Appendix_D_(CDRL_List)_v1.1.pdf
PDF 117 KB Posted
- Attached to
- Electronic Security Systems (ESS) Federal contract opportunity
- Solicitation number
- W912D0-19-R-0006
About this file
Appendix D CRDL
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q&A_Doc2.pdf | ||
| Suggested_Parts_Inventory.pdf | ||
| AR-_380_5_(Sep_2000).pdf | ||
| Q&A_Doc.pdf | ||
| Combined_Synopsis_for_ICIDS_V7.pdf | ||
| Wage_Det__15-5683_Rev_7.pdf | ||
| Suggested_Parts_Inventory.pdf | ||
| PWS_for_ESS_v1.10.pdf | ||
| Appendix_A_ESS_Locations_for_Fort_Greely.PDF | ||
| Appendix_A_Fort_Wainwright_ESS_Alarmed_Location_List.pdf | ||
| CS_ICIDS_V6.pdf | ||
| BidSheetv.3.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANNEX D
Electronic Security Systems (DAQ) Contract Data Requirements List (CDRL)
CDRL# PWS
SECTION
DESCRIPTION FORMAT FREQUENCY DISTRIBUTION
0001 2. Verify / Validate Appendix A
MS Excel Once 90 days after award Prior to Option Year
COR
0002 5.2.1 Personnel Verification (Special Sites)
MS Word /
document
Prior to notice to proceed, when needed
COR
0003 5.2.9 Valid Driver’s License
Copy of Driver’s License
20 days after award, when needed
COR
0004 4.2 Quality Control and Safety Plan
MS Word Once (10 days after award)
COR
0005 5.5 Training Certificates
Certificates 30 calendar days after contract start date
COR and Applicable ACOR
0006 2.3 Preventive Maintenance Plan
(PM)
Contractor Format
Quarterly, IAW appendix A
COR and Applicable ACOR
0007 3.2.1 Preventive Maintenance Service Calls
Contractor Format
5th day of each month
COR
0008 3.1 Record of Performance
Contractor Format
Quarterly COR
0009 2.4 Corrective Maintenance
(CM)
Contractor Format
As needed, 10 Days after work completion
COR and Applicable ACOR
0010 3.3 Bench Stock, Spare parts Inventory and Inventory Control
Contractor format
Annually COR
0011 3.2, 2.5.1.3 Emergency Maintenance
(EM)
MS Word As needed, 5 Days after work completion
COR and Applicable ACOR
0012 2.5.1 Emergency Maintenance (EM) Plan
MS Word Post Award Meeting
COR
0013 2.5.5 Emergency Maintenance Point of Contact
Contractor Format
Post Award Meeting
COR
0014 2.10.1 Replacement Parts without Tech specification
Manufacture Format
As required COR
0015 5.2.6 Resource Requirements List
Contractor Format
As needed KO, COR