W912CH-24-Q-0020_0003.pdf
PDF 117 KB Posted
- Attached to
- W912CH-24-Q-0020; PANEL, POWER DISTRIB; NSN: 6110-01-586-2301; AMD 0003- Solicitation and Amendment
- Solicitation number
- W912CH-24-Q-0020
- Issued by
-
Department of the Army
About this file
This is Amendment 0003 to Request for Quotation (RFQ) W912CH-24-Q-0020, which re-solicits from 100% small business set-aside to full and open competition for a Firm-Fixed-Price purchase order. The requirement is for 26 Panel, Power Distribution units (NSN: 6110-01-586-2301) with a 100% option quantity available, to be delivered to DLA Distribution Red River in Texarkana, TX.
The Technical Data Package (TDP) requires controlled access through SAM.gov and active Joint Certification Program (JCP) registration. The top drawing number is 12485652, verified as of September 27, 2023. Proposals must be submitted via email to the Contract Specialist with a copy to the Contracting Officer by January 6, 2025 at 5:00 PM EST. Deliveries will occur in six increments between 240-390 days after award. The amendment extends the solicitation closing date and changes the competition type while maintaining all other terms and conditions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912CH24Q0020_0002.pdf | ||
| W912CH24Q0020 0002.pdf | ||
| W912CH24Q0020 0001.pdf | ||
| Attach A -- CUI 2023.pdf | ||
| W912CH24Q0020.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION This RFQ is is not a small business set-aside Page Of
(This is NOT an Order)
1. Request No. 2. Date Issued 3. Requisition/Purchase Request No. 4. Cert For Nat Def. Under BDSA Rating
See Schedule Reg. 2 and/or DMS Reg. 1 5A. Issued By 6. Deliver by (Date)
See Schedule
7. Delivery
FOB Other Destination
5B. For Information Call: (Name and telephone no.) (No collect calls)
8. To: Name and Address, Including Zip Code 9. Destination (Consignee and address, including Zip Code)
See Schedule
10. Please Furnish Quotations to the Issuing Office in Block 5A On or Before Close of Business (Date)
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please indicate on this form and return it to the address in Block 5B. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services.
Supplies are of domestic origin unless otherwise indicated by quoter. Any interpretations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. Schedule (Include applicable Federal, State, and local taxes)
Item Number (a)
Supplies/Services (b)
Quantity (c)
Unit (d)
Unit Price (e)
Amount (f)
(See Schedule)
12. Discount For Prompt Payment a. 10 Calendar Days b. 20 Calendar Days c. 30 Calendar Days d. Calendar Days % % % Number Percentage
NOTE: Additional provisions and representations are are not attached.
13. Name and Address of Quoter (Street, City, County, State and 14. Signature of Person Authorized to Sign 15. Date of Quotation Zip Code) Quotation
16. Signer
a. Name (Type or Print) b. Telephone
Area Code
c. Title (Type or Print) Number
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 18 (Rev. 8-95) PREVIOUS EDITIONS NOT USABLE 18-118 Prescribed by GSA-FAR (43 CFR) 53.215-1(a)
X
W912CH-24-Q-0020 2024MAY24 DOA4
W912CHACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
CIARA WOODARD-BROWN (571)588-9077
CCTA-APS-B
EMAIL: CIARA.L.WOODARD-BROWN.CIV@ARMY.MIL
X
2025JAN06
1 56
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
THE FOLLOWING AMENDMENTS HAVE BEEN INCORPORATED
Buyer Name: CIARA WOODARD-BROWN
Buyer Office Symbol/Telephone Number: CCTA-APS-B/(571)588-9077
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
Weapon System: Multiple Launch Rocket System (MLRS)
*** End of Narrative A0000 ***
1. This Request for Quote (RFQ) Solicitation, W912CH-24-Q-0020, will result in a Firm-Fixed-Price purchase order for the procurement of the following:
NOUN NSN Quantity
PANEL, POWER DISTRIB 6110-01-586-2301 26 EA*
*100% option available
2. This Technical Data Package (TDP) is competitive and Distribution Code C.
Top Drawing Number: 12485652
Verified Date: 27 SEPTEMBER 2023
3. Packaging Requirements are listed in SECTION D - PACKAGING AND MARKING, D.01 PACKAGING REQUIREMENTS (SELECTIVE GROUP PACKAGING
REQUIREMENTS.
4. In Section J - LIST OF ATTACHMENTS, Attachment 0001 - ADDITIONAL GUIDELINES FOR CONTROLLED UNCLASSIFIED INFORMATION, is provided.
This document outlines the general security guidelines for the protection of Controlled Unclassified Information required of the contractor.
5. First article testing and approval is not required for this procurement.
6. Interested Offerors shall submit a proposal via e-mail to the Contract Specialist (ciara.l.davis3.civ@army.mil) and cc the corresponding Contracting Officer (katherine.e.macfarland.civ@army.mil) with subject header: Proposal Submission- W912CH-24-Q-0020
(Company Name). Once a proposal is received, the Contract Specialist and or the Contracting Officer will reply to the respective Offeror stating receipt of proposal submission.
7. Contractor is authorized to ship early with no quantity restrictions and at no additional cost to the Government.
8. All shipments will be FOB Destination to the following address:
SU W0MC ARMY GENERAL SUPPLY
DLA DISTRIBUTION RED RIVER
HIGHWAY 82 WEST
TEXARKANA, TX, 75507-5000
*** END OF NARRATIVE A0001 ***
A.01 Electronic Contracting
(a) All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website
2 56
W912CH-24-Q-0020 REPRINT
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(https://www . sam.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b Unless directed to do otherwise in Section L of this solicitation, offerors shall follow the instructions in paragraph (c) below.
(c) With the recent transition from www.FBO.gov to www.beta.sam.gov and then to www.sam.gov , the www.sam.gov site has been experiencing a number of issues. Interested Offerors shall submit a proposal via email to the Contract Specialist
(ciara.l.davis3.civ@army.mil) and cc the corresponding Contracting Officer (katherine.e.macfarland.civ@army.mil) with the subject header: Proposal Submission W912CH-24-Q-0020 (company name). Once a proposal is received, the Contract Specialist/Contracting Officer will reply with the respective Offeror stating receipt of proposal submission.
(1) Maximum size of each e-mail shall be 10 megabytes. You may use multiple e-mail messages for each bid/submission, however, you must annotate the subject lines as described above for each message, and number them in this manner: Message 1 of 3, 2 of 3, 3 of 3.
Bids can be submitted can be submitted using any of the following electronic formats:
(2) Microsoft Office Products; Word, Excel, or PowerPoint. Spreadsheets must be sent in a format that includes all formulate macro and format information. Print image is not acceptable.
(3) Files in Adobe PDF (Portable Document Format). Scanners should be set to 300 dots per inch.
(4) Files in HTML (Hypertext Markup Language). HTML documents must not contain active links to live Internet sites or pages.
All linked information must be contained within your electronic bid/offer and be accessible offline.
(5) Other electronic formats are not acceptable.
Ensure that filenames of attachments DO NOT contain spaces to limit virus scanners rejecting the email as unscannable.
(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
(e) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the
Government infrastructure (in this case, received through SAM) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
(f) Solicitations may remain posted on www.sam.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the
Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
A.02 ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
3 56
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Amendment Number: Date:
A.03 ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website: https://www.tacom.army.mil/ombudsperson
. (Best viewed using Google Chrome or Microsoft Edge)
A.04 DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE
(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Section
2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States
Code). This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(b) To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, Militarily
Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:
http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's
Section C Technical Data Package instructions.
(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.
(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the
TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
A.05 ALL OR NONE
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.
4 56
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE A0002 ***
Amendment 0001 to solicitation W912CH-24-Q-0020.
1. The purpose of this amendment is to extend the solicitation closing date from 24 June 2024 to 12 July 2024.
2. Interested Offerors shall submit a proposal via e-mail to the Contract Specialist (ciara.l.davis3.civ@army.mil) and cc the corresponding Contracting Officer(katherine.e.macfarland.civ@army.mil) with subject header: Proposal Submission- W912CH-24-Q-0020
(Company Name) no later than Friday, 12 July 2024 at 5:00pm EST. Once a proposal is received, the Contract Specialist and or the _____________
Contracting Officer will reply to the respective Offeror stating receipt of proposal submission.
3. Except as specifically provided in this amendment, all other terms and conditions to remain unchanged and in full force and effect.
*** END OF NARRATIVE A0003 ***
Amendment 0002 to solicitation W912CH-24-Q-0020.
1. The purpose of this amendment is to extend the solicitation closing date from 12 July 2024 to 2 August 2024.
2. Interested Offerors shall submit a proposal via e-mail to the Contract Specialist (ciara.l.davis3.civ@army.mil), and (ciara.l.woodard-brown.civ@army.mil) and cc the corresponding Contracting Officer (katherine.e.macfarland.civ@army.mil) with subject header: Proposal
Submission- W912CH-24-Q-0020 ( Company Name ) no later than Friday, 2 August 2024 at 5:00pm EST. Once a proposal is received, the _____________
Contract Specialist and or the Contracting Officer will reply to the respective Offeror stating receipt of proposal submission.
3. Except as specifically provided in this amendment, all other terms and conditions to remain unchanged and in full force and effect.
*** END OF NARRATIVE A0004 ***
Amendment 0003 to solicitation W912CH-24-Q-0020.
1. The purpose of this amendment is to re-solicit from 100% small business set-aside to full and open competition.
2. Interested Offerors shall submit a proposal via e-mail to the Contract Specialist(ciara.l.woodard-brown.civ@army.mil) and cc the corresponding Contracting Officer(katherine.e.macfarland.civ@army.mil) with subject header: Proposal Submission- W912CH-24-Q-0020
( C o m p a n y N a m e ) no later than Monday, 06 January 2025 at 5:00pm EST. Once a proposal is received, the Contract Specialist and or the Contracting Officer will reply to the respective Offeror stating receipt of proposal submission.
3. Except as specifically provided in this amendment, all other terms and conditions to remain unchanged and in full force and effect.
*** END OF NARRATIVE A0005 ***
5 56
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PANEL,POWER DISTRIB
NSN: 6110-01-586-2301
Mfr CAGE: 19207
Mfr Part Number: 12485652
0001AA PRODUCTION QUANTITY 26 EA $ $ ____________________ ______________ __________________
COMMODITY NAME: PANEL,POWER DISTRIB
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH3C0664EH PRON AMD: 01
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 12485652
DATE: 27-SEP-2023
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W56HZV3269003X W562RM J 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 5 0240
002 5 0270
003 5 0300
004 5 0330
005 5 0360
006 1 0390
FOB POINT: Destination
SHIP TO:
(W562RM) SR W0MC ARMY GENERAL SUPPLY
DLA DISTRIBUTION RED RIVER
HIGHWAY 82 WEST
TEXARKANA,TX,75507-5000
6 56
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0002 PANEL, POWER DISTRIB
NSN: 6110-01-586-2301
Mfr CAGE: 19207
Mfr Part Number: 12485652
0002AA UNEXERCISED OPTION QUANTITY 26 EA $ $ ___________________________ ______________ __________________
COMMODITY NAME: PANEL, POWER DISTRIB
CLIN CONTRACT TYPE:
Firm Fixed Price
Option Quantity, pursuant to the clause entitled
Option for Increased Quantity--Separately Priced Line
Item (52.217-7).
The quantity stated for the option CLIN DOES NOT form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.
**The failure of the offeror to insert a unit price applicable to the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the offer will be evaluated for award accordingly**
(End of narrative B001)
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 12485652
DATE: 27-SEP-2023
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 5 0240
002 5 0270
7 56
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
003 5 0300
004 5 0330
005 5 0360
006 1 0390
FOB POINT: Destination
SHIP TO:
(W912CH) XR W6QK ACC- DTA
KO DIRECTORATE OF CONTRACTING
6501 EAST 11 MILE ROAD
WARREN,MI,48397-5000
W912CH is used as a placeholder. The actual delivery location will be notated if the option is exercised.
