DRAFT SOLICITATION - Cost Analysis Support (CAS) Indefinite Delivery Indefinite Quantity (IDIQ)_ast.pdf
PDF 211 KB Posted
- Solicitation number
- W912CH-24-R-0172
- Issued by
-
Department of the Army
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
Offeror To Complete Block 12, 17, 23, 24, & 30
1. Requisition Number Page Of
2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date
7. For Solicitation Information Call:
A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time
9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:
Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program
Hubzone Small Business EDWOSB
Service-Disabled Veteran-Owned Small Business NAICS:
Email: 8(A) Size Standard:
11. Delivery For FOB Destination Unless Block Is Marked
12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating
See Schedule 14. Method Of Solicitation RFQ IFB RFP
15. Deliver To Code 16. Administered By Code
Telephone No.
17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code
Telephone No.
17b. Check If Remittance Is Different And Put Such Address In Offer
18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
(Use Reverse and/or Attach Additional Sheets As Necessary)
25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)
27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.
27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.
28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.
Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:
30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)
30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed
Authorized For Local Reproduction Previous Edition Is Not Usable
Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212
W912CH-24-R-0172
ASHLEY TREIER (571)588-8976
ASHLEY.S.TREIER.CIV@ARMY.MIL
W912CH
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
X
X 100
541330
X
X DOA5
X
SEE SCHEDULE
SEE SCHEDULE
X X
X 1
1 90
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
32a. Quantity In Column 21 Has Been
Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________
32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative
32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative
32g. E-Mail of Authorized Government Representative
33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final
38. S/R Account No. 39. S/R Voucher Number 40. Paid By
41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)
42c. Date Rec’d (YY/MM/DD) 42d. Total Containers
Standard Form 1449 (Rev. 2/2012) Back
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: ASHLEY TREIER
Buyer Office Symbol/Telephone Number: CCTA-CPB-B/(571)588-8976
Type of Contract 1: Firm Fixed Price
Type of Contract 2: Cost No Fee
Kind of Contract: Service Contracts
*** End of Narrative A0000 ***
A.1 Background and Description of Action. _____________________________________
A.1.1 Executive Overview & Objectives.
This is a Request for Proposal (RFP)for a non-personal services contract to provide Cost Analysis Support (CAS) for the Program
Executive Office Combat Support & Combat Service Support (PEO CS & CSS), Program Executive Office Ground Combat Systems (PEO GCS). CAS services encompass the areas of cost, economic, and technical analysis of major weapon system programs of the Department of the Army
(DA) and United States Marine Corps (USMC) within the Department of Defense (DoD). Services will consist of cost, economic, and technical analysis for combat weapon systems, combat support and combat service support systems, information management systems, as well as associated acquisition and financial management reporting.
A.2 Acquisition Approach and Structure. ___________________________________
A.2.1 Acquisition Approach.
U.S. Army Contracting Command - Detroit Arsenal (ACC-DTA) intends to award a Firm-Fixed Price (FFP), Single Award, Indefinite Delivery, Indefinite Quantity (IDIQ) contract consisting of five ordering periods.
This contract will provide for the execution of Task Orders for requirements within the general scope of the IDIQ contract. The work awarded for each Task Order will be FFP and travel will be on a Cost, No Fee (CNF) basis only.
In accordance with (IAW) Federal Acquisition Regulation (FAR) 16.504(a)(4)(ii), the minimum value of services the Government will order against this contract will be $150,000.00.
A.2.2 Contract Performance beyond Ordering Period Expiration.
Under this effort, there are six defined ordering periods consisting of five, 12-month ordering periods and one optional six-month ordering period. In the event that the Government issues a Task Order in the fifth Ordering Period, the Period of Performance (PoP) for that effort may continue beyond the expiration of the fifth Ordering Period in accordance with FAR 52.216-22(d).
A.3 North American Industry Classification Systems (NAICS) Code. _____________________________________________________________
The requirement will be a 100% small business set-aside under NAICS code 541330, Engineering Services except Military and Aerospace
Equipment and Military Weapons.
A.4 Evaluation of Proposal(s). __________________________
A.4.1 Section L of this RFP provides information and instructions for proposal preparation.
A.4.2 Section M of this RFP describes how the Government will evaluate proposal(s) for award.
A.4.3 The Government will evaluate all offeror(s) responding to the RFP using the criteria stated in Sections L and M.
A.5 Detroit Arsenal Electronic Contracting. _______________________________________
2 90
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(a) This ACC-DTA solicitation will be publicized on the System for Award Management website (https://www.sam.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) Per Section L instructions, vendor proposals shall be electronically submitted via e-mail to the Contract Specialist and the corresponding Contracting Officer.
