W912CH25B0006.pdf

PDF 186 KB Posted

Attached to
Solicitation: Hand Operated Drum Winches (Multiple NSNs)
Solicitation number
W912CH-25-B-0006
Issued by

About this file

This is an Invitation for Bid (IFB) for Winch and Support Assembly components for the U.S. Army's Battalion Counter Mine Systems (BCS). The procurement is for two primary items: a Left Winch and Support Assembly (NSN 3950-01-134-3794, Part Number 13222E0453) with 48 units, and a Right Winch and Support Assembly (NSN 3950-01-134-3795, Part Number 13222E0463) with 66 units. The solicitation is a total small business set-aside, and bidders must have a Technical Data Package (TDP) access prior to submission. The contract is firm-fixed-price with a potential 100% option quantity, and deliveries are scheduled for 150 days after award at a rate of 24 units per month.

Key requirements include obtaining TDP access, completing all necessary representations and certifications, and submitting bids electronically by October 23, 2025. The bid opening will be held virtually on October 23, 2025, at 1:00 P.M. local time. Bidders must be registered in the System for Award Management (SAM) under NAICS code 333923 (Overhead Traveling Crane, Hoist, and Monorail System Manufacturing) with a size standard of 1,250 employees. The contract will be awarded to the lowest-priced, responsible bidder meeting all material requirements, with award anticipated in October 2025.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W912CH-25-B-0006 X 2025SEP18

1 signed

/SIGNED/

2025OCT2003:30pm

DOA4

2025SEP18 SEE SCHEDULE

W912CH

ACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

NICHOLAS LANG

(571)588-9166

CCTA-APS-C

NICHOLAS.A.LANG.CIV@ARMY.MIL

1 75

X 1

X 6 X 14

X 17 X 21 X 24

X 30

X 32

X 33

X 53

X 54

X 67

X 74

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: NICHOLAS LANG

Buyer Office Symbol/Telephone Number: CCTA-APS-C/(571)588-9166

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Weapon System: Battalion Counter Mine Systems (BCS)

*** End of Narrative A0000 ***

A.1. DESCRIPTION OF ACTION

A.1.1. This Invitation for Bids (IFB) is intended to result in the award of a firm-fixed-price (FFP) contract with 100% option for Winch and Support Assembly, Left, National Stock Number (NSN): 3950-01-134-3794, Part Number: 13222E0453, and Winch and Support Assembly, Right, NSN: 3950-01-134-3795, Part Number: 13222E0463.

A.1.2. This IFB is a total small business set-aside in accordance with Federal Acquisition Regulation (FAR) 19.502-2, Total small business set-asides.

A.1.3. There are Technical Data Packages (TDPs) associated with this procurement. The TDPs are distribution code "D", which limits access to DoD and U.S. DoD contractors. Please refer to Section C.1 for additional information. BIDDERS MUST BE GRANTED TDP ACCESS

PRIOR TO SUBMITTING THEIR BID OR THE BID SUBMISSION WILL BE REJECTED.

A.1.4. Bidders are advised to carefully read and understand this entire IFB, including Section L and Section M, prior to submitting a bid for evaluation. The Government will evaluate bids without discussions and does not assume the duty to search for data to cure problems it finds in any bid. Therefore, all information necessary for the review and evaluation of a bid is to be contained within the bid submission.

A.1.5. Bidders must complete all necessary fill-ins, representations, and assertions throughout this IFB, including but not limited to:

A.1.5.1. STANDARD FORM 33: Blocks 13 through 18;

A.1.5.2. SECTION B: The unit prices and dollar amounts requested for CLIN 0001AA: Production Quantity, CLIN 0001AB: Unexercised Option

Quantity, CLIN 0002AA: Production Quantity, and CLIN 0002AB: Unexercised Option Quantity;

A.1.5.3. SECTION I: FAR 52.204-8 - Annual Representations and Certifications (Deviations 2025-O00003 and 2025-O00004) - Alternate I;

A.1.5.4. SECTION J: Attachment 0002 - DFARS 252.227-7017 Identification and Assertions;

A.1.5.5. SECTION K: FAR 52.209-13 - Violation of Arms Control Treaties or Agreements - Certification;

A.1.5.6. SECTION K: FAR 52.225-18 - Place of Manufacture; and

A.1.5.7. SECTION K: FAR 52.229-11 - Tax on Certain Foreign Procurements - Notice and Representation

Failure to complete any required items may result in the rejection of a bid.

