Materials_List_Chapicuy_Clinic_Construction.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Chapicuy (Uruguay) Clinic Construction Federal contract opportunity
Solicitation number
W912CL-16-R-0009
Issued by
Department of the Army Cyber Command

About this file

Materials List

View the file

Other files for this federal contract opportunity

Other files attached to Chapicuy (Uruguay) Clinic Construction, newest first.
File Type Posted
Solicitation_Amendment_1_Chapicuy_Clinic_Construction.doc DOC document
TE_10_-_A.dwg DWG drawing
TE_26_Sign-Seal-Plaque.ppt PPT presentation
TE_17_-_A.dwg DWG drawing
TE_19_-_E..dwg DWG drawing
TE_11_-_A.dwg DWG drawing
TE_25_-_Parking_Lot.dwg DWG drawing
TE_14_-_A.dwg DWG drawing
TE_02_-_X001EE01.dwg DWG drawing
TE_07_-_A.dwg DWG drawing
TE_05_-_A.dwg DWG drawing
TE_03_-_X002EE01.dwg DWG drawing
TE_20_-_E.dwg DWG drawing
TE_18_-_A.dwg DWG drawing
TE_04_-_A.dwg DWG drawing
Solicitation_Chapicuy_Clinic_Construction.doc DOC document
TE_13_-_A.dwg DWG drawing
TE_16_-_A.dwg DWG drawing
TE_06_-_A.dwg DWG drawing
TE_01_-_COVER.dwg DWG drawing
TE_08_-_A.dwg DWG drawing
TE_22_-_E.dwg DWG drawing
TE_12_-_A.dwg DWG drawing
TE_23_-_S.dwg DWG drawing
TE_24_-_S.dwg DWG drawing
TE_09_-_A.dwg DWG drawing
TE_21_-_E.dwg DWG drawing
TE_15_-_A.dwg DWG drawing
Site_Visit_sign_in_sheet.pdf PDF
Pre-solicitation_notice_updated.docx DOCX document
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material List

Material List - Chapicuy Clinc Construction
ItemDescriptionUnitQuantityUnit CostPartial Cost
1NOT USED$ - 0
2NOT USED$ - 0
3SURVEY, DESIGN, AND TESTS. To include project site survey, project designs validation and certification, and required structural, electrical, plumbing, and mechanical tests.
3.1SurveyLS1$ - 0
3.2DesignLS1$ - 0
3.3TestsLS1$ - 0
4REQUIRED STUDIES. To include soil, electrical loads, and water demand studies.
4.1Soil studyLS1$ - 0
4.2Electrical loadLS1$ - 0
4.3Water demandsLS1$ - 0
5SITE PREPARATION. Include earth movement, grading, utilities infrastructure installion, and drainage.SM2,750$ - 0
6CLINIC CONSTRUCTION
6.1CONCRETE STRUCTURES
6.1.1Beam for reinforced wall footersM350$ - 0
6.1.2Column footersM320$ - 0
6.1.3Column footersM315$ - 0
6.1.4Beam footerM320$ - 0
6.1.5LintelsM312$ - 0
6.1.6Slabs and rampsM345$ - 0
6.1.7Water tank reinforced concrete structureM34$ - 0
6.2STRUCTURAL CONCRETE BLOCKSM2356$ - 0
6.3ROOF. Reinforced with steel rebars and sealed, and sloped to prevent leaks. Drainage and gutters (to include end cap, downspout, elbows, and splash block).M2421$ - 0
6.4PLASTERM2356$ - 0
6.5DOOR WITH FRAME
6.5.1Door C1EA14$ - 0
6.5.2Door C2EA16$ - 0
6.5.3Door C3EA1$ - 0
6.5.4Door C4EA1$ - 0
6.5.5Door C5EA3$ - 0
6.5.6Door pump houseEA1$ - 0
6.5.7Door storageEA3$ - 0
6.6WINDOWS
6.6.1Type w/1EA1$ - 0
6.6.2Type w/2EA1$ - 0
6.6.3Type w/3EA1$ - 0
6.6.4Type w/4EA1$ - 0
6.6.5Type w/5EA1$ - 0
6.6.6Type w/6EA1$ - 0
6.6.7Type A1 - Operable WindowsEA6$ - 0
6.6.8Type A2 - Operable WindowsEA10$ - 0
6.6.9Type A3 - Operable WindowsEA5$ - 0
6.6.10Type Pharmacy sliding windowEA1$ - 0
6.6.11Type Administration sliding windowEA1$ - 0
6.6.12Type storage aluminum louvered windowEA5$ - 0
6.6.13Insect screenSM31$ - 0
6.7STEEL
6.7.1Security bar for windowsM247$ - 0
6.7.2Handrail for handicap ramp and water tank. Also include water tower steel stairs.LS1$ - 0
6.8ELECTRIC SYSTEM
6.8.1Main control panel to include authomatic transfer switchLS1$ - 0
6.8.2Distribution panelsLS3$ - 0
6.8.3Receptacle Ground Fault Circuit Interrupter (GFCI) with plateEa2.00$ - 0
6.8.4Receptacles with plateEA120$ - 0
6.8.5Switches with plateLS35$ - 0
6.8.6Register boxEA6$ - 0
6.8.7Conductors/WiringLS1$ - 0
6.8.8Exterior Lights with lamps outside the building. 2-main entrance, 2-front (corners), 2-back, 1 at each side. For the storage, 2 for front of the bulding. Energy efficient LED.EA10$ - 0
6.8.9Perimeter exterior lights with lamps. Energy efficient LED. Include 10 meters reinforced pole, dual lamps, brackets, and accessories.EA8$ - 0
6.8.10Interior lights with lamps. Energy efficient LED. Include ceiling and wall lights.EA40$ - 0
6.8.11Examination lam. Energy efficient LED.EA11$ - 0
6.8.12Ceiling mounted fans (living room, exam rooms, and dorms)EA23$ - 0
6.8.13Smoke detectorEA5$ - 0
6.8.14BellEA5$ - 0
6.8.15Air Conditioner and heating unitsEA20$ - 0
6.8.16Emergency lightEa10.00$ - 0
6.8.17Hand-dryerEa5.00$ - 0
6.8.18VentEa7.00$ - 0
6.8.19Exit signEa6.00$ - 0
6.8.20Diesel generador with main fuel, sub-base fuel tanks, and retaining/leak containment pool. Include transfer switch and connection accessories.LS1$ - 0
6.8.21Grounding and lighting protection systems. Include clinic, storages, generator, and elevated water tower.EA1$ - 0
6.8.22Electric meter with input and output electrical accessoriesEA1$ - 0
6.8.23Electrical conduit, connection, and transformer. Include all conduits, fitting, bands, and accessories requires to run wires according to electrical code. It also includes a transformer.LS1$ - 0
6.9GENERATOR AND FUEL TANK SHACKSM18$ - 0
6.10UNDERGROUND UTILITIESLS$ - 0
6.11PLUMBING ACCESSORIES
6.11.1White low tank toilet with seat and lid (water saver). Italian quality.Ea8.00$ - 0
6.11.2White urinal (water saver). Italian quality.Ea1.00$ - 0
6.11.3Stainless steel vandalism resistant wall-hung urinal troughs.Ea1.00$ - 0
6.11.4Italian quality sinkEa20.00$ - 0
6.11.5Paper toilet holderEa8.00$ - 0
6.11.6Soap holderEa20.00$ - 0
6.11.7Small towel holder bar at sinkEa20.00$ - 0
6.11.8Hook at sinkEa20.00$ - 0
6.11.9Faucet sinkEa20.00$ - 0
6.11.10Goose neck faucet kitchen sinkEa1.00$ - 0
6.11.11Faucet utilities (outside clinic, janitor, and storage)Ea6.00$ - 0
6.11.12Drain point with PVC pipeEa29.00$ - 0
6.11.13Vent with PVC 2 inches pipeEa29.00$ - 0
6.11.144 inches PVC pipem50.00$ - 0
6.11.152 inches PVC pipem25.00$ - 0
6.11.16Threaded clean out 4 inches diameterEa7.00$ - 0
6.11.17Drain for kitchen sink 2 inches diameterEa2.00$ - 0
6.11.18Cold water point with PVC pipeEa29.00$ - 0
6.11.19Distribution network 1/2 inch PVC pipem20.00$ - 0
6.11.20Distribution network 3/4 inch PVC pipem10.00$ - 0
6.11.21Potable PVC 2 inches pipem50.00$ - 0
6.11.22Double bow concrete utility sinkEA1$ - 0
6.11.23Janitor utility room sinkEA1$ - 0
6.11.24Handicap grab barsEA3$ - 0
6.11.25Installation of potable water pipes, drain pipes, and fittings. Include installation and materials.LS1$ - 0
6.11.26Mirrors with wooden frameSM10$ - 0
6.12TILES
6.12.1Floor tiles plus "zócalo". Anti-skid tiles shall be providedM2341$ - 0
6.12.2Wall tiles (Type "azulejo")M266$ - 0
6.13LOCKS AND HARDWARE
6.13.1Key dead lock exterior doors (clinic, storage, generator, water tower)EA7$ - 0
6.13.2Key knob lock interior doors (clinic)EA19$ - 0
6.13.3Silencer (exterior doors clinic)EA3$ - 0
6.13.4Handle main entrance clinicEA1$ - 0
6.13.5Commercial type heavy duty handle all other doorsEA25$ - 0
6.13.6Door stopperEA26$ - 0
6.13.7HingesEA81$ - 0
6.13.8Weather stripsEA27$ - 0
6.13.9PAINT
6.13.10Masonry primer (one coat)SM3,802$ - 0
6.13.11Exterior & Interior masonry paint (two coats)SM7,603$ - 0
6.13.12Anticorrosive paintSM10$ - 0
6.13.13Varnish for cabinets and doors. Two coatsSM110$ - 0
7.0SPECIAL SYSTEMS
7.1Septic tank & absorption well. Include septic tanks, connection fittings and pipes, and all other accessories.LS1$ - 0
7.2SidewalksM315$ - 0
7.3Elevated water storage tank, tower, pump, connection fittings and pipes, cistern, and all other accessories.LS1$ - 0
7.4Perimeter fenceLM200$ - 0
7.6Curtains and railsLM45$ - 0
7.7Flag and poleLS1$ - 0
7.8IncineratorLS$ - 0
7.9Drop ceilingLS$ - 0
7.10Utility buildingLS1$ - 0
8.0CLINIC SIGNSLS1$ - 0
8.1Room and area signsLS1$ - 0
8.2Clinic signLS1$ - 0
9.0FURNITURE, APPLIANCE, AND EQUIPMENT
9.1Stove with gas tank and gas tank shackEA1$ - 0
9.2MicrowaveEA1$ - 0
9.3RefrigeratorEA1$ - 0
9.4Television (smart tv, flat screen with brackets)EA2$ - 0
9.5DVD playersEA2$ - 0
9.6Dining table with 4 chairsEA1$ - 0
9.7Office chairsEA18$ - 0
9.8Waiting room chairsEA70$ - 0
9.9Executive chairEA9$ - 0
9.10Medical stool chairEA8$ - 0
9.11Executive deskEA1$ - 0
9.12Administrative deskEA7$ - 0
9.13Examination beds with mattressEA$ - 0
9.14LockersEA6$ - 0
9.15Fire extinguishersEA5$ - 0
9.16Love seatEA1$ - 0
9.17Dentist chairEA$ - 0
9.18Wall hardwood cabinets (not shown in design). For kitchen above sink base. Include provision and installation, two shelves each, hardware, hinges, and door knobs.LS1$ - 0
9.19Base hardwood cabinets (not shown in design). For kitchen and bathroom sinks.LS1$ - 0
9.20Base hardwood cabinets (not shown in design). For general medicine, nursing, dentist, gynocology, pediatric, height & weight, vaccination, extraction, kitchen, administration and records, and pharmacy rooms.LS1$ - 0
9.21Administration and pharmacy hardwood shelves (not shown in design).LS1$ - 0
9.22Granite counter tops for cabinets (not shown in design). For kitchen and bathrooms base cabinets.SM3$ - 0
9.23Granite counter tops for cabinets (not shown in design). For general medicine, nursing, dentist, gynocology, pediatric, height & weight, vaccination, and extraction.SM15$ - 0
9.24Granite counter tops forAdministration and pharmacy shelves.SM18$ - 0
9.25Wall to wall and stand-alone filing shelving cabinets for Administration roomLS3$ - 0
9.26Wall to wall and stand-alone filing shelving cabinets for Pharmay roomEA7$ - 0
10.0TELEPHONE SYSTEMLS1$ - 0
11.0FIRE ALARM SYSTEMLS1$ - 0
12.0DATA SYSTEMLS1$ - 0
13.0PLAQUE, SEAL, and SIGN
13.1Dedication PlaqueEA1$ - 0
13.2ARSOUTH SealEA1$ - 0
13.3Project SignEA1$ - 0
15PARKING. Include base, concrete surface 152 mm thick), parking stopper, marking spaces, handi-cap spaceSM1,575$ - 0
16TRAININGEA1$ - 0
17FINAL CLEAN UPLS1$ - 0

TOTAL PROJECT COST $ - 0

Notes:
1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final.

&P/&N