Note to offerors:
(c) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
(d) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure (in this case, received through e-mail) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
(e) Solicitations may remain posted on SAM.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(f) Any award issued as a result of this solicitation will be distributed electronically.
In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive
Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of
Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(g) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation.
A.6 Notice of Elevated Threat Level Force Protection Condition (FPCON). ___________________________________________________________________
Contractors are hereby notified that there is a potential impact on contractor performance during increased FPCON during periods of increased threat. During FPCONs Charlie and Delta, services may be discontinued/postponed due to higher threat. Services will resume when FPCON level is reduced to level Bravo or lower.
A.7 Notice of Random Antiterrorism Measures Program (RAMP). _______________________________________________________
In accordance with Army Regulation (AR), 525-13 "Antiterrorism" of 12 DEC 1997 , Contractor personnel working on an Army installation, arsenal, base or other DoD facility (owned or leased by DoD/Department of the Army), are subject to participation in Installation RAMP security program (e.g. vehicles searches, wearing of ID badges, etc.).
A.8 Acknowledgement of Amendments. ______________________________
Acknowledge all the amendments you've received from us by identifying the amendment number and its issue date in the box below:
Amendment # Date
3 90
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A.9 All or None. ____________
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION ARE INELIGIBLE FOR AWARD.
A.10 Question-and-Answer Period. ___________________________
A.10.1 Questions/comments regarding this solicitation shall be submitted to the two email addresses listed below NLT close of business, To Be Determined (TBD). All questions must be in the body of the email. Any questions submitted via attachment to an email will not be accepted; questions submitted via attachment will be returned to the sender to be resubmitted.
Chardae.l.walton.civ@army.mil
Ashley.s.treier.civ@army.mil
A.10.2 Any questions/comments regarding the solicitation submitted after this date/time may not be answered.
A.11 Overview of Section J Attachments. __________________________________
A.11.1 Due to formatting restrictions within the Government's contract writing system, the Government is unable to physically incorporate some attachments directly into the solicitation. Therefore, some attachments will be provided as a separate attachment, retrievable thru SAM.gov.
A.11.2 An overview of all exhibits and attachments, and whether they are incorporated within or provided as an external attachment to the solicitation is as follows; additionally, the attachments that are for evaluation purposes only are annotated accordingly:
Exhibit A CONTRACT DATA REQUIREMENTS LIST
Attachment 0001 GOVERNMENT FORMAT PRICING MODEL (GFPM) W912CH-24-R-0172*
Attachment 0002 DRAFT NON-DISCLOSURE AGREEMENT (NDA)*
Attachment 0003 EXPERIENCE MATRIX*
Attachment 0004 DCAA PRE-AWARD SURVEY PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEMS CHECKLIST*
Attachment 0005 DRAFT DD254*
* Exhibit/Attachment is provided as an external attachment to the solicitation.
Local Narratives________________
A.12__NOTICE OF ELEVATED THREAT LEVEL FORCE PROTECTION CONDITION (FPCON)
Contractor is hereby notified that there is a potential impact on contractor performance on during increased FPCON during periods of increased threat. During FPCONs Charlie and Delta, services may be discontinued / postponed due to higher threat. Services will resume when FPCON level is reduced to level Bravo or lower.
A.13__NOTICE OF RANDOM ANTITERRORISM MEASURES PROGRAM (RAMP)
In accordance with AR 525-13, Contractor personnel working on an Army installation, arsenal, base or other DoD facility (owned or leased by DoD/Department of the Army), are subject to participation in Installation RAMP security program (e.g. vehicle searches, wearing of ID badges, etc).
4 90
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE A0001 ***
5 90
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0001 60 DAY PHASE-IN $ _______________ __________________
SERVICE REQUESTED: 60 DAY PHASE-IN CAS IDIQ
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0011 ORDERING PERIOD 1 - LABOR $ _________________________ __________________
SERVICE REQUESTED: OP1 LABOR - CAS IDIQ
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0012 ORDERING PERIOD 1 - TRAVEL $ __________________________ __________________
SERVICE REQUESTED: OP1 TRAVEL - CAS IDIQ
CLIN CONTRACT TYPE:
Cost No Fee
Travel shall be billed IAW FAR 31.205-46.
(End of narrative B001)
Deliveries or Performance _________________________
0013 ORDERING PERIOD 1 - SERVICE CONTRACT REPORTING ______________________________________________
6 90
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(SCR) _____
0014 CONTRACT DATA REQUIREMENTS LIST _______________________________
0021 ORDERING PERIOD 2 - LABOR $ _________________________ __________________
SERVICE REQUESTED: OP2 LABOR - CAS IDIQ
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0022 ORDERING PERIOD 2 - TRAVEL $ __________________________ __________________
SERVICE REQUESTED: OP2 TRAVEL - CAS IDIQ
CLIN CONTRACT TYPE:
Cost No Fee
Travel shall be billed IAW FAR 31.205-46.
(End of narrative B001)
Deliveries or Performance _________________________
0023 ORDERING PERIOD 2 - SERVICE CONTRACT REPORTING ______________________________________________
(SCR) _____
0024 CONTRACT DATA REQUIREMENTS LIST _______________________________
0031 ORDERING PERIOD 3 - LABOR $ _________________________ __________________
7 90
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: OP3 LABOR - CAS IDIQ
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0032 ORDERING PERIOD 3 - TRAVEL $ __________________________ __________________
SERVICE REQUESTED: OP3 TRAVEL - CAS IDIQ
CLIN CONTRACT TYPE:
Cost No Fee
Travel shall be billed IAW FAR 31.205-46.
(End of narrative B001)
Deliveries or Performance _________________________
0033 ORDERING PERIOD 3 - SERVICE CONTRACT REPORTING ______________________________________________
(SCR) _____
0034 CONTRACT DATA REQUIREMENTS LIST _______________________________
0041 ORDERING PERIOD 4 - LABOR $ _________________________ __________________
SERVICE REQUESTED: OP4 LABOR - CAS IDIQ
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
8 90
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0042 ORDERING PERIOD 4 - TRAVEL $ __________________________ __________________
SERVICE REQUESTED: OP4 TRAVEL - CAS IDIQ
CLIN CONTRACT TYPE:
Cost No Fee
Travel shall be billed IAW FAR 31.205-46.
(End of narrative B001)
Deliveries or Performance _________________________
0043 ORDERING PERIOD 4 - SERVICE CONTRACT REPORTING ______________________________________________
(SCR) _____
0044 CONTRACT DATA REQUIREMENTS LIST _______________________________
0051 ORDERING PERIOD 5 - LABOR $ _________________________ __________________
SERVICE REQUESTED: OP5 LABOR - CAS IDIQ
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0052 ORDERING PERIOD 5 - TRAVEL $ __________________________ __________________
SERVICE REQUESTED: OP5 TRAVEL - CAS IDIQ
CLIN CONTRACT TYPE:
Cost No Fee
Travel shall be billed IAW FAR 31.205-46.
9 90
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative B001)
Deliveries or Performance _________________________
0053 ORDERING PERIOD 5 - SERVICE CONTRACT REPORTING ______________________________________________
(SCR) _____
0054 CONTRACT DATA REQUIREMENTS LIST _______________________________
0061 OPTIONAL SIX-MONTH ORDERING PERIOD (OP) LABOR $ _____________________________________________ __________________
SERVICE REQUESTED: OPTIONAL SIX MONTH OP
Deliveries or Performance _________________________
0062 OPTIONAL SIX-MONTH ORDERING PERIOD TRAVEL $ _________________________________________ __________________
SERVICE REQUESTED: OPTIONAL SIX MONTH OP TRAVEL
CLIN CONTRACT TYPE:
Cost No Fee
Travel shall be billed IAW FAR 31.205-46.
(End of narrative B001)
Deliveries or Performance _________________________
0063 OPTIONAL SIX MONTH ORDERING PERIOD - SERVICE ____________________________________________
CONTRACT REPORT _______________
0064 OPTIONAL SIX-MONTH ORDERING PERIOD CONTRACT DATA ________________________________________________
REQUIREMENT ___________
10 90
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Executive Office Cost Analyst PWS and Contract Requirements
DESCRIPTION / SPECIFICATION / WORK STATEMENT
C.1.0 General Information ___________________
This is a non-personal services contract to provide Cost Analysis Support (CAS) for the Program Executive Office Combat Support & Combat
Service Support (PEO CS&CSS), as well as Program Executive Office Ground Combat Systems (PEO GCS)and other organizations as specified.
The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government, regardless of the performance location.
C.1.0.1 Description of Supplies and Services / Introduction
The contractor shall provide all non-personal services, qualified personnel, and supervision necessary to perform the CAS services as defined in this Performance Work Statement (PWS) except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
C.1.0.2 Customer
The intent of this contract is to provide support to multiple Project Management Offices (PMO) for both PEOs in addition to other organizations, which include:
i. Tank-automotive and Armaments Command (TACOM) Life Cycle Management Command (LCMC)
ii. Program Executive Office Soldier (PEO- Soldier)
iii. Joint Program Executive Office Chemical Biological Defense (JPEO-CBD)
iv. Marine Corps Systems Command (MARCORSYSCOM)
v. The Office of the Deputy Assistant Secretary of the Army Cost and Economics (ODASA-CE)
vi. Program Executive Office for Simulation, Training and Instrumentation (PEO STRI)
vii. Department of the Navy
viii. Ground Vehicle Systems Center (GVSC)
ix. Army Futures Command (AFC)
x. Other Department of Defense (DoD) Agencies as requested and subject to approval of Army Contracting Command -
Detroit Arsenal Procurement Contracting Officer (PCO)
C.1.0.3 Scope
This PWS applies to services in the areas of cost, economic, and technical analysis of weapon system programs, acquisition programs, investment activities, and other sustainment/support workload efforts of the Department of the Army (DA) and United States Marine Corps
(USMC) within the DoD. Services will consist of cost, economic, and technical analysis for combat weapon systems, combat support and combat service support systems, information management systems, as well as associated acquisition and financial management reporting and data analytics.
C.1.0.4 Period of Performance/Ordering Periods
The period of performance for any specific task(s) will be identified at the task order level. At the Indefinite Delivery Indefinite
Quantity (IDIQ) contract level, there will be five, one year ordering periods with an optional six-month ordering period, as follows:
1st Ordering Period Date of Contract Award - 364 days after Contract Award (DACA)
2nd Ordering Period 365 DACA - 729 DACA
3rd Ordering Period 730 DACA - 1,094 DACA
4th Ordering Period 1,095 DACA - 1,459 DACA
5th Ordering Period 1,460 DACA - 1,824 DACA
Optional 6th Ordering Period 1,825 DACA - 2,008 DACA
The total of the contract-ordering periods is 66 months.
C.1.0.5 Recognized Holidays
The contractor is not required to perform services on the day these holidays are observed:
i. New Years Day
ii. Martin Luther King Day
iii. Presidents Day
11 90
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
iv. Memorial Day
v. Juneteenth
vi. Independence Day
vii. Labor Day
viii. Columbus Day
ix. Veterans Day
x. Thanksgiving Day
xi. Christmas Day
C.1.0.6 Hours of Operation
The contractor shall conduct business no more than 40 hours per workweek per employee. The contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS and in individual Task Orders. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
C.1.0.7 Place of Performance
The contractor shall perform the work under this contract at the contractors facility and/or onsite at the Detroit Arsenal (DTA) in
Warren, MI; Selfridge Air National Guard Base (SANGB) in Harrison Township, MI; Ft. Belvoir, VA; Marine Corps Base Quantico, VA;
Aberdeen Proving Ground, MD; Natick Soldier Systems Center, MA; Redstone Arsenal, AL or any other mutually agreed upon location.
Contractor personnel performing services under this PWS may be required to travel and work at off-site duty locations in accordance with paragraph C.1.0.12 of this PWS.
C.1.0.8 Type of Contract
The contract type for all task orders issued against this contract will be Firm Fixed Price (FFP) in accordance with FAR 16.202. Travel will be on a Cost, No Fee (CNF) basis only.
C. 1.0.9 Physical Security
The contractor shall be responsible for safeguarding all government equipment, information, and property provided for contractor use.
C.1.0.10 Contracting Officer Representative (COR)
A qualified COR will be appointed by the Contracting Officer at the IDIQ level and will serve as the COR for all awarded task orders unless an alternate COR (ACOR) is appointed at the Task Order level. (The term ACOR herein after will be synonymous with the term COR).
The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor
Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinates availability of government furnished property; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially regarding changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract or the resulting orders.
C.1.0.10.1 Government Surveillance.
C.1.0.10.2 Methods of Surveillance.
The following Methods of Surveillance will be utilized in monitoring the Contractors' performance:
Contract/Task Order Performance Requirements Summary (PRS)__________________________________________________________
Required Services_________________ Performance Standard Acceptable Quality Level (AQL)______________________________________________________________ Method of Surveillance________________________
Develop credible, Applicable policy, and No more than one revision per 100% review at all defendable cost estimates, regulations plus any study task. meetings and reviews.
studies, analyses and Government guidance products using sound provided under this 100% inspection of analytical techniques and task order. product.
processes. All of C.3.2.
Required skill set, academics and experience.
12 90
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Prepare and deliver high Applicable policy, and No more than one revision per 100% inspection IAW CDRL A002 quality, fully documented regulations (see 1.4) plus any report.
reports for all cost estimates, Government guidance provided studies, analyses and products under this task order.
assigned. C.3.5.1. CDRL A002
Required skill set, academics and experience.
