| 20-B-0001 OF1419 POST signed.pdf | ||
| W912CN-20-B-0001 Amendment 3.pdf | ||
| W912CN-20-B-0001 Amendment 2 Conformed.pdf | ||
| W912CN-20-B-0001 Amendment 2.pdf | ||
| W912CN-20-B-0001 Amendment 1.pdf | ||
| W912CN-20-B-0001 Amendment 1 Conformed.pdf | ||
| Tab 8 Excel Pricing Sheet.xlsx | XLSX spreadsheet | |
| W912CN-20-B-0001 Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912CN20B0001
PROJECT TITLE: Open-End Asphaltic Concrete Paving Repair and Installation, Various Military Reservations, Island of Oahu, Haw aii.
FEWR: RH000659J
NAICS: 237310
MAGNITUDE OF CONSTRUCTION: Betw een $10,000,000 and $25,000,000
X
SSG ANTHONY L WASHINGTON 808.656.0991
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
20-Feb-2020
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______30 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________23 Mar 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
413 CSB
413TH CSB, RCO-HAWAII,
742 SANTOS DUMONT AVENUE
BLDG 108, 3RD FLOOR (WAAF)
SCHOFIELD BARRACKS HI 96857-5026
W912CN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
10:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912CN20B0001 385
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 00 00 - Procurement and Contracting Requirements
NOTICE TO BIDDERS
1. TYPE OF SOLICITATION. This solicitation is being issued as an Invitation for Bid (IFB) in accordance with FAR 14 Sealed Bidding. This solicitation is 100% set aside to all small business concerns. The requirement is to furnish labor, equipment, materials, management, tools, transportation, and other incidental items to perform asphaltic concrete paving repair and installation at various military reservations on the island of Oahu, Hawaii.
2. CONTRACT TYPE. Contract will be a firm-fixed price requirement type construction contract. Quantities are estimated and stated for information of the prospective contractors. The actual quantities ordered may be more or less than the estimated quantities. Reference FAR 52.216-21. As a prerequisite of the Government hereunder, there must be (i) adequate and sufficient funds available to cover the order; and (ii) an administrative determination by the Government that the requirement exists.
3. PERIOD OF PERFORMANCE. The anticipated period of performance will be a base year and two (2) one-year option periods as shown below:
Base Year: 15 MAY 2020 – 14 MAY 2021 Option 1: 15 MAY 2021 – 14 MAY 2022 Option 2: 15 MAY 2022 – 14 MAY 2023
4. AWARD. Award will be made to the lowest responsible bidder whose bid is responsive to the terms and conditions of the Invitation for Bid and is most advantageous to the Government.
5. DUE DATE. All bids must be received by the due date and time indicated in the solicitation.
6. QUESTIONS. Questions may be submitted by email to SSG Anthony Washington, Contract Specialist, at anthony.l.washington1.mil@mail.mil and cc Irene Saito contract specialist at Irene.a.saito.civ@mail.mil with the solicitation number W912CN-20-B-0001 in the subject line. Telephone and faxed inquires will not be accepted. In order to ensure a timely response, questions must be submitted no later than 10:00am, seven days after date of this solicitation. Questions and responses will be issued on an amendment. Any questions received after the due date may not be answered.
7. BID OPENING DATE AND TIME. To attend the Bid Opening, notify SSG Anthony Washington by email at anthony.l.washington1.mil@mail.mil and cc Irene Saito at Irene.a.saito.civ@mail.mil no later than 19 March 2020 2:00 PM HST. Within the emal please provide the company name, the name and good contact number of the personnel attending the Bid Opening. (maximum of 1 personnel). Due to the COVID-19 situation if we do not receive a repersentive name from your company by the date and time stated above you may not be allowed to attend the IFB.
Bid opening will occur on 23 Mar 2020, 10:00am. Bid Opening will be located at:
413th Contracting Support Brigade Regional Contracting Office, Hawaii
Bldg. 108, 3rd Floor Main Conference Room 472 Santos Dumont Street Wheeler Army Airfield, HI 96854
SUBMISSION REQUIREMENT:
A. Bids shall include the following:
a) TAB 1 Completed Standard Form 1442.
b) TAB 2 Completed Schedule of bids/prices. All unit price and estimated amount filled out.
c) TAB 3 Completed Attachment 1 (Bid Attachment).
d) TAB 4 Signed or other acknowledgement of all amendments.
e) TAB 5 Completed Representation and Certifications.
f) TAB 6 Bid Guarantee in accordance with FAR 52.228-1
g) TAB 7 Copy of Bid (items a-f) on CD in PDF format.
h) TAB 8 Excel Pricing Sheet on CD in excel format
B. Bids shall be submitted in sealed envelope or package and shall be addressed to the office specified below no later than the time and date specified.
413th Contracting Support Brigade Regional Contracting Office, Hawaii ATTN: SSG Anthony Washington (W912CN-20-B-0001)
Bldg., 108, 3rd Floor 472 Santos Dumont Street Wheeler Army Airfield, HI 96854
C. Bidders shall furnish unit prices and extended total for all items listed on the schedule of bid items in Section 00 10 00. In the event there is a difference between a unit price and the extended total, the unit price will be the intended bid. In the event the unit price and extended total are omitted for any item, the bid will be deemed nonresponsive.
D. Bidders using commercial carrier services shall ensure that the bid is addressed and marked on the outermost envelope or wrapper as prescribed in the paragraph above.
E. Bids may be mailed or hand carried. If the bid is mailed, it must be post marked before the due date.
F. Electronic bids will not be considered.
G. Access to Army Installation. All vehicle operators must be prepared to provide a valid driver’s license, vehicle registration, certificate of insurance and current safety inspection to the security guard prior to entry to the installation at Lyman Gate on Schofield Barracks. Allow for delays at the gate.
Ensure you plan sufficient time to locate our facility and adjust to gate and road closures/detours to ensure your bid is submitted in accordance with the terms and conditions of the Invitation for Bids.
GENERAL INFORMATION:
1. Scope of Work: This is a firm fixed price requirements type construction contract to furnish all furnish labor, equipment, materials, management, tools, transportation, and other incidental items to perform asphaltic concrete paving repair, installation, and sidewalks that might be impacted by the road work at various military reservations on the island of Oahu, Hawaii.
The cost limitation for K Work is $5 million and L Work is $1 million.
IAW FAR 36.205(b):
(2) That an offer which does not contain separately-priced schedules will not be considered; and
(3) That the price on each schedule shall include an approximate apportionment of all estimated direct costs, allocable indirect costs, and profit.
2. The contractor shall submit a safety plan within 30 days of award or 5 days prior to commencement of on-site work, whichever occurs first in accordance with the AR 385-10, Construction Safety, US Army Corps of
Engineers "Safety and Health Requirements Manual (EM 385-1-1)" and Occupational Safety and Health Administration (OSHA) regulations.
3. To assure compliance with general construction trade practice, the contractor shall establish and maintain quality control for materials and work. The Government may perform inspections and conduct tests while the contractor's work is in process to assure compliance to performance standards.
4. Existing conditions or areas damaged or disturbed by the contractor's operation shall be restored to their original condition, or near original condition as possible, to the satisfaction of the Contracting Officer at no additional cost to the Government.
5. Prior to start of any excavation or trenching work, the contractor shall obtain clearance, in writing, from the appropriate communications agency and from the Directorate of Public Works.
6. Interruptions to existing utilities shall be held to a minimum. A schedule for any required power or water outages shall be submitted to the Contracting Officer a minimum of four weeks prior to the intended outage.
7. The contractor shall establish work procedures and methods to prevent interference with existing operations within or adjacent to the construction area.
8. The Contractor’s normal working hours will be 7:00 a.m. – 4:00 p.m. Monday thru Friday. The Contractor will not normally work on Saturdays, Sundays, or Holidays listed below. If the Contractor chooses to work outside the normal working hours, Contractor must submit an application to the Contracting Officer in writing one week prior to the requested work for approval and shall be maintained at the job site.
New Year's Day Presidents' Day Memorial Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas
The government may require work to be performed at night or on Saturdays for projects in high traffic areas to reduce disruptions to operations. In such cases work shall not exceed 8 hours per day or 40 hours per week.
Work shall be performed at no additional cost.
9. Rubbish and debris shall be removed from Government-controlled property daily unless otherwise directed, so as not to allow accumulation inside or outside the building. Materials that cannot be removed daily shall be stored in areas designated by the Contracting Officer.
10. The contractor shall provide, install, and maintain all necessary signs, lights, barricades, markers, cones, flagmen, and other protective facilities and shall take all necessary precautions for the protection and for the convenience and safety of military and public traffic (vehicular and pedestrian).
11. The amount of dust resulting from the contractor's work shall be controlled to prevent the spread of dust and to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as flooding and pollution.
12. The contractor shall obtain the necessary hot work permit from the appropriate Fire Department prior to any welding, burning, and torching operations.
13. Daily Clean-up - During the course of the work, the Contractor shall keep the entire premises free from any accumulation of empty cans, rags, etc. or rubbish that constitutes a fire hazard. At the end of each day’s work, the Contractor shall remove all debris. The entire area shall be cleaned and left in a condition acceptable to the Technical Representative of the Contracting Officer.
14. Storage area will not be provided.
15. The Government will provide a reasonable amount of water and electricity required to accomplish subject project.
16. The Contractor shall be responsible to have a quality control program to ensure services are performed in accordance with the Scope of Work and commonly accepted commercial practices.
17. The Contractor is required to follow DPW’s Best Management Practice (BMP) of Storm Water Compliance. Copy will be provided at the pre-construction conference, if requested.
18. The work shall be constructed using best practices per industry standards.
19. If a dumpster is provided for this contract, contractor shall include a sign on the dumpster with their name/address/phone and indicate the dumpster is only used for construction debris.
20. Abbreviations used in the Unit column:
CY = Cubic Yard; LH = Labor Hours; SF = Square Foot; EA = Each; FT = Linear Foot; SY = Square Yard
21. Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes."
22. Identification of Contractor Employees.
a. Provide each employee with identification (ID) badge made of nonmetallic material, easily readable and including employee’s name, contractor’s name, functional area of assignment, with recent color photograph of the employee.
All contractor personnel shall wear the ID badge at all times when performing work under this contract at a Government site, including while attending Government meetings that may take place outside the Government facility. Contractor employee shall wear the ID badge in a conspicuous place on the front of exterior clothing above the waist except when safety or health reasons prohibit such placement.
23. ESTIMATED QUANTITIES: All quantities are estimated and are stated for the information of the prospective contractors. The actual quantities ordered may be more or less than the estimated quantities. (See clause at Section 00 70 00 entitled “Requirements”). As a prerequisite the Government, there must be (i) adequate and sufficient funds available to cover the order, and (ii) an administrative determination by the Government that the requirement exists.
24. Contractor Manpower Reporting (CMR)
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to fill in all required data fields completely using the following web address: http://www.ecmra.mil/, and then click on "Department of the Army CMRA" or the icon of the DoD organization that is receiving or benefitting from the contracted services.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), this runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk by clicking on "Send an email" which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component's CMR website." Reporting is required for each task order issued, but the line item will be invoice for and paid only once per contract period.
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1,000 Cubic
Yard
0001 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0001: Excavate, remove and dispose of existing grade material. To include grading, shaping, compaction as required (to provide positive drainage), clean up, and all incidental items necessary to complete the work. L Work Refer to section 01026 FOB: Destination
PSC CD: Z2LB
NET AMT
0002 100 Cubic
0002 Z2LB Repair or Alteration of HW/RD
CLIN 0002: Install approved subgrade fill material. To include grading, shaping, compaction as required (to provide positive drainage), clean up, and all incidental items necessary to complete the work. L Work Refer to section 01026
0003 20 Cubic
0003 Z2LB Repair or Alteration of HW/RD
CLIN 0003: Remove tree roots, 2'-0" past outer edge of sidewalk or curbing and replacement of sub grade with approved fill material. To include shaping, compaction as required (to provide positive drainage), clean up, and all incidental items necessary to complete the work. L Work Refer to section 01026
0004 50 Linear
Foot
0004 Z2LB Repair or Alteration of HW/RD
CLIN 0004: Install Root Barrier. The root barrier shall be at least 19 inches in depth from finished grade. The root barrier substrate fabric shall be made of synthetic polyolefins with UV stabilizer. Chemical control shall be trifluralin herbicide embedded in polyethylene nodules for slow release that are attached to the substrate fabric on 1.5 inch centers. To include grading and compaction as required (to provide positive drainage), clean up and all incidental items necessary to complete the work. L Work Refer to section 01026
0005 900 Cubic
0005 Z2LB Repair or Alteration of HW/RD
CLIN 0005: Install 6" thick base course. To include grading, compaction as required prime coat, clean up, and all incidental items necessary to complete the work. L Work Refer to section 01026
0006 20 Square
0006 Z2LB Repair or Alteration of HW/RD
CLIN 0006: Construct 4" thick reinforced concrete sidewalk, driveways, and wheelchair ramps. To include compaction of base course as required, clean up, and all incidental items necessary to complete the work. Provide smooth transitions. L Work Refer to section 01026
0007 300 Linear
0007 Z2LB Repair or Alteration of HW/RD
CLIN 0007: Construct concrete curbs. To include installation, clean up, and all incidental items necessary to complete the work. L Work Refer to section 01026
0008 20 Linear
0008 Z2LB Repair or Alteration of HW/RD
CLIN 0008: Construct concrete gutters. To include installation, clean up, and all incidental items necessary to complete the work. L Work Refer to section 01026
0009 1,000 Square
0009 Z2LB Repair or Alteration of HW/RD
CLIN 0009: Install 1-1/2" thick asphaltic concrete leveling course. To include all surface preparation, prime coat, clean up, and all incidental items necessary to complete the work. Provide smooth transitions. L Work Refer to section 01026
0010 1,000 Square
0010 Z2LB Repair or Alteration of HW/RD
CLIN 0010: Install 2-1/2" thick asphaltic concrete leveling course. To include all surface preparation, prime coat, clean up, and all incidental items necessary to complete the work. Provide smooth transitions. L Work Refer to section 01026
0011 2,000 Square
0011 Z2LB Repair or Alteration of HW/RD
CLIN 0011: Install 3" thick asphaltic concrete leveling course. To include all surface preparation, prime coat, clean up, and all incidental items necessary to complete the work. Provide smooth transitions. L Work Refer to section 01026
0012 2,000 Square
0012 Z2LB Repair or Alteration of HW/RD
CLIN 0012: Install 4" thick asphaltic concrete leveling course. To include all surface preparation, prime coat, clean up, and all incidental items necessary to complete the work. Provide smooth transitions. L Work Refer to section 01026
0013 2 Each 0013 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0013: Adjust manhole or utility box/covers to match new final finish grade.
To include clean up, and all incidental items necessary to complete the work.
Provide smooth transitions. L Work Refer to section 01026
0014 200 Linear
0014 Z2LB Repair or Alteration of HW/RD
CLIN 0014: Pavement striping. To include all surface preparation, striping, clean up and all incidental items necessary to complete the work. (Payment is based on 1'-0" long by 4" wide stripe, i.e. 40 feet by 4" stripe will be paid as 40 FT. or 20'- 0", of 8" wide stripe will be paid as 40 FT.). L Work Refer to section 01026
0015 5 Each 0015 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0015: Pavement letters and arrows. To include all surface preparation, painting, clean up and all incidental items necessary to complete the work. 4'-0" Letters. L Work Refer to section 01026 https://mutcd.fhwa.dot.gov/pdfs/2009r1r2/pdf_index.htm
0016 5 Each 0016 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0016: Pavement letters and arrows. To include all surface preparation, painting, clean up and all incidental items necessary to complete the work. 8'-0" Letters. L Work Refer to section 01026 https://mutcd.fhwa.dot.gov/pdfs/2009r1r2/pdf_index.htm
0017 5 Each 0017 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0017: Pavement letters and arrows. To include all surface preparation, painting, clean up and all incidental items necessary to complete the work.
Pavement Arrows L Work Refer to section 01026 https://mutcd.fhwa.dot.gov/pdfs/2009r1r2/pdf_index.htm
0018 5 Each 0018 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0018: Pavement letters and arrows. To include all surface preparation, painting, clean up and all incidental items necessary to complete the work.
Handicap Logos L Work Refer to section 01026 https://mutcd.fhwa.dot.gov/pdfs/2009r1r2/pdf_index.htm
0019 100 Each 0019 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0019: Install raised reflective and non-reflective pavement markers. To include all surface preparation, adhesive, installation, clean up and all incidental items necessary to complete the work L Work Refer to section 01026
0020 100 Square
0020 Z2LB Repair or Alteration of HW/RD
CLIN 0020: Install 8" thick portland cement concrete pavement. To include recompacting of base course, placement of #4 round, reinforcing bars at 12" on center; each way, clean up, and all incidental items necessary to complete the work. Provide smooth transitions L Work Refer to section 01026
0021 10 Each 0021 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0021: Install standard pre-cast 6'-0" (L) X 6" (W) X 4" (H), concrete parking bumpers with 1/2" round X 18" Long steel anchor rods on asphalt pavement. To include clean up, and all incidental items necessary to complete the work. L Work Refer to section 01026
0022 1,000 Linear
0022 Z2LB Repair or Alteration of HW/RD
CLIN 0022: Install Thermo-plastic Pavement Striping. To include all surface preparation, striping, clean up and all incidental items necessary to complete the work. (Payment is based on 1'-0" long by 4" wide stripe, i.e. 40 feet by 4" stripe will be paid as 40 FT. or 20'-0", of 8" wide stripe will be paid as 40 FT.). L Work Refer to section 01026
0023 3 Each 0023 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0023: Install 6'-0" x 6'-0" Traffic Sensor Loop, per attached sketch. To include clean up, reprogramming, and all incidental items necessary to complete the work. L Work Refer to section 01026
0024 50 Square
0024 Z2LB Repair or Alteration of HW/RD
CLIN 0024: Install Biaxial or Triaxial Geogrid having an ultimate tensile strength of 1300 lb/ft (minimum). L Work Refer to section 01026
0025 5 Months 0025 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0025: Provide Solar powered Computerized message board. Includes 5 Ea.
Type 1 barricades with flashers to be placed around the message board.
MINIMUM DIMENSIONS/MINIMUM REQUIREMENTS) L Work Refer to section 01026
DIMENSION: Height: sign fully raised – 142”.
Message Panel: Display: 3 lines by 8 characters in various alpha, numeric, and alpha-numeric combinations.
Messages: Control console shall be capable of storing minimum of 25 messages, each message capable of accommodating a minimum of 6 pages. *Message display times at a minimum of 0.4 to 9.9 seconds.
Solar Panels: Single solar cells that provides continuous operations.
Characteristics/visibility: *The message sign panel shall be visible at minimum of 1,000 feet in daylight and night conditions. The message display color shall at a minimum of 587.4 – 592 nano meters amber.
Power System: *The entire message display system shall operate from solar or battery. To optimize performance of pure uninterrupted solar operation Contractor shall adjust the solar/battery arrangement to meet load demand versus weather conditions.
0026 2,500 Square
0026 Z2LB Repair or Alteration of HW/RD
CLIN 0026: Install Woven Stabilization Geotextile Fabric composed of High-tenacity yarns, which are woven into a stable network such that the yarns retain their relative position. Woven Stabilization Geotextile Fabric shall conform to the following properties. L Work Refer to section 01026 Grab Strength (lb) 315/202 Puncture Strength (lb) 112/78 Tear Strength (lb) 112/78 Permittivity (S-1) >0.01 Apparent Opening Size (mm) <0.3 Strengths specified for <50% Elongation/>50% Elongation
0027 1,000 Square
0027 Z2LB Repair or Alteration of HW/RD
CLIN 0027: Install Grassing. To include all surface preparation, clean up (maintenance for a minimum of 60 days or until grass seed takes root and first cutting) and all incidental items necessary to complete the work L Work Refer to section 01026
0028 100 Linear
0028 Z2LB Repair or Alteration of HW/RD
CLIN 0028: Install standard Asphaltic Concrete Curb 7” (W) X 4”(H), on asphalt or concrete pavements. To include clean up, and all incidental items necessary to complete the work L Work Refer to section 01026
0029 1 Each 0029 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0029: The Contractor shall be responsible for obtaining Hawaii State NPDES permit/ Soil Erosion Plan and Controls complying with any Federal, State and Municipal Laws, Codes and regulations, in connection with the performance of this contract. L Work Refer to section 01026
0030 12,000 Cubic
0030 Z2LB Repair or Alteration of HW/RD
CLIN 0030: Excavate, and remove damaged asphaltic concrete/portland cement concrete pavement, base course, subgrade, curb, gutter, and sidewalk sections. To include saw cutting, removal of damaged sections, disposal of waste materials, unclassified excavation, grading and compaction of subgrade as required, clean up and all incidental items necessary to complete the work. Provide smooth transitions. K Work Refer to section 01026
0031 200 Cubic
0031 Z2LB Repair or Alteration of HW/RD
CLIN 0031: Install approved sub grade fill material. To include grading, shaping, compaction as required (to provide positive drainage), clean up and all incidental items necessary to complete the work. K Work Refer to section 01026
0032 60 Cubic
0032 Z2LB Repair or Alteration of HW/RD
CLIN 0032: Remove tree roots, 2'-0" past outer edge of sidewalk or curbing and replacement of sub grade with approved fill material. To include shaping, compaction as required (to provide positive drainage), to correct, clean up, and all incidental items necessary to complete the work. K Work Refer to section 01026
0033 100 Linear
0033 Z2LB Repair or Alteration of HW/RD
CLIN 0033: Install Root Barrier. The root barrier shall be at least 19 inches in depth from finished grade. The root barrier substrate fabric shall be made of synthetic polyolefins with UV stabilizer. Chemical control shall be trifluralin herbicide embedded in polyethylene nodules for slow release that are attached to the substrate fabric on 1.5 inch centers. To include grading and compaction as required (to provide positive drainage), clean up and all incidental items necessary to complete the work. K Work Refer to section 01026
0034 8,000 Cubic
0034 Z2LB Repair or Alteration of HW/RD
CLIN 0034: Install 6" thick base course. To include grading, compaction as required prime coat, clean up, and all incidental items necessary to complete the work K Work Refer to section 01026
0035 20 Square
0035 Z2LB Repair or Alteration of HW/RD
CLIN 0035: Construct 4" thick reinforced concrete sidewalk, driveways, and wheelchair ramps. To include compaction of base course as required, clean up, and all incidental items necessary to complete the work. Provide smooth transitions. K Work Refer to section 01026
0036 300 Linear
0036 Z2LB Repair or Alteration of HW/RD
CLIN 0036: Construct concrete curbs. To include installation, clean up, and all incidental items necessary to complete the work K Work Refer to section 01026
0037 50 Linear
0037 Z2LB Repair or Alteration of HW/RD
CLIN 0037: Construct concrete gutters. To include installation, clean up, and all incidental items necessary to complete the work. Provide smooth transitions K Work Refer to section 01026
0038 60,000 Square
0038 Z2LB Repair or Alteration of HW/RD
CLIN 0038: Install 1-1/2" thick asphaltic concrete leveling course. To include all surface preparation, prime coat, clean up, and all incidental items necessary to complete the work. Provide smooth transitions. K Work Refer to section 01026
0039 15,000 Square
0039 Z2LB Repair or Alteration of HW/RD
CLIN 0039: Install 2-1/2" thick asphaltic concrete leveling course. To include all surface preparation, prime coat, clean up, and all incidental items necessary to complete the work. Provide smooth transitions. K Work Refer to section 01026
0040 40,000 Square
0040 Z2LB Repair or Alteration of HW/RD
CLIN 0040: Install 3" thick asphaltic concrete leveling course. To include all surface preparation, prime coat, clean up, and all incidental items necessary to complete the work. Provide smooth transitions K Work Refer to section 01026
0041 20,000 Square
0041 Z2LB Repair or Alteration of HW/RD
CLIN 0041: Install 4" thick asphaltic concrete leveling course. To include all surface preparation, prime coat, clean up, and all incidental items necessary to complete the work. Provide smooth transitions K Work Refer to section 01026
0042 1,000 Square
0042 Z2LB Repair or Alteration of HW/RD
CLIN 0042: Repair asphaltic concrete with slurry seal. To include all surface preparations and application of slurry seal, clean up, and all incidental items necessary to complete the work. K Work Refer to section 01026
0043 10 Each 0043 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0043: Adjust manhole or utility box/covers to match new final finish grade.
To include clean up, and all incidental items necessary to complete the work.
Provide smooth transitions. K Work Refer to section 01026
0044 100,000 Linear
0044 Z2LB Repair or Alteration of HW/RD
CLIN 0044: Pavement striping. To include all surface preparation, striping, clean up and all incidental items necessary to complete the work. (Payment is based on 1'-0" long by 4" wide stripe, i.e. 40 feet by 4" stripe will be paid as 40 FT. or 20'- 0", of 8" wide stripe will be paid as 40 FT.). K Work Refer to section 01026
0045 15 Each 0045 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0045: Pavement letters and arrows. To include all surface preparation, painting, clean up and all incidental items necessary to complete the work. 4'-0" Letters K Work Refer to section 01026 https://mutcd.fhwa.dot.gov/pdfs/2009r1r2/pdf_index.htm
0046 15 Each 0046 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0046: Pavement letters and arrows. To include all surface preparation, painting, clean up and all incidental items necessary to complete the work. 8'-0" Letters K Work Refer to section 01026 https://mutcd.fhwa.dot.gov/pdfs/2009r1r2/pdf_index.htm
0047 10 Each 0047 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0047: Pavement letters and arrows. To include all surface preparation, painting, clean up and all incidental items necessary to complete the work. 8’-0” Pavement Arrows K Work Refer to section 01026 https://mutcd.fhwa.dot.gov/pdfs/2009r1r2/pdf_index.htm
0048 10 Each 0048 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0048: Pavement letters and arrows. To include all surface preparation, painting, clean up and all incidental items necessary to complete the work. 4’-0” Handicap Logos K Work Refer to section 01026 https://mutcd.fhwa.dot.gov/pdfs/2009r1r2/pdf_index.htm
0049 35,000 Linear
0049 Z2LB Repair or Alteration of HW/RD
CLIN 0049: Install Thermo-plastic Pavement Striping. To include all incidental items necessary to complete the work. (Payment is based on 1'-0" long by 4" wide stripe, i.e. 40 feet by 4" stripe will be paid as 40 FT. or 20'-0", of 8" wide stripe will be paid as 40 FT.). K Work Refer to section 01026
0050 2,000 Each 0050 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0050: Install raised reflective and non-reflective pavement markers. To include all surface preparation, adhesive, installation, clean up and all incidental items necessary to complete the work. K Work Refer to section 01026
0051 5,000 Square
0051 Z2LB Repair or Alteration of HW/RD
CLIN 0051: Cold mill 2" existing asphalt concrete pavement. To include removal, disposal of milled material, surface cleaning, clean up, and all incidental items necessary to complete the work. K Work Refer to section 01026
0052 5,000 Square
0052 Z2LB Repair or Alteration of HW/RD
CLIN 0052: Cold mill 3" existing asphalt concrete pavement. To include removal, disposal of milled material, surface cleaning, clean up, and all incidental items necessary to complete the work K Work Refer to section 01026
0053 30,000 Square
0053 Z2LB Repair or Alteration of HW/RD
CILN 0053: Cold mill 4" existing asphalt concrete pavement. To include removal, disposal of milled material, surface cleaning, clean up, and all incidental items necessary to complete the work K Work Refer to section 01026
0054 7,000 Square
0054 Z2LB Repair or Alteration of HW/RD
CLIN 0054: Install 8" thick portland cement concrete pavement. To include re-compacting of base course, placement of #4 round, reinforcing bars at 12" on center; each way, clean up, and all incidental items necessary to complete the work. Provide smooth transitions. K Work Refer to section 01026
0055 500 Linear
0055 Z2LB Repair or Alteration of HW/RD
CLIN 0055: Crack sealing of asphaltic concrete pavement with an elastomeric crack and joint filler. To include surface preparation, application of sealer, clean up, and all incidental items necessary to complete the work. Provide smooth transitions. K Work Refer to section 01026
0056 50 Each 0056 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0056: Remove and dispose of existing damaged concrete parking bumpers and install new standard pre-cast 6'-0"(L) x 9"(W) X 5"(H), concrete parking bumpers with 3/4" round X 18" Long steel anchor rods on existing asphaltic concrete pavement. To include clean up, and all incidental items necessary to complete the work K Work Refer to section 01026
0057 80,000 Linear
0057 Z2LB Repair or Alteration of HW/RD
CLIN 0057: Remove and dispose Pavement Striping. To include all clean up and all incidental items necessary to complete the work. (Payment is based on 1'-0" long by 4" wide stripe, i.e. 40 feet by 4" stripe will be paid as 40 FT. or 20'-0", of 8" wide stripe will be paid as 40 FT.). K Work Refer to section 01026
0058 10 Each 0058 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0058: Install 6'-0" x 6'-0" Traffic Sensor Loop, per attached sketch. To include clean up, reprogramming, and all incidental items necessary to complete the work. K Work Refer to section 01026
0059 100 Square
0059 Z2LB Repair or Alteration of HW/RD
CLIN 0059: Install Biaxial or Triaxial Geogrid having an ultimate tensile strength of 1300 lb/ft (minimum). K Work Refer to section 01026
0060 24 Months 0060 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0060: Provide Solar powered Computerized message board. Includes 5 Ea.
Type 1 barricades with flashers to be placed around the message board.
MINIMUM DIMENSIONS/MINIMUM REQUIREMENTS) K Work Refer to section 01026
DIMENSION: Height: sign fully raised – 142”.
Message Panel: Display: 3 lines by 8 characters in various alpha, numeric, and alpha-numeric combinations.
Messages: Control console shall be capable of storing minimum of 25 messages, each message capable of accommodating a minimum of 6 pages. *Message display times at a minimum of 0.4 to 9.9 seconds.
Solar Panels: Single solar cells that provides continuous operations.
Characteristics/visibility: *The message sign panel shall be visible at minimum of 1,000 feet in daylight and night conditions. The message display color shall at a minimum of 587.4 – 592 nano meters amber.
Power System: *The entire message display system shall operate from solar or battery. To optimize performance of pure uninterrupted solar operation Contractor shall adjust the solar/battery arrangement to meet load demand versus weather conditions.
0061 50,000 Square
0061 Z2LB Repair or Alteration of HW/RD
0061: Install Woven Stabilization Geotextile Fabric composed of high-tenacity yarns, which are woven into a stable network such that the yarns retain their relative position. Geotextile fabric is inert to biological degradation and resistant to naturally encountered chemicals, alkalis, and acids. Geotextile Fabric shall conform to the following properties. K Work Refer to section 01026 Grab Strength (lb) 315/202 Puncture Strength (lb) 112/78 Tear Strength (lb) 112/78 Permittivity (S-1) >0.01
0062 500 Square
0062 Z2LB Repair or Alteration of HW/RD
CLIN 0062: Install Grassing. To include all surface preparation, clean up (maintenance for a minimum of 60 days or until grass seed takes root and first cutting) and all incidental items necessary to complete the work K Work Refer to section 01026
0063 100 Linear
0063 Z2LB Repair or Alteration of HW/RD
CLIN 0063: Install standard Asphaltic Concrete Curb 7” (W) X 4”(H), on asphalt or concrete pavements. To include clean up, and all incidental items necessary to complete the work. K Work Refer to section 01026
0064 5 Each 0064 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0064: The Contractor shall be responsible for obtaining Hawaii State NPDES permit/ Soil Erosion Plan and Controls complying with any Federal, State and Municipal Laws, Codes and regulations, in connection with the performance of this contract. K Work Refer to section 01026
0065 25 Cubic
0065 Z2LB Repair or Alteration of HW/RD
CLIN 0065: The Contractor shall install Controlled Low Strength Material to comply with the Hawaii Department of Transportation Specifications Section 314” Controlled Low Strength Material (CLSM) for Utilities and Structures”. CLSM shall be poured in segments to address any issues with pressure on piping. CLSM shall be placed with a maximum freefall height of four feet. K Work Refer to section 01026
0066 1 Years 0066 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 0066: Contract Manpower Reporting (CMR), in accordance with paragraph
1.5 of Section 01026. Reporting is required for each task order issued, but the line item will be invoiced for and paid only once per contract period.
1001 1,000 Cubic
OPTION 1001 Z2LB Repair or Alteration of HW/RD
CLIN 1001: Excavate, remove and dispose of existing grade material. To include grading, shaping, compaction as required (to provide positive drainage), clean up, and all incidental items necessary to complete the work. L Work Refer to section 01026
1002 100 Cubic
OPTION 1002 Z2LB Repair or Alteration of HW/RD
CLIN 1002: Install approved subgrade fill material. To include grading, shaping, compaction as required (to provide positive drainage), clean up, and all incidental items necessary to complete the work. L Work Refer to section 01026
1003 20 Cubic
OPTION 1003 Z2LB Repair or Alteration of HW/RD
CLIN 1003: Remove tree roots, 2'-0" past outer edge of sidewalk or curbing and replacement of sub grade with approved fill material. To include shaping, compaction as required (to provide positive drainage), clean up, and all incidental items necessary to complete the work. L Work Refer to section 01026
1004 50 Linear
OPTION 1004 Z2LB Repair or Alteration of HW/RD
CLIN 1004: Install Root Barrier. The root barrier shall be at least 19 inches in depth from finished grade. The root barrier substrate fabric shall be made of synthetic polyolefins with UV stabilizer. Chemical control shall be trifluralin herbicide embedded in polyethylene nodules for slow release that are attached to the substrate fabric on 1.5 inch centers. To include grading and compaction as required (to provide positive drainage), clean up and all incidental items necessary to complete the work. L Work Refer to section 01026
1005 900 Cubic
OPTION 1005 Z2LB Repair or Alteration of HW/RD
CLIN 1005: Install 6" thick base course. To include grading, compaction as required prime coat, clean up, and all incidental items necessary to complete the work. L Work Refer to section 01026
1006 20 Square
OPTION 1006 Z2LB Repair or Alteration of HW/RD
CLIN 1006: Construct 4" thick reinforced concrete sidewalk, driveways, and wheelchair ramps. To include compaction of base course as required, clean up, and all incidental items necessary to complete the work. Provide smooth transitions. L Work Refer to section 01026
1007 300 Linear
OPTION 1007 Z2LB Repair or Alteration of HW/RD
CLIN 1007: Construct concrete curbs. To include installation, clean up, and all incidental items necessary to complete the work. L Work Refer to section 01026
1008 20 Linear
OPTION 1008 Z2LB Repair or Alteration of HW/RD
CLIN 1008: Construct concrete gutters. To include installation, clean up, and all incidental items necessary to complete the work. L Work Refer to section 01026
1009 1,000 Square
OPTION 1009 Z2LB Repair or Alteration of HW/RD
CLIN 1009: Install 1-1/2" thick asphaltic concrete leveling course. To include all surface preparation, prime coat, clean up, and all incidental items necessary to complete the work. Provide smooth transitions. L Work Refer to section 01026
1010 1,000 Square
OPTION 1010 Z2LB Repair or Alteration of HW/RD
CLIN 1010: Install 2-1/2" thick asphaltic concrete leveling course. To include all surface preparation, prime coat, clean up, and all incidental items necessary to complete the work. Provide smooth transitions. L Work Refer to section 01026
1011 2,000 Square
OPTION 1011 Z2LB Repair or Alteration of HW/RD
CLIN 1011: Install 3" thick asphaltic concrete leveling course. To include all surface preparation, prime coat, clean up, and all incidental items necessary to complete the work. Provide smooth transitions. L Work Refer to section 01026
1012 2,000 Square
OPTION 1012 Z2LB Repair or Alteration of HW/RD
CLIN 1012: Install 4" thick asphaltic concrete leveling course. To include all surface preparation, prime coat, clean up, and all incidental items necessary to complete the work. Provide smooth transitions. L Work Refer to section 01026
1013 2 Each OPTION 1013 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 1013: Adjust manhole or utility box/covers to match new final finish grade.
To include clean up, and all incidental items necessary to complete the work.
Provide smooth transitions. L Work Refer to section 01026
1014 200 Linear
OPTION 1014 Z2LB Repair or Alteration of HW/RD
CLIN 1014: Pavement striping. To include all surface preparation, striping, clean up and all incidental items necessary to complete the work. (Payment is based on 1'-0" long by 4" wide stripe, i.e. 40 feet by 4" stripe will be paid as 40 FT. or 20'- 0", of 8" wide stripe will be paid as 40 FT.). L Work Refer to section 01026
1015 5 Each OPTION 1015 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 1015: Pavement letters and arrows. To include all surface preparation, painting, clean up and all incidental items necessary to complete the work. 4'-0" Letters. L Work Refer to section 01026 https://mutcd.fhwa.dot.gov/pdfs/2009r1r2/pdf_index.htm
1016 5 Each OPTION 1016 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 1016: Pavement letters and arrows. To include all surface preparation, painting, clean up and all incidental items necessary to complete the work. 8'-0" Letters. L Work Refer to section 01026 https://mutcd.fhwa.dot.gov/pdfs/2009r1r2/pdf_index.htm
1017 5 Each OPTION 1017 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 1017: Pavement letters and arrows. To include all surface preparation, painting, clean up and all incidental items necessary to complete the work.
Pavement Arrows L Work Refer to section 01026 https://mutcd.fhwa.dot.gov/pdfs/2009r1r2/pdf_index.htm
1018 5 Each OPTION 1018 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 1018: Pavement letters and arrows. To include all surface preparation, painting, clean up and all incidental items necessary to complete the work.
Handicap Logos L Work Refer to section 01026 https://mutcd.fhwa.dot.gov/pdfs/2009r1r2/pdf_index.htm
1019 100 Each OPTION 1019 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 1019: Install raised reflective and non-reflective pavement markers. To include all surface preparation, adhesive, installation, clean up and all incidental items necessary to complete the work L Work Refer to section 01026
1020 100 Square
OPTION 1020 Z2LB Repair or Alteration of HW/RD
CLIN 1020: Install 8" thick portland cement concrete pavement. To include recompacting of base course, placement of #4 round, reinforcing bars at 12" on center; each way, clean up, and all incidental items necessary to complete the work. Provide smooth transitions L Work Refer to section 01026
1021 10 Each OPTION 1021 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 1021: Install standard pre-cast 6'-0" (L) X 6" (W) X 4" (H), concrete parking bumpers with 1/2" round X 18" Long steel anchor rods on asphalt pavement. To include clean up, and all incidental items necessary to complete the work. L Work Refer to section 01026
1022 1,000 Linear
OPTION 1022 Z2LB Repair or Alteration of HW/RD
CLIN 1022: Install Thermo-plastic Pavement Striping. To include all surface preparation, striping, clean up and all incidental items necessary to complete the work. (Payment is based on 1'-0" long by 4" wide stripe, i.e. 40 feet by 4" stripe will be paid as 40 FT. or 20'-0", of 8" wide stripe will be paid as 40 FT.). L Work Refer to section 01026
1023 3 Each OPTION 1023 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 1023: Install 6'-0" x 6'-0" Traffic Sensor Loop, per attached sketch. To include clean up, reprogramming, and all incidental items necessary to complete the work. L Work Refer to section 01026
1024 50 Square
OPTION 1024 Z2LB Repair or Alteration of HW/RD
CLIN 1024: Install Biaxial or Triaxial Geogrid having an ultimate tensile strength of 1300 lb/ft (minimum). L Work Refer to section 01026
1025 5 Months OPTION 1025 Z2LB Repair or Alteration of HW/RD
FFP
CLIN 1025: Provide Solar powered Computerized message board. Includes 5 Ea.
Type 1 barricades with flashers to be placed around the message board.
MINIMUM DIMENSIONS/MINIMUM REQUIREMENTS) L Work Refer to section 01026
DIMENSION: Height: sign fully raised – 142”.
Message Panel: Display: 3 lines by 8 characters in various alpha, numeric, and alpha-numeric combinations.
Messages: Control console shall be capable of storing minimum of 25 messages, each message capable of accommodating a minimum of 6 pages. *Message display times at a minimum of 0.4 to 9.9 seconds.
Solar Panels: Single solar cells that provides continuous operations.
Characteristics/visibility: *The message sign panel shall be visible at minimum of 1,000 feet in daylight and night conditions. The message display color shall at a minimum of 587.4 – 592 nano meters amber.
Power System: *The entire message display system shall operate from solar or battery.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .