Text version
Contractor Questions for W912D0-19-Q-0006 PTM-10018-8J Power Panel Install Bldg. 5109
The Contractor phrased three questions; the answers are as follows:
Question- Is there available load capacity on the existing MDP to allow for a 300 amp additional load?
Answer- SOW paragraph 4.G.- All conductors shall be installed in conduit from Contractor furnished 60 ampere three phase breaker in the MDP of building #5108 electrical/mechanical room to the exterior wall mounted disconnect of building #5109. All wiring shall include an appropriately sized grounding conductor. Except where rising up to the buildings, all conduits shall be installed buried at a minimum of 36 inches below final finish grade.
**Note: 400 ampere 208 volt three phase MDP as shown in the supplied pictures with the Scope of Work- the load is 60 ampere not 300 ampere.
Question- Is there adequate space for the transformer footprint of 2.5'w x2.5'd x 4'h with 6" of clearance on the sides and back?
Answer- Yes; see drawings that were included with the Scope of Work
Question- The transformer weighs approx. 700 lbs. will a housekeeping pad be required?
Answer- No