A.1.6. Bidders shall acknowledge receipt of all IFB amendments by the date and time indicated for receipt of bids. If this IFB is amended, then all terms and conditions which are not modified remain unchanged. Please see Section A.4 and FAR 52.214-3: Amendments to

IFBs (Section L) for additional information.

A.1.7. Bid opening will be held with all Bidders and shall commence on Thursday, 23-Oct-2025 at 1:00 P.M. local time (Warren, MI). Due to security protocols at the Detroit Arsenal, bid opening will be held virtually. Bidder attendance at this event is not required. The

Government will provide a Microsoft Teams link, teleconference number, and passcode prior to bid opening. Please contact the personnel identified below, after IFB close and at least 24 hours prior to bid opening, to receive this information:

NICHOLAS LANG

CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL

E-MAIL: NICHOLAS.A.LANG.CIV@ARMY.MIL

-AND-

STANLEY BIERNACKI

2 75

W912CH-25-B-0006

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL

E-MAIL: STANLEY.R.BIERNACKI.CIV@ARMY.MIL

A.2. BID STRUCTURE

A.2.1. The Government will utilize North American Industry Classification System (NAICS) code 333923, Overhead Traveling Crane, Hoist, and Monorail System Manufacturing.

A.2.2. Failure to register via the System for Award Management (SAM) website for the NAICS code identified above, prior to submitting a bid in response to this IFB, may preclude your firm from receiving an award. Bidders should be aware of how U.S. Small Business concerns are defined in FAR Part 19, Defense Federal Acquisition Regulation Supplement (DFARS) Part 219, and 13 CFR 121 Small Business

Size Regulations. Bidders are advised to review 13 CFR 121.103, "How does SBA determine affiliation?", if applicable to this IFB.

A.2.3. All bids received in response to this IFB shall be valid for a minimum of ninety (90) calendar days. Please see FAR 52.214-16:

Minimum Bid Acceptance Period (Section K) for additional information.

A.3. ELECTRONIC CONTRACTING

par(a) All Army Contracting Command - Detroit Arsenal IFBs will be publicized on the System for Award Management (SAM) website:

https://www.SAM.gov

Any additional attachments, including the TDP(s) when available electronically, will be separate attachments or links embedded in the

IFB.

(b) Interested Bidders shall submit a completed IFB, on the Standard Form 33, via e-mail with the subject line "IFB Submission - W912CH-

25-B-0006 (Winch, Drum, Hand Operated)" to the following personnel:

NICHOLAS LANG

CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL

E-MAIL: NICHOLAS.A.LANG.CIV@ARMY.MIL

-AND-

STANLEY BIERNACKI

CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL

E-MAIL: STANLEY.R.BIERNACKI.CIV@ARMY.MIL

Once a bid is received, the Contract Specialist will reply to the respective Bidder indicating receipt of the submission. NOTE: FAX, HARDCOPY (PAPER), AND DVD/CD-ROM BIDS WILL NOT BE ACCEPTED. HAND-CARRIED BIDS, WHETHER HARDCOPY OR ELECTRONIC, WILL ALSO NOT BE

ACCEPTED.

(c) Please pay close attention to the Issued By block on the cover page of this IFB for a closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 52.214-7: Late Submissions, Modifications, and Withdrawals of Bids, Bidders are responsible for submitting bids, and any revisions/modifications, so as to be received by the Government office designated in the IFB by the date and time specified.

(d) It is the Bidder's responsibility to ensure the bid is received by the date and time specified on the cover page of this IFB. In accordance with FAR 52.214-7: Late Submissions, Modifications, and Withdrawals of Bids, if the bid was not received at the initial point of entry to the Government infrastructure (in this case, received via e-mail) by the exact date and time specified on the cover page of this IFB, it will be determined late. Bid is defined to mean ALL volumes or parts required in the IFB are included in the electronic submission.

Note: There is no "expected" or "target" length of time for bid submission; size and content may be factors, therefore Bidders are strongly cautioned when submitting bids to allow adequate time for submission.

(e) IFBs may remain posted on SAM.gov after the IFB closing date. If the response deadline has passed for the IFB, vendors will no longer be able to submit electronic responses.

(f) Any award issued as a result of this IFB will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this IFB, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Government's intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include cost or

3 75

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

pricing data/information. If a Bidder objects to such release in the base contract or contract modifications, the Bidder must notify the Contracting Officer in writing prior to the closing date identified in this IFB and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on the rationale given.

(g) All questions pertaining to this IFB shall be submitted, in writing, to the personnel identified below by Friday, 03-Oct-2025 at

3:30 P.M. local time (Warren, MI):

NICHOLAS LANG

CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL

E-MAIL: NICHOLAS.A.LANG.CIV@ARMY.MIL

-AND-

STANLEY BIERNACKI

CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL

E-MAIL: STANLEY.R.BIERNACKI.CIV@ARMY.MIL

Responses will be furnished via a Q&A log posting to SAM.gov or as an IFB amendment, if the information is necessary in submitting bids or if the lack thereof would be prejudicial to other prospective Bidders. Please see FAR 52.214-6: Explanation to Prospective Bidders

(Section L) for additional information. The Government will review all questions received but is not obligated to answer questions submitted after the date noted above, prior to IFB close.

For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement

Technical Assistance Center (PTAC) website to locate a regional center at:

http://www.aptac-us.org

A.4. ALL OR NONE

Bids in response to this IFB must be submitted for the total quantity of items identified in the IFB:

(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS IFB.

(2) BIDS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS IFB WILL BE DEEMED NONRESPONSIVE.

A.5. ACKNOWLEDGEMENT OF AMENDMENTS

Acknowledge all Government-issued IFB amendments by identifying the amendment number and its issue date below:

Amendment Number: Date:

A.6. ARMY CONTRACTING COMMAND - DETROIT ARSENAL OMBUDSPERSON

Information regarding the Ombudsperson for this contract is located at the following website:

https://tacom.army.mil/ombudsperson

Note: Website is best viewed using Google Chrome or Microsoft Edge.

A.7. DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE

(a) This IFB and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of

4 75

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 48014852 of Title 50, United States Code).

Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provision of DoD Directive

5230.25 and DoD Instruction 2040.02. THIS ALSO APPLIES TO DISTRIBUTION OF THE TDP TO ALL SUBCONTRACTORS AT EVERY LEVEL.

(b) To be eligible to gain access to this export controlled TDP (via SAM.gov) a Bidder must have a current DD 2345, "Militarily Critical

Technical Data Agreement" certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:

http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx

Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, a Bidder may request the TDP in accordance with Section C.1. Technical Data Package Information.

(c) Upon completion of the purposes for which Government technical data has been provided, the Bidder, and all subcontractors, vendors, and sub-vendors of the Bidder, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.

(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

*** END OF NARRATIVE A0001 ***

5 75

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 WINCH/SUPPORT ASSEMBLY, LEFT

NSN: 3950-01-134-3794

Mfr CAGE: 97403

Mfr Part Number: 13222E0453

0001AA PRODUCTION QUANTITY 48 EA $ $ _____________________________ ______________ __________________

COMMODITY NAME: WINCH/SUPPORT ASSEMBLY, LEFT

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: EH4C0896EH PRON AMD: 02

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING REQUIREMENTS CLAUSE

UNIT PACK: 001

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Inspection and acceptance at origin means that the contractor must contact the Defense Contract

Management Agency (DCMA) to arrange for a Government inspection before production under CLIN 0001AA is shipped.

Failure to have production inspected and accepted at origin will result in its rejection at destination.

Rejected production will be returned at the contractor's expense.

(End of narrative E001)

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W56HZV4176021V W562RP J 2

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 48 0150

FOB POINT: Destination

SHIP TO:

(W562RP) SR W0LX ARMY GENERAL SUPPLY

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

ANNISTON,AL,36201-4199

6 75

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Please see FAR 52.211-8: Time of Delivery for a complete explanation of delivery rates.

Note: The PCO has authorized the contractor to ship early when at no additional cost to the Government

(End of narrative F001)

0001AB UNEXERCISED OPTION QUANTITY 48 EA $ $ ___________________________ ______________ __________________

COMMODITY NAME: WINCH/SUPPORT ASSEMBLY, LEFT

CLIN CONTRACT TYPE:

Firm Fixed Price

Option quantity, pursuant to FAR 52.217-7: Option for

Increased Quantity - Separately Priced Line Item.

The quantity stated for CLIN 0001AB does not form a part of the basic contractual quantity. However, all or part of it may be added to the contract at the

Government's discretion, via exercise of the Option clause.

The offeror's failure to insert a unit price for the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the offer will be evaluated accordingly.

(End of narrative B001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING AND REQUIREMENTS CLAUSE

UNIT PACK: 001

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Inspection and acceptance at origin means that the contractor must contact the Defense Contract

Management Agency (DCMA) to arrange for a Government inspection before production under CLIN 0001AB is shipped.

Failure to have production inspected and accepted at origin will result in its rejection at destination.

Rejected production will be returned at the contractor's expense.

7 75

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative E001)

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 48 0150

FOB POINT: Destination

SHIP TO:

(W562RP) SR W0LX ARMY GENERAL SUPPLY

CENTRAL RECEIVING POINT

7 FRANKFORD AVE BLDG 362

ANNISTON,AL,36201-4199

Please see FAR 52.211-8: Time of Delivery for a complete explanation of delivery rates.

Note: The PCO has authorized the contractor to ship early when at no additional cost to the Government.

(End of narrative F001)

8 75

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0002 WINCH/SUPPORT ASSEMBLY, RIGHT

NSN: 3950-01-134-3795

Mfr CAGE: 97403

Mfr Part Number: 13222E0463

0002AA PRODUCTION QUANTITY 66 EA $ $ ______________________________ ______________ __________________

COMMODITY NAME: WINCH/SUPPORT ASSEMBLY, RIGHT

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: EH4C0897EH PRON AMD: 02

Inspection and acceptance at origin means that the contractor must contact the Defense Contract

Management Agency (DCMA) to arrange for a Government inspection before production under CLIN 0002AA is shipped.

Failure to have production inspected and accepted at origin will result in its rejection at destination.

Rejected production will be returned at the contractor's expense.

(End of narrative B001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING AND REQUIREMENTS CLAUSE

UNIT PACK: 001

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W56HZV4176022V W562RP J 2

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 66 0150

FOB POINT: Destination

SHIP TO:

(W562RP) SR W0LX ARMY GENERAL SUPPLY

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

ANNISTON,AL,36201-4199

9 75

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Please see FAR 52.211-8: Time of Delivery for a complete explanation of delivery rates.

Note: The PCO has authorized the contractor to ship early when at no additional cost to the Government.

(End of narrative F001)

0002AB UNEXERCISED OPTION QUANTITY 66 EA $ $ ___________________________ ______________ __________________

COMMODITY NAME: WINCH/SUPPORT ASSEMBLY, RIGHT

CLIN CONTRACT TYPE:

Firm Fixed Price

Option quantity, pursuant to FAR 52.217-7: Option for

Increased Quantity - Separately Priced Line Item.

The quantity stated for CLIN 0002AB does not form a part of the basic contractual quantity. However, all or part of it may be added to the contract at the

Government's discretion, via exercise of the Option clause.

The offeror's failure to insert a unit price for the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the offer will be evaluated accordingly.

(End of narrative B001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING AND REQUIREMENTS CLAUSE

UNIT PACK: 001

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Inspection and acceptance at origin means that the contractor must contact the Defense Contract

Management Agency (DCMA) to arrange for a Government inspection before production under CLIN 0002AB is shipped.

Failure to have production inspected and accepted at origin will result in its rejection at destination.

Rejected production will be returned at the contractor's expense.

10 75

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative E001)

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 66 0150

FOB POINT: Destination

SHIP TO:

(W562RP) SR W0LX ARMY GENERAL SUPPLY

CENTRAL RECEIVING POINT

7 FRANKFORD AVE BLDG 362

ANNISTON,AL,36201-4199

Please see FAR 52.211-8: Time of Delivery for a complete explanation of delivery rates.

Note: The PCO has authorized the contractor to ship early when at no additional cost to the Government.

(End of narrative F001)

9000 CONTRACT DATA REQUIREMENTS LIST (CDRL) A001 - A003 __________________________________________________

The Exhibit Line Item Numbers (ELINs) below are associated with specific contract requirements.

Please refer to the citations listed within each ELIN for additional information.

(End of narrative A001)

A001 ENGINEERING CHANGE PROPOSAL 1 LO $ ** NSP ** ___________________________ __________________

SERVICE REQUESTED: CDRL A001 - ECP

CLIN CONTRACT TYPE:

Firm Fixed Price

Engineering Change Proposal (ECP), pursuant to the requirements listed in:

SECTION C

- C.7.: Configuration Management Documentation

11 75

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

ADDENDA

- Exhibit A: Contract Data Requirements List - DD

Form 1423, A001

Note: DD Form 250 not required.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A002 REQUEST FOR VARIANCE 1 LO $ ** NSP ** ____________________ __________________

SERVICE REQUESTED: CDRL A002 - RFV

CLIN CONTRACT TYPE:

Firm Fixed Price

Request for Variance (RFV), pursuant to the requirements listed in:

SECTION C

- C.7.: Configuration Management Documentation

ADDENDA

- Exhibit A: Contract Data Requirements List - DD

Form 1423, A002

Note: DD Form 250 not required.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A003 NOTICE OF REVISION 1 LO $ ** NSP ** __________________ __________________

SERVICE REQUESTED: CDRL A003 - NOR

CLIN CONTRACT TYPE:

Firm Fixed Price

12 75

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Notice of Revision (NOR), pursuant to the requirements listed in:

SECTION C

- C.7.: Configuration Management Documentation

ADDENDA

- Exhibit A: Contract Data Requirements List - DD

Form 1423, A003

Note: DD Form 250 not required.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

13 75

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1. TECHNICAL DATA PACKAGE INFORMATION

The following "X"d item applies to this IFB:

[_ _] 1. There is no Technical Data Package (TDP) included with this IFB.

[_X_] 2. The TDP for this IFB resides within the System for Award Management (SAM) posting associated with this solicitation number:

W912CH-25-B-0006

To access the data through SAM:

a. Log on to the SAM website: https://www.SAM.gov

b. Search for the solicitation number

c. Click on the attachment you would like to view

d. If the attachment is restricted, request access to the document

(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 48014852 of Title 50, United States Code).

(2) Further dissemination of the TDP must be in accordance with provisions of DoD Directive 5230.25, DoDI 5230.24, its

Distribution Statement markings, and U.S. export control laws. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(3) TO OBTAIN THESE TDPs, CONTRACTORS MUST HAVE A CURRENT DD 2345, MILITARILY CRITICAL TECHNICAL DATA AGREEMENT ON FILE WITH

DEFENSE LOGISTICS INFORMATION SERVICE (DLIS). To obtain certification, go to DD FORM 2345 Instructions and DD 2345.

(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the

Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

e. If technical data is otherwise restricted, select "Request Explicit Access." This will generate an email to the Contract

Specialist at Army Contract Command Detroit Arsenal with all the information needed to grant contractor access to restricted documents.

SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.

f. If multiple individuals in the contractor's organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.

Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to:

https://www.SAM.gov

The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.

g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed "Use and

Non-Disclosure Agreement" at the same time if the IFB requires both to gain access to view the TDP.

C.2. REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN

(a) The Contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S. Government

OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.

(b) The Contractor will receive a copy of the SOP/Plan (Attachment 0001) at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC

Officers.

(c) The Contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is

14 75

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

OPSEC Level I.

C.3. OPSEC TRAINING REQUIREMENT

Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:

https://securityawareness.usalearning.gov/opsec/index.htm

The Contractor shall maintain the training certificates/proof of completion and make them available to the Contracting Officer's

Representative (COR) or Procuring Contracting Officer (PCO) upon request.

C.4. CONTROLLED UNCLASSIFIED INFORMATION GUIDELINES

The Contractor will be required to handle, access, or store Controlled Unclassified Information (CUI), legacy U//FOUO, and/or other technical data and is subject to the guidelines contained within Attachment 0001: Additional Guidelines for Controlled Unclassified

Information.

C.5. DRAWING LIMITATIONS

(a) The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are adequate to permit manufacture, and:

(1) Depict the completed item(s), and

(2) Serve as the basis for inspection of the completed item(s).

(b) These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.

(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.

(d) The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.

(e) Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the

Government and no delivery schedule extension.

C.6. ACQUISITION OF MANUFACTURER'S PART NUMBER: COMPONENTS

One or more of the drawings for part of the contract item set forth in the Schedule and in the Technical Data Package specify manufacturer's part numbers. Since complete Government technical data for such part or parts are not available, it is understood that the Contractor, by accepting this contract, agrees to furnish only the listed manufacturer's part number(s) for those components of the contract item. It is further understood and agreed that references to manufacturer's part numbers herein shall be deemed to include all changes or revisions thereto which the approved manufacturer has made effective as of the first date of delivery of any of the items under this contract; provided, that no change or revision that affects the interchangeability (ability to be interchanged with previous parts and to match with all mating parts when assembled) of the listed manufacturer's part shall be incorporated into the contract item without the prior written approval of the Procuring Contracting Officer.

C.7. CONFIGURATION MANAGEMENT DOCUMENTATION

The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).

15 75

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

a. The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense

Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).

b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.

c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.

d. All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.

e. For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.

(i) For ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.

(ii) For RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.

(iii) For NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.

f. The Government's acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Government's sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.

g. The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the

Administrative Contracting Officer (ACO).

h. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.

*** END OF NARRATIVE C0001 ***

16 75

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

D.1. PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS): NSN 3950-01-134-3794

(a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below.

(1) LEVEL OF PRESERVATION: Military

(2) LEVEL OF PACKING: B

(3) QUANTITY PER UNIT PACKAGE: 1 EA

(4) SPECIAL PACKAGING INSTRUCTION NUMBER: AK11343794

(a) REVISION: B

(b) DATE OF REVISION: 2019-03-19

(c) THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL: N/A

(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobe's website (http://get.adobe.com/reader/) for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging

Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the

"Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")

(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

(c) Marking:

(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and as applicable, unitized loads shall be marked in accordance with MIL-STD-129). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not.

Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.

(2) When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at: https://www.acq.osd.mil/dpap/pdi/uid/guides.html) for development of the UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.

(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):

(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), "Regulation of Wood Packaging Material in International Trade," current edition, (hereinafter "ISPM 15"), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging

Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organization's compliance program.

(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging

Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:

http://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.

(3) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.

17 75

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

The ALS approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Foreign manufacturers shall comply with ISPM -15 and shall have the marking of WPM verified in accordance with their National Plant Protection Organization's compliance program.

(e) Hazardous Materials (As applicable):

(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.

(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:

- International Air Transport Association (IATA) Dangerous Goods Regulations

- International Maritime Dangerous Goods Code (IMDG)

- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).

(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the

United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the

SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to

PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.

(g) SUPPLEMENTAL INSTRUCTIONS:

Unit Pack Weight (LBS): 43

Unit Pack Length (IN): 19.7

Unit Pack Width (IN): 19.7

Unit Pack Depth (IN): 19.7

Unit Pack Cube (Cubic Feet): 4.403

Quantity Per Unit Pack: 1

D.2. PACKAGING REQUIREMENTS (SELECTIVE GROUP PACKAGING REQUIREMENTS): NSN 3950-01-134-3795

(a) Military preservation, packing, and marking for this contract shall be accomplished in accordance with the specific requirements identified below and all the applicable requirements of MIL-STD-2073-1

(1) LEVEL OF PRESERVATION: Military

(2) LEVEL OF PACKING: B

(3) QUANTITY PER UNIT PACKAGE: 001

(b) MIL-STD-2073-1, Appendix J establishes and defines codes used in describing military packaging methods and materials. The following codes from Appendix J apply:

(1) Preservation Method Code: 20 (Table j.i. and j.ia.)

(2) Cleaning Procedure Code: 1 (Table j.ii)

18 75

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(3) Preservative Material Code: 01 (Table j.iii)

(4) Wrapping Material Code: GC (Table j.iv)

(5) Cushioning and Dunnage Code: ZZ (Table j.v)

(6) Thickness of Cushioning or Dunnage Code: Z (Table j.vi)

(7) Unit Container Code: EG (Table j.vii)

(8) Intermediate Container Code: 00 (Table j.vii)

(9) Quantity per Intermediate Container Code: AAA (Appendix J.4.11)

(10) Packing Code: A (Table j.IX and J.IXa)

(11) Special Marking Code: 00 (Table j.x)

(c) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage

(d) Marking:

All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive material will not identify the nature of the material. When an item is assigned Unique Item Identifier (UII) markings as indicated by the inclusion of contract clause DFARS 252.211-

7003, refer to the DoD Guide to Uniquely Identifying Items (available at: https://www.acq.osd.mil/dpap/pdi/uid/guides.html) for development of the UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.

(e) Heat Treatment and Marking of Wood Packaging Materials (WPM):

(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), "Regulation of Wood Packaging Material in International Trade," current edition, (hereinafter "ISPM 15"), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging

Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organization's compliance program.

(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging

Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:

http://www.alsc.org). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.

(3) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.

The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .