signed Solicitation.pdf
PDF 156 KB Posted
- Attached to
- PLUNGER ASSEMBLY - NSN : 1015013406103
- Solicitation number
- W912CH-24-Q-0077
- Issued by
-
Department of the Army
About this file
This is a Request for Quotation (RFQ) from the Army Contracting Command Detroit Arsenal for a Plunger Assembly (NSN 1015-01-340-6103) for a Howitzer, Light Towed, 105mm, M119A1 weapon system. The solicitation is set aside exclusively for small businesses and is a Firm Fixed Price contract. The procurement includes 21 units for the base quantity, with an additional 21-unit option quantity, and requires a First Article Test (FAT) for the initial production run.
Key details include a delivery schedule of 150 days for the base quantity (240 days with FAT) and submission of various technical documents such as Heavy Phosphate Coating procedures, Engineering Change Proposals, and Requests for Variance. The contract requires compliance with specific technical data package (TDP) requirements, distribution restrictions, and export control regulations. Offerors must be registered in the System for Award Management (SAM), have a NAICS code of 332994 (Small Arms, Ordnance, and Ordnance Accessories Manufacturing), and submit proposals electronically by the specified closing date. The government will evaluate offers based on the lowest price technically acceptable approach.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912CH24Q0077-Amendment 0001 signed.pdf | ||
| ACC-DTA OPSEC PLAN 3.pdf | ||
| First-Article-Waiver-Worksheet 9-15.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION This RFQ is is not a small business set-aside Page Of
(This is NOT an Order)
1. Request No. 2. Date Issued 3. Requisition/Purchase Request No. 4. Cert For Nat Def. Under BDSA Rating
See Schedule Reg. 2 and/or DMS Reg. 1 5A. Issued By 6. Deliver by (Date)
See Schedule
7. Delivery
FOB Other Destination
5B. For Information Call: (Name and telephone no.) (No collect calls)
8. To: Name and Address, Including Zip Code 9. Destination (Consignee and address, including Zip Code)
See Schedule
10. Please Furnish Quotations to the Issuing Office in Block 5A On or Before Close of Business (Date)
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please indicate on this form and return it to the address in Block 5B. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services.
Supplies are of domestic origin unless otherwise indicated by quoter. Any interpretations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. Schedule (Include applicable Federal, State, and local taxes)
Item Number (a)
Supplies/Services (b)
Quantity (c)
Unit (d)
Unit Price (e)
Amount (f)
(See Schedule)
12. Discount For Prompt Payment a. 10 Calendar Days b. 20 Calendar Days c. 30 Calendar Days d. Calendar Days % % % Number Percentage
NOTE: Additional provisions and representations are are not attached.
13. Name and Address of Quoter (Street, City, County, State and 14. Signature of Person Authorized to Sign 15. Date of Quotation Zip Code) Quotation
16. Signer
a. Name (Type or Print) b. Telephone
Area Code
c. Title (Type or Print) Number
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 18 (Rev. 8-95) PREVIOUS EDITIONS NOT USABLE 18-118 Prescribed by GSA-FAR (43 CFR) 53.215-1(a)
X
W912CH-24-Q-0077 2025NOV26 DOA5
W912CHACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
BRIAN T. HURD (571)588-9137
CCTA-APN-A
EMAIL: BRIAN.T.HURD.CIV@ARMY.MIL
X
2025DEC29
1 61
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: BRIAN T. HURD
Buyer Office Symbol/Telephone Number: CCTA-APN-A/(571)588-9137
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
Weapon System: Howitzer, Light Towed, 105mm, M119A1
*** End of Narrative A0000 ***
A.1 BACKGROUND/DESCRIPTION OF THE ACTION
This solicitation is intended to result in the award of a Firm Fixed Price Contract for supplies specified, with 100% option.
A.1.1 This solicitation is set aside for Small Businesses IAW FAR clause 19.502-2.
A.1.2 There is a Technical Data Package (TDP) associated with this procurement. The TDP is distribution code "D", which limits access to the U.S. Government agencies and its contractors. Please refer to Section C for additional information.
A.2 SOLICITATION STRUCTURE
A.2.1 Particular attention should be given to clauses and paragraphs throughout the solicitation hat require the contractor to fill-in various information.
The Government will utilize North American Industry Classification System (NAICS) code 332994 (Small Arms, Ordnance, and
Ordnance Accessories Manufacturing).
A.3 SYSTEM for AWARD MANAGEMENT(SAM), SIZE STANDARDS, AND NAICS CODES
Failure to register in SAM for the corresponding NAICS code identified in paragraph A.2.1 prior to submitting a proposal against this Solicitation may preclude an award being made to your company.
A.3.1 Offerors should be aware of how U.S. Small Business (SB) concerns are defined in FAR Part 19, Defense Federal Acquisition
Regulation Supplement (DFARS) Part 19, and 13 CFR 121, Small Business Size Regulations. Offerors are advised to review 13 CFR
121.103, "How does SBA Determine Affiliation".
A.4 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE
(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms
Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(b) To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD
2345, Militarily Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS).
To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office
(JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification
Program website at: http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's Section C Technical Data Package instructions.
(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed
(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
A.5 ELECTRONIC CONTRACTING
A.5.1 All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award
2 61
W912CH-24-Q-0077 REPRINT
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Management website (https://www.sam.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
Once a proposal is received, the Contract Specialist/Contracting Officer
Interested offerors shall submit a proposal via email to the Contract Specialist HYPERLINK:
"mailto:brian.t.hurd.civ@army.mil"brian.t.hurd.civ@army.mil and cc the corresponding
Contracting Officer HYPERLINK:
"mailto:amy.m.dombrowski.civ@army.mil" with the following subject header:
Proposal Submission - W912CH-24-Q-0077 (company name).
Once a proposal is received, the Contract Specialist/Contracting Officer will reply with the respective Offeror stating receipt of proposal submission.
A.5.2 Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with
FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, to be received by the
Government office designated in the solicitation by the time specified.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
A.5.3 Solicitations may remain posted on www.SAM.gov after the solicitation closing date.
A.5.4 Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June
23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act
(FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
A.5.5 Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
A.6 ACKNOWLEDGEMENT OF AMENDMENT
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
_________________ _________r_________________ _________
A.7 ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website:
https://www.tacom.army.mil/ombudsperson . (Best viewed using Google Chrome or Microsoft Edge)
A.8 ALL OR NONE
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
A.8.1 ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
A.8.2 OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED
NONRESPONSIVE.
3 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE A0001 ***
4 61
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PLUNGER ASSEMBLY SP
NSN: 1015-01-340-6103
Mfr CAGE: 19200
Mfr Part Number: 12591352
0001AA Production Quantity 21 EA $ $ ____________________ ______________ __________________
COMMODITY NAME: PLUNGER ASSEMBLY SP
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH4C0225EH PRON AMD: 02
AMS CD: SM2B1100000
Description/Specs./Work Statement
TOP DRAWING NR: 12591352
REVISION: D
DATE: 15 Jan 2020
(End of narrative B001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W52H094024022V W562RP J 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 21 0150
FOB POINT: Destination
SHIP TO:
(W562RP) SR W0LX ARMY GENERAL SUPPLY
DLA DISTRIBUTION ANNISTON
7 FRANKFORD AVE 362
ANNISTON,AL,36201-4199
5 61
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0001AB FIRST ARTICLE TEST REPORT - SEPERATELY PRICED 1 LO $ _____________________________________________ __________________
SERVICE REQUESTED: PLUNGER ASSEMBLY
CLIN CONTRACT TYPE:
Firm Fixed Price
First Article Test for the following Subcomponent
P/Ns, (3 ea) items shall be submitted for submission and approval IAW individual QAPs:
2592571, PLUNGER, DETENT
12592572, BUSHING, SLEEVE
12592573, SPRING, HELICAL COMPRESSION
12592574, BODY, PLUNGER
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0240
0002 PLUNGER ASSEMBLY
0002AA UNEXERCISED OPTION QUANTITY 21 EA $ $ ___________________________ ______________ __________________
COMMODITY NAME: PLUNGER ASSEMBLY
CLIN CONTRACT TYPE:
Firm Fixed Price
OPTION QUANTITY, PURSUANT TO THE CLAUSE ENTITLED
OPTION FOR INCREASED QUANTITY--- SEPARATELY PRICED
LINE ITEM (FAR 52.217-7).
The quantity stated for the option CLIN DOES NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.
The failure of the offeror to insert a unit price applicable to the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the offer will be evaluated for award
6 61
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
accordingly.
Description/Specs./Work Statement
TOP DRAWING NR: 12591352
REVISION: B
DATE: 15 Jan 2020
(End of narrative B001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMNETS
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 21 0150
FOB POINT: Destination
SHIP TO:
(W562RP) SR W0LX ARMY GENERAL SUPPLY
DLA DISTRIBUTION ANNISTON
7 FRANKFORD AVE 362
ANNISTON,AL,36201-4199
7 61
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
9000 DATA ITEMS __________
A001 TEST PROCEDURE HEAVY PHOSPHATE COATING 1 LO $ ** NSP ** ______________________________________ __________________
SERVICE REQUESTED: PLUNGER ASSEMBLY
CLIN CONTRACT TYPE:
Firm Fixed Price
ELIN A001 is associated with the HEAVY PHOSPHATE TEST
PROCEDURE
See Exhibit A, CDRL DD Form 1423 Sequence Number A001 for preparation and delivery of data submission.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A002 DATA ITEM NOT PRICED-DD 250 NOT REQUIRED 1 LO $ ** NSP ** ________________________________________ __________________
SERVICE REQUESTED: ENGINEERING CHANGE PROPOSAL
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A003 DATA ITEM NOT PRICED-DD 250 NOT REQUIRED 1 LO $ ** NSP ** _________________________________________ __________________
SERVICE REQUESTED: REQUEST FOR VARIANCE
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
8 61
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A004 DATA ITEM NOT PRICED -DD 250 NOT REQUIRED 1 LO $ ** NSP ** _________________________________________ __________________
SERVICE REQUESTED: NOTICE OF REVISION
CLIN CONTRACT TYPE:
Firm Fixed Price
Firm Fixed Price
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
9 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 TECHNICAL DATA PACKAGE INFORMATION
The following Xd item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[X] 2. The TDP for this solicitation (Attachment 0001) resides within the System for Award Management (SAM) (https://SAM.gov ) associated with this solicitation number:
W912CH-24-Q-0077
To access the data through SAM:
C.1.1 Log on to the SAM web site: HYPERLINK "https://SAM.gov"https://SAM.gov.
C.1.2 Search for the solicitation number.
C.1.3 Click on the attachment you would like to view.
C.1.4 If the attachment is restricted, request access to the document.
C.1.4.1 TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq.
C.1.4.2 Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
C.1.4.3 To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). To obtain certification, go to DD FORM 2345 Instructions and DD 2345.
C.1.4.4 Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the
Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
C.1.5 If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the Contract
Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.
C.1.6 If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP. Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.
C.2 CONFIGURATION MANAGEMENT DOCUMENTATION
C.2.1 The Configuration Change Management section of SAE EIA-649-1 Configuration Management Requirement for Defense Contracts, Paragraph
3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1), and the General Note in paragraph 3.3.2.4(1) which reads as Generally, Minor RFVs address product changes that are temporary and do not impact the baseline.
C.2.2 Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
10 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.2.3 Value Engineering Change Proposals (VECPs) for cost saving improvements to the Technical Data Package (TDP) should not be processed per SAE EIA-649-1 and should be referred to FAR Part 48 Value Engineering.
C.2.4 All Engineering Change Proposals (ECPs) submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.
C.2.5 For ECPs, RFVs, NORs, the Contractor must submit the applicable documentation listed in sub-paragraphs e (i) through e
(iii). Failure to submit a complete legible package may result in return of the ECP/RFV/NOR without processing.
C.2.5.1 For ECPs, the Contractor shall prepare and deliver the ECP IAW CDRL A003.
C.2.5.2 For RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A004.
C.2.5.3 For NORs, the Contractor shall prepare and delivery the NOR IAW CDRL A005.
C.2.6 The Governments acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the
CDRL at the Governments sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.
C.2.7 The Contractor should direct questions regarding the status of previously submitted ECP or RFV to the Procuring
Contracting Officer (PCO), copy to the Administrative Contracting Officer (ACO).
C.3 DRAWING LIMITATIONS
C.3.1 The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are adequate to permit manufacture, and:
C.3.1.1 depict the completed item(s), and
C.3.1.2 serve as the basis for inspection of the completed item(s).
C.3.2 These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.
C.3.3 The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.
C.3.4 The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or
Contract Specialist prior to the solicitation closing date.
C.3.5 Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.
C.4 HEAVY PHOSPHATE COATING REQUIREMENT
The following requirements regarding heavy phosphate coatings are applicable to this solicitation and any resultant contract in addition to those requirements set forth in specification MIL-DTL-16232 (Finish Series 5.3 of MIL-STD-171) and/or Light
Phosphate TT-C-490 (Finish Series 5.1 of MIL-STD-171), and requires written process approval by RDAR-MEE-W, Mark Godlewski at
HYPERLINK "mailto:mark.a.godlewski.civ@army.mil"mark.a.godlewski.civ@army.mil.
C.4.1 Paragraph 3.1 of MIL-DTL-16232 refers to "Preproduction Inspection." The procedure shall be submitted in accordance with the Contract Data Requirements List (CDRL) contained in the contract. The contract number must be cited on all phosphate coating procedures submitted for review and approval. Procedures shall include product name and manufacturer of all chemicals/materials to be used. All processes, equipment, controls along with testing and test frequencies used for phosphating
11 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
including application of supplemental finishes shall be described in detail.
C.4.2 Paragraph 3.2.5-c of MIL-DTL-16232 refers to the "Chromic acid rinse, (Classes 1, 2 and 3)." The final rinse shall be checked by a standard free and total acid titration along with a pH reading "prior to starting production and at least every 8 hours thereafter."
C.4.3 Paragraph 4.7.3 of MIL-DTL-16232 refers to "Weight per unit area of phosphate coatings." The frequency for testing coating weight is "per lot, at least every 8 hours."
C.4.4 Paragraph 4.7.5 of MIL-DTL-16232 refers to "Accelerated corrosion resistance." Accelerated corrosion resistance shall be determined in accordance with 4.7.5.1. The frequency for testing accelerated corrosion resistance per ASTM B117 is "per lot, at least every 8 hours."
C.4.5 The "product name" along with the manufacturer of the supplemental dry film lubricant or CARC paint (primer/topcoat) shall be stated in the procedure and shall be traceable to the applicable Qualified Products List (QPL) or Qualified Products
Database (QPD) at Assist Online. QPD products may be obtained at the quick search site, type the specification number (i.e., 3150) in the second block and click the "Submit" button. Then click on the specification (i.e., MIL-PRF-3150). In the next screen, click on the word "Qualification".
To obtain MIL Specs, MIL Standards, QPL and QPD products see <"https://assist.dla.mil/online/start /">. To obtain MIL Specs, MIL Standards, QPD products see <"https://assist.dla.mil/online/start/">.
C.4.6 A thickness range for the supplemental dry film lubricant or CARC paint (primer/topcoat) shall be stated in the procedure along with a frequency for testing. A daily frequency is required.
C.4.7 Heat cured dry film lubricant shall be air dried for 1.0 hour (until dry to touch) after dipping/spraying or flash dried at 155-175 degrees F for 10-30 minutes and then heat cured at a temperature of 375-425 degrees F for 55-65 minutes per paragraph 4.4.2.2 of MIL-PRF-46010.
C.4.8 Air cure dry film lubricant shall be air dried at room temperature for 24 hours minimum.
C.4.8.1 Adhesion testing shall be stated in the procedure for a supplemental coating of dry film lubricant per ASTM D2510 or
CARC paint per ASTM D3359, method B along with the frequency for testing. A daily frequency is required.
C.4.8.2 Salt spray testing of parts with phosphate and supplemental dry film lubricant per ASTM B117 for 100 hours shall be stated in the procedure along with the frequency for testing. The frequency for testing is "per lot or weekly." Parts shall show no more than 3 rust spots per 3" x 6" area with none larger than 1.0mm in diameter. Salt spray testing of parts with phosphate and primer per ASTM B117 for 336 hours shall be included in the procedure for supplemental coatings of CARC paint along with a frequency for testing. The frequency for salt spray testing is "per lot or monthly." Parts shall show no visible rust exceeding rust grade no. 9 per ASTM D610, no more than
5 blisters per 4" x 6" area with none larger than 3/64 inch in diameter. Under film attack at the scribe shall not exceed 1/8 inch.
C.4.8.3 Topcoat color shall be visual/equipment checked against the specified chip no. of SAE AMS-STD-595 per paint batch. The procedure shall include the specified color chip number.
C.4.8.3.1 Cure of the paint shall be checked daily by solvent wipe per paragraph 4.2.3.2 of MIL-DTL-53072. The manufacturer of the MEK solvent shall be stated in the procedure.
C.5 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN
C.5.1 The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S.
Government OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan (Attachment 0003) specifies the governments critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.
C.5.2 The contractor will receive a copy of the SOP/Plan (Attachment 0003) at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.
C.5.3 The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is OPSEC Level I.
C.5.4 The contractor is not required to produce an OPSEC Plan. U.S. contractors with access to CUI (e.g. technical information, information marked with a distribution statement or CUI or classified information shall be required to follow an OPSEC Plan.
The contract may choose to follow the TACOM OPSEC plan in lieu of developing a new OPSEC plan. Personnel who have taken the
12 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
approved OPSEC training within the last 12 months shall be considered compliant.
C.6 OPSEC TRAINING REQUIREMENT
Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSE awareness training is available at:
https://securityawareness.usalearning.gov/opsec/index.htm . Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officers Representative (COR), if assigned to the contract, or the
Procuring Contracting Officer (PCO).
C.7 THREAT AWARENESS REPORTING PROGRAM
C.7.1 All contractor employees with security clearances working on any Army contract must receive annual TARP training by a
Counter Intelligence (CI) agent, or other authorized designated training method, per Army Regulation 381-12, para. 2-4b, Threat
Awareness and Reporting Program (TARP). The in-person training is the preferred method and is available by contacting the local
CI Office to arrange for the conduct of training.
C.7.2 The Contractor shall contact the CI Office within (30) days of contract award to schedule TARP training. Once training is complete Contractor shall provide certificates/proof of completion of training to the Contracting Officer's Representative
(COR), if assigned to the contract, or to the Procurement Contracting Officer (PCO) within (10) days of completion.
C.7.3 The Contractor shall contact the CI Office to schedule training for any new employee whose performance commences after award, and who did not attend the initial TARP training session. Upon completion of the TARP training, certification/proof of completion shall be provided as required in paragraph (b). In special circumstances (on deployments or in remote locations) when in-person training is not available, TARP computer based training (CBT), which has been approved by Deputy Chief of Staff
(DCS), G-2, is the only authorized online training method permitted. This alternate CBT training is only authorized in special circumstances with written approval obtained from the PCO. Upon receipt of the necessary written approval, contractor employees possessing an Army Knowledge Online (AKO) account and password or a Common Access Card can register and complete the online
TARP training course by utilizing the Army Learning Management System (ALMS) at: HYPERLINK
"http://www.lms.army.mil"www.lms.army.mil.
C.8 ADDITIONAL GUIDELINES FOR CONTROLLED UNCLASSIFIED INFORMATION
General: There are types of information that are not classified but that require application of access and distribution controls and protective measures for a variety of reasons. This information is known as controlled unclassified information
(CUI). The types of information considered CUI are U.S. Government technical information and information listed at the CUI registry(https://www.archives.gov/cui/registry/category-list ). When handling CUI material, all personnel are to comply with these requirements and follow their company policy and/or applicable Non-Disclosure Agreement (NDA) concerning the protection of proprietary information in situations not clearly stated herein.
Technical Information Description: Any recorded information related to experimental, developmental, or engineering works that can be used to define an engineering or manufacturing process, or can be used to design, procure, produce, support, maintain, operate, repair, or overhaul program material. The data may be graphic or pictorial delineations in media (e.g., computer software, drawings, or photographs), text in specifications, related performance or design documents, or computer printouts.
Examples of technical information include research and engineering data, engineering drawings, and associated lists, specifications, standards, process sheets, manuals, technical reports, catalog-item identifications, and related information, and computer software documentation.
CUI Information Description: Unclassified Information that requires safeguarding or dissemination controls pursuant to and consistent with applicable law, regulations, and government-wide or LRGWP policies but is not classified under EO 13526, (Classified National Security Information).
CUI Markings All documents containing CUI will carry the CUI markings in accordance with DoDI 5200.48. Discontinue all use of legacy or other markings not permitted or included in either the CUI Registry or DoDI 5200.48. Marking of Technical Information will include the statement provided in the Security Classification Guide. If the contents of the technical document require more than one Distribution Statement, apply the most restrictive statement. This does not preclude additional mandated markings as may be required by the contract.
Protection of CUI Information Access: In accordance with (IAW) DoDI 5200.48, Controlled Unclassified Information (CUI), 6 MAR
2020, all contractors supporting this contract who receive, store, or generate CUI are required to take the DoD Mandatory CUI training available on the Security Awareness Hub at: HYPERLINK
"https://securityawareness.usalearning.gov/cui/index.html"https://securityawareness.usalearning.gov/cui/index.html.
13 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Per DoDI 5200.48 and pursuant to all contractual requirements, DoD contractors require initial CUI training and annual CUI refresher training. CUI may be released only to an individual who has a valid need for such access in connection with the accomplishment of a lawful and authorized Government purpose. Further dissemination of such information will be at the discretion of the Government Security Manager. All personnel supporting this contract shall sign a CUI Non- disclosure
Agreement prior to gaining access to the information. Personnel no longer requiring access to CUI must dispose (see Disposal below) or surrender any in their possession and terminate future access to it.
Storing/Handling: During working hours, take reasonable steps to minimize risk of access to CUI by unauthorized personnel.
After working hours, when not in physical possession of the owner, all CUI (whether hardcopy or optical media (e.g., DVDs, CDs) that contain CUI) must be afforded a reasonable degree of physical protection to prevent theft of program information (e.g., store CUI information in locked desks or file cabinets, locked rooms, cable lock laptops, storing in a trunk, storing out of site or similar means). Do not display CUI in public places (e.g., airports, airplanes, restaurants). Electronic storing and processing of CUI shall be in accordance with DFARS 252.204- 7012 Safeguarding Controlled Defense Information and Cyber
Incident Reporting. Do not process CUI on public computers (e.g., those available for use by the general public in kiosks, hotel business centers), public wireless networks or computers that do not have access control. Personally owned computers and personally owned devices are not authorized to process CUI. Portable electronic devices (e.g., smartphones, laptop computers, tablets), non-portable computers, and removable media (e.g., external hard drives, flash drives, USB drives; not including optical media) must be physically and electronically protected as described in this instruction, DFARS 252.204-7012 and DoDI
8582.01.
Dissemination: CUI printed documents and material may be transmitted through mail channels, commercial carrier or hand- carried without formal courier orders. CUI information may be disseminated to DoD personnel and DoD contractors to conduct official business for the program. If dissemination is required outside of DoD personnel or DoD contractors, contact the Government
Security Manager for approval. Technical information will follow the release instructions identified in the Distribution
Statement. Use secure communications whenever possible; however, land-line telephones are more secure than cellular telephones and should be used whenever available for discussions involving CUI. Transmit voice and facsimile transmissions only when you have a reasonable assurance that only authorized recipients will have access to the transmission. Digital transmission shall comply with the below: All transmission and/or dissemination of CUI (i.e., email and file transfers) must use NIST/NIAP-approved cryptographic products/algorithms, e.g., DoD-approved Public Key Infrastructure Certification or DoD Safe Exchange at https://safe.apps.mil/ . These are available at:
http://iase.disa.mil/pki/eca or
HYPERLINK "http://csrc.nist.gov/groups/STM/cmvp/documents/140-1/140val-all.htm"http://csrc.nist.gov/groups/STM/cmvp/documents/140-1/140val-all.htm.
This encryption requirement includes communications that contain passcodes to teleconferences or web conferences where there is a reasonable expectation that CUI may be discussed. When encryption is not available, a government collaborative suite (aka
Integrated Digital Environment [IDE]) must be used to transmit CUI.
Contractor-hosted collaborative suites may be used for digital transmission and/or dissemination of CUI by personnel not located on a government backbone (e.g., NIPRNET), provided the following conditions apply: 1) Use only NIST/NIAP- approved cryptographic products/algorithms. The latest validation lists may be obtained athttp://iase.disa.mil/pki/eca or http://csrc.nist.gov/groups/STM/cmvp/documents/140-1/140val-all.htm ; and, 2) Use an internally hosted service that does not use a third party collaborative suite service provider.
Do not post CUI to web pages that are publicly available or have access limited only by domain/IP restrictions. As permitted by other contract provisions, CUI may be posted to web pages that control access through the use of a DoD approved Public Key
Infrastructure Certification and that provide protection via use of secure sockets, or other equivalent technologies. These are available at HYPERLINK "http://iase.disa.mil/pki/eca"http://iase.disa.mil/pki/eca.
As new technologies become available in the electronics arena, care should be given to providing a reasonable degree of protection from known vulnerabilities.
The Internet is Public Access. CUI must be reviewed and officially approved by the TACOM Public Affairs Officer for public release before placing on the Internet. This is not applicable when the Internet is used for e-mail transmissions and encryption is used as noted above.
Disposal: The contractor shall ensure any covered defense information provided by the Government under this contract is destroyed or sanitized from contractor-owned media and reported in accordance with National Institute of Standards and
Technology (NIST) Special Publication (SP) 800-88, Rev 1, Guidelines for Media Sanitization, (December 2014) (NIST SP 800-88, rev 1), destruction methods, or any destruction method approved for Classified National Security Information (32 CFR 2001.47) unless the CUI category's authority mandates other destruction methods (CUI Specified categories). Agencies must also use
14 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
destruction methods specifically required by law, regulation, or Government-wide policy for CUI Specified categories. Destroy
CUI documents in a manner that makes it unreadable, indecipherable, and irrecoverable (32 CFR 2002.14(f)(2)). For paper documents, Reference CUI Notice 2019-03:Destroying of Controlled Unclassified Information (CUI) in paper form.
Report of Loss of CUI: Report any loss of CUI to the Government Security Manager. Initial reports shall be made as expeditiously as possible in all cases within 72 hours of discovery. If additional information is required after submission and review of the initial report, guidance will be provided at that time. Initial report content shall include the following information as available.
Applicable dates, including dates of compromise and dates of discovery Threat methodology, including all known resources used
(e.g. IP addresses, domain names, software tools) Account of what actions the threat(s) may have taken on victim system/network. What information may have been compromised or lost, and its potential impact on government programs l
*** END OF NARRATIVE C0001 ***
PACKAGING AND MARKING
D.1 PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS)
D.1.1 Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below.
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: B
(3) QUANTITY PER UNIT PACKAGE: 001
(4) SPECIAL PACKAGING INSTRUCTION NUMBER: 12591352
(5) REVISION: D
(6) DATE OF REVISION: 15 Jam 2020
D.1.1.2 THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL: (See Section J) SPI. (Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobes website (http://get.adobe.com/reader/)for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging Instructions in
Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the "Advanced" tab.
Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")
D.1.1.3 Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic
15 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being
D.1.2 Marking:
D.1.2.1 Marking: All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive material will not identify the nature of the material. When an item is assigned Unique Item Identifier (UII) markings as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at:
https://www.acq.osd.mil/dpap/pdi/uid/guides.html) for development of the UII and MIL-STD-129 for UII package marking requirements.
Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
D.1.3 Heat Treatment and Marking of Wood Packaging Materials (WPM):
D.1.3.1 In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging
Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.
D.1.3.2 Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging
Material Policy and Wood Packaging Material Enforcement Regulations (see URL:http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:
http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
D.1.4 Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The
ALS approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. These packaging requirements are intended to provide protection against environmentally induced corrosion and deterioration, physical and mechanical damage, and other forms of degradation during storage, multiple handling, and shipment associated with the military distribution system. The Government encourages contractors to submit requests for changes that will result in savings or improve the packaging. Please submit request for changes in accordance with the RFD clause of the contract. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, blocking, bracing, cushioning, and packing at contractor's expense.
D.1.5 Hazardous Materials (As applicable):
D.1.5.1 Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
D.1.5.2 Packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
-International Air Transport Association (IATA) Dangerous Goods Regulations
-International Maritime Dangerous Goods Code (IMDG)
-Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
-Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
D.1.5.3 If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the
United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of
16 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
D.1.6 SUPPLEMENTAL INSTRUCTIONS: N/A
*** END OF NARRATIVE D0001 ***
INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2015 (21 Oct 2015) or equivalent
Tailored by excluding paragraph(s) 8.3
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .