This document is a Bill of Materials (BOM) and Salient Characteristics specification for Relocatable Modular Buildings (RLBs) used in federal contracting for temporary facility construction.

The specification defines nine facility types across seven Contract Line Items (CLINs 0001-0007) with two unfunded options (CLINs 1008-1009). The facilities include: Office/Admin RLB (50x50, 2,500 SF); Large Office/HQ RLB (40x50, 2,000 SF); Open-Bay Student Barracks (40x50, 2,000 SF, 40-50 PAX); Cadre/Transient Barracks (50x50, 2,500 SF with 14 sleeping rooms); Medical/Troop Clinic (1,200-1,600 SF); Conditioned Storage Facility (40x50, 2,000 SF with 6-inch SOG); Covered Canopy/Lightning Shelter (40x50, 2,000 SF); Containerized Shower Unit (40 FT, unfunded option); and Containerized Restroom/Latrine Unit (40 FT, unfunded option). Each RLB CLIN is fully burdened and independently executable. All facilities require complete installed systems including structural foundation/piers, fire-rated exterior assemblies where specified, HVAC conditioning, electrical panelboards with generator-ready connections, LED lighting, fire alarm/life safety systems, grounding and lightning protection, and interior finishes appropriate to facility type. The specification emphasizes that contractors must verify final design compliance with applicable codes, manufacturer requirements, site conditions, and written PWS requirements, with BOM quantities serving as planning references only. Material lists include specific quantities for components such as split-system AC units, receptacles, doors, partitions, and IT infrastructure pathways tailored to each facility's operational purpose.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RLB Facility Salient Characteristics RLB Salient Characteristics: Each RLB shall be a complete installed facility suitable for the stated use. Facility-specific plans and BOMs identify room configuration, minimum systems, and material expectations. The Contractor shall provide all incidental work required to deliver the awarded facility as a complete, usable, and code-compliant installation.

Facility Type Minimum Deliverable Features

Office/Admin RLB Open office, administrative space, workstations, conference/support rooms where shown, passive IT pathways, HVAC, interior finishes, electrical, life safety, and entry systems.

HQ / Larger Office RLB Administrative or command/control layout with conference, office, IT/telecom, support spaces, HVAC zoning, passive pathways, life safety, and interior systems.

Open-Bay Billeting RLB Open-bay sleeping or troop billeting configuration with lighting, receptacles, HVAC, egress, life safety, and durable finishes.

Cadre Billeting RLB Room-based cadre billeting with corridor, privacy partitions, sound-rated walls where required, HVAC zoning, electrical, life safety, and interior finishes.

Medical / Aid Station RLB Medical/admin layout with washable surfaces where required, handwashing/plumbing where indicated, passive IT pathway, HVAC, life safety, and connection-ready utilities.

Conditioned Storage RLB Conditioned and humidity-controlled storage; concrete SOG; vapor barrier; roll-up door provisions where shown; interior caging where required; rated exterior envelope.

Covered Canopy Covered assembly/protection area with SOG, structural canopy, grounding and lightning protection where required, lighting where indicated, and corrosion-resistant exterior assemblies.

Shower / Latrine Units Connection-ready hygiene units with building-side systems, traps, drains, exhaust/ventilation, wet-area finishes, electrical, water, and sanitary interfaces.

UNIFORM BILL OF MATERIALS / QUANTITY REFERENCE APPENDIX

The following BOM tables provide uniform material/system references for offeror scope validation and unit price development. Quantities are approximate planning references and do not relieve the Contractor from providing complete, code-compliant, manufacturer-compliant, Government-accepted systems. Written PWS requirements, TE-45, TE-4A, Attachment J-X/J-Y, and the pricing workbook govern if conflicts exist.

Each CLIN price shall be fully burdened and independently executable. Where fire-rated exterior assemblies are required by the PWS or technical exhibits, the applicable RLB CLIN includes the complete rated assembly, protected openings, firestopping, rated penetrations, rated sealants/caulking, joint protection, flashing, weatherproofing, and system coordination necessary to maintain the required rating.

BOM Crosswalk BOM Ref Prototype / Facility CLIN Reference Dimension / Basis BOM-1 Office / Admin RLB 0001 Base 50x50, 2,500 SF BOM-2 Large Office / HQ / OCT Office RLB 0002 40x50, 2,000 SF BOM-3 Open-Bay Student Barracks RLB 0003 40x50, 2,000 SF BOM-4 Cadre / Transient / OCT Barracks

RLB

0004 50x50, 2,500 SF

BOM-5 Medical / Troop Clinic RLB 0005 1,200-1,600 SF BOM-6 Conditioned Storage Facility 0006 40x50, 2,000 SF; 6-inch SOG with vapor barrier BOM-7 Covered Canopy / Lightning Shelter 0007 40x50, 2,000 SF; 4-inch SOG

BOM – 8 Containerized Shower Unit 1008 – Unfunded Option 40 FT containerized wet unit BOM - 9 Containerized Restroom / Latrine Unit 1009 – Unfunded Option 40 FT containerized wet unit

Unfunded options CLIN 1001-1007 use the same BOM/Dimensions/Designs as CLIN 001-007

BOM-2. Office / Admin RLB - 40x50, 2,000 SF

CLIN Reference Base CLIN 0001; rated exterior wall assemblies included where required by the PWS/technical exhibits Planning Basis 40x50 office/admin prototype with conference room, offices, open work area, data/IDF closet, electrical closet, storage, vestibule, cable tray, surface-mounted data conveyance, split systems, fire alarm/detection/life safety, and generator-ready building interface.

Approximate material/quantity reference. Offeror shall verify final design, dimensions, code compliance, manufacturer requirements, site conditions, and installed scope before fabrication or installation.

Material / System Qty Unit Notes / Minimum Technical Criteria Relocatable modular building shell 2,000 SF Complete installed, connection-ready RLB building system.

Pier foundation / RLB support package 1 LS ISO/elevated pier support system, anchorage, load path, corrosion protection, and drainage clearance.

Perimeter wall assembly 180 LF Exterior envelope suitable for tropical/marine conditions; rated assembly only where fire-rated option is selected.

Fire-rated exterior envelope option 1 LS Turnkey rated envelope where selected; includes rated assemblies, openings, penetrations, firestopping, sealants, flashing, weatherproofing, and exterior equipment coordination.

Interior wall framing / partitions 112 LF Approx. 100-120 LF interior framing; verify final layout.

Interior and perimeter wall blocking 60 LF Include blocking/backing for wall-mounted equipment, displays, and specialties.

Interior doors / frames / hardware 8 EA Commercial-grade hardware; rated where required by assembly/room.

Exterior double doors 3 EA Exterior-rated, lockable assemblies with closers, thresholds, sweeps, weatherstripping, and weather shrouds/hoods.

Entry platform / stair assemblies 3 EA Weather-resistant, slip-resistant assemblies sized for doors and egress.

Office rooms 2-6 EA Final quantity per approved layout.

Conference room 1 EA Include wall blocking for conference AV.

Data / IDF closet 1 EA Conditioned; FRT plywood backboard; grounding/bonding; 4 duplex receptacles and 1 quad receptacle on dedicated circuit.

Electrical closet 1 EA Conditioned or ventilated as required; no general storage.

Storage closet 1 EA Building support storage only.

Interior LED fixtures 37 EA LED fixtures suitable for space function and humid/tropical conditions.

Exterior wall pack lights 6 EA At entries/exits and exterior service points; exterior-rated, corrosion-resistant.

Exit signs 4 EA Illuminated with battery backup or approved emergency source.

Emergency lights, battery backup 8 EA Minimum 90-minute operation unless more stringent requirement applies.

Smoke / heat detectors 8-12 EA Quantity per final fire/life-safety design.

Horn/strobes 4-6 EA Quantity per occupancy, layout, and fire alarm design.

Fire extinguisher cabinets/mounts 4 EA Include blocking and accessible placement.

Fire alarm control panel / FA interface 1 EA Provide local FA panel/interface as required.

Split-system AC units 11 EA Final quantity and BTU sizing per design loads and climate assumptions.

Split-system BTU basis Sized EA Contractor to size properly for occupancy, envelope, and room layout.

Dedicated data/server room cooling 1 EA Provide where data/IDF heat load requires independent conditioning.

Duplex receptacles, 20A 64 EA AFCI/GFCI protection where required; distribute per final layout.

Exterior GFCI receptacles 6 EA Weather-resistant, extra-duty in-use covers, corrosion-resistant boxes.

Light switches / controls 11 EA Switching by room/zone and exterior lighting control.

Electrical panelboard 1 LS Mounted on FRT plywood/backboard or approved support; typed schedule; 25% spare space/ampacity;

grounding/bonding included.

Generator-ready connection cabinet 1 LS Exterior-rated and grounded; protected penetrations where applicable; generator source/fuel excluded.

Cable tray 110 LF Passive data infrastructure with spare capacity.

Surface-mounted raceway / Panduit 540 LF Pathways with boxes, straps, blank covers, and pull strings where applicable.

Dual data boxes / blank covers 42 EA Passive infrastructure only; active IT and cabling by others unless specifically included.

Patch panel / wall rack allowance 1 LS Backboard/rack allowance only unless active equipment is separately included.

Conference AV blocking 20 LF AV blocking only; active AV equipment excluded unless included by CLIN.

Conference AV receptacle/data rough-in 1 LS Power/data rough-in to AV locations; active devices excluded.

Grounding electrode / bonding system 1 LS Complete building grounding/bonding; include panel, generator interface, cable tray, metallic raceways, HVAC, and telecom bonding.

Lightning protection system 1 LS Where required by design; air terminals, down conductors, bonding, and continuity.

BOM-1. Large Office / HQ / OCT Office RLB - 50x50, 2,500 SF

CLIN Reference Option CLIN 0002; rated exterior wall assemblies included where required by the PWS/technical exhibits Planning Basis 50x50 office/admin/OCT support prototype with office rooms, conference room, open work area, data/IDF closet, electrical closet, storage, vestibule, cable tray, surface-mounted data conveyance, split systems, fire alarm/detection/life safety, and generator-ready building interface.

Approximate material/quantity reference. Offeror shall verify final design, dimensions, code compliance, manufacturer requirements, site conditions, and installed scope before fabrication or installation.

Material / System Qty Unit Notes / Minimum Technical Criteria Relocatable modular building shell 2,500 SF Complete installed, connection-ready RLB building system.

Pier foundation / RLB support package 1 LS ISO/elevated pier support system, anchorage, load path, corrosion protection, and drainage clearance.

Perimeter wall assembly 200 LF Exterior envelope suitable for tropical/marine conditions; rated assembly only where fire-rated option is selected.

Fire-rated exterior envelope option 1 LS Turnkey 1-hour rated envelope where selected; includes rated assemblies, openings, penetrations, firestopping, sealants, flashing, weatherproofing, and exterior equipment coordination.

Interior wall framing / partitions 194 LF Include allowance for approx. 200 LF interior wall framing.

Interior and perimeter wall blocking 100 LF Blocking/backing for wall-mounted equipment, displays, and specialties.

Interior doors / frames / hardware 10 EA Commercial-grade hardware; rated where required.

Exterior double doors 3 EA Exterior-rated assemblies with weather shrouds/hoods and egress hardware where required.

Entry platform / stair assemblies 3 EA Weather-resistant, slip-resistant assemblies sized for doors and egress.

Office rooms 5 EA Final layout per approved prototype plan.

Conference room 1 EA Include wall blocking for conference AV partition/display.

Data / IDF closet 1 EA Conditioned; FRT plywood backboard; grounding/bonding; 4 duplex receptacles and 1 quad receptacle on dedicated circuit.

Electrical closet 1 EA Conditioned or ventilated as required; no general storage.

Storage closet 1 EA Building support storage only.

Entry vestibule 1 EA Weather separation and entry control.

Interior LED fixtures 45 EA LED fixtures suitable for space function and humid/tropical conditions.

Exterior wall pack lights 8 EA At entries/exits and exterior service points.

Exit signs 4 EA Illuminated with battery backup or approved emergency source.

Emergency lights, battery backup 10 EA Minimum 90-minute operation unless more stringent requirement applies.

Smoke / heat detectors 8-12 EA Quantity per final fire/life-safety design.

Horn/strobes 4-6 EA Quantity per occupancy, layout, and fire alarm design.

Fire extinguisher cabinets/mounts 4 EA Include blocking and accessible placement.

Fire alarm control panel / FA interface 1 EA Provide local FA panel/interface as required.

Split-system AC units 12 EA Final quantity and BTU sizing per design loads and climate assumptions.

Split-system BTU basis Sized EA Contractor to size properly for occupancy, envelope, and room layout.

Dedicated data/server room cooling 1 EA Provide where data/IDF heat load requires independent conditioning.

Duplex receptacles, 20A 64 EA AFCI/GFCI protection where required; distribute per final layout.

Exterior GFCI receptacles 6 EA Weather-resistant, extra-duty in-use covers, corrosion-resistant boxes.

Light switches / controls 13 EA Switching by room/zone and exterior lighting control.

Electrical panelboard 1 LS Mounted on FRT plywood/backboard or approved support; typed schedule; 25% spare space/ampacity;

grounding/bonding included.

Generator-ready connection cabinet 1 LS Exterior-rated and grounded; protected penetrations where applicable; generator source/fuel excluded.

Cable tray 140 LF Passive data infrastructure with spare capacity.

Surface-mounted raceway / Panduit 600 LF Pathways with boxes, straps, blank covers, and pull strings where applicable.

Dual data boxes / blank covers 42 EA Passive infrastructure only; active IT and cabling by others unless specifically included.

Patch panel / wall rack allowance 1 LS Backboard/rack allowance only unless active equipment is separately included.

Conference AV blocking 20 LF AV blocking only; active AV equipment excluded unless included by CLIN.

Conference AV receptacle/data rough-in 1 LS Power/data rough-in to AV locations; active devices excluded.

Grounding electrode / bonding system 1 LS Complete building grounding/bonding system.

Lightning protection system 1 LS Where required by design; air terminals, down conductors, bonding, and continuity.

BOM-3. Open-Bay Student Barracks RLB - 40x50, 2,000 SF CLIN Reference Option CLIN 0003; rated exterior wall assemblies included where required by the PWS/technical exhibits Planning Basis 40x50 open-bay sleeping prototype with 40-50 PAX maximum planning occupancy, RLB on piers, open bay, support closets, exterior doors, split systems, power/data rough-in, fire alarm/detection/life safety, and generator-ready building interface. Furniture, bunks, and wall lockers are excluded unless separately included.

Approximate material/quantity reference. Offeror shall verify final design, dimensions, code compliance, manufacturer requirements, site conditions, and installed scope before fabrication or installation.

Material / System Qty Unit Notes / Minimum Technical Criteria Relocatable modular building shell 2,000 SF Complete installed, connection-ready RLB building system.

Pier foundation / RLB support package 1 LS ISO/elevated pier support system, anchorage, load path, corrosion protection, and drainage clearance.

Fire-rated exterior envelope option 1 LS Turnkey 1-hour rated envelope where selected; includes rated assemblies, openings, penetrations, firestopping, sealants, flashing, weatherproofing, and exterior equipment coordination.

Exterior single doors 2 EA Exterior-rated, lockable assemblies with closers, thresholds, sweeps, weatherstripping, and weather shrouds/hoods.

Exterior double doors 2 EA Exterior-rated, egress-compliant assemblies with weather shrouds/hoods.

Interior closet doors 2 EA Commercial-grade hardware.

Entry platform / stair assemblies 4 EA Sized for single/double egress doors; include handrails and slip-resistant surfaces.

Exterior wall framing / assembly 180 LF Exterior wall assembly; rated where fire-rated option is selected.

Interior wall framing / partitions 40 LF Include allowance for support closets and interior partitions.

Interior and perimeter wall blocking 60 LF Blocking/backing for equipment, data, extinguishers, and accessories.

Electrical closet 1 EA Approx. 4x4; conditioned or ventilated; light, switch, and clear working space.

Storage closet 1 EA Approx. 4x4; light and switch.

Interior LED fixtures 27 EA LED fixtures suitable for open-bay sleeping area.

Exterior wall pack lights 6 EA At entries and exterior service points.

Exit signs 4 EA Illuminated with battery backup or approved emergency source.

Emergency lights, battery backup 8 EA Minimum 90-minute operation unless more stringent requirement applies.

Smoke / heat detectors 6 EA Quantity per final fire/life-safety design.

Horn/strobe notification appliances 6 EA Quantity per occupancy, layout, and fire alarm design.

Fire alarm control panel or local FA interface 1 EA Provide local FA panel/interface as required.

Fire extinguisher cabinets/mounts 4 EA Include blocking and accessible placement.

Split-system AC units 7 EA Final quantity and BTU sizing per design loads and climate assumptions.

Split-system BTU basis 18K-24K BTU/EA Final capacity by load calculation.

Industrial / ceiling fans 6 EA Include switches and mounting coordination.

Duplex receptacles, 20A 40-50 EA AFCI/GFCI protection where required; approx. 6-7 receptacles per 20A breaker basis.

Exterior GFCI receptacles 6 EA Weather-resistant, extra-duty in-use covers, corrosion-resistant boxes.

Light switches / controls 6 EA At entries and zones; include exterior/interior switching.

Electrical panelboard 1 EA Mounted on FRT plywood/backboard or approved support; typed schedule; 25% spare space/ampacity;

grounding/bonding included.

Generator-ready connection cabinet 1 LS Exterior-rated and grounded; protected penetrations where applicable; generator source/fuel excluded.

Grounding electrode / bonding system 1 LS Complete building grounding/bonding system.

Lightning protection system 1 LS Where required by design; air terminals, down conductors, bonding, and continuity.

Wall lockers, if contractor-furnished 40-50 EA Not in contract unless separately included.

Bunk beds, if contractor-furnished 20-25 EA Not in contract unless separately included.

Wireless interior internet / WAP devices N/A NIC Active IT, WAPs, and wireless service are excluded unless separately included. Provide rough-in only where directed.

BOM-4. Cadre / Transient / OCT Barracks RLB - 50x50, 2,500 SF CLIN Reference Option CLIN 0004; rated exterior wall assemblies included where required by the PWS/technical exhibits Planning Basis 50x50 room-based barracks prototype on piers with single/double/triple rooms, corridors, support room, dedicated or zoned split systems, fire alarm/detection/life safety, exterior access points, and generator-ready building interface. Furniture, bunks, and wall lockers are excluded unless separately included.

Approximate material/quantity reference. Offeror shall verify final design, dimensions, code compliance, manufacturer requirements, site conditions, and installed scope before fabrication or installation.

Material / System Qty Unit Notes / Minimum Technical Criteria Relocatable modular building shell 2,500 SF Complete installed, connection-ready RLB building system.

Pier foundation / RLB support package 1 LS ISO/elevated pier support system, anchorage, load path, corrosion protection, and drainage clearance.

Fire-rated exterior envelope option 1 LS Turnkey 1-hour rated envelope where selected; includes rated assemblies, openings, penetrations, firestopping, sealants, flashing, weatherproofing, and exterior equipment coordination.

Sleeping rooms 14 RM Planning basis: 5 single, 5 double, 4 triple rooms.

Electrical / communications closet 1 EA Conditioned; FRT plywood backboard; grounding/bonding; 4 duplex receptacles and 1 quad receptacle on dedicated circuit.

Storage/support closet 1 EA 4 duplex receptacles; verify final layout.

Corridor partitions 1 LS Two-corridor planning basis.

Interior wall framing / partitions 302 LF Approximate interior framing; include blocking/backing.

Exterior wall framing / assembly 200 LF Exterior wall assembly; rated where fire-rated option is selected.

Interior doors / frames / hardware 16-18 EA Commercial-grade hardware; rated where required.

Exterior single doors 2 EA Exterior-rated assemblies with weather shrouds/hoods.

Exterior double doors 2 EA Exterior-rated assemblies with weather shrouds/hoods.

Entry platform / stair assemblies 4 EA Sized for two double and two single doors; slip-resistant and corrosion-resistant.

Interior LED fixtures 41 EA LED fixtures suitable for room/corridor layout.

Exterior wall pack lights 6 EA At entries/exits and exterior service points.

Exit signs 6 EA Illuminated with battery backup or approved emergency source.

Emergency lights, battery backup 21 EA Minimum 90-minute operation unless more stringent requirement applies.

Smoke / heat detectors 19 EA Quantity per final fire/life-safety design.

Horn/strobes 6-8 EA Quantity per occupancy, layout, and fire alarm design.

Fire extinguisher cabinets/mounts 6 EA Include blocking and accessible placement.

Fire alarm control panel / FA interface 1 EA Provide local FA panel/interface as required.

Split-system AC units 20 EA Final quantity and BTU sizing per design loads and climate assumptions.

Split-system BTU basis 9K-12K BTU/EA Final capacity by load calculation and zoning.

Duplex receptacles, 20A 86 EA AFCI/GFCI protection where required; distribute per room layout.

Interior GFCI receptacles 53 EA GFCI/AFCI protected where required.

Exterior GFCI receptacles 6 EA Weather-resistant, extra-duty in-use covers, corrosion-resistant boxes.

Light switches / controls 20 EA Room/zone switching; exterior/interior controls.

Electrical panelboard 1 EA Mounted on FRT plywood/backboard or approved support; typed schedule; 25% spare space/ampacity;

grounding/bonding included.

Generator-ready connection cabinet 1 LS Exterior-rated and grounded; protected penetrations where applicable; generator source/fuel excluded.

Lightning protection system 1 LS Where required by design; air terminals, down conductors, bonding, and continuity.

BOM-5. Conditioned Storage Facility - 40x50, 2,000 SF CLIN Reference Option CLIN 0006; 100% rated exterior envelope as required by the PWS/technical exhibits Planning Basis 40x50 conditioned/humidity-controlled storage facility with slab-on-grade, vapor barrier/vapor retarder, caged storage, office/support spaces, insulated roll-up doors, split systems, life safety, grounding, and lightning protection. Storage is the current SOG facility in the RLB package.

Approximate material/quantity reference. Offeror shall verify final design, dimensions, code compliance, manufacturer requirements, site conditions, and installed scope before fabrication or installation.

Material / System Qty Unit Notes / Minimum Technical Criteria Relocatable modular building shell 2,000 SF Complete conditioned storage building system; site-specific placement and fire-rated requirements apply.

Slab-on-grade 2,000 SF 6-inch planning depth, thickened edge, reinforcing basis #4 at 12 inches each way, verify final design.

Underslab vapor barrier / vapor retarder 2,000 SF Required; include compacted base/capillary break, lapped/taped/sealed joints, protected penetrations, and placement documentation.

Fire-rated exterior envelope option 1 LS Turnkey 2-hour rated storage envelope where selected; includes rated assemblies, openings, penetrations, firestopping, sealants, flashing, weatherproofing, and exterior equipment coordination.

Insulated roll-up doors 4 EA 10 ft / 12 ft width planning basis; unit price per roll-up door as applicable.

Entry apron to roll-up doors 4 EA Contractor to clarify dimensions and typical details.

Bollards 6 EA Include bollard unit price/reference where directed.

Interior wall framing / partitions 60 LF Interior wall assemblies for offices/support/caging.

Perimeter wall assembly 180 LF Rated accordingly with fire-rated assembly options where selected.

Interior doors / frames / hardware 4 EA Commercial-grade hardware; rated where required.

Interior caging entries 3 EA Man-door size entries; unit price per caging entry.

Interior caging 36 LF Caging panels/posts; verify final caging plan.

Exterior double doors 1 EA Exterior-rated assembly with weather shroud/hood.

Exterior single doors 2 EA Exterior-rated assemblies with weather shrouds/hoods.

Entry concrete stoops 3 EA Concrete stoops at single/double doors.

Office rooms 2 EA Office/support spaces per plan.

Electrical closet 1 EA Conditioned/ventilated as required; clearances maintained.

Storage closet 1 EA Support closet.

Interior LED fixtures 22 EA LED fixtures suitable for storage/office functions.

Exterior wall pack lights 9 EA At entries, roll-up doors, and each elevation.

Exit signs 3-4 EA Illuminated with battery backup or approved emergency source.

Emergency lights, battery backup 6 EA Minimum 90-minute operation unless more stringent requirement applies.

Smoke / heat detectors 8 EA Quantity per final fire/life-safety design.

Horn/strobes 6 EA Quantity per occupancy and fire alarm design.

Fire extinguisher cabinets/mounts 4 EA Include blocking and accessible placement.

Fire alarm control panel / FA interface 1 EA Provide local FA panel/interface as required.

Split-system AC units 8 EA Final quantity and BTU sizing per design loads and storage conditions.

Split-system BTU basis Sized EA Contractor to size properly for conditioned/humidity-controlled storage.

Dedicated data/server room cooling 0 EA Not applicable unless directed.

Duplex receptacles, 20A 25 EA AFCI/GFCI protection where required; distribute per final layout.

Exterior GFCI receptacles 6 EA Weather-resistant, extra-duty in-use covers, corrosion-resistant boxes.

Light switches / controls 8 EA Zone lighting, rooms, interior/exterior controls.

Electrical panelboard 1 EA Mounted on FRT plywood/backboard or approved support; weather-resistant where required; 25% spare space/ampacity; grounding/bonding included.

Generator-ready connection cabinet 1 LS Exterior-rated and grounded; protected penetrations where applicable; generator source/fuel excluded.

Office wall blocking 20 LF For displays, shelves, or wall-mounted items.

Lightning protection system 1 LS Air terminals, down conductors, bonding, and continuity to grounding system where required.

BOM-6. Covered Canopy / Lightning Shelter - 40x50, 2,000 SF

CLIN Reference Option CLIN 0007; 4-inch SOG with thickened edge and vapor barrier/vapor retarder where required Planning Basis Open-air canopy / lightning shelter with covered dining/assembly space, steel canopy structure, lighting, fans, GFCI power, grounding, lightning protection and slab on grade foundation IAW PWS 5.2.7 and either gravel base with geotextile or SOG option. If SOG is selected, include capillary break and vapor barrier/vapor retarder.

Approximate material/quantity reference. Offeror shall verify final design, dimensions, code compliance, manufacturer requirements, site conditions, and installed scope before fabrication or installation.

Material / System Qty Unit Notes / Minimum Technical Criteria Steel canopy structure 2,000 SF Pre-engineered metal building or engineered steel canopy structure.

Roof panels / trim / gutters 2,000 SF PEMB/engineered roof system with drainage.

Columns PEB LS Engineered column layout and support.

Column foundations PEB LS Engineered foundation system for canopy loads.

X-bracing bays PEB LS Where required by structural design.

Gravel base with geotextile 2,000 SF Gravel fill planning basis: 6 inches with non-woven geotextile fabric.

Optional SOG 2,000 SF 4-6 inch slab-on-grade with reinforcing, thickened edges, and entry apron where SOG option is selected.

Vapor barrier / vapor retarder for canopy

SOG

2,000 SF Include with SOG option unless deleted by Government; coordinate with capillary break, joints, columns, and lightning/grounding.

Optional perimeter concrete curb 180 LF Containment for interior gravel where selected.

Industrial outdoor ceiling fans 4-6 EA Exterior-rated; include switches.

High-bay / canopy LED fixtures 8 EA Exterior/wet-location rated as applicable; include switches/controls.

Exterior GFCI receptacles 12-14 EA Weather-resistant, extra-duty in-use covers; charging/power basis with GFCI protection.

Electrical panelboard 1 EA Mounted on FRT plywood/backboard or approved support; weather-resistant enclosure where required;

generator connection and grounding/bonding included.

Light switches / controls 2 EA Zones for lighting and fans.

Fire extinguisher cabinets/mounts 4 EA Accessible placement.

Lightning protection air terminals 6-10 EA Engineered lightning protection and grounding system.

Down conductors 4 EA Engineered lightning protection and grounding system.

Ground rods / ground ring 1 LS Engineered grounding system.

Bonding to steel columns 12-16 EA Bond steel columns to grounding/lightning system.

Generator-ready connection cabinet 1 LS Exterior-rated and grounded; generator source/fuel excluded.

BOM-7. Medical / Troop Clinic RLB - 1,200 to 1,600 SF CLIN Reference Option CLIN 0005; rated exterior wall assemblies included where required by the PWS/technical exhibits Planning Basis Medical aid station / troop clinic RLB with exam/admin rooms, washable finishes, handwashing, privacy/acoustics, utilities interface, fire alarm/detection/life safety, and generator-ready building interface. Medical equipment and supplies are excluded unless separately included.

Approximate material/quantity reference. Offeror shall verify final design, dimensions, code compliance, manufacturer requirements, site conditions, and installed scope before fabrication or installation.

Material / System Qty Unit Notes / Minimum Technical Criteria Modular medical building shell 1,200-

1,600 SF Complete installed, connection-ready medical support RLB.

Pier or SOG foundation package 1 LS Default to piers unless SOG is specifically selected/required.

Fire-rated exterior envelope option 1 LS Turnkey rated envelope where selected or required by life-safety analysis.

Interior partitions / full-height rooms 1 LS Reference final plan and room requirements.

Washable wall/ceiling finish allowance 1 LS FRP panels or equal cleanable finish where required.

Interior doors / frames / hardware 4 EA Commercial-grade hardware; privacy where required.

Interior wall assembly with blocking 60 LF Include blocking/backing for wall-mounted equipment/accessories.

Exterior double doors 2 EA Exterior-rated assemblies with weather shrouds/hoods.

Entry platform / ramp assemblies 2 EA Weather-resistant, slip-resistant access assemblies.

Handwashing sinks 4 EA Within-building plumbing; source water/sanitary by others unless included.

Utility sink 1 EA Include within-building plumbing and utility interface.

Water heater 1 EA Dedicated circuit as required; source utilities by others unless included.

Exhaust fans 4 EA Ventilation for rooms requiring exhaust.

Split-system AC units 8 EA Final quantity and BTU sizing per design loads and clinical support use.

Interior LED fixtures 16 EA Switches per room area and open lobby/support spaces.

Exterior wall packs 6 EA At entries/exits and exterior service points.

Duplex receptacles, 20A 16 EA AFCI/GFCI protection where required.

GFCI receptacles 6 EA Wet/clinical support locations as required.

Data drops / dual data boxes 4 EA Passive infrastructure only; active IT excluded.

Surface raceway / Panduit 120 LF Passive data/electrical pathways where required.

Electrical panelboard 1 EA Mounted on FRT plywood/backboard or approved support; typed schedule; 25% spare space/ampacity;

grounding/bonding included.

Generator-ready connection cabinet 1 LS Exterior-rated and grounded; generator source/fuel excluded.

Fire alarm / smoke / horn-strobe system 1 LS Provide required FA/detection/notification package.

Exit signs 4 EA Illuminated with battery backup or approved emergency source.

Emergency lights 8 EA Minimum 90-minute operation unless more stringent requirement applies.

Fire extinguisher cabinets/mounts 4 EA Accessible placement and blocking.

Grounding / bonding system 1 LS Complete building grounding/bonding system.

BOM-8. Containerized Shower Unit - 40 FT CLIN Reference Option CLIN 0008; connection-ready shower unit; source water/sanitary by separate utility CLIN/BLS basis unless awarded Planning Basis 40-foot wet container shower unit with approximately 10-12 shower positions, washable finishes, exhaust, hot water, GFCI protection, exterior manifolds, and generator-ready building interface. Source water, sanitary disposal, and BLS support are excluded unless specifically included.

Approximate material/quantity reference. Offeror shall verify final design, dimensions, code compliance, manufacturer requirements, site conditions, and installed scope before fabrication or installation.

Material / System Qty Unit Notes / Minimum Technical Criteria 40 FT ISO shower unit 1 EA Complete containerized shower unit.

Shower stalls / pans 10-12 EA Enclosure assembly, door, and shower caddy.

Shower valves / heads 10-12 EA Commercial-grade shower fixtures.

Lavatories / sinks 0 EA Not included in shower-only unit unless directed.

Floor drains 8 EA Wet area drainage to sanitary/graywater interface.

Water heaters 2 EA Dedicated circuits and shutoffs as required.

Mixing / tempering valves 2 EA Tempered water control.

Exhaust fans 4 EA Wet-location exhaust.

Split-system AC unit 2 EA Final quantity and capacity by design.

Wet-rated LED fixtures 8 EA Wet/damp-rated lighting as required.

GFCI receptacles 4 EA Approximate 8-ft spacing basis; GFCI protected.

Exterior wall pack lights 2 EA Exterior-rated at entries.

Exit signs 2 EA Illuminated with battery backup or approved emergency source.

Emergency lights 2 EA Minimum 90-minute operation unless more stringent requirement applies.

Smoke / heat detection 2 EA As required by fire/life-safety design.

Fire extinguisher cabinet/mount 2 EA Accessible placement.

Exterior connection manifold 1 LS Exterior interface for utility connections.

Potable water connection 2 EA Connection interface only; source by BLS/Government/separate contract unless included.

Sanitary / graywater connection 2 EA Connection interface only; disposal by BLS/Government/separate contract unless included.

Entry platform / steps 2 EA Weather-resistant, slip-resistant access.

Grounding / bonding system 1 LS Complete unit grounding/bonding.

Exterior doors 2 EA Exterior-rated assemblies with weather shrouds/hoods.

Windows 4 EA Exterior-rated where included.

Shower hooks per shower unit 12 EA Blocking for each hook.

Electrical panelboard 1 EA Mounted on FRT plywood/backboard or approved support; weather-resistant enclosure as required;

grounding/bonding included.

BOM-9. Containerized Restroom / Latrine Unit - 40 FT CLIN Reference Option CLIN 0009; connection-ready latrine unit; source water/sanitary by separate utility CLIN/BLS basis unless awarded Planning Basis 40-foot toilet/sink unit with approximately 10-12 toilet/sink positions, washable finishes, exhaust, GFCI protection, sanitary connection, and generator-ready building interface. Source water, sanitary disposal, and BLS support are excluded unless specifically included.

Approximate material/quantity reference. Offeror shall verify final design, dimensions, code compliance, manufacturer requirements, site conditions, and installed scope before fabrication or installation.

Material / System Qty Unit Notes / Minimum Technical Criteria 40 FT ISO restroom / latrine unit 1 EA Complete containerized restroom/latrine unit.

Toilets 10-12 EA Commercial-grade fixtures.

Toilet partitions 10-12 EA Durable wet/damp-area partitions.

Lavatories / sinks 10-12 EA Commercial-grade fixtures.

Floor drains 4-6 EA Wet area drainage to sanitary interface.

Exhaust fans 4 EA Wet-location exhaust.

Split-system AC unit 2 EA Final quantity and capacity by design.

Wet/damp-rated LED fixtures 16 EA Wet/damp-rated lighting as required.

GFCI receptacles 10-12 EA 6-7 per 20A breaker basis; GFCI protected.

Exterior wall pack lights 2 EA Exterior-rated at entries.

Exit signs 2 EA Illuminated with battery backup or approved emergency source.

Emergency lights 4 EA Minimum 90-minute operation unless more stringent requirement applies.

Smoke / heat detection 2 EA As required by fire/life-safety design.

Fire extinguisher cabinet/mount 2 EA Accessible placement.

Potable water connection 1 EA Connection interface only; source by BLS/Government/separate contract unless included.

Sanitary connection 1 EA Connection interface only; disposal by BLS/Government/separate contract unless included.

Entry platform / steps 2 EA Weather-resistant, slip-resistant access.

Grounding / bonding system 1 LS Complete unit grounding/bonding.

Exterior doors 2 EA Exterior-rated assemblies with weather shrouds/hoods.

Windows 4 EA Exterior-rated where included.

Electrical panelboard 1 EA Mounted on FRT plywood/backboard or approved support; weather-resistant enclosure as required;

grounding/bonding included.