PWS_Bldg_652_Revision_1.pdf
PDF 85 KB Posted
- Attached to
- Vindicator Security System Upgrade Federal contract opportunity
- Solicitation number
- w912D0-19-R-0020
About this file
Revised PWS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attch_A,_BLDG_652_security_Update_Drawing_Aug_19.pptx | PPTX presentation | |
| Wage_Det.pdf | ||
| PWS_Bldg_652_Ver_1.pdf | ||
| Combined_Synopsis_for_Vindicator.pdf | ||
| BLDG_652_security_Update_Drawing_Feb_19.pptx | PPTX presentation |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1
PERFORMANCE WORK STATEMENT
C.1.1. GENERAL INFORMATION. The contractor shall provide all parts, labor, materials, etc., and certified staff to perform installation and performance verification testing of the (Honeywell Vindicator Badge Manager 2.0 Enhancements for People Management. "System must be able to have digital log of who when and which door was opened, must be able to store at a minimum 6 months of logs. "Upgrades must be compatible with the existing base systems. MR-52 Reader interface shall be enclosed in a 1'x1'x4" or larger box with a key. This will hold the MR52 and anything else needed for the correct operation of the door, along with the MR-52, power supply, PD-8 and battery. The door must armed with mag lock using entry and exit card reader). HID CAC reader will be used for opening all components associated with provided listing and drawings in attachment A. The contractor will provide system requirements meeting DoD 5200.1, DoD 5200.08R, MIL-HDBK-1013/1A, UFGS 28.20.01.00.10, UFC 4- 021-02, Electronic Security Systems, AR 380-5, and AR 190-13 within bldg 652. Placement equipment and components is critical and will be coordinated with JBER Physical Security Office, 673 CES/CEFP - JBER Fire Prevention Section, and the 59th Signal Battalion S2 Office personnel.
C.1.1.1. HOURS OF OPERATION. Work shall be performed during regular working hours (7:30 AM – 4:30 PM) Monday through Friday, excluding Federal holidays unless the Contracting Officer approves after duty hours or holiday work in writing.
C.1.2. PERSONNEL. The contractor shall provide a certified work force possessing the skills, knowledge, and training to satisfactorily perform the services required by this contract. The work force provided will have at least 5 year work experience administrating, maintaining, and repairing a Honeywell Vindicator Badge Manager 2.0 Enhancements for People Management, MR-52 system and, at least 5 year maintenance and repair experience, and documented low voltage training. Proof of certification, training and work experience is required to be provided with initial proposal. Personnel performing work under this contract shall remain employees of the contractor and will not be considered employees of the Government.
Contractor will ensure the work force provided can perform duties involving the design, operation, and/or maintenance of Honeywell Vindicator Badge Manager 2.0 Enhancements for People Management, MR-52 system.
C.1.3. REFERENCES. Contractor will reference and follow the publications listed in this work statement. Publications will be provided upon request or are available at https://armypubs.army.mil/. All maintenance shall be performed in accordance with the equipment manufacturer's recommendations, as shown in the Technical Manuals, for the equipment applicable code requirements, installations design guide, DOD & HQDA regulations governing security systems, and IAW all Quality Assurance Surveillance Plan (QASP) performance standards..
C.1.3A. MIL-HDBK-419A Grounding, Bonding and Shielding Practices and Procedures for Electronic Equipment Facilities
C.1.3B. MIL-HDBK-1013/1A, Design Guidelines for Physical Security of Facilities
C.1.3C. UFGS 28.20.01.00.10, Unified Facilities Guide Specifications, Electronic Safety and Security
C.1.3D. UFC 4-021-02, Electronic Security Systems
C.1.3E. UFC 3-600-01, Fire Protection Engineering for Facilities
C.1.3F. NFPA 101, Life Safety Code, to the list of references. Must comply with NFPA 101, Chapter 7 for egress door requirements.
C.1.3G. OSH 2206 Occupational Safety and Health Administration General Industry Standards
C.1.3H. ANSI C2 National Electrical Safety Code
C.1.3I. NFPA 70 National Electrical Code 2005
C.1.3J. Telecommunications Industry Association TIA/EIA Telecommunications Building Wiring Standards
C.1.3K. ANSI/TIA/EIA-569A, Commercial Building Standard for Telecommunications Building Wiring Standards
C.1.3L. ANSI/TIA/EIA-568B.1, Commercial Building Telecommunications Cabling Standard
C.1.3M. NSI/TIA/EIA-568-B.3, Optical Fiber Cabling Components Standard
C.1.3N. EIA/TIA-606 - Administration Standard for Commercial Telecommunications Infrastructure.
C.1.3O. Installation, Information, Infrastructure and Architecture (I3A) Feb. 2010
C.1.3P. DoDM 5200.01-V3, February 24, 2012, Information Security
C.1.3Q. DoDM 5200.01, February 24, 2012, Information Security
C.1.3R. DoD 5200.08, Physical Security Program
C.1.3S. AR 380-5, Department of the Army Information Security Program
C.1.3T. AR 190-13, The Army Physical Security Program C.1.3U. AF MFR "Non-Nuclear Intrusion Detection System (IDS) Equipment Approval
C.1.2.1. CONTRACTOR REPRESENTATIVE.
C.1.2.1.1. The Project Manager will be on site to complete the initial walk through and will also be on site during the validation and testing from the JBER IDS/EECS section where the government technician representative determines that all required systems meet above regulation requirements. The certified contractor shall provide a project manager who shall be available on-call during the normal duty hours 7:30 AM – 4:30 PM, to conduct over-all management coordination and provide liaison with the Government. The contractor’s project manager shall be the point of contact with the Government and shall have the authority to act or make decisions for the contractor on all matters pertaining to this contract.
C.1.2.1.2. The Government and the Contractor understand and agree that the services to be delivered under this contract are non-personal services and that no employer-employee relationship exists or will exist under the contract between the Government and the Contractor or between the Government and the Contractor’s personnel. Further, the Contractor is not the Government’s agent.
C .1.2.1.3. The Government will not exercise any supervision or control over Contractor personnel performing services under this contract. Contractor personnel shall not become an integrated part of the Government organization in connection with performance under this contract.
C.1.2.1.4. The services to be performed under this contract do not require the Contractor or his employees to exercise personal judgment and discretion on behalf of the Government, but rather, the Contractor’s employees shall act and exercise personal judgment and discretion on behalf of the Contractor and the workmanship and quality of system installation.
C.1.2.1.5. Contractor personnel shall not be eligible, by virtue of performance under this contract, for payments by the Government of entitlements and benefits accorded federal employees. The entire consideration to the Contractor for performance of this contract is contained in the provisions for payment set forth in this contract.
C.1.2.2. The certified contractor shall designate an alternate site lead/project manager who shall be authorized to act on behalf of the contractor in the absence of the contractor’s project manager or when the contractor’s project manager is not available.
C.1.2.3. The certified contractor shall provide the name, address, telephone number, email and facsimile number for the contractor’s project manager and alternate to the Contracting Officer within 5 (5) calendar days following contract award. The certified contractor shall verbally notify the Contracting Officer of changes as they occur and provide written changes not later than 24 hours after the effective date of change.
C.1.2.4. IDENTIFICATION BADGES. Contractor’s certified personnel on duty will be escorted at all times during core hours, receive/sign the escort briefing and wear the 59th Contractor badge during performance, and return the badge at the end of the duty day/contract.
C.2. CONTRACTOR PERSONNEL: The certified company performing the installation, their repairmen or technicians shall be trained and certified for installation and maintenance of Honeywell Vindicator Badge Manager 2.0 Enhancements for People Management, MR-52 system reflective of equipment installed at JBER.
C.2.1. LOCAL BACKGROUND CHECK REQUIREMENTS: Contractor’s will have a local background check completed before access is granted to the installation IAW AR 190-13, para 8-
2. If the Contractor is unable to receive access to the installation they will not be allowed access.
All contractors needing access into classified areas will be escorted at all times, after the area has been sanitized and follow the instructions given by the escort official. The contractor shall comply with guidance found in the attached local U.S. Army Alaska Regulation 380-67.
C.2.2. Contracting Manpower Reporting: The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address: https://cmra.army.mil by Sep 30, 2019.
C.2.3. CONTRACTING PROTECTION: The contractor shall guard and protect all Government classified information, documents, materials, models, etc., coming into the possession of the contractor, all items will be turned over to the escort official.
C.2.4. CONTRACT DISCREPANCY REPORT. The certified contractor may be issued a Contract Discrepancy Report (CDR) when contract performance is unsatisfactory. The contractor shall complete Blocks 7, 8, and 9 of the CDR and return it to the Contracting Officer within two
(2) days after receipt.
C.2.5. INTERFACE WITH GOVERNMENT OPERATION. Performance of work by certified contractor personnel under the terms of this contract shall not interfere with regularly scheduled limited Government operational activities.
C.2.6. CONSERVATION OF UTILITIES. Certified contractor personnel shall practice utilities conservation and shall operate under conditions which preclude waste of Government furnished utilities.
C.2.7. FILES. The certified contractor shall provide the Government Agency, 100% design drawings in auto-cad format, as built drawings and performance verification testing (PVT) results as part of the contract performance requirements of this contract as applicable.
C.2.8. DISCLOSURE OF INFORMATION. Performance under this contract may require the certified contractor to access data and information proprietary to a Government agency, another Government contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. No such information shall be released or shared with other non-government agencies or individuals without the approval of the Contracting Officer.
https://cmra.army.mil/
C.2.9. Upon contract completion, an invoice shall be submitted through the Contract Administrator to the Contracting Officer, at the Regional Contracting Office, JBER, for certification. After certification approval, the Contracting Officer will forward the invoice to the Defense Finance and Accounting Office.
SECTION C.3.
GOVERNMENT FURNISHED PROPERTY (GFP) AND SERVICES
C.3.1. PROPERTY: The certified contractor shall not use property provided by the Government for any purpose other than in the performance of this contract.
C.3.2. Government equipment shall remain the property of the Government and shall at no time be removed from JBER, AK without prior KO or COR written approval.
C.3.3. CONTRACT OFFICER REPRESENTATIVE (COR): There will be a COR designated for oversight and receiving reports at JBER.
C.3.4. Honeywell Vindicator Badge Manager 2.0 Enhancements for People Management, MR- 52 system New Installation: All equipment for new installations of Honeywell Vindicator Badge Manager 2.0 Enhancements for People Management, MR-52 system, Prox/Pin Reader shall be bought and provided by the contractor under the supervision of the Government Physical Security Technician. The contractor will meet DoD 5200.1, DoD 5200.08R, MIL-HDBK- 1013/1A, UFGS 28.20.01.00.10, UFC 4-021-02, Electronic Security Systems, AR 380-5, and AR 190-13 requirements within bldg. 652.
C.3.5. PARTS: Maintenance and Repair of Honeywell Vindicator Badge Manager 2.0 Enhancements for People Management, MR-52 system: The Contractor is responsible for procurement and replacement of all associated components as appropriate with any warranty period.
SECTION C.4.
CERTIFIED CONTRACTOR FURNISHED ITEMS
C.4.1. CERTIFIED CONTRACTOR FURNISHED ITEMS: The contractor shall provide all parts, labor, and materials, furnish all office and maintenance support equipment including computers, printers, faxes, tools, testing equipment and services which are necessary to perform the requirements of this contract.
SECTION C.5.
SPECIFIC TASKS
C.5.1. The contractor shall provide all parts, labor, materials, etc., and certified staff to perform installation and performance verification testing of the (Honeywell Vindicator Badge Manager
2.0 Enhancements for People Management. Upgrades must be compatible with the existing base systems. MR-52 Reader interface shall be enclosed in a 1'x1'x4" or larger box with a key. This will hold the MR52 and anything else needed for the correct operation of the door, along with the MR-52, power supply, PD-8 and battery. The door must armed with mag lock using entry and exit card reader). HID CAC reader will be used for opening the door systems within bldg. 652, System communications wire, and upgraded security equipment for Building 652, Information Processing Node to include associated components, sensors, connections, system wiring, control units, and conduit at Building 652 Joint Base Elmendorf Richardson, Alaska (JBER). Contractor will install all components associated with provided listing and drawings in attachment A. The contractor will provide system requirements meeting DoD 5200.1, DoD 5200.08R, MIL-HDBK- 1013/1A, UFGS 28.20.01.00.10, UFC 4-021-02, Electronic Security Systems, AR 380-5, and AR 190-13 within bldg 652. Placement equipment and components is critical and will be coordinated with JBER Physical Security Office and the 59th Signal Battalion S2 Office personnel.
C.5.2. FIRE SYSTEM: All Fire systems must be IAW UFC-600-01, as well as local requirements and be approved by the local Joint Base Elmendorf Richardson Fire Marshall. Fire system must have a way to override the MAGLOCKS. If not in compliance contractor will correct all issues at their expense.
C.5.5. PARTS CONDUIT & WIRING: All conduit and electrical will meet the latest NFPA 70 Electrical Code IAW UFC 4-021-02 para 9-6.11
C.5.5.1. Wiring: All AC power and signal communication wiring will be installed in accordance with National Electrical Code (NEC); with the additional requirements as follows:
1.) Component/sensor wiring will be home run cabling with no splices. ***No sensors will be daisy chained or spliced to include programing.***
2.) No more than 180 degrees of bends in conduit runs between pull boxes.
3.) All wiring signal communication paths between buildings, consisting of twisted pair telephone wiring and fiber optic cabling are government supplied and will be maintained by the government. Certified contractor shall maintain electronic equipment that supports signals dedicated to Honeywell Vindicator Badge Manager 2.0 Enhancements for People Management, MR-52 system, and wiring from such equipment to telephone punch blocks, switches, routers located within a building.
4.) Refer to AR 380-5, Chapter 7, Storage and Physical Security Standards 5.) Power Supplies: Primary power for all systems will be commercial AC or DC power.
In the event of commercial power failure at the protected area or monitor station, the equipment will change power sources without causing an alarm indication.
(1) Emergency Power: Emergency power will consist of a protected independent backup power source that provides a minimum of 4 hours operating power battery and/or generator power. When batteries are used for emergency power, they will be maintained at full charge by automatic charging circuits.
Emergency power in bldg. 652 will be wired into the current generator & battery backup power and validated by 673rd CE.
(2) Power Source and Failure Indication: An illuminated indication will exist at the PCU of the power source in use (AC or DC). Equipment at the monitor station will indicate a failure in power source, a change in power source, and the location of the failure or change. Component Tamper Protection IDE components located inside or outside the secure area will be evaluated for a tamper protection requirement. If access to a junction box or controller will enable an unauthorized modification, tamper protection will be provided.
6.) AR 380-5, Chapter 7-14(C) (2) Reporting. The PCU receives signals from all sensors in the protected area and incorporates these signals into a communication scheme.
Another signal is added to the communication for supervision, to prevent compromise of the communication scheme by tampering or injection of false information by an intruder.
The supervised signal is sent by the PCU through the transmission link to the monitor station. Inside the monitor station either a dedicated panel or central processor monitors information from the PCU signals. When an alarm occurs, an annunciator generates an audible and visible alert to security personnel. Alarms result normally from intrusion, tampering, component failure, or system power failure.
7.) Refer to UFC 4-021-02, Electronic Security Systems.
C.5.5.2. EMT conduit protects against EMI 9-6.6 Electromagnetic Interference (EMI).Interference can be introduced to unprotected communication lines that are in close proximity to electrical power wiring, radio frequency sources, large electric motors, generators, induction heaters, power transformers, welding equipment, and electronic ballasts. Protection from EMI includes avoiding the sources of the interference by physical separation or shielding wire lines by means of specialty wiring (coaxial, twisted shielded (foil) pairs, and metal sheathed cables), and metallic conduit systems.
C.5.5.3. Cable Routing 9-6.7.1 Cable Routing. All conduit and cabling associated with the ESS should be installed within the perimeter of the protected area to the greatest extent possible.
C.5.6. Cable type is 2 pair of size 22 twisted copper from sensor to panel. No splicing is authorized. ***Note*** Only compression fittings for EMT conduit permitted. No set screw fittings allowed. Fit ends of conduit with insulated bushings.
C.5.7. The (5) HD73HD1 IR Mini Dome Cameras will be installed to meet the latest NFPA 70 Electrical Code IAW UFC 4-021-02 para 9-6.11
C.5.8. The contractor shall provide certified staff to perform installation and performance verification testing of the Access Control System (ACS). System to be installed is Honeywell Vindicator Command and Control Platform (VCCP) Windows 7 (64-bit): V5 ACS with Vindicator Badge Manager 3 (VBM) and associated required equipment in accordance regulations stated below. ACS will be able to create new access cards and program for use with DoD issued CAC. VBM will be installed in a secure cabinet with KVM extension for external accessing of the system. All other required ACS equipment can be installed in the cabinet with tampers on the all doors (hinged doors require 2 tampers on opposite side, non-hinged doors require 4 tampers, each panel can be run in series), if other security equipment is required for the full operation of the ACS then it will be located in this rack with a KVM tray. All enclosures will be keyed and have tampers installed (hinged doors require 2 tampers on opposite side, non-hinged doors require 4 tampers). All junction boxes will be tampered if there are splices, if no splices then tamper screws are sufficient. No junction box will have knockouts. All connections will be thru rigid conduit with compression fittings. Each door will consist of HID Reader with Keypad on both sides with Maglock and BMS (BMS can be integrated into the Maglock).
Power for all of the ACS will be dedicated circuit(s). Installation of new system communications wire, and upgraded security equipment for Building 652, Information Processing Node to include associated components, sensors, connections, system wiring, control units, and conduit at Building 652 Joint Base Elmendorf Richardson, Alaska (JBER). Contractor will install all components associated with provided listing and drawings in attachment 1, bldg. 62 drawing.
The contractor will provide enough system requirements meeting DoD 5200.1, DoD 5200.08R, MIL-HDBK-1013/1A, UFGS 28.20.01.00.10, UFC 4-021-02, Electronic Security Systems, AR 380-5, AF MFR "Non-Nuclear Intrusion Detection System (IDS) Equipment Approval", and AR 190-13 within bldg 652. Placement equipment and components is critical and will be coordinated with JBER Physical Security Office (907) 384-0812 and the 59th Signal Battalion S2 Office personnel at (907) 384-0057. The period of performance for this contract will be from 1 August 2019 thru completion of the work.
SECTION C.6.
PERFORMANCE REQURIEMENTS SUMMARY
6.1. Standard. The Contractor shall perform all work required in accordance with the Performance Work Statement (PWS). The Government will not accept services until all deficiencies have been corrected.
6.2. Procedures. The COR, or designated ACOR, will inspect all performance objectives to ensure contractor compliance with the appropriate paragraphs of the PWS. If inspection indicates unacceptable performance, the inspector (COR or ACOR) will notify the contractor of the deficiencies for correction. The Contractor shall be provided one (1) day after notification to correct the unacceptable performance. The COR, through coordination with the applicable Garrison, may allow additional time if the COR deems that additional time is appropriate. If deficiencies are not corrected within the required time frame, the COR will fill a contract discrepancy report with the Contracting Officer for action.
6.3. Evaluation Procedures. The COR/ACOR will randomly visit and observe and evaluate the work requirements listed in PWS as either satisfactory (S) or unsatisfactory (U) on the Surveillance Activity Checklist. A brief description of any noted defects, actions taken, etc. will be provided, if appropriate. If defective conditions are discovered, a contract discrepancy report will be sent to the Contracting Officer for resolution.
6.4. The specific requirements listed in the Performance Work Statement (PWS), includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
This table specifies the standard for satisfactory performance of the tasks specified in this performance work statement. The contractor shall perform the tasks in accordance with manufacturer’s service manuals.
Required service
Performance Standard
Acceptable Quality Level
(AQL)
Monitoring Method
Discrepancy Handling
1 Installation of
(7) Separate badging in/out Entry Control Systems IAW bldg. 652 slide drawing and must be AF compliant.
All badging in/out Entry Control Systems will be installed in compliance with PWS C.1.3A thru C1.3Q and the bldg. 652 drawing.
100% The COR & 673 Civil Engineer Group Resources Information Technology will perform a 100% inspection on every Key Pad Entry Control Systems
Contractor shall place in/out Entry Control Systems identified in the bldg. 652 drawing IAW PWS C.1.3A thru C1.3Q, if not correctly installed contractor will correct the issues at no additional cost to the government.
2 Installation of
(1) new Enrollment Workstation IAW bldg. 652 slide 1 of the drawing and the PWS.
Enrollment Workstation will be installed in compliance with PWS C.1.3A thru C1.3Q and the bldg. 652 drawing.
100% The COR & 673 Civil Engineer Group Resources Information Technology will perform a 100% inspection on every Key Pad Entry Control Systems
Contractor shall place the new Enrollment Workstation IAW with the bldg. 652 drawing and PWS C.1.3A thru C1.3Q, if not correctly installed contractor will correct the issues at no additional cost to the government.
3 Installation of
(1) Control Panel IAW bldg. 652 slide 1 of the drawing and the PWS.
Control Panel system will be installed in compliance with PWS C.1.3A thru C1.3Q and the bldg. 652 drawing.
100% The COR & 673 Civil Engineer Group Resources Information Technology will perform a 100% inspection on control panel to ensure proper operation.
Contractor shall install the control panel as identified in the bldg. 652 drawing IAW PWS C.1.3A thru C1.3Q, if not correctly installed contractor will correct the issues at no additional cost to the government.
4 Installation of
(2) Doors timed maglock IAW bldg. 652 slide 1 of the drawing and the PWS.
All identified doors time maglocks Systems will be installed in compliance with PWS C.1.3A thru C1.3Q and the bldg. 652 drawing.
100% The COR & 673 Civil Engineer Group Resources Information Technology will perform a 100% inspections on the maglocks and ensure the system is properly operational
Contractor shall place (2) Door Timed Maglocks as identified in the bldg. 652 drawing IAW PWS C.1.3A thru C1.3Q, if not correctly installed contractor will correct the issues at no additional cost to the government. Maglocks must be IAW UFC-600-01, fire systems must have way to override the maglocks.
5 Installation of
(4) Strike Locks IAW bldg. 652 slide 1 of the drawing and the PWS.
Strike locks will be installed in compliance with PWS C.1.3A thru C1.3Q and the bldg. 652 drawing.
100% The COR & 673 Civil Engineer Group Resources Information Technology will perform a 100% inspections on the strike locks system are properly operational
Contractor shall install (4) strike locks as identified in the bldg. 652 drawing IAW PWS C.1.3A thru C1.3Q, if not correctly installed contractor will correct the issues at no additional cost to the government.
6 If required Install (2) Fire alarm system and (1) Fire alarm control panel IAW bldg. 652 slide 1 of the drawing and the PWS.
All Fire Systems will be installed in compliance with PWS C.1.3A thru C1.3Q and the bldg. 652 drawing.
100% The COR &
CES/CEFP -
JBER Fire Prevention Section will perform a 100% inspection on all fire systems
Contractor shall install all Fire systems as identified in the bldg. 652 drawing IAW PWS C.1.3A thru C1.3Q and IAW UFC-600-01, if not correctly installed contractor will correct the issues at no additional cost to the government.
7 Installation of
(5) HD73HD1
IR mini Dome TA Compliant Cameras to cover the secure areas IAW bldg. 652 slide 1 of the drawing and the PWS.
All (5)
HD73HD1 IR
mini Dome TA Compliant Cameras will be installed in compliance with PWS C.1.3A thru C1.3Q and the bldg. 652 drawing.
100% The COR & 673 Civil Engineer Group Resources Information Technology will perform a 100% inspection on all installed Motion Detectors Systems
Contractor shall install (5) HD73HD1 IR mini Dome TA Compliant Cameras to properly cover the secure area as identified in the bldg. 652 drawing IAW PWS C.1.3A thru C1.3Q, if not correctly installed contractor will correct the issues at no additional cost to the government.
8 Installation of
(1) Maxpro viewer station IAW bldg. 652 slide 1 of the drawing and the PWS.
Maxpro viewer station Systems will be installed in compliance with PWS C.1.3A thru C1.3Q and the bldg. 652 drawing.
100% The COR & 673 Civil Engineer Group Resources Information Technology will perform a 100% inspection on all Systems
Contractor shall install Maxpro viewer station system in Bldg 652 drawing IAW PWS C.1.3A thru C1.3Q, if not correctly installed contractor will correct the issues at no additional cost to the government.
9 All Systems will be ran through EMT
IAW NFPA 70
Electrical Code
IAW
UFC 4-021-02
para 9-6.11, and the PWS
EMT will be installed in compliance with PWS C.1.3A thru C1.3Q.
100% The COR & 673 Civil Engineer Group Resources Information Technology will perform a 100% inspection on all EMT.
Contractor will ensure all conduit and electrical meet NFPA 70 Electrical Code IAW UFC 4-021-02 para 9-6.11.
EMT conduit protects against EMI 9-6.6 Electromagnetic Interference (EMI). ***Note*** Only compression fittings for EMT conduit permitted. No set screw fittings allowed. Fit ends of conduit with insulated bushings. EMT conduit protects against EMI. 9-6.6
Electromagnetic Interference (EMI). Interference can be introduced to unprotected communication lines that are in close proximity to electrical power wiring, radio frequency sources, large electric motors, generators, induction heaters, power transformers, welding equipment, and electronic ballasts. Protection from EMI includes avoiding the sources of the interference by physical separation or shielding wire lines by means of specialty wiring (coaxial, twisted shielded (foil) pairs, and metal sheathed cables), and metallic conduit systems. IAW PWS C.1.3A thru C1.3Q, if not correctly installed contractor will correct the issues at no additional cost to the government.
10 All Systems will be IAW
NFPA 70
Electrical Code
IAW
UFC 4-021-02
para 9-6.11 and the PWS
Cabling will be installed in compliance with PWS C.1.3A thru C1.3Q.
100% The COR & 673 Civil Engineer Group Resources Information Technology will perform a 100% inspection on all Systems
Contractor will ensure all Cable type is 2 pair of size 22 twisted copper from sensor to panel. (No Splicing is authorized). Cable Routing 9-6.7.1 Cable Routing.
All conduit and cabling associated with the ESS should be installed within the perimeter of the protected area to the greatest extent possible. IAW PWS C.1.3A thru C1.3Q, if not correctly installed contractor will correct the issues at no additional cost to the government.