Minimum Salient Characteristics (MSCs) For
8TH Theater Sustainment Command – Portable Accommodation Modules
1. DESCRIPTION OF SUPPLY:
Items Item Qty Product Description
0001 2 Off Shore Portable Accommodation Module – Leased
Number of Occupants to Accommodate: Minimum 12 per unit Lease Period: 4 September 2020 to 25 September 2020 Dimensions / Weight Restrictions: No larger than 43'L x 12'W x 10'6"H - Units cannot be stacked
ABS, USCG, DNV 2.7-1, SOLAS A60
Climate Control: Must have AC Capability Power: The Vessel is equipped with two 50 amp, 2 pole circuit breakers which feed four electrical connections. The electrical connections provide 208 VAC between phase A and B but only 120VAC from phase A or B to phase C (used as a neutral).
We require a male connector to connect to the female connectors along with at least 100 ft of cable to provide power to the units. In addition, our power configuration must meet the unit panel requirements. This may include the need of transformers.
Attached are pictures of our connections and electrical drawings.
Water/Sewage: We do not require plumbing or sanitation – wet areas will not be utilized.
Safety Features: Will require both fire and gas detectors, as well as connectors and cabling capable of linking to the vessel’s fire and PA systems.
Other Specialized Equipment or Materials Required: Auxiliary equipment, Transformer (If Required)
0002 1 Installation
Manpower Required: A Technician to supervise the connections from our vessel to the units. This person would ensure that electrical connections and compatibility are correct; communication connections and compatibility are correct; and fire panel connections and compatibility are correct. In addition, he/she will test to ensure all unit systems are operational and safe.
Materials Required:100ft of power cable with male connection provided for main power cable
0003 1 Shipping/Delivery
Full delivery of modules and associated equipment to Apra Harbor, Piti Guam
Return shipping of modules and associated equipment to point of origin from Apra Harbor, Piti Guam.
2. DELIVERY TO:
545th Transportation Detachment LSV4, Apra Harbor Piti Guam
3. REQUIRED DELIVERY/ INSTALLATION DATE: Delivery is required no later than 4 September 2020. Unit estimates two days for installation and testing of the modules to the vessel.
4. ACCEPTOR’S INFORMATION