DPW 00023-4J Revision 1 Replace Upper Roof B661 Page 1 of 6

DEPARTMENT OF THE ARMY

Office of the Department of Public Works Box 31310, Fort Greely, AK 99731

September 6, 2018

Memorandum For:

Reference: DPW 00023-4-J

Subject: Replace Roof, Bldg 661

Overview: The upper portion of the roof was repaired in 2006. The upper portion is in bad shape and leaking. The work order is to increase the R-value of the roof from R-40 to R-60 rating.

STATEMENT OF WORK:

1. General: Provide all material, labor, and equipment to replace roof with single ply membrane, EPDM, 60 mil., fully-adhered and mechanically fastened roofing system. See attachments. Building shall be protected at all times from rain and wind during roof replacement.

1.1 Remove flashings, EPDM roofing, insulation, sleepers, and 810 SF of damaged vapor barrier. All roofing and control joints shall be removed down to the roof decking and walls. Disposal of material shall be disposed at Ft Greely landfill in accordance with Ft Greely Environmental Procedures (FGA ISWMP).

1.2 For the two (2) rain drains, install new drain bowl extensions, clamping rings and metal dome. Solid blocking shall be installed from the bottom of the roof drain down to the concrete to support it.

1.3 Vapor barrier shall be 4 ply fiberglass felt hot mopped with Type 3 asphalt that meets or exceeds ASTM D-312 for vapor retarder repair, which will be installed before treated 2x4 sleepers are installed. Meets the requirements of US 55A, Type G1 for asphalt content and minimum weight. It also shall comply with ASTM D2178 Type IV and listed with FM, UL and Intertek/WHI.

1.4 Self-adhering membrane shall be polyethylene-faced sheet, ASTM D 1970, 60 mils thick minimum, consisting of slip-resisting polyethylene-film reinforcing and top surface laminated to SBS-modified asphalt adhesive, with release paper backing to be cold applied.

1.5 All concrete roof decking will have a Fully-Adhered Roofing System with a Mechanically Fastened subordinate system, designed for “High

B661 Page 2 of 6

Wind” applications. All perimeter parapet walls shall be lined with treated 2x4s sleepers and spaced 10’-0” on center perpendicular to the long wall. The treated 2x4s will be mechanically fastened through the vapor barrier into the concrete decking using 3/8”x5” drive in wedge anchors, positioned every 24” oc. Roof Fasteners will be installed at 18” oc., securing the recovery board to the 2x4 pressure treated sleepers (AWPA C31 with 0.6 pounds of retention). All remaining operations of the Fully Adhered System shall remain standard in accordance with roofing manufactures’ engineering design guide.

1.6 Insulation will be Expanded Polystyrene (EPS) Insulation with 1.5 density for a total R-value averaging 60 and sloping down (decreasing in R-value) to the drains and scuppers, sloping no more than 1%.

Make sure joints are not aligned with next layer. Cover board shall meet or exceed ASTM C208 for Grade 2 Roof Insulation Board.

Cover board shall be adhered with 2 part cold adhesive and mechanically attached to sleepers.

1.7 The 60 mil. EPDM membrane shall cover the parapet wall and perimeter framing. Flashing covering the parapet on top of the membrane. Flashing shall be 24 GA. Color (Galvalume) coated steel, using face screws on the vertical metal side. The topside of the flashing which fastens down to the EPDM will receive screws where possible or needed. The building has EIFS to the existing parapet wall, so flashing shall be placed and sealed to prevent moisture entering the EIFS and center parapet wall around the perimeter of the roof.

2. Proposed Schedules:

2.1 The construction period is 120 days after issuance of NTP. The NTP will be issued 10 days after the date the contract is awarded. The construction period includes material procurement and equipment delivery times.

2.2 A revised detailed schedule shall be submitted at the time of the preconstruction conference for approval. The schedule shall be in the form of a progress chart of suitable scale and in sufficient detail to indicate the percentage of work scheduled for completion at any given date during the period. The schedule shall take into consideration anticipated adverse weather that could preclude progress, long-lead equipment or materials critical to the completion of the project, review periods for submittal items requiring Government review and approval, and other events and milestones as necessary.

3. Submittals: Submittals shall be accompanied by a completed ENG Form 4025-R;

incomplete submittals will be rejected without action pending completion. When directed, or as specified, the contractor shall provide information and/or submit samples of equipment and materials that the contractor contemplates

B661 Page 3 of 6 incorporating in the work. All submittals shall be at the contractor’s expense.

See submittal register for a detailed list. In addition to paper copies, all closeout submittals shall be submitted in searchable digital format on a single CD or DVD.

If searchable documents are not available (in the case of handwritten reports) scanned .pdf files will be acceptable. Contractor may choose to submit the digital submittal disc after the paper copies have been approved. All items on any given submittal shall be restricted to a single CSI tech section (items on any given submittal shall not be from more than one CSI tech section). Submittals are required on the following products/materials for approval:

3.1 Submittals required with proposal:

3.1.1 Submit the name, supervisor and qualifications of the Contractor QC Manager.

3.1.2 Submit the names and qualifications of the Contractor QC personnel.

3.2 Submittals required:.

3.2.1 Sub-contractor personnel list (POC with phone number)

3.2.2 Submittal Register

3.2.3 Shop drawings of the roof demolition and replacement.

3.2.4 Catalogue Cut sheets and other documentation showing that the roofing material meets the requirements set forth in this document.

3.2.5 Revised (approved) construction schedule

3.3 Submittals Required Prior To Final Inspection:

3.3.1 O&M Manual

3.3.2 Warranty Manual

3.3.3 Record Drawings

4. Pre-construction Meeting:

4.1. A pre-construction meeting with DPW personnel will be held to review the contractor’s schedule and quality control plan, submittals and discuss any required coordination, issues and clarifications. Once all the items above have been approved by the Government, the Contractor shall set up a preparatory meeting to show the Government how the work shall be performed.

5. Pre-final and Final Inspections:

5.1 Pre-Final/Final Inspection Request Notification: The contractor shall contact the government PM/QAR to schedule a pre-final/final inspection of the project after all work has been completed, and the site has been cleaned. The government PM/QAR will meet with the

B661 Page 4 of 6 contractor on site to inspect the work. A request for final payment shall not be submitted by the contractor until after this inspection has been made, any punch list items have been corrected, and the project re-inspected.

5.2 Final Inspection and Acceptance: Final inspection and acceptance shall be conducted after the pre-final inspection punch list items are completed. The CQC representative compiles the pre-final punch list immediately after the work is completed. The Government’s QA representative will sign for completion documents up to 90% (all work completed and Beneficial Occupancy taken) and the Project Manager will sign the final 100% payment documents upon receipt of acceptable work.

6. Warranties:

6.1 Roofing shall be with a 20 year Manufacturer’s warranty.

7. Attachments:

7.1 Site Location

7.2 fg00661-03a

7.3 A-1

7.4 A-2

7.5 Environmental Analysis and Provisions

7.6 Submittal Register

7.7 FGA ISWMP

GENERAL NOTES:

1. Submit with cost proposal a probable sequence of events timeline to include long lead item delivery times and TOTAL JOB DURATION.

2. A schedule will be submitted, for approval or negotiation, to DPW Contract

Management within five business days after receipt of a Notice to Proceed (NTP).

3. Schedule format shall be Microsoft Projects or equal with the start date to be same as the Notice to Proceed date. NTP will be issued 10 days after the date the contract is awarded.

4. All schedule changes will be negotiated and approved through DPW Contract Management.

5. A pre-construction meeting with DPW personnel will be held to review the contractor’s schedule, quality control plan, submittals and discuss any required coordination, issues and clarifications. Once all the items above have been approved by the Government, the Contractor shall set up a preparatory meeting to show the Government how the work shall be performed.

6. Installed equipment, real property, and salvageable material will remain property of the Government unless otherwise noted by Owner’s Representative.

7. Materials submittals will be delivered to DPW Contract Management for approval prior to use on job.

B661 Page 5 of 6

8. All materials used will be new and free of defects unless previously approved by DPW Contract Management. All materials will be installed to Industry Standards in accordance with Manufacturers’ recommendations and instructions.

9. All work will comply with General Building Requirement UFC 1-200-01. Copies of UFCs can be found at http://dod.wbdg.org. Army Regulations (AR) can be found at www.apd.army.mil.

10. All work will comply with Federal, State, and Ft. Greely Environmental Regulations “which include Waste Management” (see FGA Environmental Procedure Manual which a copy can be obtained from DPW Environmental).

11. The contractor shall comply with all state and local occupational safety and health requirements, and requirements of EM 385-1-1 US Army Corps of Engineers Safety and Health Requirements Manual. Copies of EMs and TMs can be found at www.apd.army.mil.

12. All work shall be performed in a skillful and skilled craftsman-like manner to current applicable industry standards. Work requiring certified craftsmen shall be performed by certified personnel. Proof of such certification, training, or other qualifications shall be made available to the Government upon request. The Contractor shall pay all training and certification costs.

13. The contractor shall at all time keep the work area free of accumulation of waste materials. All trash shall be removed from the site on a daily basis.

14. Contractors shall provide temporary 6’ high fencing as required to separate outside construction.

15. Contractor shall provide temporary barriers to separate occupied areas and take measures to mitigate noise and air pollution during construction.

16. Contractor’s responsibilities include following their government approved, corporate QC plan. The Contractor is responsible for quality control and shall establish and maintain an effective quality control system. The quality control system shall consist of plans, procedures, and organization necessary to produce an end product that complies with the specified requirements.

17. Final inspection date is predicated upon completion of all contractors QC punch list items.

18. All work is subject to inspection and testing by the Government at all places and at all reasonable times before acceptance. Government inspections and tests do not relieve the contractor of the responsibility for providing adequate quality control measures, nor does it constitute or imply Government acceptance of the work. The presence or absence of a Government inspector does not relieve the contractor of complying with the specified requirements, nor is the Government inspector authorized to change any terms or condition of the specification without the Contraction Officer’s written authorization.

19. Provide a manufacturers standard warranty or one year warranty (whichever is greater) from time of final acceptance by the government, unless otherwise stated in the above portion under Statement of Work (SOW).

20. The Contractor is responsible for proper job site postings to include the DOL publication WH-1321 (WHs found at www.dol.gov/esa) and applicable WD found in the Task Order.

B661 Page 6 of 6

21. The Contractor is responsible to ensure that sub-contractors submit properly completed SF1413s Standard Forms (SFs) found at www.apd.army.mil) and certified payrolls.

22. The Contractor is responsible for keeping their own and sub’s certified payrolls filed for each special project to include all SF 1413’s, SF 1445’s and making them available on request by KO, COTR or QAE’s.

23. Contractor’s responsibilities include coordination with Doyon Utilities, the local utility provider, for any utility tie-ins to include water, waste water, steam and electrical distribution.

24. All new utility work shall be constructed according to Doyon Utilities (DU) construction standards. DU construction standards can be found on their web site which is www.doyonutilities.com. Once on their web site, click on the plans and standards tab then scroll down until you find the category you are looking for. Any payment owed DU for new work or utility work that is part of the contract is between the contractor and DU including any repairs of contractor damaged utilities.

25. Include UFCs 4-010-01, 4-01-02 and 4-022-01 (as applicable) in the project as requirements for any new construction, renovation, design and/or build. See electronic links.

26. Criminal background checks and personal information via DD Form 254 (DD forms found at www.apd.army.mil) shall be submitted via channels to the Security Manager for all contractor personnel, regardless of whether they're primes or subs, no exceptions.

27. The contractor shall be required to perform mandatory training for AT-OPSEC contract requirements. That includes AT Level 1 training, iWatch training, and OPSEC training. Any questions concerning ATOPSEC shall get a hold of ATO for FGA at 907-873-5032.

Coordinate with the undersigned for any further details:

Deborah Byam DPW Lead Staff Engineer Wolf Creek Federal Services (907)873-1140