Develop and deliver high Complete, Accurate, Timely No more than one revision per 1
00% inspection quality plans, presentation each study task.
materials and briefings, as required to support tasks, meetings and reviews. All of
C.2.3 and C.3.2 CDRL A003
Attend and/or participate in Contractor is in attendance. 100% Compliance 1
00% inspection of attendance all required meetings and reviews. C.2, CDRL A001. Attendees are prompt and 1
00% inspection as documented appropriately prepared. b y CDRL A001 with COR c onfirmation.
Method of attendance is the most effective and cost-efficient choice.
Prepares and delivers trip Trip Reports/Meeting Minutes 100% compliance with reporting 1
00% inspection as documented reports/meeting minutes for are complete, timely and b y CDRL A001 with COR all travel, and meetings accurate. c onfirmation.
attended. C.2.4 CDRL A001
Prepares and submit monthly Complete, Accurate, Timely 100% compliance with reporting 10
0% inspection as documented task order status reports. b y CDRL A004 with COR
C.4.1 CDRL A004 c onfirmation.
C.1.0.11 Identification of Contractor Employees
All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
C.1.0.12 Contractor Travel
The contractor may be required to travel as specified by individually issued Task Orders. Contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract and applicable task orders. All travel requires Government approval and authorization and a notification to the COR.
C.1.0.13 Organizational Conflict of Interest
Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services, which may create a current or subsequent Organizational
Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it
13 90
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the
Contracting Officer to avoid or mitigate any such OCI. The Contractors mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies he or she deems necessary, to include prohibiting the Contractor from participation in subsequent contracting opportunities.
C.1.1 Common Access Card (CAC) Automated Contractor Verification System _________________________________________________________________
C.1.1.1 CAC Applications
The contractor shall appoint an Information Assurance Officer to process CAC applications for its employees and subcontractor employees in accordance with (IAW) Federal Acquisition Regulation (FAR) 52.204-9, Personal Identity Verification of contractor Personnel, DoD
Directive 8190.3 Smart Card Technology and DoD Instruction 8520.2 PKI and PK Encryption.
C.1.1.2 Requests for CAC
The contractor shall submit requests for CACs, with the personnel and job titles, via email to the COR.
C.1.1.3 Contractor Verification System (CVS)
The Government will establish a CVS application account for each CAC request and provide each contractor and subcontractor employee a
User Identification (ID) and password via email.
C.1.1.4 CAC Access
Contractor and subcontractor employees shall access the CVS account and complete the CAC application within seven calendar days of notification of ID and password.
C.1.1.5 CAC Request Status
The Government will inform contractor and subcontractor employees via email of the status of the CAC request. The status will be one of the following: (1) Approved; contractor shall proceed to nearest Real-Time Automated Personnel Identification System (RAPIDS) Defense
Enrollment and Eligibility Reporting System (DEERS) location to obtain CAC; (2) Returned; additional information or correction to application required by contractor employee; or (3) Rejected; Government in separate correspondence will provide reason(s) for rejection.
C.1.1.6 CAC Approved and Rejected Applications
The contractor shall maintain records of all approved and rejected CAC applications.
C.1.1.7 CAC Period of Performance
Issued CACs may be for a period of performance no longer than two years or the contract performance completion date (inclusive of all options), whichever is earlier. If a requirement for a CAC exists beyond two years, the contractor and subcontractor(s) shall submit a new request.
C.1.1.8 CAC Return
The contractor and subcontractor(s) shall return issued CACs to the DEERS office IAW FAR 52.204-9. The contactor shall notify the
Government of all CACs returned to the DEERS Office.
C.2.0 MEETINGS
C.2.1 Start of Work Meeting (SOWM)
The contractor shall hold a start of work meeting at its facility, unless some other location is designated in the contract, within 30 calendar days after contract award. The Start of Work Meeting is to assure a clear and mutual understanding of the contract terms, conditions, line items, technical requirements and sequence of events needed for successful execution of the subject contract effort.
The contractor shall participate with the Government to arrange a schedule and agenda for the meeting.
The contractor shall at a minimum invite Government contracting personnel (PCO/Contract Specialist). At the discretion of the PCO, other
Government technical personnel may be invited to the meeting: Contracting Officer's Representative (COR) identified in Section G or in an appointment letter; Quality Assurance personnel; DCMA; etc. All Government invitees shall be given at least 14 days advance notice of the time, date, and location of the start of work meeting. The preferred method of notification is by email. The contractor shall prepare and submit a proposed agenda for the SOWM at least three business days before the scheduled meeting date, to include an outline of how it will accomplish all awarded tasks IAW Contract Data Requirement List (CDRL) A003. The contractor shall provide the Government
14 90
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
with minutes of the Start of Work Meeting within 3 business days after the meeting is held IAW CDRL A001.
C.2.2 Task Order Kickoff Meeting __________________________
The contractor shall host a Kickoff Meeting for each Task Order awarded. The Kickoff Meeting shall include the contractor personnel assigned to the tasks prescribed by the Task Order and PEOs CS&CSS and GCS personnel overseeing the Task Order. The contractor shall hold Kickoff Meetings via Microsoft TEAMS within 15 calendar days of award of a Task Order, unless otherwise agreed to by PEOs CS&CSS and GCS.
C.2.3 Task Order Status Meeting _________________________
The contractor shall host Task Order Status Meetings at its facility, unless the parties agree to some other location, as identified by an individual Task Order. The Contractor shall prepare presentation materials IAW CDRL A003 for each status meeting.
C.2.4 Meeting Minutes _______________
When required by a Task Order, the contractor shall provide meeting minutes within two business days IAW CDRL A001 (Record of Meeting
Minutes).
C.3.0 COST ANALYSIS SUPPORT REQUIREMENTS __________________________________
The Government will assign services for the contractor to perform under this contract, via Task Orders, and may include tasks from one or more sections of this PWS.
C.3.1 Minimum Labor Qualifications.
All work under this Task Order shall be performed by the Contractor using the Contractors equivalent labor category(s) for the six labor descriptions identified in C.3.1.1 - C.3.1.6 below. The primary interface and point of contact to the Government on all program and contract administrative issues shall be qualified at the Subject Matter Expert or Principal Cost / Data Analyst level. Each task order shall have a primary technical lead assigned. Primary technical leads shall be at the Subject Matter Expert, Principal Cost / Data
Analyst, Senior Cost / Data Analyst or Cost /Data Analyst level depending on the scope of the task order project.
For all six labor categories, a minimum of a bachelor's degree in operations research, mathematics, statistics, engineering, economics, data science, computer science or related discipline, from an accredited college or university is required. A degree in another subject requiring substantial competence in college-level mathematics, statistics, or programming may satisfy the requirement.
C.3.1.1 Subject Matter Expert.
The Subject Matter Expert shall perform the tasks defined in Part 3 of the PWS and guide less senior Analyst(s) in the performance of task orders.
A minimum of 20 years of experience in cost analysis, cost estimating, or data analytics is required. Advanced degrees or certifications (e.g. Masters in Cost Estimating and Analysis, masters in mathematics, statistics, economics or other related field, International Cost Estimating and Analysis Association Certification) can be substituted for a combined total of 1 year of experience.
C.3.1.2 Principal Cost / Data Analyst.
The Principal Cost / Data Analyst shall perform the tasks defined in Part 3 of the PWS and guide less senior Analyst(s) in the performance of task orders.
A minimum of 15 years of experience in cost analysis, cost estimating, or data analytics is required. Advanced degrees or certifications (e.g. Masters in Cost Estimating and Analysis, masters in mathematics, statistics, economics or other related field, International Cost Estimating and Analysis Association Certification) can be substituted for a combined total of 1 year of experience.
C.3.1.3 Senior Cost / Data Analyst
The Senior Cost / Data Analyst shall perform the tasks defined in Part 3 of the PWS and guide less senior Analyst(s) in the performance of task orders.
A minimum of 11 years of experience in cost analysis, cost estimating, or data analytics is required. Advanced degrees or certifications
(e.g. Masters in Cost Estimating and Analysis, masters in mathematics, statistics, economics or other related field, International Cost
Estimating and Analysis Association Certification) can be substituted for a combined total of 1 year of experience.
C.3.1.4 Cost / Data Analyst
15 90
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
The Cost / Data Analyst shall perform the tasks defined in Part 3 of the PWS and guide Junior Cost / Data Analyst(s) in the performance of task orders.
A minimum of 7 years of experience in cost analysis, cost estimating, or data analytics is required. Advanced degrees or certifications
(e.g. Masters in Cost Estimating and Analysis, masters in mathematics, statistics, economics or other related field, International Cost
Estimating and Analysis Association Certification) can be substituted for a combined total of 1 year of experience.
C.3.1.5 Junior Cost / Data Analyst
The Junior Cost / Data Analyst shall perform the tasks defined in Part 3 of the PWS.
A minimum of 3 years of experience relating to cost analysis, cost estimating, or data analytics is required.
C.3.1.6 Entry Level Cost / Data Analyst
The Entry Level Cost / Data Analyst shall perform the tasks defined in Part 3 of the PWS.
C.3.2 Cost Analyst Products and Support
The Contractor shall perform cost analysis and/or On-Site support under this PWS. The Contractor will develop and deliver high quality plans, presentation materials and briefings, as required to support task orders, meetings and reviews IAW CDRL A003. Task Orders can include individual efforts, or combinations of efforts, from the following task areas of cost analysis products and services that the
Contractor will develop and provide to any of its customers listed in C.1.0.2:
Task Area 1: Life Cycle Cost Estimates
Task Area 2: Specialized Cost Estimates and Data Analysis Techniques
Task Area 3: Cost and/or Benefit Comparisons
Task Area 4: Contractor Performance Analysis
Task Area 5: Programmatic Support to PMs/PEOs and Headquarters Elements
Task Area 6: Knowledge Management
C.3.2.1 Task Area 1 Life Cycle Cost Estimates
A complete, detailed, and fully documented material system life cycle cost estimate updated to support the Defense Acquisition System, Joint Capabilities Integration and Development System (JCIDS) the Planning, Programming, Budgeting, and Execution (PPBE) system. It estimates the systems life cycle cost, from cradle to grave. This includes all Research and Development, Procurement, Acquisition
Operations and Maintenance, Military Construction, Operations and Support, and Disposal elements. Reference: Army Cost Analysis Manual, March 2020 and associated 13 Mar 2020 Implementation Memorandum. Cost elements included in the life cycle cost estimate are defined in reference.
C.3.2.1.1 Defense Acquisition System Cost Estimates
The Defense Acquisition Systems processes require Life Cycle Cost Estimates (LCCE) to inform programmatic decisions and assess program performance. The LCCE is a document that includes costs incurred during the total life (from project initiation through termination) of a system or aggregation of systems. This includes all Research and Development, Procurement, Acquisition Operations and Maintenance, Military Construction, Operations and Support, and Disposal elements. Depending on the acquisition program, the purpose of the estimate and the office completing the estimate the LCCE may have a different title. Examples of types of LCCEs include, but are not limited to:
Program Office Estimate, Independent Cost Estimate, Component Cost Estimate (CCE), Army Cost Position, and Army Cost Estimate.
Reference: Army Cost Analysis Manual, March 2020 and associated 13 Mar 2020 Implementation Memorandum. Cost elements included in the life cycle cost estimate are defined in reference.
C.3.2.1.2 Cost Informed Requirements Development
Requirements documents must identify the overall resources associated with pursuing the capability solution, including materiel and non-materiel costs over its projected lifecycle, and to ensure those resources are planned to be available for successful execution of the program. To support the requirements approval, process a Cost Benefit Analysis (CBA) or Analysis of Alternatives (AoA) may be required.
A CBA is a structured methodology that determines the costs and benefits of one or more alternatives and compares them in order to identify the best alternative to achieve a stated goal/objective. An AoA provides a systematic and unbiased comparative analysis of operational effectiveness, costs, affordability and risks of potential alternatives. It also provides a comparative analysis of the benefits and costs of proposed solutions(s). Both CBAs and AoAs will include LCCEs of each alternative. References: U Army Regulation 70-
1 (AR 70-1) Army Operation of the Adaptive Acquisition Framework November 2023; Manual for the Operation of the Joint Capabilities
Integration and Development System, October 2021; DoD Instruction 5000.84 Analysis of Alternatives, August 2020; Office of the Secretary of Defense Cost Assessment and Program Evaluation Analysis of Alternatives Cost Estimating Handbook, July 2021.
C.3.2.1.3 Budget Estimate Formulation
16 90
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Budget formulation estimates can support a number of activities, including acquisition, base support operations, installation management, and personnel requirements. The types of activities will vary based on a variety of factors including the system acquisition category (ACAT), the Adaptive Acquisition Pathway, and stage of the systems lifecycle This task is the process of updating a programs
Program Office Estimate to support the PPBE process and/or provide support to the PPBE process. Budget estimate formulations, updates, and course of action analysis may be required to support: Strategic Portfolio Analysis Review (SPAR), Program Objective Memorandum
(POM), Budget Estimate Submission (BES), Budget Document (P&R Form) creation, higher headquarters and Congressional Requests for
Information (RFIs), the Budget enactment process or budgeting drills. References: To be provided at issuance of applicable task orders.
C.3.2.1.4 Affordability Analysis
Affordability analysis is required to support the Defense Acquisition System, JCIDS, and PPBE processes. A LCCE may be required to develop program affordability goals, targets, and caps. LCCEs will be maintained and assessed against affordability criteria (including goals, targets, caps, and program funding). Affordability analysis may be an iterative process including the updating LCCEs, assessing affordability, and adjust program requirements, schedules or funding. Examples of affordability assessment processes or documents include Cost Informed Trade Assessments (CITA), Cost as an Independent Variable (CAIV), Program Funding and Quantities (Spruill) Chart, Unit Cost target assessments, and Buy to Budget Drills. References: To be provided at issuance of applicable task orders.
C.3.2.2 Task Area 2: Specialized Cost Estimates and Data Analysis Techniques
The objective of this task area is for the Contractor to prepare and provide estimates that are more specialized. Task Orders issued under this task area may require the Contractor to prepare and deliver items and perform services listed and described below:
C.3.2.2.1 Cost Estimate.
A prediction of costs consisting of:
i. A clearly defined requirement.
ii. A statement of cost assumptions.
iii. A source identification for basic cost data; and
iv. Documentation of the methodologies used.
Further defined as: the estimated cost of a component or aggregation of components that is developed by using historical cost data and
/or mathematical models. Reference: Army Cost Analysis Manual, March 2020 and associated 13 Mar 2020 Implementation Memorandum.
C.3.2.2.2 Cost Analysis
The act of developing, analyzing, and documenting cost estimates through various analytical approaches and techniques. It is the process of analyzing and estimating incremental and total resources required to support past, present and future systems. In its application to future resource requirements, it becomes an integral step in selection of alternatives by the decision maker. Reference: Army Cost
Analysis Manual, March 2020 and associated 13 Mar 2020 Implementation Memorandum.
C.3.2.2.3 Software Cost Estimate
A cost estimate / life cycle cost estimate for software for a system. Reference: Army Cost Analysis Manual, March 2020 and associated 13
Mar 2020 Implementation Memorandum.
C.3.2.2.4 Data Collection
Data are the foundation of every cost estimate and reliable cost estimates are rooted in historical data. The data collection plan should emphasize the collection of current and relevant technical, programmatic, cost, and risk data. Data collection is a lengthy process and continues throughout the development of a cost estimate and through program execution. Many types of data need to be collected: technical, schedule, program, and cost data. In addition to gathering historical data from other programs, cost analysts should develop plans to collect data on the current program throughout program execution. It is best practice to continuously collect new data. Cost analysts should assess current data processes and data sources. Process steps investigated should include, but are not limited to, the data source(s) currently utilized, data gaps, data cleansing, data assumptions, and frequency of data refreshes.
Examples of potential data collection includes both government data (program budget and accounting data, program schedules and technical reports) and contractor data (catalog prices, contractor CDRLs, forward pricing rate agreements). References: Army Cost Analysis Manual, March 2020 and associated 13 Mar 2020 Implementation Memorandum; GAO Cost Estimating and Assessment Guide: Best Practices for Developing and Managing Program Costs, March 2020; and DoD Instruction 5000.73 entitled Cost Analysis Guidance and Procedures, March 2020.
C.3.2.2.5 Development of Methodologies, Models, Databases, Tools or Applications
The design and development of cost estimating approaches, spreadsheets, models, tools, techniques, methods which are used to support the cost analysis, cost estimating process. Analysts build most DoD cost estimating models in Microsoft Excel or Automated Cost Estimating
Integrated Tools (ACEIT). Some organizations have built Microsoft Excel templates to bring consistency to model building and facilitate their management. The Army requires the use of ACEIT on all ACAT I and II programs. There are also many tools available to support
17 90
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
specific parts of the cost estimating process such as statistical analysis, software cost estimating, data visualization, and simulation. In addition to Microsoft Excel and ACEIT, system dynamics models and data science applications like R and Python are becoming popular for specific analysis, especially as data files get larger. Data visualization tools include software applications like
Microsoft Power BI, Tableau, and Qlik. Analysts need to select tools to support the cost estimating process. Analysts should not tailor the cost estimating process simply to accommodate the constraints of any particular tool. References: Army Cost Analysis Manual, March
2020, associated 13 Mar 2020 Implementation Memorandum DoD Cost Estimating Guide December 2020; GAO Cost Estimating and Assessment
Guide: Best Practices for Developing and Managing Program Costs, March 2020; and DoD Instruction 5000.73 Cost Analysis Guidance and
Procedures, March 2020.
C.3.2.2.6 Risk, Uncertainty or Sensitivity Analysis
Cost uncertainty analysis is the process of identifying and quantifying the uncertainties associated with elements of the cost estimate in the areas such as cost, technical and schedule. Risk is the probability of the unfavorable outcome. Sensitivity analysis is an analysis whereby different values of certain key variables are tested to see how sensitive investment results are to possible change in assumptions. It is a method of evaluating the riskiness of an investment. References: Army Cost Analysis Manual, March 2020, associated
13 Mar 2020 Implementation Memorandum and Joint Agency Cost Schedule Risk & Uncertainty Handbook, March 2014.
C.3.2.2.7 Data…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .