This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a U.S. Army solicitation (W912CH-24-Q-0077) for a Plunger Assembly related to a 105mm M119A1 Howitzer weapon system. The amendment (0001) makes two key changes: 1) extends the offer due date from 29 December 2025 to 14 January 2026, and 2) reduces the delivery lead time for the First Article Test (FAT) CLIN 0001AB from 240 to 60 days after award. The contract is a firm fixed-price supply contract, with inspection at origin and acceptance at destination. The procurement involves 1 Plunger Assembly (NSN: 1015-01-340-6103) and a separately priced First Article Test Report, with delivery schedules specified for different contract line items.

View the file

Other files

File Type Posted
ACC-DTA OPSEC PLAN 3.pdf PDF
signed Solicitation.pdf PDF
First-Article-Waiver-Worksheet 9-15.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0001 2026JAN08

W912CH

ACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

BRIAN T. HURD

EMAIL: BRIAN.T.HURD.CIV@ARMY.MIL

W912CH-24-Q-0077

2025NOV26

X

X 2026JAN14 04:00pm

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 4

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: BRIAN T. HURD

Buyer Office Symbol/Telephone Number: CCTA-APN-A/(571)588-9137

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Weapon System: Howitzer, Light Towed, 105mm, M119A1

*** End of Narrative A0000 ***

SOLICITATION: W912CH-24-Q-0077

AMENDMENT: 0001

1. The purpose of this amendment is to:

SECTION A

a) Extend the Offer Due Date from 29 December 2025 to 14 January 2026.

SECTION B

b) Change the delivery lead time under FAT CLIN 0001AB from 240 to 60 days after award.

SECTION F

c) Change the delivery lead time of FAT CLIN 0001AB under FAR 52.211-8 Time of Delivery from 240 to 60 days after award.

2. All other terms and conditions, except for those addressed above, remain unchanged and are full and effect.

*** END OF NARRATIVE A0002 ***

2 4

W912CH-24-Q-0077

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SUPPLIES OR SERVICES AND PRICES/COSTS

0001 PLUNGER ASSEMBLY

NSN: 1015-01-340-6103

0001AB FIRST ARTICLE TEST REPORT - SEPERATELY PRICED 1 LO $ _____________________________________________ __________________

SERVICE REQUESTED: PLUNGER ASSEMBLY

CLIN CONTRACT TYPE:

Firm Fixed Price

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

Deliveries or Performance _________________________

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 1 0090

3 4

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DELIVERIES OR PERFORMANCE

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

1 CHANGED 52.211-8 TIME OF DELIVERY JUN/1997

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER CONTRACT AWARD

CLIN 0001AA 21 EA 150 DAYS WITHOUT FAT; 240 DAYS WITH FAT

CLIN 0001AB 1 EA 060 DAYS

CLIN 0002AA 21 EA 150 DAYS WITHOUT FAT

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFEROR'S PROPOSED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

CLIN 0001AA 21 EA ___________ Days Without FAT; _____Days With FAT

CLIN 0001AB 1 EA ___________ Days

CLIN 0002AA 21 EA ___________ Days

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the

Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the

Contractor's date of receipt of the contract or notice of award by adding

(1) five calendar days for delivery of the award through the ordinary mails, or

(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term

"working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

(End of Clause)

4 4