Attachment_B_PWS_Overhead_Doors.pdf

PDF 29 KB Posted

Attached to
Overhead Doors - Ft. Wainwright AK
Solicitation number
W912D0-16-T-0019
Issued by

About this file

Attachment B - Performance Work Statement

View the file

Other files

File Type Posted
OH_Door_Site_Visit_Sign-in.pdf PDF
PWS_outline_Final(2).pdf PDF
Overhead_Door_Site_Visit_Questions_(002).pdf PDF
Picture_6_East_End.jpg JPG image
Picture_2.jpg JPG image
Picture_1.jpeg JPEG file
Picture_3.jpg JPG image
Picture_5_West_End.jpg JPG image
Picture_4.jpg JPG image
NOTICE_TO_PROSPECTIVE_OFFERORS_OF_SITE_VISIT.pdf PDF
Combined_Synopsis_Solicitation_Overhead_Doors_25_Apr_16.pdf PDF
Attachment_A_Quote_Worksheet_Overhead_Doors.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B

PERFORMANCE WORK STATEMENT (PWS)

DOOR REPLACEMENT ON SPRUNG SHELTERS

MAIN GATE AND BADGER GATE

FT. WAINWRIGHT, ALASKA 99703

Part 1

General Information

1. GENERAL: The contractor shall remove, dispose of 8 existing doors, provide and install 8 new doors in the sprung shelters at Main Gate and Badger Gate, Fort Wainwright, Alaska. The Government shall not exercise any supervision or control over the contract service providers performing the services herein.

Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the removal and installation of 8 doors as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: Currently the sprung shelter doors are past their life expectancy and has become an operational liability. All are in need of replacement and can be installed at same time.

1.3 Objectives:

Procurement of 8 sectional doors, door will be constructed of steel on both Side, and filled with foam for an R-value of 15 or greater.

Door sizes are 12'2" x 14'1", door color: white, embossed stucco

Mechanical electric door openers for each door.

3 ea. Thermolite style double insulated SSB windows evenly mounted left to right in 3rd panel of door from the ground for each door.

Remove and dispose of old doors and hardware.

Motor with photo cells for reverse activation.

Brush style weather stripping on bottom of doors.

Fully wired and ready for operation with electrical components and accessories.

Conduit water tight as appropriate.

1 physical wall remote and 1 garage door hand held opener per door on each side of bldg. adjacent the door themselves.

1.4 Period of Performance: Fully installed and operational by 1 August, 2016.

1.5 General Information:

1.5.1 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0600 hours – 2100 hours Monday thru Sunday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential as well as the installation security requirments.

Badger Gate will be closed 22 May 2016 thru 25 June 2016 and access to the sprung shelter will be through Main Gate into base.

1.5.2 Place of Performance: The work to be performed under this contract will be performed at Main Gate and Badger Gate, Fort Wainwright, Alaska 99703.

1.5.3 Security Requirements: No additional security requirement is required as area will be continuously occupied with government employees and area will be supervised by government staff.

1.5.4 Contractor Physical Security Requirements: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.5.5 Lock Combinations: The contractor will not be provided with combination codes to controlled areas.

Government personnel will provide access as required.

1.5.6 Special Qualifications: None is required

1.5.7 Contractor Travel: No contractor travel is required.

1.5.8 Other Direct Costs: No other direct costs are required.

1.5.9 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.5.10 PHASE IN /PHASE OUT PERIOD: Not Applicable

1.5.11 Key Control: No Keys will be issued to the contractor.

PART 2

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

2. GOVERNMENT FURNISHED ITEMS AND SERVICES:

2.1. Services: No Government services will be provided.

2.2 Facilities: The Government will provide the necessary workspace for the contractor staff to accomplish the contract as outlined in the PWS.

2.3 Utilities: The Government will provide all available utilities required by the contractor to accomplish the contract as stated in the PWS. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities. There is not power currently in the Main Gate facility(circuit box has shorted out and is awaiting repair); require all conduit/power requirements to be install to a single point where temporary power can be applied for testing and acceptance. A future project will bring power to that single point

2.4 Equipment: There will be no Government equipment provided to the contractor.

2.5 Materials: The Government will not provide any materials to the contractor.

PART 3

CONTRACTOR FURNISHED ITEMS AND SERVICES

3. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

3.1 General: The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of this PWS.

3.2 Secret Facility Clearance: Is not applicable.

3.3. Materials: The Contractor shall provide and install 8 new doors.

3.4. Equipment: The Contractor shall provide all equipment necessary to meet contract requirements.

PART 4

SPECIFIC TASKS

4. Specific Tasks: The contractor shall remove 8 existing doors and provide and install 8 new doors within the Main Gate and Badger Gate sprung shelters, Fort Wainwright, Alaska.