W912CN-19-B-0002_Open-End_Painting_IFB.pdf
PDF 950 KB Posted
- Attached to
- Open-End Painting, U. S. Army Garrison, Hawaii Federal contract opportunity
- Solicitation number
- W912CN-19-B-0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19-B-0002_OF1419_Attach_Pg_3_(Additional_Award_Memo_Charts).pdf | ||
| 19-B-0002_OF1419_Pg_1.pdf | ||
| 19-B-0002_OF1419a_Pg_2.pdf | ||
| W912CN-19-B-0002_0001_Conformed.pdf | ||
| W912CN-19-B-0002_Amendment_0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011315158
PROJECT TITLE: This is a f irm f ixed price requirements-type construction contract to furnish all labor, materials, equipment, management, supervision, tools, transportation and other incidental items to perform Open-End Interior / Exterior Painting and related w ork of Miscellaneous Buildings, Various Army Installations (Schofield Barracks, Fort Shafter, Wheeler Army Air Field, Helemano Military Reservation, Aliamanu Military Reservation, Tripler Army Medical Center) on the Island of Oahu, Haw aii.
FEWR: RH000319J
NAICS: 238320
Magnitude of Construction: Betw een $5,000,000 and $10,000,000.
X
SFC ELIJAH T. FELTON 808.656.0994
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
07-Jun-2019
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______30 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________08 Jul 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
EXPEDITIONARY CONTRACTING COMMAND
413THCONTRACTING SUPPORT BRIGADE
BLDG T122 536 PALM CIRCLE DR 2ND FLOOR H
FORT SHAFTER HI 96858-5025
W912CN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
10:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
8084386544 / 8084386563FAX:TEL: 8084386535 TEL: FAX:
W912CN19B0002 314
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912CN19B0002
Section 00 10 00 - Solicitation
NOTICE TO BIDDERS
SUBMISSION REQUIREMENT:
1. This Solicitation is 100% SET-ASIDE FOR 8(A) COMPETITIVE FIRMS. The proposed contract is limited to qualifying 8(a) firms serviced by the Hawaii District Office (HDO) of the Small Business Administration. The Government will not consider offers from firms other than 8(a) firms or from 8(a) firms outside of the HDO. 8(a) firms that are not serviced by the HDO, but have a bona fide place of business (as defined by SBA) within the geographic area served by the HDO are also eligible to submit offers. An 8(a) firm not serviced by the HDO must consult its servicing District Office regarding the establishment of a bona fide place of business or status of a previously established bona fide place of business. All other firms are deemed ineligible to submit offers.
(a) Bid shall be submitted in a sealed envelope or package to include the solicitation number, W912CN-19-B-0002, and the name and address of the bidder and shall be addressed to the office specified below no later than the time and date specified in block 13A of this solicitaion.
413th Contracting Support Brigade Regional Contracting Office, Hawaii ATTN: CCEC-PAH-C (Lisa Nakamoto) Bldg 108, 3rd Floor 472 Santos Dumont Street Wheeler Army Airfield, HI 96854
SUBMISSION REQUIREMENT
1. Bids shall include the following:
a. Completed Standard Form 1442.
b. Completed Schedule of bids/prices. All unit price and estimated amount filled out.
c. Completed Attachment 1 Bid Attachment.
d. Signed or other acknowledgement of all amendments.
e. Completed Representation and Certifications.
f. Bid Guarantee in accordance with FAR 52.228-1.
g. Copy of Bid (items a-f) on CD in PDF format.
(b) Offerors shall furnish unit prices and extended total for all items listed on the schedule of bid items in Section 00 10 00. In the event there is a difference between the unit price and the extended total, the unit price will be the intended bid. In the event the unit price and extended total are omitted for any item, the bid will be deemed nonresponsive.
(c) Offerors using commercial carrier services shall ensure that the proposal is addressed and marked on the outermost envelope or wrapper as prescribed in the paragraph above.
(d) Proposal may be mailed or hand carried. If the proposal is mailed it must be post marked before the date specified for proposal due date and time.
(e) Facsimile proposals will not be considered.
(f) Telegraphic proposals will not be considered.
