Overhead_Door_Site_Visit_Questions_(002).pdf

PDF 43 KB Posted

Attached to
Overhead Doors - Ft. Wainwright AK
Solicitation number
W912D0-16-T-0019
Issued by

About this file

Site Visit Q A's

View the file

Other files

File Type Posted
OH_Door_Site_Visit_Sign-in.pdf PDF
PWS_outline_Final(2).pdf PDF
Picture_6_East_End.jpg JPG image
Picture_2.jpg JPG image
Picture_1.jpeg JPEG file
Picture_3.jpg JPG image
Picture_5_West_End.jpg JPG image
Picture_4.jpg JPG image
NOTICE_TO_PROSPECTIVE_OFFERORS_OF_SITE_VISIT.pdf PDF
Attachment_B_PWS_Overhead_Doors.pdf PDF
Combined_Synopsis_Solicitation_Overhead_Doors_25_Apr_16.pdf PDF
Attachment_A_Quote_Worksheet_Overhead_Doors.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Overhead Door Site Visit – Question & Answers:

Main Gate/Gaffney Rd.

Q: Who will remove the security cameras and conduit?

A: Government will remove and reinstall security cameras. Conduit and cabling is contractor requirement.

Q: Who will reinstall the security cameras and conduit?

A: Government will remove and reinstall security cameras. Conduit and cabling is contractor requirement.

Q: Are the cameras being used?

A: Yes

Q: Is there any concern with not having a door in place at the end of a workday?

A: No, the Govt. will coordinate with the Contractor throughout the project.

Q: Does the cord on the outside of the building control all of the doors?

A: It supplies electricity to structure which supplies power to the door controls.

Q: What is the voltage for the outside cord?

A: Unknown.

Q: What is the voltage for each opener?

A: Unknown.

Q: Is the Government intending on adding heat to insulate the building this coming winter?

A: Not at this time.

Q: The thresholds under the door are not level and there will be a gap under the door. Is this gap acceptable?

A: Yes, the gap under the doors due to the slope of the asphalt is acceptable under this action.

Contractor should seek to minimize any gap during door installation.

Q: Please specify what you are looking for as far as controls. Do you want remotes?

A: Yes (please see PWS para 1.3.) 1 – hand remote per door and 1 wall mount per door and a manual override for each door for power outages.

Q: Do you want all doors controlled from one remote or separate remotes for each door?

A: One remote per door. Please (see PWS para 1.3.) 1 – hand remote per door and 1 wall mount per door and a manual override for each door for power outages.

Q: Do you want corresponding numbers on the doors to match remotes such as vinyl stickers?

A: Not required. Contractor will clearly delineate remotes and associated doors. Gov’t will mark the doors afterward.

Q: Do you want to keep one inspection bay operational?

A: Yes if possible one inspection needs to be operational at Main Gate. Badger gate will be closed to inspections during construction. The Govt. will coordinate with the scheduling needs of the contractor.

Badger Gate

Q: Can the tie downs be relocated?

A: Yes they can be removed for the installation of the doors and relocated to secure the structure to the ground as appropriate.

Q: Is the Contractor responsible to relocate and reinstall the tie downs?

A: Yes.

Q: What type of fuel is in the fuel line?

A: Diesel, JP-8 for heaters.

Q: Do you want the same plug-in as the main gate?

A: No the power box has a dedicated circuit breaker for each door located in the power panel in the east end of the structure.

Q: Can the bottom conduit be abandoned?

A: No. Conduit pathways may be relocated reinstalled with same cabling pulled back in new pathway.

Gov’t will remove cameras before and reinstall cameras once work is completed.

File details come from the government source that posted it. Updated .