0010956586

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation cited in Block 9a is amended to add price schedule in the solicitation.

a. Addendum 52.212-1 is revsied

b. The follow ing CLIN extended description: 0001, 0002 & 1001, 1002 has changed

c. All other terms and conditions remain unchanged. Please see "Summary of Changes".

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-May-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912CN-17-R-0019

X 9B. DATED (SEE ITEM 11)

25-May-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-May-2017

CODE

EXPEDITIONARY CONTRACTING COMMAND

413TH CSB, RCO-HAWAII,

742 SANTOS DUMONT AVENUE

BLDG 108, 3RD FLOOR (WAAF)

SCHOFIELD BARRACKS HI 96857-5026

W912CN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

PREVENTIVE MAINTENANCE (UP TO 10 TON)Reference Performance Work Statement: 2, 2.1, 2.2, & 3.1, and TechnicalExhibit 1.60 Units x 12 months = 720 QTY (est.)

To:

PREVENTIVE MAINTENANCE (UP TO 10 TON)Reference Performance Work Statement: 2, 2.1, 2.2, & 3.1, and TechnicalExhibit 1.60 Units x 12 months = 720 QTY.

CLIN 0002

PREVENTIVE MAINTENANCE HOIST AND CRANE 11-20 TON CAPACITY.Reference Performance Work Statement: 2, 2.1, 2.2, & 3.1, and TechnicalExhibit 18 Units x 12 months = 96 QTY (est.)

To:

PREVENTIVE MAINTENANCE HOIST AND CRANE 11-20 TON CAPACITY.Reference Performance Work Statement: 2, 2.1, 2.2, & 3.1, and TechnicalExhibit 18 Units x 12 months = 96 QTY.

CLIN 1001

PREVENTIVE MAINTENANCE (UP TO 10 TON)Reference Performance Work Statement: 2, 2.1, 2.2, & 3.1, and TechnicalExhibit 1.60 Units x 12 months = 720 QTY (est.)

To:

PREVENTIVE MAINTENANCE (UP TO 10 TON)Reference Performance Work Statement: 2, 2.1, 2.2, & 3.1, and TechnicalExhibit 1.60 Units x 12 months = 720 QTY.

CLIN 1002

Statement: 2, 2.1, 2.2, & 3.1, and TechnicalExhibit 18 Units x 12 months = 96 QTY (est.)

To:

Statement: 2, 2.1, 2.2, & 3.1, and TechnicalExhibit 18 Units x 12 months = 96 QTY.

The following have been added by full text:

PRICE SCHEDULE

PRICE SCHEDULE

LINE UNIT TOTAL

ITEM DESCRIPTION QTY U/I PRICE AMOUNT

Base Period: 9/1/2017-8/31/2018 0001 Preventative Maint (Up to 10 TON) 720 EA $___________ $____________ PWS para. 2, 2.1, 2.2, & 3.1, and Technical Exhibit 1.

0002 Preventative Maint (11-20 TON) 96 EA $___________ $____________ PWS para. 2, 2.1, 2.2, & 3.1, and Technical Exhibit 1.

0003 Preventative Maint (21 TON and Above) 24 EA $___________ $____________ PWS para. 2, 2.1, 2.2, & 3.1, and Technical Exhibit 1.

0004 Load Test Hoist and Crane Up to 10 TON 60 EA $___________ $____________ PWS para. 3.2 Load Test

0005 Load Test Hoist and Crane 11-20 TON 8 EA $___________ $____________ PWS para. 3.2 Load Test

0006 Load Test Hoist and Crane 21 TON & Over 2 EA $___________ $____________ PWS para. 3.2 Load Test

0007 Unscheduled and Emergency Repair Services 1 Job $___________ $____________ PWS para. 3.4. Price Ceiling is $11,881.77

0008 Parts PWS para 3.3 repair work & 1 Job $___________ $____________ Replacement parts Technical Exhibit#2

0009 Contractor Manpower Reporting 1 EA $___________ $____________

Total Amount for Base Year $____________

1st Option Period: 9/1/2018-8/31/2019

1001 Preventative Maint (Up to 10 TON) 720 EA $___________ $____________ PWS para. 2, 2.1, 2.2, & 3.1, and Technical Exhibit 1.

1002 Preventative Maint (11-20 TON) 96 EA $___________ $____________ PWS para. 2, 2.1, 2.2, & 3.1, and Technical Exhibit 1.

1003 Preventative Maint (21 TON and Above) 24 EA $___________ $____________ PWS para. 2, 2.1, 2.2, & 3.1, and Technical Exhibit 1.

1004 Load Test Hoist and Crane Up to 10 TON 60 EA $___________ $____________ PWS para. 3.2 Load Test

1005 Load Test Hoist and Crane 11-20 TON 8 EA $___________ $____________ PWS para. 3.2 Load Test

1006 Load Test Hoist and Crane 21 TON & Over 2 EA $___________ $____________ PWS para. 3.2 Load Test

1007 Unscheduled and Emergency Repair Services 1 Job $___________ $____________ PWS para. 3.4. Price Ceiling is $11,881.77

1008 Parts PWS para 3.3 repair work & 1 Job $___________ $____________

1009 Contractor Manpower Reporting 1 EA $___________ $____________

Total Amount for 1st Option Year $____________

2nd Option Period: 9/1/2019-8/31/2020

2001 Preventative Maint (Up to 10 TON) 720 EA $___________ $____________ PWS para. 2, 2.1, 2.2, & 3.1, and Technical Exhibit 1.

2002 Preventative Maint (11-20 TON) 96 EA $___________ $____________ PWS para. 2, 2.1, 2.2, & 3.1, and Technical Exhibit 1.

2003 Preventative Maint (21 TON and Above) 24 EA $___________ $____________ PWS para. 2, 2.1, 2.2, & 3.1, and Technical

Exhibit 1.

2004 Load Test Hoist and Crane Up to 10 TON 60 EA $___________ $____________ PWS para. 3.2 Load Test

2005 Load Test Hoist and Crane 11-20 TON 8 EA $___________ $____________ PWS para. 3.2 Load Test

2006 Load Test Hoist and Crane 21 TON & Over 2 EA $___________ $____________ PWS para. 3.2 Load Test

2007 Unscheduled and Emergency Repair Services 1 Job $___________ $____________ PWS para. 3.4. Price Ceiling is $11,881.77

2008 Parts PWS para 3.3 repair work & 1 Job $___________ $____________

2009 Contractor Manpower Reporting 1 EA $___________ $____________

Total Amount for 2nd Option Year $____________

3rd Option Period: 9/1/2020-8/31/2021

3001 Preventative Maint (Up to 10 TON) 720 EA $___________ $____________ PWS para. 2, 2.1, 2.2, & 3.1, and Technical Exhibit 1.

3002 Preventative Maint (11-20 TON) 96 EA $___________ $____________ PWS para. 2, 2.1, 2.2, & 3.1, and Technical Exhibit 1.

3003 Preventative Maint (21 TON and Above) 24 EA $___________ $____________ PWS para. 2, 2.1, 2.2, & 3.1, and Technical Exhibit 1.

3004 Load Test Hoist and Crane Up to 10 TON 60 EA $___________ $____________ PWS para. 3.2 Load Test

3005 Load Test Hoist and Crane 11-20 TON 8 EA $___________ $____________ PWS para. 3.2 Load Test

3006 Load Test Hoist and Crane 21 TON & Over 2 EA $___________ $____________ PWS para. 3.2 Load Test

3007 Unscheduled and Emergency Repair Services 1 Job $___________ $____________ PWS para. 3.4. Price Ceiling is $11,881.77

3008 Parts PWS para 3.3 repair work & 1 Job $___________ $____________

3009 Contractor Manpower Reporting 1 EA $___________ $____________

Total Amount for 3rd Option Year $____________

4th Option Period: 9/1/2021-8/31/2022

4001 Preventative Maint (Up to 10 TON) 720 EA $___________ $____________ PWS para. 2, 2.1, 2.2, & 3.1, and Technical Exhibit 1.

4002 Preventative Maint (11-20 TON) 96 EA $___________ $____________ PWS para. 2, 2.1, 2.2, & 3.1, and Technical Exhibit 1.

4003 Preventative Maint (21 TON and Above) 24 EA $___________ $____________ PWS para. 2, 2.1, 2.2, & 3.1, and Technical Exhibit 1.

4004 Load Test Hoist and Crane Up to 10 TON 60 EA $___________ $____________ PWS para. 3.2 Load Test

4005 Load Test Hoist and Crane 11-20 TON 8 EA $___________ $____________ PWS para. 3.2 Load Test

4006 Load Test Hoist and Crane 21 TON & Over 2 EA $___________ $____________ PWS para. 3.2 Load Test

4007 Unscheduled and Emergency Repair Services 1 Job $___________ $____________ PWS para. 3.4. Price Ceiling is $11,881.77

4008 Parts PWS para 3.3 repair work & 1 Job $___________ $____________

4009 Contractor Manpower Reporting 1 EA $___________ $____________

Total Amount for 4th Option Year $____________

SUMMARY FOR BASE & OPTION YEARS:

TOTAL AMOUNT FOR BASE YEAR (CLINS 0001-0009) $__________________

TOTAL AMOUNT FOR FIRST OPTION YEAR (CLINS 1001-1009) $__________________

TOTAL AMOUNT FOR SECOND OPTION YEAR (CLINS 2001-2009) $__________________

TOTAL AMOUNT FOR THIRD OPTION YEAR (CLINS 3001-3009) $__________________

TOTAL AMOUNT FOR FOURTH OPTION YEAR (CLINS 4001-4009) $__________________

The following have been modified:

ADDENDUM TO 52.212-1

INSTRUCTIONS TO OFFERORS-COMMERCIAL ITEMS

QUOTE SUMBITTAL INSTRUCTIONS

Offerors are required to furnish a complete package; failure to submit a complete package by the date and time specified for receipt of quotes will render the offeror as non-compliant.

Materials not directly related to the information requested shall no be included in the quote.

1. This is a Request for Quote (RFQ) and the evaluation of quotes will be conducted in accordance with (IAW) FAR Subpart 13.5 - Simplified Procedures for Certain Commercial Items.

2. Each interested contractor shall complete and submit the following forms, clauses, and statements with their quote. Failure to do so may cause a quote to be considered unacceptable.

a. Standard Form (SF) 1449, signed and dated; Submittal of quotes in accordance with FAR 52.212-1(b).

b. Amendments or acknowledgements (if applicable), signed and dated.

c. Use the Price Schedule included in the solicitation to price out the quote for base plus option periods.

d. Submit the Relevant Work Experience Information Form(s) (Attachment A) with the quote.

e. Submit copy of the Load Test certified inspectors/technicians and resume for inspectors/technicians.

f. Complete clause 52.212-3, Offeror Representations and Certifications-Commercial Items (Jan 2017), if not entered into the System for Award Management (SAM) website.

3. Responsibility - For purposes of conducting responsibility assessments, the contractor will provide a narrative addressing the following, IAW FAR 9.104-1:

a. Have adequate financial resources to perform the contract, or ability to obtain them;

b. Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;

c. Have a satisfactory record. A prospective contractor shall not be determined responsible or nonresponsible solely on the basis of a lack of relevant performance history.

d. Have a satisfactory record of integrity and business ethics and responsibility standard as stated in FAR 9.104-1(c).

e. Have the necessary organization, experience, accounting, and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs, applicable to materials to be produced or services to be performed by the prospective contractor and sub-contractors).

f. Have the necessary technical equipment or ability to obtain them to perform the service.

4. Submit quote and all other required documents to Yun Ho Chu at yun.h.chu.civ@mail.mil. by the due date and time of 7/07/2017 at 10:00a.m. Hawaii Standard Time. If you have any issues, please contact Yun Ho Chu at yun.h.chu.civ@mail.mil.

a. Solicitation and amendment - Issued solicitation package will be posted to FEDBIZOPPS website at https://www.fbo.gov. Once posted, interested contractors are responsible to monitor the website until the closing date for any issued amendments.

b. It is the responsibility of the contractor to ensure quotations are received and acknowledged by the Contract Specialist, Yun Ho Chu at yun.h.chu.civ@mail.mil on or before the deadline as stated on Block 8 of the SF 1449.

c. Interested contractor shall submit questions in writing regarding the solicitation to the Contract Specialist via email yun.h.chu.civ@mail.mil. A summary of questions received and Government responses will be provided via amendment of the solicitation and posted on the FEDBIZOPPS website.

FAX COPIES ARE NOT ACCEPTABLE

(End of Summary of Changes)

PRICE SCHEDULE
ITEM DESCRIPTION QTY U/I PRICE AMOUNT

File details come from the government source that posted it. Updated .