View the file

Other files

File Type Posted
Amendment_0001_to_17Q0005.pdf PDF
Conform_Copy_of_0001_to_17Q0005.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912CN-17-Q-0005 18-May-2017

b. TELEPHONE NUMBER

808.656.0937

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 21 Jun 2017

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912CN9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

ANGELA U. MCCOLOR

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

0010874077-0001

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

EXPEDITIONARY CONTRACTING COMMAND

413TH CSB, RCO-HAWAII,

742 SANTOS DUMONT AVENUE

BLDG 108, 3RD FLOOR (WAAF)

SCHOFIELD BARRACKS HI 96857-5026

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE WX3JN3 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

US ARMY GARRISON HI DIR OF PUB WKS DPW

DEANNA YAMADA

BLDG 104 947 WRIGHT AVE WAAF SERVICE CO

SCHOFIELD BARRACKS HI 96857-5013

TEL: 8086562797 FAX: 8086567771

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$7,500,000

NAICS:

562991

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF98

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE ESTIMATED AMOUNT

0001 12 Months

PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Monthly Inspections of Cesspools, Septic Tanks, ATU, and Holding Tank in accordance with the PWS paragraph 3.1 FOB: Destination

PURCHASE REQUEST NUMBER: 0010874077-0001

ESTIMATED

NET AMT

UNIT UNIT PRICE ESTIMATED AMOUNT

0002 12 Months

PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Monthly Pumping and Cleaning Service Schedule for Cesspools, Septic Tanks, ATU, and Holding Tank in accordance with PWS paragraph 3.2.

UNIT UNIT PRICE ESTIMATED AMOUNT

0003 96 Each

PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Pumping, Cleaning, and Disposal of Cesspools, Septic Tanks, ATU, and Holding Tank in accordance with PWS 3.3 and 3.4.

UNIT UNIT PRICE ESTIMATED AMOUNT

0004 8 Each

PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Unscheduled Pumping and Disposal of Cesspools, Septic Tanks, ATU, and Holding Tank in accordance with PWS paragraphs 3.5.

UNIT UNIT PRICE ESTIMATED AMOUNT

0005 1 Each

PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Contractor Manpower Reporting

UNIT UNIT PRICE ESTIMATED AMOUNT

1001 12 Months

OPTION PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Monthly Inspections of Cesspools, Septic Tanks, ATU, and Holding Tank in accordance with the PWS paragraph 3.1

UNIT UNIT PRICE ESTIMATED AMOUNT

1002 12 Months

OPTION PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Monthly Pumping and Cleaning Service Schedule for Cesspools, Septic Tanks, ATU, and Holding Tank in accordance with PWS paragraph 3.2.

UNIT UNIT PRICE ESTIMATED AMOUNT

1003 96 Each

OPTION PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Pumping, Cleaning, and Disposal of Cesspools, Septic Tanks, ATU, and Holding Tank in accordance with PWS 3.3 and 3.4.

UNIT UNIT PRICE ESTIMATED AMOUNT

1004 8 Each

OPTION PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Unscheduled Pumping and Disposal of Cesspools, Septic Tanks, ATU, and Holding Tank in accordance with PWS paragraphs 3.5.

UNIT UNIT PRICE ESTIMATED AMOUNT

1005 1 Each

OPTION PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Contractor Manpower Reporting

UNIT UNIT PRICE ESTIMATED AMOUNT

2001 12 Months

OPTION PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Monthly Inspections of Cesspools, Septic Tanks, ATU, and Holding Tank in

UNIT UNIT PRICE ESTIMATED AMOUNT

2002 12 Months

OPTION PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Monthly Pumping and Cleaning Service Schedule for Cesspools, Septic Tanks, ATU, and Holding Tank in accordance with PWS paragraph 3.2..

UNIT UNIT PRICE ESTIMATED AMOUNT

2003 96 Each

OPTION PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Pumping, Cleaning, and Disposal of Cesspools, Septic Tanks, ATU, and Holding

UNIT UNIT PRICE ESTIMATED AMOUNT

2004 8 Each

OPTION PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Unscheduled Pumping and Disposal of Cesspools, Septic Tanks, ATU, and

UNIT UNIT PRICE ESTIMATED AMOUNT

2005 1 Each

OPTION PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

3001 12 Months

OPTION PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Monthly Inspections of Cesspools, Septic Tanks, ATU, and Holding Tank in

UNIT UNIT PRICE ESTIMATED AMOUNT

3002 12 Months

OPTION PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Monthly Pumping and Cleaning Service Schedule for Cesspools, Septic Tanks, UNIT UNIT PRICE ESTIMATED AMOUNT

3003 96 Each

OPTION PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Pumping, Cleaning, and Disposal of Cesspools, Septic Tanks, ATU, and Holding

UNIT UNIT PRICE ESTIMATED AMOUNT

3004 8 Each

OPTION PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Unscheduled Pumping and Disposal of Cesspools, Septic Tanks, ATU, and

UNIT UNIT PRICE ESTIMATED AMOUNT

3005 1 Each

OPTION PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

4001 12 Months

OPTION PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Monthly Inspections of Cesspools, Septic Tanks, ATU, and Holding Tank in

UNIT UNIT PRICE ESTIMATED AMOUNT

4002 12 Months

OPTION PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Monthly Pumping and Cleaning Service Schedule for Cesspools, Septic Tanks, UNIT UNIT PRICE ESTIMATED AMOUNT

4003 96 Each

OPTION PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Pumping, Cleaning, and Disposal of Cesspools, Septic Tanks, ATU, and Holding

UNIT UNIT PRICE ESTIMATED AMOUNT

4004 8 Each

OPTION PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

Unscheduled Pumping and Disposal of Cesspools, Septic Tanks, ATU, and

UNIT UNIT PRICE ESTIMATED AMOUNT

4005 1 Each

OPTION PSC S222 WASTE TREAMENT/STORAGE SVCS

FFP

PRICE SCHEDULE

PRICE SCHEDULE

LINE UNIT TOTAL

ITEM DESCRIPTION QTY U/I PRICE AMOUNT

Base Period: 8/1/2017-7/31/2018 0001 Monthly Inspections in accordance with 12 MO $___________ $____________ PWS para. 3.1

0002 Monthly Pumping and Cleaning Service 12 MO $___________ $____________ schedule in accordance with PWS para. 3.2

0003 Pumping, Cleaning, and Disposal in 96 EA $___________ $____________ accordance with PWS para. 3.3 and 3.4

0004 Unscheduled Pumping & Disposal in 8 EA $___________ $____________ accordance with PWS para. 3.5

0005 Contractor Manpower Reporting 1 EA $___________ $____________

Total Amount for Base Year $____________

1st Option Period: 8/1/2018-7/31/2019

1001 Monthly Inspections in accordance with 12 MO $___________ $____________ PWS para 3.1

1002 Monthly Pumping and Cleaning Services 12 MO $___________ $____________ schedule in accordance with PWS para 3.2

1003 Pumping, Cleaning, and Disposal in accordance 96 EA $___________ $____________ with PWS para 3.3 and 3.4

1004 Unscheduled Pumping & Disposal in 8 EA $___________ $____________ accordance with PWS para. 3.5

1005 Contractor Manpower Reporting 1 EA $___________ $____________

Total Amount for 1st Option Year $____________

2nd Option Period: 8/1/2019-7/31/2020

2001 Monthly Inspections in accordance with 12 MO $___________ $____________ with PWS para. 3.1

2002 Monthly Pumping and Cleaning Services 12 MO $___________ $____________ in accordance with PWS para. 3.2

2003 Pumping, Cleaning, and Disposal in 96 EA $___________ $____________ accordance with PWS para. 3.3 and 3.4

2004 Unscheduled Pumping and Disposal 8 EA $___________ $____________ in accordance with PWS para 3.5

2005 Contactor Manpower Reporting 1 EA $___________ $____________

Total Amount for 2nd Option Year $____________

3rd Option Period: 8/1/2020-7/31/2021

3001 Monthly Inspections in accordance with 12 MO $___________ $____________ with PWS para 3.1

3002 Monthly Pumping and Cleaning Services 12 MO $___________ $____________ in accordance with PWS para. 3.2

3003 Pumping, Cleaning, and Disposal in 96 EA $___________ $____________ accordance with PWS para. 3.3 and 3.4

3004 Unscheduled Pumping and Disposal 8 EA $___________ $____________ in accordance with PWS para. 3.5

3005 Contractor Manpower Reporting 1 EA $___________ $____________

Total Amount for 3rd Option Year $____________

4th Option Period: 8/1/2021-7/31/2022

4001 Monthly Inspections in accordance with 12 MO $___________ $____________ with PWS para 3.1

4002 Monthly Pumping and Cleaning Services 12 MO $___________ $____________ in accordance with PWS para. 3.2

4003 Pumping, Cleaning, and Disposal in 96 EA $___________ $____________ accordance with PWS para. 3.3 and 3.4

4004 Unscheduled Pumping and Disposal 8 EA $___________ $____________ in accordance with PWS para. 3.5

4005 Contractor Manpower Reporting 1 EA $___________ $____________

Total Amount for 4th Option Year $____________

SUMMARY FOR BASE & OPTION YEARS:

TOTAL AMOUNT FOR BASE YEAR (CLINS 0001-0005) $__________________

TOTAL AMOUNT FOR FIRST OPTION YEAR (CLINS 1001-1005) $__________________

TOTAL AMOUNT FOR SECOND OPTION YEAR (CLINS 2001-2005) $__________________

TOTAL AMOUNT FOR THIRD OPTION YEAR (CLINS 3001-3005) $__________________

TOTAL AMOUNT FOR FOURTH OPTION YEAR (CLINS 4001-4005) $__________________

GRAND TOTAL OF BASE YEAR PLUS FOUR OPTION PERIODS $__________________

DESCRIPTION OF SERVICES

1. SERVICES. The Contractor shall provide all management, tools, transportation, supplies, equipment and labor necessary to perform waste water inspection, pumping, cleaning, treatment and disposal services for cesspools, septic tanks, holding tanks, and Aerobic Treatment Unit (ATU) at the various Army Installations on the Island of Oahu, Hawaii. Services shall be performed in accordance with Local, State, and Federal laws and regulations.

2. SOLICITATION/AWARD. The solicitation/award will be 100% set-side small business.

This solicitation will result in a firm-fixed-price requirements-type service contract based on FAR 12 Acquisition of Commercial Items and FAR Subpart 13.5 Simplified Procedures for Certain Commercial Items. All quantities shown are estimates only. The actual quantities ordered may be more or less than the estimated quantities (SEE FAR 52.216-21 entitled "Requirements"). As a pre-requisite of the Government hereunder, there must be, (i) adequate and sufficient funds available to cover the order, and (ii) an administrative determination by the Government that the requirement exists.

3. PERIOD OF PERFORMANCE. The requirement is for one (1) 12-month base period and four (4) 12-month option periods utilizing FAR 52.217-8 - Option to Extend the Services for six

(6) additional months for a total duration of 66 months.

Base Year: 8/1/2017-7/31/2018 1st Option: 8/1/2018-7/31/2019 2nd Option: 8/1/2019-7/31/2020 3rd Option: 8/1/2020-7/31/2021 4th Option: 8/1/2021-7/31/2022

4. SOLICITATION PACKAGE.

This solicitation package contains the following:

a. Solicitation/Contract/Order for Commercial Items (SF 1449)

b. Technical Exhibit 1 Locations of Cesspools, Septic Tanks, and Aerobic Treatment Unit (ATU) and Holding Tank.

c. Attachment A - Work Experience Information Form

If you are unable to view or download all documents, contact Angela McColor at angela.u.mccolor.civ@mail.mil.

5. SUBMISSION OF OFFER. Follow the direction in addendum to 52.212-1, Instructions to Offerors.

6. QUOTE. Quote shall be emailed to Angela McColor at angela.u.mccolor.civ@mail.mil, quote must be received by the contracting office no later than the closing date/time of 6/21/2017 at 10:00am Hawaii Standard Time (HST).

PERFORMANCE WORK STATEMENT

Performance Work Statement (PWS) Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) Pumping and Disposal Service located on the island of Oahu, Hawaii 05/10/2017 Version 1.0

Vision Statement

1. Scope

2. General Requirements

2.1. Location and Hours of Work

3. Performance Requirements

3.1. The Contractor shall perform cesspools, septic tanks, holding tanks, and Aerobic Treatment Unit (ATU) monthly inspections

3.2. The Contractor shall provide schedule for pumping and cleaning cesspools, septic tanks, holding tanks, and Aerobic Treatment Unit (ATU)

3.3. The Contractor shall clean, wash, and pump cesspools, septic tanks, holding tanks, and Aerobic Treatment Unit (ATU)

3.4. Disposal of Waste………………………………………………………………………………5

3.4.1. Disposal Report

3.5. Unscheduled pumping and disposal of cesspools, septic tanks, holding tanks, and Aerobic Treatment Unit (ATU)

4. Special Requirements

4.1. Security and Safety

4.1.1. Level 1 Antiterrorism (AT) Standard…...…………………………………………………..6

4.1.2. Access to Army Installations Personnel and Vehicles…

4.1.3. I-Watch………………………………………………………………………………………………………………………………..7

4.2. Government Furnished Services

5. Deliverables

5.1. Contractor Manpower Reporting Activity (CMRA)………….………………………………………………….8

5.2. Deliverables……………………………………………………………………………………………………………………….…8

6. Related Documents……………………………………………………….…………………………………………………….…..9

Performance Work Statement (PWS) Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) Pumping and Disposal Service located on the island of Oahu, Hawaii

Vision Wastewater inspection, pumping, cleaning, treatment, and disposal services for cesspools, septic tanks, holding tanks, and Aerobic Treatment Unit (ATU) at various Army installations on the island of Oahu, Hawaii.

1. Scope The Contractor shall provide all management, tools, transportation, supplies, equipment and labor necessary to perform waste water inspection, pumping, cleaning, treatment and disposal services for cesspools, septic tanks, holding tanks, and Aerobic Treatment Unit (ATU) at the various Army Installations on the Island of Oahu, Hawaii. Services shall be performed in accordance with Local, State, and Federal laws and regulations.

2. General Requirements

2.1. Location and Hours of Work

Accomplishment of the results contained in this PWS requires work on Schofield Barracks, Field Station Kunia, Kahuku Training Area, Makua Military Reservation, Wheeler Army Airfield, and East Range on the Island of Oahu, Hawaii. (See Technical Exhibit (TE) 1). Normal workdays are Monday through Friday except Federal Holidays.

Government normal working hours are 7:30 a.m. 4:00 p.m., Monday through Friday, excluding Federal holidays. Unscheduled work may be performed before or after duty hours to include weekends and Federal holidays.

3. Performance Requirements

3.1. The Contractor shall perform cesspools, septic tanks, holding tanks, and Aerobic Treatment Unit (ATU) monthly inspections.

The intent of the inspection services portion of this contract is to provide required information to the Contracting Officers Representative (COR) and the Directorate of Public Works Environmental Division on waste that is generated during military exercises and performance of cesspools and septic tanks. The data will be used by the contractor to determine pumping and cleaning schedule. No overflows should occur due to overfilled tanks.

For ATU systems, inspect ATU equipment to ensure proper operation. Provide regular maintenance of equipment as required by the manufacturer. Verify the aerobic system is providing adequate mixing and aeration of the microbes. Measure the depth or volume of sludge in the ATU and assess if sludge removal is necessary. Provide sludge pumping, as needed. If pumping is necessary, record the depth of sludge or percentage of sludge volume in the ATU prior to pumping.

Performance Standards

a) STD: Perform monthly inspections on cesspool, septic tanks, holding tanks, and aerobic treatment unit (ATU) that shall consist of measuring thickness of floating material, thickness of sediment, and total fluid depth (including floating material + water + sediment) in the upstream chamber of cesspool and septic tanks and check the condition/level.

Submit to the COR an spread sheet containing the three (3) measurements identified, the building number and any service performed within five (5) working days of the following month.

AQL: 95%

Deliverables A001 monthly inspection

3.2. The Contractor shall provide schedule for pumping and cleaning cesspools, septic tanks, holding tanks, and Aerobic Treatment Unit (ATU) The data from the monthly inspections will be used by the contractor to determine pumping, cleaning, and treatment schedule. No overflows should occur due to overfilled tanks.

Performance Standards

a) STD: Submit the service schedule request with date and times of services to the COR, as determined from the monthly inspection. The schedule is due no less than five

(5) working days prior to scheduled service.

AQL: 95%

A002 pumping and cleaning schedule

3.3. The Contractor shall clean, wash, pump, and perform treatment on cesspools, septic tanks, holding tanks, and Aerobic Treatment Unit (ATU) Cleaning shall include washing of distribution boxes, scraping and washing of the tank walls, cleaning of the existing effluent filter, and washing of any T-section pipes or cleanouts. The Contractor shall perform treatment to prevent odors from cesspools and septic tanks. Submit a cleaning report to include comments of the condition of each site with an explanation of the treatment completed to the COR signed by the building Point of Contact (POC) on duty within five (5) working days after each service. Furnish a copy of the cleaning report to the POC on duty. This is a confined space environment and there is a potential explosion and/or asphyxiation (death) hazard due to the presence of gases. Pumping and cleaning requires the removal and disposal of all grease, food, waste products, sediments, gravel, mud, and debris. Post warning signs and erect temporary barricades during service as applicable. Immediately report to the COR where access could not be obtained to facilities, equipment and systems because the requestor failed to be available at the pre-arranged time, or other reason for inability to gain access to the equipment requiring service.

Performance Standards:

a) STD: Complete pumping and cleaning requires the removal and disposal of all grease, food, waste products, sediments, gravel, mud, and debris to include odor treatment. Post warning signs and erect temporary barricades during service as applicable.

AQL: 95%

A003 Cleaning, Washing, Pumping, and Treatment

3.4. Disposal of Waste

The Contractor shall dispose of all waste material at a State of Hawaii approved disposal site in accordance with the current U.S. Environmental Protection Agency (EPA), Federal, State of Hawaii and City and County of Honolulu requirements.

3.4.1. The contractor shall provide the COR a report as proof of proper waste water disposal. The documentation shall state at minimum: The waste disposal company’s name, Governments building number waste pumped from, gallons of waste water pumped for each building, Contractors permit ID number, Contractors tanker ID number and date with time of waste water disposal.

Performance Standards:

a) STD: Disposal of all waste material from the at a State of Hawaii approved disposal site in accordance with the current U.S. Environmental Protection Agency (EPA), Federal, State of Hawaii and City and County of Honolulu requirements. The contractor shall provide the COR a document as proof of proper wastewater disposal.

AQL: 100%

Deliverables A004 Disposal of Waste Report

3.5. Unscheduled Pumping and Disposal of Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU). Unscheduled pumping and disposal of cesspools, septic tanks, holding tanks, and Aerobic Treatment Unit (ATU) after duty hours as needed by COR.

Performance Standards:

a) STD: Unscheduled pumping and disposal of cesspools, septic tanks, holding tanks, and ATU after duty hours as needed by COR.

AQL: 100%

A005 Unscheduled Pumping and Disposal

4. Special Requirements The pumper vehicles has to be registered with the State Department of Health. The vehicle requires a placard on the window.

4.1. Security and Safety

4.1.1. LEVEL I ANTITERRORISM (AT) STANDARDS

See RCO-HI Local Clauses, Safety/Installation Rules, 52.242-5001 – DOD Level I Antiterrorism (AT) Standards.

4.1.2. Access to Army Installations Personnel and Vehicles

See RCO-HI Local Clauses, Safety/Installation Rules 52.242-5000 Access to Army Installations Personnel and Vehicles.

4.1.3. I-WATCH within the Army is a nation-wide modern version of a neighborhood watch program focused on the threat of terrorist activity. It is an antiterrorism awareness program that the contractors’ workforce, while on Army installations, must all be familiar with to promote and enhance reporting suspicious activity or behavior. The program has two elements: “passive” and “active.” The passive element is an individual’s situational awareness of his or her surroundings. The active element of I- Watch involves individuals taking action to report suspicious behavior or activities to law enforcement for more investigation.

Contractor personnel, to include subcontractors, performing on or within an Army controlled facility, area or on an Army installation are required to brief and train their personnel on line at IWATCH Training US Army. Contractor personnel shall train all personnel within 5 days of contract award or within 5 days of hiring action. Contractors shall report all completed training to the COR within 7 days of contract award or hiring action.

4.2. Government Furnished Services

The Government will provide water and electricity from the existing facilities at no cost to the Contractor.

5. Deliverables

5.1. Contractor Manpower Reporting Activity (CMRA)

The Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Army via a secure data collection site. The contractor is required to fill in all required data fields completely using the following web address: http://www.ecmra.mil/, and then click on “Department of the Army CMRA” or the icon for the DOD organization that is receiving or benefiting from the contracted services.

Reports inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), this runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk by clicking on “Send an email” which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component’s CMR website.

5.2. Deliverables

The contractor shall provide deliverables as described in subsequent task orders.

Deliverables shall be specified by the government. Format and delivery schedule for deliverables shall be outlined in CDRLs and/or other means TBD.

