Contractor__Answered_Questions_for_W912D0-19-Q-0006_PTM_Power_Panel_Receptacle.pdf

PDF 327 KB Posted

Attached to
PTM-10018-8J Power Panel Install Bldg 5109
Solicitation number
W912D0-19-Q-0006
Issued by

About this file

Contractor Answered Questions for W912D0-19-Q-0006 PTM Power Panel Receptacle

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Questions for W912D0-19-Q-0006 PTM-10018-8J Power Panel Install Bldg. 5109

The Contractor phrased three questions; the answers are as follows:

Question- Is there available load capacity on the existing MDP to allow for a 300 amp additional load?

Answer- SOW paragraph 4.G.- All conductors shall be installed in conduit from Contractor furnished 60 ampere three phase breaker in the MDP of building #5108 electrical/mechanical room to the exterior wall mounted disconnect of building #5109. All wiring shall include an appropriately sized grounding conductor. Except where rising up to the buildings, all conduits shall be installed buried at a minimum of 36 inches below final finish grade.

**Note: 400 ampere 208 volt three phase MDP as shown in the supplied pictures with the Scope of Work- the load is 60 ampere not 300 ampere.

Question- Is there adequate space for the transformer footprint of 2.5'w x2.5'd x 4'h with 6" of clearance on the sides and back?

Answer- Yes; see drawings that were included with the Scope of Work

Question- The transformer weighs approx. 700 lbs. will a housekeeping pad be required?

Answer- No