(g) Proposals must be submitted by July 08, 2019, 10:00 am.
NOTIFICATION TO BIDDERS - ACCESS TO ARMY INSTALLATIONS: All vehicle operators must be prepared to provide a valid driver's license, vehicle registration, certificate of insurance and current safety inspection to the security guard prior to entry to the installation at Lyman Gate on Schofield Barracks. Allow for delays at the gates.
Please ensure you plan sufficient time to locate our facility and adjust to gate and road closures/detours to ensure your bid is submitted in accordance with the terms and conditions of the Invitation for Bids.
GENERAL INFORMATION:
1. Scope of Work: This is a firm fixed price requirements-type construction contract to furnish all labor, materials, equipment, management, supervision, tools, transportation and other incidental items to perform open-end interior / exterior painting and related work of miscellaneous buildings at various Army Installations (Schofield Barracks, Fort Shafter, Wheeler Army Air Field, Helemano Military Reservation, Aliamanu Military Reservation, Tripler Army Medical Center and Fort Derussy) on the Island of Oahu, Hawaii.
2. The contractor shall submit a safety plan within 30 days of award or 5 days prior to commencement of on-site work, whichever occurs first in accordance with the AR 385-10, Construction Safety, US Army Corps of Engineers "Safety and Health Requirements Manual (EM 385-1-1)" and Occupational Safety and Health Administration (OSHA) regulations.
3. To assure compliance with general construction trade practice, the contractor shall establish and maintain quality control for materials and work. The Government may perform inspections and conduct tests while the contractor's work is in process to assure compliance to performance standards.
4. Existing conditions or areas damaged or disturbed by the contractor's operation shall be restored to their original condition, or near original condition as possible, to the satisfaction of the Contracting Officer at no additional cost to the Government.
5. Prior to start of any excavation or trenching work, the contractor shall obtain clearance, in writing, from the appropriate communications agency and from the Directorate of Public Works.
6. Interruptions to existing utilities shall be held to a minimum. A schedule for any required power or water outages shall be submitted to the Contracting Officer a minimum of four weeks prior to the intended outage.
7. The contractor shall establish work procedures and methods to prevent interference with existing operations within or adjacent to the construction area.
8. The Contractor’s normal working hours will be 7:30 a.m. – 4:30 p.m. Monday thru Friday.
The Contractor will not normally work on Saturdays, Sundays, or Holidays. If the Contractor chooses to work outside the normal working hours, Contractor must submit an application to the Contracting Officer in writing one week prior to the requested work for approval.
9. Rubbish and debris shall be removed from Government-controlled property daily unless otherwise directed, so as not to allow accumulation inside or outside the building. Materials that cannot be removed daily shall be stored in areas designated by the Contracting Officer.
10. The contractor shall provide, install, and maintain all necessary signs, lights, barricades, markers, cones, flagmen, and other protective facilities and shall take all necessary precautions for the protection and for the convenience and safety of military and public traffic (vehicular and pedestrian).
11. The amount of dust resulting from the contractor's work shall be controlled to prevent the spread of dust and to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as flooding and pollution.
12. The contractor shall obtain the necessary hot work permit from the appropriate Fire Department prior to any welding, burning, and torching operations.
13. Daily Clean-up - During the course of the work, the Contractor shall keep the entire premises free from any accumulation of empty cans, rags, etc. or rubbish that constitutes a fire hazard. At the end of each days work, the Contractor shall remove all debris. The entire area shall be cleaned and left in a condition acceptable to the Technical Representative of the Contracting Officer.
14. Storage area will be determined per each task order. The Government may furnish a designated parcel of land for the contractor’s use at the various locations, if requested.
15. The Government will provide a reasonable amount of water and electricity required to accomplish subject project.
16. The Contractor shall be responsible to have a quality control program to ensure services are performed in accordance with the Scope of Work and commonly accepted commercial practices.
17. The Contractor is required to follow DPW’s Best Management Practice (BMP) of Storm Water Compliance. Copy will be provided at the pre-construction conference, if requested.
18. The work shall be constructed using best practices per industry standards. The Contractor shall abide by all applicable regulations to include Federal, State, local requirements.
19. Progress of Work. Contractor shall submit all proposed work schedules to the Contracting Officer for review/approval within ten (10) calendar days after issuance of the Notice to Proceed (NTP) unless otherwise specified.
20. All materials used under this project shall be Energy Star compliant. The following website lists all energy star compliant materials. www.energystar.gov
21. If a dumpster is provided for this contract, contractor shall include a sign on the dumpster with their name/address/phone and indicate the dumpster is only used for construction debris.
22. Abbreviations used in the Unit column: (use if applicable)
CY = Cubic Yard; LH = Labor Hours; SF = Square Foot; EA = Each; LF = Linear Foot; SY = Square Yard
23. Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes."
24. Identification of Contractor Employees.
a. Provide each employee with identification (ID) badge made of nonmetallic material, easily readable and including employee’s name, contractor’s name, functional area of assignment, with recent color photograph of the employee.
b. All contractor personnel shall wear the ID badge at all times when performing work under this contract at a Government site, including while attending Government meetings that may take place outside the Government facility. Contractor employee shall wear the ID badge in a conspicuous place on the front of exterior clothing above the waist except when safety or health reasons prohibit such placement.
25. ESTIMATED QUANTITIES: All quantities are estimated and are stated for the information of the prospective contractors. The actual quantities ordered may be more or less than the estimated quantities. (See clause at 52.216-21, Section 0070 00 entitled “Requirements”). As a prerequisite the Government, there must be (i) adequate and sufficient funds available to cover the order, and (ii) an administrative determination by the Government that the requirement exists.
26. HARDWARE and PAINT supplies: Hardware and paint are to be purchased from AbilityOne. Please refer to FAR Clause 52.208-9. See website http://www.abilityone.com for ordering instructions.
Unless otherwise specified herein, the contractor shall furnish all supplies, material and equipment necessary for the performance of work under this contract. The contractor shall utilize products and materials made from biobased materials (e.g. biobased degreasers and biobased toilet bowl cleaner) to the maximum extent practical without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. The EPA’s Comprehensive Procurement Guidelines and product list can be found at http://www.epa.gov/epawaste/conserve/tools/cpg/index.htm.
Upon request of the COR, the contractor shall submit a list indicating the name of the manufacturer, the brand name, and the intended use of each of the materials used in the performance of its work. The Contractor shall not use any materials, chemicals, or compound which the COR determines would be unsuitable for the intended purpose or harmful to the surfaces to which applied or, as might be the case for such items as paper or soap products, unsatisfactory for use by occupants. For biobased content products evaluation, all non-chemical products proposed for use under this contract must conform to the Department of Agriculture (USDA) Designated Biobased Products List (DBPL) whenever practicable.
27. Enterprise-wide Contractor Manpower Reporting Application (ECMRA) The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Directorate of Public Works via a secure data collection site. The contractor is required to fill in all required data fields completely using the following web address: https://www.ecmra.mil/Default.aspx and then click on "Department of the Army CMRA" or the icon of the DoD organization that is receiving or benefitting from the contracted services.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), this runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2020. Contractors may direct questions to the help desk by clicking on "Send an email" which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component's CMR website." Reporting is required for each task order issued, and shall be entered via the CMR website.
28. Option to Extend Services. Contracting Officers when evaluating proposals for contract award, as part of the price evaluation, will evaluate the Option to Extend Services under FAR Clause 52.217-8 by adding one-half of the offeror’s final option price to the offeror’s total price.
The final award evaluation will include the base year, all option years, and the six month FAR
52.217-8 clause option. The FAR 52.217-8 clause is useable at periods throughout the life of the contract (i.e., after the basic period, after the end of any of the exercised option periods); but not to exceed 6 months for the total life of the contract.
29. APPLICABLE CODES AND REGULATIONS
29.1. The latest edition of the following Codes, regulations, guides, and criteria shall be used for all design and construction under this contract. If there is a conflict between these codes or regulations and these contract specifications the Unified Facility Criteria will override. The Contractor shall have a copy of each of these documents available for use during the term of this contract.
The Unified Facility Criteria (UFC) documents including, but not limited to:
UFC 3-410-01 Design: Heating, Ventilating, And Air Conditioning UFC 4-010-01 Dod Minimum Antiterrorism Standards For Buildings UFC 3-600-01 Design: Fire Protection Engineering For Facilities UFC 1-200-01 DoD Building Code (General Building Requirements
A complete listing can be obtained at http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
29.2. The Unified Facility Guide Specifications are mandatory for all work required under this contract. The contractor is responsible for obtaining the Unified Facility Guide Specifications and for maintaining updates to the specifications. The specifications whether referenced or not (in whole or part), shall be considered to be a part of all task orders issued under this contract. Where two specifications are listed for a certain item of work the Army section as denoted by an “A” shall be used. When there is no Army designated spec use the Navy (denoted by “N”) or in the absence of either use an industry standard specifications or others listed in the Construction Criteria Base CCB. A complete listing of the UFGS Division 01 - General Requirements can be obtained at https://wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs
29.3. The following are additional criteria, codes, regulations and guides which shall be incorporated into all designs and used for construction:
ASHRAE 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings EPACT 2005 Energy Policy Act of 2005, Public Law 109-58.
IBC, International Building Code IEEE C2, National Electrical Safety Code IESNA Illuminating Engineering Society of North America MIL HDBK 1190, Military Handbook for Facility Planning and Design Guide MIL HDBK 1191, Military Handbook for Medical and Dental Treatment Facilities, Design and Construction Criteria Guide National Electrical Contractors Association (NECA) National Electrical Installation Standards (NEIS) TI 800-01, Design Criteria TI 800-03, Technical Requirements for Design-Build TM 5-811-3, Electrical Design: Lightning and Static Electricity Protection •USDA – Rural Utility Service (RUS) RUS 1728F-310 Drawing Index 35.5 to 69 kV RUS 1728F-804 Drawing Index 12.5 & 7.2 kV RUS 1724D-101B System Planning Guide RUS 1724D-104 Econ Worksheet RUS 1724E-152 OH Dist. Line Conductors Mechanics RUS 1724E-153 Guys and Anchors RUS 1724E-154 Distribution Conductor Clearances and Span Limitations
RUS 1724E-200 Design Manual HV Transmission Lines RUS 1724E-203 Upgrading RUS Transmission Lines RUS 1724E-204 Specs Steel Pole H Frame RUS 1724E-205 Embedment Depths RUS 1724E-214 Guide Specifications For Standard Class Steel Transmission Poles RUS 1724E-300 Rural Sub Station Design RUS 1724E-224 Specifications and Drawings for Steel Poles RUS 1728F-804 Specifications and Drawings for 12.47/7.2 kV Line Construction RUS 1728F-806 Specifications for Underground Distribution RUS 1728F-810 Specifications and Drawings for 34.5 to 69 kV RUS 1730B-121 Pole Inspection and Maintenance RUS 1751F-650 Aerial Plant Guying and Anchoring UEP-steel poles Guidelines for the Use Steel Distribution Poles Uniform Building Code Uniform Mechanical Code Uniform Plumbing Code Standard Building Code National Electrical Code (NEC) American National Standards Institute (ANSI) C-2, national Electrical Safety Code (QIESC) Life Safety Code, National Fire Protection Association (NFPA) 101 National Fire Protection Association (NFPA) MIL Handbook 1190
29.4. Workmanship shall be governed by the preceding documents and National Electrical Contractors Association (NECA) listed below:
NECA 100-2006 - Electrical Symbols Set © 2006, NECA NECA 100-2006 - Symbols for Electrical Construction Drawings (ANSI) © 2006, NECA NECA 101-2006 - Standard for Installing Steel Conduit (Rigid, IMC, EMT) (ANSI) © 2006, NECA NECA 102-2004 - Standard for Installing Aluminum Rigid Metal Conduit (ANSI) © 2004, NEIS NECA 111-2003 - Standard for Installing Nonmetallic Raceways (RNC, ENT, LFNC) (ANSI) © 2003, NECA NECA 1-2010 - Standard Practice of Good Workmanship in Electrical Construction (ANSI) © 2010, NECA NECA 120-2006 - Standard for Installing Armored Cable (Type AC) and Metal-Clad Cable (Type MC) (ANSI) ©
2006, NECA
NECA 121-2007 - Standard for Installing Nonmetallic-Sheathed Cable (Type NM) and Underground Feeder and Branch-Circuit Cable (Type UF) (ANSI) © 2007, NECA NECA 130-2010 - Standard for Installing and Maintaining Wiring Devices © 2010, NECA NECA 169 - Standard for Installing and Maintaining Arc-Fault Circuit Interrupters © 2010, NECA NECA 200-2010 - Recommended Practice for Installing and Maintaining Temporary Electric Power at Construction Sites (ANSI) © 2010, NECA NECA 202-2006 - Standard for Installing and Maintaining Industrial Heat Tracing Systems (ANSI) © 2006, NECA NECA 230-2010 - Standard for Selecting, Installing, and Maintaining Electric Motors and Motor Controllers
(ANSI) © 2010, NEIS
NECA 303-2005 - Standard for Installing Closed-Circuit Television Systems (CCTV) (ANSI) © 2005, NECA NECA 305-2010 - Standard for Fire Alarm System Job Practices (ANSI) © 2010, NECA NECA 331-2009 - Standard for Building and Service Entrance Grounding and Bonding (ANSI) © 2009, NECA NECA 400-2007 - Standard for Installing and Maintaining Switchboards (ANSI) © 2007, NECA NECA 402-2007 - Standard for Installing and Maintaining Motor Control Centers (ANSI) © 2007, NECA NECA 406-2003 - Standard for Installing Residential Generator Sets (ANSI) © 2003, NECA NECA 407-2009 - Recommended Practice for Installing and Maintaining Panelboards (ANSI) © 2009, NECA NECA 408-2009 - Standard for Installing and Maintaining Busways (ANSI) © 2009, NECA NECA 409 – 2009 - Standard for Installing and Maintaining Dry-Type Transformers (ANSI) © 2009, NECA NECA 410-2005 - Standard for Installing and Maintaining Liquid-Filled Transformers (ANSI) © 2005 NECA 411-2006 - Standard for Installing and Maintaining Uninterruptible Power Supplies (UPS) (ANSI) © 2006 NECA 420-2007 - Standard for Fuse Applications (ANSI) © 2007, NECA
NECA 430-2006 - Standard for Installing Medium-Voltage Metal-Clad Switchgear (ANSI) © 2006, NEIS NECA 503-2005 - Standard for Installing Fiber Optic Lighting Systems © 2005, NECA NECA 505 Standard for Installing and Maintaining High Mast, Roadway and Area Lighting © 2010, NECA NECA 700-2010 - Standard for Installing Overcurrent Protection to Achieve Selective Coordination • © 2010, NECA NECA 90 Recommended Practice for Commissioning Building Electrical Systems (ANSI) © 2009, NECA NECA/AA 104-2006 - Standard for Installing Aluminum Building Wire and Cable (ANSI) © 2006, NEIS NECA/BICSI 568-2006 - Standard for Installing Building Telecommunications Cabling (ANSI) © 2006, NECA NECA/BICSI 607-2011 - Standard for Telecommunications Bonding and Grounding Planning and Installation Methods for Commercial Buildings © 2011, NECA/BICSI NECA/EGSA 404-2007 - Standard for Installing Generator Sets (ANSI) © 2007, NECA NECA/FOA 301-2009 - Standard for Installing and Testing Fiber Optics (ANSI) © 2009, NEIS NECA/IESNA 500-2006 - Standard for Installing Indoor Lighting Systems (ANSI) © 2006, NECA, NECA/IESNA 501-2006 - Standard for Installing Exterior Lighting Systems (ANSI) © 2006, NEIS NECA/IESNA 502-2006 - Standard for Installing Industrial Lighting Systems (ANSI) © 2006, NECA NECA/MACSCB 600-2003 - Recommended Practice for Installing and Maintaining Medium- Voltage Cable
(ANSI) © 2003, NECA
NECA/NEMA 105-2007 - Standard for Installing Metal Cable Tray Systems (ANSI) © 2007, NECA NECA/NEMA 605-2005 - Recommended Practice for Installing Underground Nonmetallic Utility (ANSI) © 2005, NECA
EM 385-1-1 Corps of Engineers Manual, - Safety and Health Requirements Manual Additional publications and regulatory documents may be identified as required for individual task orders.
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0001 500,000 Square Foot
0001 Z2AA - REPAIR OR ALTERATION OF
FFP
: CLIN 0001; Pressure wash building exterior prior to painting. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011315158
PSC CD: Z2AA
ESTIMATED
NET AMT
UNIT UNIT PRICE ESTIMATED AMOUNT
0002 500,000 Square
0002 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0002; Two-coats exterior painting with two-coat masonry paint. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003 15,000 Square
0003 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0003; Two-coats exterior painting of previously painted concrete steps, porches, and floors. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0004 100,000 Square
0004 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0004; Two-coats exterior painting of wood surfaces. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0005 80,000 Square
0005 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0005; Two-coats exterior painting of metal surfaces. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0006 20,000 Square
0006 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0006; Two-coats exterior painting of galvanized surfaces. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0007 100 Board Feet
0007 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0007; Replacement of exterior deteriorated surface lumber. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0008 100 Board
0008 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0008; Replacement of exterior deteriorated structural lumber. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0009 500,000 Square
0009 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0009; One-coat Exterior grade primer of bare or previously painted surfaces. To include clean-up, and all incidental items ne cessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0010 100 Square
0010 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0010; One-coat cement emulsion fill coat. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0011 20,000 Square
0011 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0011; Non-Lead paint chips removal and disposal from various Wood surfaces. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0012 6,000 Square
0012 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0012; Non-Lead paint chips removal various Metal surfaces. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0013 10,000 Square
0013 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0013; Non-Lead paint chips removal and disposal from various Concrete surfaces. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0014 2,000 Square
0014 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0014; Non-Lead paint chips removal and disposal from various CMU surfaces. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0015 500 Square
0015 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0015; Non-Lead paint chips removal and disposal from various drywall surfaces. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0016 40,000 Square
0016 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0016; Remove mold prior to painting. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0017 80,000 Square
0017 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0017; Two-coats interior painting with semi-gloss latex paint on wood, metal, concrete, fiberboard or gypsum board walls, ceilings, doors, and windows.
To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0018 20,000 Square
0018 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0018; Two-coats interior painting with gloss latex paint on wood, metal, concrete, fiberboard or gypsum board walls, ceilings, doors, and windows. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0019 100 Square
0019 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0019; Two-coats interior painting with flat latex paint on wood, concrete, fiberboard or gypsum board walls, ceilings, doors, and windows. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0020 100 Square
0020 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0020; Two-coats interior painting with flat latex paint on rough textured acoustical plaster ceilings. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0021 100 Square
0021 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0021; Two-component Epoxy paint, with surface preparation, mixing, Epoxy base, and finish. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0022 100 Board
0022 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0022; Replacement of interior deteriorated surface lumber. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0023 100 Board
0023 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0023; Replacement of interior deteriorated structural lumber. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0024 100 Square
0024 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0024; Repair/replace drywall. Provide 1/2" or 5/8 gypsum wallboard (match existing), tape edges, level 4 finish. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0025 150,000 Square
0025 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0025; One-coat Interior grade primer of bare or previously painted surfaces. To include clean-up, and all incidental items ne cessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0026 10 Each
0026 Z2AA - REPAIR OR ALTERATION OF
FFP
: CLIN 0026; Sample analysis: Collection and laboratory analysis to determine if paint contains lead and resulting debris can be classified as hazardous waste. To include sampling, testing, clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0027 5 Each
0027 Z2AA - REPAIR OR ALTERATION OF
FFP
: CLIN 0027; Soil sample testing prior to and after work completion. To include sampling, testing, clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0028 30 Each
0028 Z2AA - REPAIR OR ALTERATION OF
FFP
: CLIN 0028; Collection and laboratory analysis to determine if paint exceeds regulatory limits for RCRA 8 materials and resulting debris can be classified as hazardous waste, testing, clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0029 20,000 Square
0029 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0029; Lead based paint chips removal and disposal from Various Wood surfaces. To include clean-up, area air monitoring, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0030 2,000 Square
0030 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0030; Lead based paint chips removal and disposal from various Metal surfaces. To include clean-up, area air monitoring, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0031 30,000 Square
0031 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0031; Lead based paint chips removal and disposal from various Concrete surfaces. To include clean-up, area air monitoring, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0032 500 Square
0032 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0032; Lead based paint chips removal and disposal from various CMU surfaces. To include clean-up, area air monitoring, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0033 500 Square
0033 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0033; Lead based paint chips removal and disposal from various drywall surfaces. To include clean-up, area air monitoring, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0034 4,500 Square
0034 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0034; Lead containing paint chips removal and disposal from Various Wood surfaces. To include clean-up, area air monitoring, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0035 500 Square
0035 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0035; Lead containing paint chips removal and disposal from various Metal surfaces. To include clean-up, area air monitoring, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0036 3,000 Square
0036 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0036; Lead containing paint chips removal and disposal from various Concrete surfaces. To include clean-up, area air monitoring, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0037 500 Square
0037 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0037; Lead containing paint chips removal and disposal from various CMU surfaces. To include clean-up, area air monitoring, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0038 500 Square
0038 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0038; Lead containing paint chips removal and disposal from various drywall surfaces. To include clean-up, area air monitoring, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0039 150 Square
0039 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0039; Remove and replace existing gypsum board with lead-containing paint with new gypsum board, to match existing thickness, (1/2" or 5/8" thick), tape edges, and dispose of existing. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0040 150 Square
0040 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0040; Remove and replace existing Plywood panels with lead-containing paint with new Plywood panels, to match existing thickn ess, (1/2" or 5/8" thk.), and dispose of existing. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0041 1,250 Each
0041 Z2AA - REPAIR OR ALTERATION OF
FFP
: CLIN 0041; Equipment Rental of Articulating Telescopic Boom lift with the following nominal/minimal requirements: (40’-0” to 10” working height, 60”x30” platform size, 500 lb capacity aluminum platform and 23’-0” to 7.5” horizontal reach. To include delivery to jobsite location and return to Rental Company. (EA equals calendar days.)
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0042 20 Each
0042 Z2AA - REPAIR OR ALTERATION OF
FFP
: CLIN 0042; Equipment Rental of telescopic forklift with 55’-0” lift height and 10,000 lbs lift capacity. To include delivery to jobsite location and return to Rental Company. (EA equals calendar days.)
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0043 50 Square
0043 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0043; Surface preparation using Shot Blasting to clean and prepare existing surfaces. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0044 100 Square
0044 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0044; Contractor shall install high performance epoxy floor coating to include sand blast, sealant, four coats epoxy system and stenciling.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0045 1,000 Each
0045 Z2AA - REPAIR OR ALTERATION OF
FFP
: CLIN 0045; Contractor shall move all furniture prior to painting and return furniture to original location after painting. (EA equals Cubic Feet) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0046 500 Each
0046 Z2AA - REPAIR OR ALTERATION OF
FFP
: CLIN 0046; Scaffolding, stairs, landings erection and dismantling. To include delivery to jobsite, erection, dismantling and return to rental company. To include all incidental items required to complete the work. (EA equals Cubic Feet) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0047 500 Each
0047 Z2AA - REPAIR OR ALTERATION OF
FFP
: CLIN 0047; Scaffolding rental per month. To include scaffolding, stairs, landings bracing and all incidental items required to complete the work. (EA equals Cubic Feet. 100 CF rented for 2 months will be paid at 200 EA) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0048 100 Square
0048 Z2AA - REPAIR OR ALTERATION OF
: CLIN 0048; Non-Lead paint chips removal from various surfaces where excessive peeling is caused by latex paint over oil based paint. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0049 1 Each
0049 Z2AA - REPAIR OR ALTERATION OF
FFP
: CLIN 0049; Contractor Manpower Reporting (CMR) FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001 500,000 Square
1001 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1001; Pressure wash building exterior prior to painting. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002 500,000 Square
1002 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1002; Two-coats exterior painting with two-coat masonry paint. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003 15,000 Square
1003 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1003; Two-coats exterior painting of previously painted concrete steps, porches, and floors. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1004 100,000 Square
1004 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1004; Two-coats exterior painting of wood surfaces. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1005 80,000 Square
1005 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1005; Two-coats exterior painting of metal surfaces. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1006 20,000 Square
1006 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1006; Two-coats exterior painting of galvanized surfaces. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1007 100 Board
1007 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1007; Replacement of exterior deteriorated surface lumber. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1008 100 Board
1008 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1008; Replacement of exterior deteriorated structural lumber. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1009 500,000 Square
1009 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1009; One-coat Exterior grade primer of bare or previously painted surfaces. To include clean-up, and all incidental items ne cessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1010 100 Square
1010 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1010; One-coat cement emulsion fill coat. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1011 20,000 Square
1011 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1011; Non-Lead paint chips removal and disposal from various Wood surfaces. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1012 6,000 Square
1012 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1012; Non-Lead paint chips removal various Metal surfaces. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1013 10,000 Square
1013 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1013; Non-Lead paint chips removal and disposal from various Concrete surfaces. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1014 2,000 Square
1014 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1014; Non-Lead paint chips removal and disposal from various CMU surfaces. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1015 500 Square
1015 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1015; Non-Lead paint chips removal and disposal from various drywall surfaces. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1016 40,000 Square
1016 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1016; Remove mold prior to painting. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1017 80,000 Square
1017 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1017; Two-coats interior painting with semi-gloss latex paint on wood, metal, concrete, fiberboard or gypsum board walls, ceilings, doors, and windows.
To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1018 20,000 Square
1018 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1018; Two-coats interior painting with gloss latex paint on wood, metal, concrete, fiberboard or gypsum board walls, ceilings, doors, and windows. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1019 100 Square
1019 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1019; Two-coats interior painting with flat latex paint on wood, concrete, fiberboard or gypsum board walls, ceilings, doors, and windows. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1020 100 Square
1020 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1020; Two-coats interior painting with flat latex paint on rough textured acoustical plaster ceilings. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1021 100 Square
1021 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1021; Two-component Epoxy paint, with surface preparation, mixing, Epoxy base, and finish. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1022 100 Board
1022 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1022; Replacement of interior deteriorated surface lumber. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1023 100 Board
1023 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1023; Replacement of interior deteriorated structural lumber. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1024 100 Square
1024 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1024; Repair/replace drywall. Provide 1/2" or 5/8 gypsum wallboard (match existing), tape edges, level 4 finish. To include clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1025 150,000 Square
1025 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1025; One-coat Interior grade primer of bare or previously painted surfaces. To include clean-up, and all incidental items ne cessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1026 10 Each
1026 Z2AA - REPAIR OR ALTERATION OF
FFP
: CLIN 1026; Sample analysis: Collection and laboratory analysis to determine if paint contains lead and resulting debris can be classified as hazardous waste. To include sampling, testing, clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1027 5 Each
1027 Z2AA - REPAIR OR ALTERATION OF
FFP
: CLIN 1027; Soil sample testing prior to and after work completion. To include sampling, testing, clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1028 30 Each
1028 Z2AA - REPAIR OR ALTERATION OF
FFP
: CLIN 1028; Collection and laboratory analysis to determine if paint exceeds regulatory limits for RCRA 8 materials and resulting debris can be classified as hazardous waste, testing, clean-up, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1029 20,000 Square
1029 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1029; Lead based paint chips removal and disposal from Various Wood surfaces. To include clean-up, area air monitoring, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1030 2,000 Square
1030 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1030; Lead based paint chips removal and disposal from various Metal surfaces. To include clean-up, area air monitoring, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1031 30,000 Square
1031 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1031; Lead based paint chips removal and disposal from various Concrete surfaces. To include clean-up, area air monitoring, and all incidental items necessary to complete the work.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1032 500 Square
1032 Z2AA - REPAIR OR ALTERATION OF
: CLIN 1032; Lead based paint chips removal and disposal from various CMU surfaces.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.