Identifier Name Description A001 Monthly Inspection A002 Pumping and Cleaning Schedule A003 Cleaning, Washing, Pumping, and

Treatment

A004 Disposal of Waste Report A005 Unscheduled Pumping and

Disposal

6. Related Documents Technical Exhibit 1: Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) Inventory and Locations https://www.wdol.gov/wdol/scafiles/std/15-5689.txt?v=2 5/12/2017

Performance Requirement Summary (PRS) Cesspools, Septic Tanks, Holding Tanks, and Aerobic Treatment Unit (ATU) Pumping and Disposal Service located on the island of Oahu, Hawaii Statements Standards/AQLs Incentive/Remedy

3.1 The Contractor shall

perform cesspools, septic tanks, holding tanks, and Aerobic Treatment unit (ATU) monthly inspections.

a) The intent of the inspection services portion of this contract is to provide required information to the Contracting Officers Representative (COR) and the Directorate of Public Works Environmental Division on waste that is generated during military exercises and performance of cesspools, septic tanks, holding tanks, and Aerobic Treatment Unit (ATU). The data will be used by the contractor to determine pumping and cleaning schedule. No overflows should occur due to overfilled tanks.

Performance Standards

a) STD: Perform monthly inspections on cesspools, septic tanks, holding tanks, and aerobic treatment unit (ATU) that shall consist of measuring thickness of floating material, thickness of sediment, and total fluid depth (including floating material + water + sediment) in the upstream chamber of cesspool septic tanks, holding tanks, and Aerobic Treatment Unit (ATU) and check the condition/level.

Submit to the COR an spread sheet containing the three (3) measurements identified, the building number and any service performed within five (5) working days of the following month.

AQL: 95%

Re-performance

Statements Standards/AQLs Incentive/Remedy

3.2 The Contractor shall

provide schedule for pumping and cleaning cesspools, septic tanks, holding tanks, and Aerobic Treatment Unit (ATU)

a) The data from the monthly inspections will be used by the contractor to determine pumping, cleaning, and treatment schedule. No overflows should occur due to overfilled tanks.

Performance Standards

a) STD: Submit the service schedule request with date and times of services to the COR, as determined from the monthly inspection. The schedule is due no less than five (5) working days prior to scheduled service.

3.3 The Contractor shall

clean, wash, pump, and perform treatment on cesspools, septic tanks, holding tanks, and Aerobic Treatment Unit (ATU)

a) Cleaning shall include washing of distribution boxes, scraping and washing of the tank walls, cleaning of the existing effluent filter, and washing of any T-section pipes or cleanouts.

The Contractor shall perform treatment to prevent odors from cesspools, septic tanks, holding tanks, and Aerobic Treatment Unit (ATU). Submit a cleaning report to include comments of the condition of each site with an explanation of the treatment completed to the COR signed by the building Point of Contact (POC) on duty within five (5) working days after each service.

Furnish a copy of the cleaning report to the POC on duty. This is a confined space environment and there is a potential explosion and/or asphyxiation (death) hazard due to the presence of gases. Pumping and cleaning requires the removal and disposal of all grease, food, waste products, sediments, gravel, mud, and debris. Post warning signs and erect temporary barricades during service as applicable.

Immediately report to the COR where access could not be obtained to facilities, equipment and systems because the requestor failed to be available at the pre-arranged time, or other reason for inability to gain access to the equipment requiring service.

Performance Standards:

a) STD: Complete pumping and cleaning requires the removal and disposal of all grease, food, waste products, sediments, gravel, mud, and debris to include odor treatment. Post warning signs and erect temporary barricades during service as applicable.

3.4 Disposal of Waste a) The Contractor shall dispose of all

waste material at a State of Hawaii approved disposal site in accordance with the current U.S. Environmental Protection Agency (EPA), Federal, State of Hawaii and City and County of Honolulu requirements.

3.4.1. The contractor shall provide the

COR a report as proof of proper waste water disposal. The documentation shall state at minimum: The waste disposal company’s name, Governments building number waste pumped from, gallons of waste water pumped for each building, Contractors permit ID number, Contractors tanker ID number and date with time of waste water disposal.

Performance Standards:

a) STD: Disposal of all waste material from the at a State of Hawaii approved disposal site in accordance with the current U.S. Environmental Protection Agency (EPA), Federal, State of Hawaii and City and County of Honolulu requirements. The contractor shall provide the COR a document as proof of proper wastewater disposal.

AQL: 100%

3.5 Unscheduled pumping

and disposal of cesspools, septic tanks, holding tanks, and Aerobic Treatment Unit (ATU)

a) Unscheduled pumping and disposal of cesspools, septic tanks, holding tanks, and Aerobic Treatment Unit (ATU) after duty hours as needed by

COR.

Performance Standards:

STD: Unscheduled pumping and disposal of cesspools, septic tanks, and Aerobic Treatment Unit (ATU) after duty hours as needed by COR.

AQL: 100%

TECHNICAL EXHIBIT 1

TECHNICAL EXHIBIT I

Cesspools, Septic Tanks and Aerobic Treatment Unit (ATU) at USAG-HI Installations on Oahu Installation Bldg Number / Description System Type Field Station Kunia

P39 Holding Tank (approx 12 ft X 6 ft;

approx 1200 gal)

Kahuku Training Area Kahuku Wash Rack 1 Septic Tank (approx 5 ft X 8 ft)

Leach Field (approx 28 ft X 45 ft) Makua Military Reservation

Range Control Office next to the Old Control Tower

Aerobic Treatment Unit (approx 11 ft X 6 ft X 6ft; 1700 Gallons), ATU System Capacity: 1000 GPD Leach field (16ft X 40ft)

*Wheeler Army Airfield 803 (Kawamura Gate) Cesspool (dimensions unknown) Schofield Barracks East Range

Septic System connected to Bldg 8000 ER Lightning Academy.

Location of Septic tanks and leach field near 8001 next to laundry room.

1 Pre-loader (4ft-11 in X 7ft-5in;

Liquid Capacity: 500 Gallons) 2 Septic Tanks (Each 6ft X 9ft-4 in;

Liquid Capacity: Each 1000 Gallons) Leach field (45ft X 50 ft)

Schofield Barracks East Range

8502 ER Lightning Academy (Behind 8502 next to the water tank)

1 Septic Tank (6ft X 11ft-6in;

Liquid Capacity: 1250 Gallon) Leach field (15ft X 35ft)

Other systems may be converted to Aerobic Treatment Unit (ATU) *Cesspool will no longer need to be serviced tentatively after July 2017.

SITE VISIT

Date/Time: Tuesday, 06/06/2017, at 8:30 a.m. Hawaii Standard Time

RSVP: No later than Friday, 06/02/2017, at 2:00 p.m. Hawaii Standard Time

The purpose of this site visit is to provide clarity on any questions that may arise for this requirement. Offerors and/or respresentatives are encouraged to attend the site visit. If you are interested in attending, submit all attendee's names, e-mail addresses, cell phone and work telephone numbers to angela.u.mccolor.civ@mail.mil no later than 2:00 p.m. Hawaii Standard Time on Friday 06/02/2017. If no interest is received by this time, the Government will cancel the planned site visit. If cancelled, no other site visit will be scheduled. Picture taking will NOT be allowed during site visit. Attendance constitutes agreement to release the Government of liabilities due to any accidents or injury occurring during the site visit. Any discussions, remarks, and explanations that may be made by any Government representative during the site visit will not change the terms of the solicitation and the technical specifications unless the solicitation is amended in writing.

DIRECTIONS

Meeting Location: Parking Lot between Bldg. 108 and Bldg. 223 on Wheeler Army Airfield

(WAAF).

Coming from Kunia Road: Turn right to enter WAAF from back gate, you are on Wright Avenue. Travel approximately 3 blocks, turn right into the large parking open parking lot.

Coming from Honolulu, via H2: Proceed onto H2 north towards Mililani. Take exit 7 towards H-99N, Mililani Tech Park/Leilehua Golf Course Road/Wheeler Army Airfield. Exit the freeway and turn left at the stop sign. The traffic signal ahead is Kamehameha Hwy. Turn right onto Kamehameha Hwy. Immediately move over to the far left lane and turn left onto Kawamura Gate. After guard shack, take the first right turn onto Warkhawk place, which then becomes Wright Ave. Proceed west down Wright Ave. Make a u-turn at Dains road. You are still on Wright Ave., heading East in approximately 3 blocks, enter the large parking lot on the right.

Please call Deanna Yamada at 808-864-1461 if further assistance is needed to get to the location.

ADDENDUM TO 52.212-1

INSTRUCTIONS TO OFFERORS-COMMERCIAL ITEMS

QUOTE SUMBITTAL INSTRUCTIONS

Offerors are required to furnish a complete package; failure to submit a complete package by the date and time specified for receipt of quotes will render the offeror as non-compliant.

Materials not directly related to the information requested shall no be included in the quote.

1. This is a Request for Quote (RFQ) and the evaluation of quotes will be conducted in accordance with (IAW) Federal Acquisition Regulation (FAR) Part 12 - Acquisition for Commercial Items and FAR Subpart 13.5 - Simplified Procedures for Certain Commercial Items.

2. Each interested contractor shall complete and submit the following forms, clauses, and statements with their quote. Failure to do so may cause a quote to be considered unacceptable.

a. Standard Form (SF) 1449, signed and dated; Submittal of quotes in accordance with FAR 52.212-1(b).

b. Amendments or acknowledgements (if applicable), signed and dated.

c. Use the Price Schedule included in the solicitation to price out the quote for base plus option periods.

d. Submit the Relevant Work Experience Information Form(s) (Attachment A) with the quote.

e. Submit the Permits, Registration, Certification, and Equipment listing.

f. Complete clause 52.212-3, Offeror Representations and Certifications-Commercial Items (Jan 2017), if not entered into the System for Award Management (SAM) website.

3. Responsibility - For purposes of conducting responsibility assessments, the contractor will provide a narrative addressing the following, IAW FAR 9.104-1:

a. Have adequate financial resources to perform the contract, or ability to obtain them;

b. Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;

c. Have a satisfactory record. A prospective contractor shall not be determined responsible or nonresponsible solely on the basis of a lack of relevant performance history.

d. Have a satisfactory record of integrity and business ethics and responsibility standard as stated in FAR 9.104-1(c).

e. Have the necessary organization, experience, accounting, and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs, applicable to materials to be produced or services to be performed by the prospective contractor and sub-contractors).

f. Have the necessary technical equipment or ability to obtain them to perform the service.

4. Submit quote and all other required documents to Angela McColor at angela.u.mccolor.civ@mail.mil. by the due date and time of 6/21/2017 at 10:00a.m. Hawaii Standard Time. If you have any issues, please contact Angela McColor at angela.u.mccolor.civ@mail.mil.

a. Solicitation and amendment - Issued solicitation package will be posted to FEDBIZOPPS website at https://www.fbo.gov. Once posted, interested contractors are responsible to monitor the website until the closing date for any issued amendments.

b. It is the responsibility of the contractor to ensure quotations are received and acknowledged by the Contract Specialist, Angela McColor at angela.u.mccolor.civ@mail.mil on or before the deadline as stated on Block 8 of the SF 1449.

c. Interested contractor shall submit questions in writing regarding the solicitation to the Contract Specialist via email angela.u.mccolor.civ@mail.mil. A summary of questions received and Government responses will be provided via amendment of the solicitation and posted on the FEDBIZOPPS website.

FAX COPIES ARE NOT ACCEPTABLE

ADDENDUM TO 52.212-2

FAR 52.212-2 ADDENDUM, EVALUATION - COMMERCIAL ITEMS

a. Basis of Award. This request for quotations uses streamlined simplified acquisition procedures pursuant to FAR Subpart 12.6 and FAR Subpart 13.5. The Government will award and a Firm-Fixed-Price (FFP) Contract resulting from this solicitation to the responsible contractor whose offer conforms to the solicitation, meets the specifications of the performance work statement and will be the most advantageous to the Government, price and other factors considered.

Basis for award will be to the contractor providing the lowest quote determined to meet the minimum requirements. Responsibility determination will be conducted on apparent successful contractor only.

The following factors shall be used to evaluate offers:

Factor 1 - Permits, Registration and Certifications Factor 2 - Equipment Factor 3 - Relevant Work Experience Factor 4 - Price

Past Performance will not be formally evaluated but will be reviewed during the responsibility determination pursuant to FAR Part 9.

1) Factor 1 - Permits, Registration and Certifications: Contractor must be certified and pumper trucks has to be registered with the State Department of Health Wastewater Branch. The vehicles require a placard on the window.

Minimum Requirements:

a) Registration with State of Hawaii Department of Health to transport and dispose of wastewater and nonhazardous waste.

b) County Permit to dispose of wastewater at a State of Hawaii approved disposal site in accordance with the current U.S. Environmental Protection Agency (EPA), Federal, and State of Hawaii and City and County of Honolulu requirements.

c) Need to provide copies of current and valid registration, permits, and/or certifications.

2) Factor 2 - Equipment: The contractor shall have necessary equipment to adequately perform the required services. Contractors shall provide the type and number of equipment readily available to adequately perform the required services.

Minimum Requirement: Pump Truck minimum 1700 gallon

3) Factor 3 - Relevant Work Experience: The Contractor shall provide a completed form, which shows relevant work experience within the last three (3) years for similar work with regards to scope and magnitude performed.

Minimum Requirements: As a minimum, need to provide at least one (1) Work Experience Information form (attachment A); it shall be completed and provided with the contractor's quote. Please note that previous Government contract experience is not required.

4) Factor 4 - Price. Price will not be formally scored. The Government expects competitive quotes to be submitted for this procurement and will use these competitive quotes to determine price reasonableness in accordance with FAR 13.106-3. The lowest price quote acceptable for awar purposes will be the combined total of the base year and all option periods. The Government intends to evaluate quotes and award without discussions. Therefore, quotes should be for contractors' best pricing. If competitive quotes are not received, the Government reserves the right to utilize other methods identified in the FAR to determine price reasonableness. Each contractor is required to provide complete pricing for each contract line item identified.

Refer to FAR 52.212-2(b) regarding calculation of prices. Note that this includes requirements of Local Clause 52.217-5000.

OTHER INFORMATION

OTHER INFORMATION

1. SECURITY OF STORAGE AREA

If the Contractor elects to utilize the storage area made available to him by the Government, he shall be responsible for constructing a fence around the area. A sign shall also be installed on the fence identifying the Contractor. The installation of this fence and sign does not relieve the Contractor from his responsibilities under FAR clause 52.236- 10, Operations and Storage Areas.

2. SCHEDULING OF INSPECTIONS - PRE-FINAL AND FINAL INSPECTION

(a) The Contractor and Government Inspector will jointly conduct a pre-final inspection prior to any final inspection. Discrepancies noted shall be corrected prior to any final inspection. The Contracting Officer may schedule more than one pre-final inspection if determined necessary.

(b) When the Contractor is ready for final inspection, he shall request final inspection to the Contracting Officer or his authorized representative 5 calendar days before the desired date, unless a different time is specified in the Technical Provisions.

(c) The final inspection shall be performed with the Contractor and his subcontractors by the Directorate of Public Works personnel and representatives of the using activity. Discrepancies noted will be corrected within the time specified by the Contracting Officer prior to the final payment.

3. MATERIAL APPROVAL SUBMITTALS (NOT APPLICABLE)

(a) Required material approval submittals shall be provided to the Contracting Officer within 30 calendar days after contract award using the Material Approval Submittal Form, ZV-KO Form 83-104-R.

(b) For Indefinite Delivery contracts, where the first task order is placed in less than 30 calendar days after contract award, required submittals shall be provided to the Contracting Officer within 21 calendar days after issuance of the first task order. In any event, the contractor shall not begin on-site performance until material submittals have been approved, unless authorized by the Contracting Officer.

4. PREPARATION OF PROGRESS SCHEDULE AND REPORTS (NOT APPLICABLE)

The reports contemplated by the clause herein entitled, "Schedules of Construction Contracts" shall be provided by the Contractor to track project progress 5 days after work starts. This may be done by Gantt chart or similar process.

5. ISSUANCE OF TASK ORDERS (NOT APPLICABLE)

(a) The work to be accomplished under this contract will be performed upon receipt of a task order. The Contractor shall coordinate all work with the Contracting Officer in order that there will be a minimum of interruption and inconvenience to the Government. Scheduling and programming of work shall be arranged during the pre-construction conference.

(b) Survey of Unit Price Items: At least three (7) workdays prior to the issuance of a task order, a joint inspection by the Contractor and the Contracting Officer Representative shall be made to determine the work to be accomplished therein. Survey will be conducted within two (2) workdays of notification by the COR. During the inspection and survey, both parties will jointly annotate on the Agreement Sheet to be prescribed by the Contracting Officer, the quantity for each unit price item that is to be utilized. The Contractor shall submit the signed Agreement Sheet to the Contracting Officer Representative within (5) workdays after the date of the inspection and survey. The Contracting Officer will confirm the starting and completion date of work for each unit in the task order.

6. WORK UNDER ESTIMATED QUANTITY LINE ITEMS (NOT APPLICABLE)

This clause applies to line items 0001 - 0071.

Prior to commencement of work, the Contractor shall coordinate with the authorized representative of the Contracting Officer for mutual agreement as to the quantity of additional work required. Work performed shall not exceed the estimated quantities unless the Contracting Officer executes a modification to the contract.

7. COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK ORDERED (NOT

APPLICABLE)

(a) The Contractor shall only commence work under this contract upon receipt of a task order. The task order shall specify the building in which work is to be performed and sequence in which the work shall be performed.

(b) The Contractor shall be required to commence, prosecute and complete all work in accordance with the said task order, unless changed and mutually agreed to between the parties.

(c) The Contractor shall be verbally notified that work is required. The Contractor shall be available from 7:30 a.m.

to 4:30 p.m., Monday through Friday, excluding Federal holidays, to receive such notification. Upon receipt of notification, the Contractor shall be at the work site within two working days for preparation and signing of an agreement sheet. The Contractor may be required to remove, cut, alter, replace or repair existing work as necessary to perform work. Except as specified, the Contractor shall not disturb, cut, alter or remove any structural work and shall not disturb any ducts, plumbing, steam, gas or electrical work without prior approval of the Contracting Officer’s Representative (COR). When ordered on a task order, any walls, ceiling or partitions disturbed or removed as a result of performing the required work shall be repaired or replaced. Materials and workmanship used in restoring work shall conform in type and quality to that of existing construction. All work shall be ordered in accordance with the unit pricing schedule. Notification to Federal and State agencies shall be done no later than the following working day that the task order is received.

(d) Work called for under a specific task order shall commence and be diligently prosecuted and completed as follows: Dates to be negotiated on each task order

8. GENERAL ENVIRONMENTAL STANDARDS

(a) While performing work on any US Army Garrison, Hawaii (USAG-HI) installations, the contractor will comply with Executive Orders 13423 “Strengthening Federal Environmental, Energy, and Transportation Management” signed by the President on 24 Jan 2007 and 13514, “Federal Leadership in Environmental, Energy, and Economic Performance” signed by the President on 8 Oct 2009 requiring the acquisition of environmentally preferable goods and services, use of sustainable environmental practices, purchase of biobased, energy efficient and recycled content products. More specifically, the Contractor will strive to improve upon their sustainability performance by taking actions to:

(1) Reduce energy consumption

(2) Reduce greenhouse gas emissions

(3) Conserve and protect water resources

(4) Eliminate waste, recycle, and prevent pollution

(5) Adopt sustainable technologies

(6) Procure environmentally preferable materials, products and services

(7) Maintain sustainable buildings

(8) Strengthen livability of the local community

(9) Inform and involve personnel in the achievement of these goals.

(b) The contractor will comply with the Government directives, permit conditions, installation policies and plans as administered by the Government. The Contractor will be held liable to pay for any environmental fines resulting from his operations, waste generated or other operational environmental requirements. As applicable, the Contractor will obtain environmental permits required for wastewater pretreatment, underground tanks, hazardous waste identification numbers, air pollution permit for temporary sources, storm water permits or other pertinent environmental permits.

(c) The contractor will review and comply with applicable policies, program documents and regulatory requirements as stipulated under each environmental program media below.

(1) Environmental program documents include, but are not limited to; the Installation Hazardous Waste Management Plan – USAG-HI Regulation 200-4, Asbestos Management Plan, Lead-based Paint Management Plan, Installation Spill Prevention, Control, and Countermeasures (SPCC) Plan, Integrated Natural Resources Management Plan, Integrated Cultural Resources Management Plan, Pollution Prevention Plan, and the Storm Water Pollution Prevention Plan available at the DPW Environmental Division. Environmental program documents can be downloaded from the installation sustainability and environmental management website at:

http://www.garrison.hawaii.army.mil/sustainability/Environmental.aspx.

(2) Installation policies include, but are not limited to; the Environmental Compliance and Protection Program Policy Memorandum USAG-HI-4; Environmental Policy Memorandum USAG-HI-10; Authorized Use List Policy Memorandum USAG-HI-19, Waste Reduction and Recycling Policy Memorandum USAG-HI-25; Open Burn Policy Memorandum USAG-HI-51; Generator Control Policy Memorandum USAG-HI-55; Illicit Discharge Detection and Elimination Policy Memorandum USAG-HI-59; and the Joint USARPAC and IMCOM-Pacific Energy Conservation Policy Guidance. Installation Policy Memorandums are available for download at:

http://www.garrison.hawaii.army.mil/command/documents.htm

(3) The contractor is also encouraged to view the online A to Z sustainability and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .