Pre-solicitation_notice_updated.docx

DOCX document 15 KB Posted

Attached to
Chapicuy (Uruguay) Clinic Construction Federal contract opportunity
Solicitation number
W912CL-16-R-0009
Issued by
Department of the Army Cyber Command

About this file

Pre-Solicitation Notice in Word format

View the file

Other files for this federal contract opportunity

Other files attached to Chapicuy (Uruguay) Clinic Construction, newest first.
File Type Posted
Solicitation_Amendment_1_Chapicuy_Clinic_Construction.doc DOC document
TE_10_-_A.dwg DWG drawing
TE_26_Sign-Seal-Plaque.ppt PPT presentation
TE_17_-_A.dwg DWG drawing
TE_19_-_E..dwg DWG drawing
TE_11_-_A.dwg DWG drawing
TE_25_-_Parking_Lot.dwg DWG drawing
TE_14_-_A.dwg DWG drawing
TE_02_-_X001EE01.dwg DWG drawing
TE_12_-_A.dwg DWG drawing
TE_23_-_S.dwg DWG drawing
TE_24_-_S.dwg DWG drawing
TE_09_-_A.dwg DWG drawing
TE_21_-_E.dwg DWG drawing
TE_15_-_A.dwg DWG drawing
TE_07_-_A.dwg DWG drawing
TE_05_-_A.dwg DWG drawing
Materials_List_Chapicuy_Clinic_Construction.xlsx XLSX spreadsheet
TE_03_-_X002EE01.dwg DWG drawing
TE_20_-_E.dwg DWG drawing
TE_18_-_A.dwg DWG drawing
TE_04_-_A.dwg DWG drawing
Solicitation_Chapicuy_Clinic_Construction.doc DOC document
TE_13_-_A.dwg DWG drawing
TE_16_-_A.dwg DWG drawing
TE_06_-_A.dwg DWG drawing
TE_01_-_COVER.dwg DWG drawing
TE_08_-_A.dwg DWG drawing
TE_22_-_E.dwg DWG drawing
Site_Visit_sign_in_sheet.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clinic Construction, Chapicuy, Uruguay

Project Description: The Regional Contracting Center-Americas, 410th Contracting Support Brigade intends to award a Firm Fixed Price construction contract in order to build a new clinic. The completion of this project will assist the Ministry of Health and Chapicuy local authorities to quickly respond to emergencies during flooding and other incidents. The Contractor shall furnish all management, supervision, labor, equipment, material, transportation, and supplies required to complete this project. Work executed by the contractor shall include but is not limited to:

· Soil study;

· Site preparation;

· Construction of a new medical clinic;

· Provide and install clinic furniture and equipment;

· Construction of perimeter fence/walls;

· Construction of parking;

· Construction of water cistern and elevated water tank;

· Any other related works.

Place of Performance: The work to be performed under this contract will be performed at Chapicuy, Uruguay. Coordinates for this site are S-31.375 and W-57.959. Prior to the commencement of work, access to the installation shall be coordinated with Chapicuy Ministry of Health representatives.

Magnitude: The magnitude of this project is estimated between $500,000.00 and $1,000,000.00 U.S. Dollars

Obtaining the solicitation: The solicitation will be issued unrestricted to allow U.S. and non U.S. firms to participate. The solicitation and any technical exhibits (when applicable), will be available for download from the FedBizOpps website. All notifications of changes to the solicitation should be made through electronics means only. It is the contractor's responsibility to check for any posted changes to the solicitation. Registration in the System for Award Management (SAM) is required of Contractor to receive the contract award.

Site Visit: An organized pre-solicitation visit is scheduled for 31 May 2016 at1400 hours. Prospective contractor representatives are responsible for paying their own transportation costs for travel to and from the site.

Contemplating Awardees: Since the contemplating contract is to be awarded by the contracting activity located in Fort Sam Houston, Texas and to be performed in Uruguay, the offerors must meet the following requirement for OCONUS: DFARS 252.225-7042, "Authorization to Perform" - The Offeror has been duly authorized to operate and to do business in the country or countries in which the contract is to be performed. The Contractor shall, without additional expense to the U.S. Government, be responsible for obtaining any necessary licenses and permits, and for complying with any host government and political subdivisions laws, codes, and regulations applicable to the performance of the work.

File details come from the government source that posted it. Updated .