, KANSAS CITY +
FEDERAL BLDG CT-C 601 E 12TH ST RM 647
KANSAS CITY MO 64106-2896
to
USACE, KANSAS CITY +
FEDERAL BLDG. CT-C RM 647; 601 E 12TH
ST KANSAS CITY MO 64106-2896
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFEROR
The following have been modified:
SUBMISSION REQUIREMENTS
All bids are due by June 22, 2017 at 2:00PM, local time.
The public bid opening will begin at 2:01PM, local time, on the same date, at the following address:
Bolling Federal Building US Army Corps of Engineers Civil Contracting Branch 601 E. 12th Street Kansas City, MO 64106 Room N133
Submit one (1) original and one (1) copy also (1 ) CD (compatible to Microsoft Word or Adobe Acrobat) of the following:
a. Bid schedule - complete with your bid amount and quantities.
b. Ensure Bid is signed by a Principal of your company with authority to do so.
c. Ensure all Amendments are acknowledged.
d. Bid Bonds - required with your submission. (See solicitation for details)
INQUIRIES/QUESTIONS
Prospective Bidders shall submit contracting and technical inquiries and questions concerning this solicitation document via Bidder Inquiry in ProjNet at www.projnet.org/projnet.
a. To submit and review bid inquiry items, bidders will need to be a current registered user or self register into the system. To self-register, go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, enter the Bidder Inquiry Key for this solicitation listed below, your email address, and then click login. Fill in all required information and click create user. Verify that information on the next screen is correct and click continues.
b. From this page, you may view all bidder inquiries or add a new inquiry.
c. Bidders will receive an acknowledgement of their questions via email, followed by an answer to their questions after it has been processed by our technical team. ***Please Note: Bidders shall only submit one
(1) question per inquiry. All inquiries containing multiple questions shall be rejected***
d. The Solicitation Number is: W912DQ-17-B-1005
e. The Bidder Inquiry Key is: NTMV8I-ETBKBF
f. Plan Room Key is: UW3K3N-6XWHEM
Bidders may present their questions during the time period of 26 May 2017 thru 7 June 2017 all questions must be received by 2:00 PM (CST). A reply will not be given to any inquiry received after the designated time and date.
Bidders are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago) or by appointment for OCONUS. The telephone number for the Call Center is 1-800-428-HELP. Email to staff@rcesupport.com .
Keep in mind that the system occasionally goes through maintenance between 8:00 A.M to 8:30 A.M.
(End of Submission Requirements)
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT SPECIFICATION CHANGE
The SOLICITATION is amended as follows:
NOTE: Deleted text is shown with strikethrough. Added text is shown with underline.
1. SPECIFICATIONS: Narrative Changes
a. Delete the Table of Contents in its entirety and replace with the revised table of contents that accompanies this amendment.
b. Delete the Submittal Register in its entirety and replace with the revised submittal register that accompanies this amendment.
c. Section 01 78 00, paragraph 1.4 Submittals
SD-08 Manufacturer's Instructions
Posted Instructions; G, RO
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals; G, DO
SD-11 Closeout Submittals
As-Built Record of Equipment and Materials; G, RO Preventative Routine Maintenance; G, RO
d. Section 01 78 00, paragraph 3.2.3
3.2.3 As-Built Record of Equipment and Materials
Furnish one copy of preliminary record of equipment and materials used on the project 15 days prior to final inspection. This preliminary submittal will be reviewed and returned 2 days after final inspection with Government comments. Submit Two sets of final record of equipment and materials 10 days after final inspection. Key the designations to the related area depicted on the contract drawings. List the following data:
RECORD OF DESIGNATED EQUIPMENT AND MATERIALS DATA
Description Specification Manufacturer Composition Where Section and Catalog, and Size Used Model, and Serial Number
e. Section 01 78 00, paragraph 3.3
3.3 OPERATION AND MAINTENANCE MANUALS
Provide project operation and maintenance manuals as specified in Section 01 78 23 OPERATION AND MAINTENANCE MANUALS DATA. Provide four electronic copies of the Operation and Maintenance Manual files. Submit to the Contracting Officer for approval 30 days prior to transfer of the completed facility.
f. Section 01 78 00, paragraph 3.4
3.4 CLEANUP
Leave premises "broom clean." Clean interior and exterior glass surfaces exposed to view; remove temporary labels, stains and foreign substances; polish transparent and glossy surfaces. Clean equipment and fixtures to a sanitary condition. Clean debris from gutters, downspouts and drainage systems. Sweep paved areas and rake clean landscaped areas. Remove waste and surplus materials, rubbish and construction facilities from the site.
Paved areas shall be swept and landscaped areas shall be raked clean. The site shall have waste, surplus materials, and rubbish removed. The project area have temporary structures, barricades, project signs, and construction facilities removed. A list of completed clean-up items shall be submitted on the day of final inspection.
g. Section 01 78 00, paragraph 3.5
3.5 PREVENTATIVE ROUTINE MAINTENANCE
Provide a preventative routine maintenance list that includes information for preventive and scheduled maintenance to minimize repairs. Provide manufacturer's schedule for routine preventive maintenance, inspections, testing, condition monitoring and adjustments required to ensure proper and economical operation and to minimize repairs. Provide manufacturer's projection of preventive maintenance work-hours on a daily, weekly, monthly, and annual basis including craft requirements by type of craft.
Include anticipated frequency of maintenance and repair needs. Include list of products installed, location installed, warranty expiration date, manufacturer, model, and serial number where applicable.
h. Section 01 78 23, OPERATION AND MAINTENANCE DATA, is deleted in its entirety.
TABLE OF CONTENT CHANGES
SEE PLAN ROOM FOR TABLE OF CONTENTS AND SUBMITTAL REGISTER CHANGES!