(End of narrative F001)
8 56
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.01 TECHNICAL DATA PACKAGE INFORMATION
The following Xd item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ X ] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov ) associated with this solicitation number:
W912CH-24-Q-0020
To access the data through SAM:
a. Log on to the SAM web site: https://SAM.gov .
b. Search for the solicitation number.
c. Click on the attachment you would like to view.
d. If the attachment is restricted, request access to the document.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with
Defense Logistics Information Service (DLIS). To obtain certification, go to https://public.logisticsinformationservice.dla.mil/jcp/search.aspx
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the Contract
Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.
f. If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.
Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.
g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed Use and
Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
C.02 DRAWING LIMITATIONS
(a) The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are adequate to permit manufacture, and:
(1) depict the completed (item(s), and
9 56
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(2) serve as the basis for inspection of the completed item(s).
(b) These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.
(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.
(d) The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.
(e) Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the
Government and no delivery schedule extension.
C.03 ACQUISITION OF MANUFACTURER'S PART NUMBER: COMPONENTS
One or more of the drawings for part of the contract item set forth in the Schedule and in the Technical Data Package specify manufacturer's part numbers. Since complete Government technical data for such part or parts are not available, it is understood that the Contractor, by accepting this contract, agrees to furnish only the listed manufacturer's part number(s) for those components of the contract item. It is further understood and agreed that references to manufacturer's part numbers herein shall be deemed to include all changes or revisions thereto which the approved manufacturer has made effective as of the first date of delivery of any of the items under this contract; provided, that no change or revision that affects the interchangeability (ability to be interchanged with previous parts and to match with all mating parts when assembled) of the listed manufacturer's part shall be incorporated into the contract item without the prior written approval of the Procuring Contracting Officer.
C.04 TRUSTED ASSOCIATE SPONSORSHIP SYSTEM (TASS) PROGRAM
(a) The contract company is responsible for providing the appropriate documentation to the government to process applications for
Common Access Cards (CAC) for every contractor employee who deploys with the military force, OR who has a need to access any government computer network in accordance with FAR 52.204-9, Personal Identity Verification of Contractor Personnel.
(b) The contractor is responsible for managing requests for new, renew and reverification of CACs in sufficient time to ensure that all contractor employees have them when needed to perform work under this contract. The norm is at least ten calendar days advance notice
Trusted Agent* (TA), unless there are extenuating circumstances approved by the Contracting Officers Representative (COR) or Contracting
Officer. *The COR will be the TA for this contract.
(c) It is recommended that a Corporate Facility Security Officer (FSO) or other facility appointed personnel be established to serve as the firms single point of contact for CAC Application packages processing to G-2 and Government Trusted Agent (TA). If a FSO is not established, each contractor employee requiring a CAC card will be required to manage their own applications.
(d) CAC applications must be processed through the DoD Trusted Associate Sponsorship System (TASS). The contractors FSO or appointed personnel or contractor employee shall submit CAC requests via secure means such as DoD SAFE, encrypted email, password protected documents etc. to the COR. The COR will provide the request package to the command G-2 to be processed. The command G-2 will provide the AHRC TASS Form1, version 1.2 to the TA once CAC Application is approved. The list of required documents to complete the request package for an INITIAL CAC:
G-2 Contractor PSI_Worksheet_Nov2018
OF 306, Declaration for Federal Employment
Copy of birth certificate or passport or naturalization certificate (if foreign born)
AHRC TASS Form V1.3 dated 1 May 2021
10 56
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(e) The government TA will establish a TASS application account for each CAC request and will provide each contractor employee a USER
ID and Password to the contractor via secure means such as DoD SAFE, encrypted email, password protected documents etc. to the FSO or appointed personnel or contractor. The contractor employee shall access the TASS site, Applicant Login and complete the CAC application (entering/editing contractor information as applicable) at https://tasspki.dmdc.osd.mil/tass/ .
(f) The contractor employee will Submit completed applications in TASS. TASS will inform via email to the TA the application has been
Submitted.
(g) The TA will process the request, TASS will automatically inform the contractors applicant via email of one of the following:
- Approved*. Upon approval, the information is transferred to the Defense Enrollment Eligibility Reporting System (DEERS) database and an email notification is sent to the contractor with instructions on obtaining their CAC. The contractor proceeds to a Real-Time
Automated Personnel Identification System (RAPIDS) station (https://www.dmdc.osd.mil/rsl/ provides RAPIDS locations).
- Rejected*. Government in separate correspondence will provide reason(s) for rejection.
- Returned. Additional information, or correction to the application, required by the contractor employee.
*The contractor will maintain records of all approved and rejected applications.
(h) At the RAPIDS station, the RAPIDS Verification Officer will verify the contractor by SSN, and two forms of identification, one of which must be a picture ID. The Verification Officer will capture primary and alternate fingerprints and picture, and updates to DEERS and will then issue a CAC.
CACs require reverification every 180 days. The TA and contract employee will be notified via TASS generated email when the reverification date is approaching. The contract FSO will provide the electronically signed AHRC TASS Form 2.1 to the TA. The TA will re-verify the employee in TASS.
(i) Issued CACs shall be for a period of performance not longer than three (3) years or the individuals contract end date (inclusive of any options) whichever is earlier. Prior to the three (3) year expiration, TASS will notify both the contractor and the TA of the expiration date. The FSO or appointed personnel will submit to the TA TASS Form 1, version 1.2 indicating REISSUE on the form.
(j) The contractor shall return CACs to the DEERS office upon return from deployment, when issued a new CAC, or when employment is terminated. A receipt for each card must be obtained and provided to the TA/COR. The FSO or other appointed personnel shall provide the electronically signed AHRC TASS Form 2.1 to the TA. The TA will revoke the contractors CAC in TASS.
(k) A CAC cannot be issued without evidence that a T-1 investigation has at least been initiated by the Government, G-2. Per DODI
5200.46 Section 3.d: A CAC may be issued on an interim basis based on a favorable National Agency Check OR a Federal Bureau of
Investigation (FBI) National Criminal History Check (fingerprint check) adjudicated by appropriate approved automated procedures or by a trained security or human resource (HR) specialist, and successful submission to the investigative service provider (ISP) of a NACI or a personnel security investigation (PSI) equal to or greater in scope than a NACI. Once the fingerprints are done and the applicant has submitted the T1 (or other applicable investigation) in PSIP, a CAC can and should be issued to applicant on an interim basis to prevent delay of work and excess cost to the government as a result. If the employee does not have a valid background investigation, the government will initiate the T1. Once the TI investigation is open in Defense Information Security System (DISS), (between 3-4 weeks) an interim CAC eligibility is either granted or denied and an email will go out to the Supervisor, FSO, Sponsor, the COR, TASM and TA advising eligibility.
(l) Details and training on TASS will be provided by the government. Further details to obtain a CAC, contact 866-738-3222 or
Army.cacpki.helpdesk@army.mil.
C.05 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
a. The contractor and all associated subcontractors employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 Personal Identity Verification of Contractor Personnel) as directed by
DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force
Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
b. For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-
11 56
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial
CAC may be issued on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personal
Management.
c. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards, and procedures using the National Crime Information Center Interstate
Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures elsewhere in Section C titled as paragraph - Access to the Detroit Arsenal; Identifying Contractor Employees; Non-disclosure Statement; for OCONUS locations, refer to the Status of Forces Agreement and other theater regulations.
C.06 THREAT AWARENESS REPORTING PROGRAM
(a) All contractor employees with security clearances working on any Army contract must receive annual TARP training by a
Counterintelligence (CI) agent, or other authorized designated training method, per Army Regulation 381-12, para. 2-4b, Threat Awareness and Reporting Program (TARP). The in-person training is the preferred method, and is available by contacting the local CI Office to arrange for the conduct of training.
(b) The Contractor shall contact the CI Office within (30) days of contract award to schedule TARP training. Once training is complete
Contractor shall provide certificates/proof of completion of training to the Contracting Officer's Representative (COR), if assigned to the contract, or to the Procurement Contracting Officer (PCO) within (10) days of completion.
(c) The Contractor shall contact the CI Office to schedule training for any new employee whose performance commences after award, and who did not attend the initial TARP training session. Upon completion of the TARP training, certification/proof of completion shall be provided as required in paragraph (b). In special circumstances (on deployments or in remote locations) when in-person training is not available, TARP computer based training (CBT), which has been approved by Deputy Chief of Staff (DCS), G-2, is the only authorized online training method permitted. This alternate CBT training is only authorized in special circumstances with written approval obtained from the PCO. Upon receipt of the necessary written approval, contractor employees possessing an Army Knowledge Online (AKO) account and password or a Common Access Card can register and complete the online TARP training course by utilizing the Army Learning Management
System (ALMS) at: www.lms.army.mil .
C.07 CONTRACTOR EMPLOYEES WHO REQUIRE ACCESS TO GOVERNMENT INFORMATION SYSTEMS
All contractor employees shall be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services and must successfully complete the DoD Information Assurance Awareness training prior to access to the information system, and annually thereafter.
C.08 INFORMATION ASSURANCE (IA)/INFORMATION TECHNOLOGY (IT) TRAINING
All contractor employees and associated subcontractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in
DoD 8570.01, DoD 8570.01-M, and AR 25-2 within six months of employment. Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officers Representative (COR), if assigned to the contract, or the
Procuring Contracting Officer (PCO).
C.09 OPSEC TRAINING REQUIREMENT
Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting
12 56
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC awareness training is available at:
https://securityawareness.usalearning.gov/opsec/index.htm . Within 10 days of completing the training, the Contractor shall provide certificates/proof of completion to the Contracting Officers Representative (COR), if assigned to the contract, or the Procuring
Contracting Officer (PCO).
C.10 REQUIREMENT FOR AN OPSEC STANDING OPERATION PROCEDURE/PLAN
(a) The contractor is subject to provisions of the TACOM LCMC OPSEC Standing Operating Procedures (SOP/Plan), or other U.S. Government
OPSEC plan, per AR 530-1, Operations Security. This SOP/Plan specifies the governments critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.
(b) The contractor will receive a copy of the SOP/Plan at time of award. Local form STA Form 7114 (or similar) will be used to document and record security OPSEC reviews which are conducted by G2, TACOM LCMC or individual organizations supporting OPSEC Officers.
(c) The contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual is
OPSEC Level I.
C.11 ADDITIONAL GUIDANCE ON OPSEC
The contractor is not required to produce an OPSEC Plan. U.S. contractors with access to CUI (e.g. technical information, information marked with a distribution statement or CUI or classified information shall be required to follow an OPSEC Plan. The contract may choose to follow the TACOM OPSEC plan in lieu of developing a new OPSEC plan. Personnel who have taken the approved OPSEC training within the last 12 months shall be considered compliant.
C.12 ARMY INFORMATION SYSTEM (IS) SECURITY REQUIREMENT
CONTRACTOR INVESTIGATION/CLEARANCE. Reference AR25-2, AR 380-67, DoD 5200.2-R and Final Credentialing Standards for Issuing Personal
Identity Verification Cards under HSPD-12 (31 Jul 2008). All contractors and consultants that access government owned or operated automated information systems, networks, or databases and to safeguard controlled unclassified information shall have a favorable background investigation as required above references positions designated as IT-I, IT-II or IT-III to perform functions stipulated in contract scope of work. The minimum investigative requirements are as follows: ADP-I (AKA: IT-1 or Privileged Access) = Tier 5 (T5) /
Tier 5 Reinvestigation (T5R)(AKA: Single Scope Background Investigation (SSBI), Single Scope Periodic Reinvestigation (SSPR) or Phased
Period Reinvestigation (PPR)); ADP-II (AKA: IT-2 or Limited Privileged Access) = Tier 3 (T3) / Tier 3 Reinvestigation (T3R)(AKA : Access
National Agency Check with Written Inquiries and Credit Check (ANACI) or National Agency Check with Law and Credit Check (NACLC)); or
ADP-III (AKA: IT-3 or (Non-Privileged Access) = Tier 1 (T1) / Tier 2 with Subject Interview (T2S) or Tier 2 Reinvestigation with
Subject Interview (T2RS) (AKA: National Agency Check with Inquiries (NACI)). A Common Access Card (CAC) may be issued on an interim basis based on favorable T1 or a Federal Bureau of Investigation (FBI) National Criminal History Check (fingerprint check) adjudicated by appropriate approved automated procedures or by a trained security or human resource (HR) specialist, and successful submission to the investigative service provider (ISP) of a T1 investigation or an investigation greater in scope than a T1. Investigations will be coordinated with the G2, TACOM LCMC (AMSTA-CSS / 586-282-6262) and investigations will be through the Personnel Security Investigations
Portal Center of Excellence (PSIP COE). Non-U.S. citizens shall be Permanent Resident Aliens with requisite investigation. All personnel shall receive and certify to an Information Systems Security Briefing.
*** END OF NARRATIVE C0001 ***
PACKAGING AND MARKING
D.01 PACKAGING REQUIREMENTS (SELECTIVE GROUP PACKAGING REQUIREMENTS)
13 56
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(a) Military preservation, packing, and marking for this contract shall be accomplished in accordance with the specific requirements identified below and all the applicable requirements of MIL-STD-2073-1
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: B
(3) QUANTITY PER UNIT PACKAGE: 001
(b) MIL-STD-2073-1, Appendix J establishes and defines codes used in describing military packaging methods and materials. The following codes from Appendix J apply:
(1) Preservation Method Code: 42 (Table j.i. and j.ia.)
(2) Cleaning Procedure Code: 1 (Table j.ii)
(3) Preservative Material Code: 00 (Table j.iii)
(4) Wrapping Material Code: K3 (Table j.iv)
(5) Cushioning and Dunnage Code: NA (Table j.v)
(6) Thickness of Cushioning or Dunnage Code: A (Table j.vi)
(7) Unit Container Code: ZZ (Table j.vii)
(8) Intermediate Container Code: 00 (Table j.vii)
(9) Quantity per Intermediate Container Code: AAA (Appendix J.4.11)
(10) Packing Code: A (Table j.IX and J.IXa)
(11) Special Marking Code: 00 (Table j.x)
(c) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage
(d) Marking:
All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive material will not identify the nature of the material. Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html (best viewed with Internet Explorer 11 or higher, or FireFox) for the current
DoD Suppliers Passive RFID Information Guide. When an item is assigned Unique Item Identifier (UII) markings as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at:
https://www.acq.osd.mil/dpap/pdi/uid/guides.html ) for development of the UII and MIL-STD-129 for UII package marking requirements.
Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
(e) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging
Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a
14 56
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging
Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:
http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
(3) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.
The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
(f) These packaging requirements are intended to provide protection against environmentally induced corrosion and deterioration, physical and mechanical damage, and other forms of degradation during storage, multiple handling, and shipment associated with the military distribution system. The Government encourages contractors to submit requests for changes that will result in savings or improve the packaging. Please submit request for changes in accordance with the RFD clause of the contract. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, blocking, bracing, cushioning, and packing at contractors expense.
(g) Hazardous Materials (as applicable):
(1) Hazardous Materials is defined as a substance or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) Packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the
United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(h) SUPPLEMENTAL INSTRUCTIONS: FOR UNIT CONTAINER: USE BOX EC WITHIN BAG BS WITHIN BOX ED.
*** END OF NARRATIVE D0001 ***
INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
2 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984
3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
15 56
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
ISO 9001:2015 or equivalent
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E.01 INSPECTION AND ACCEPTANCE POINTS: ORIGIN
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
E.02 TECHNICAL DATA FOR INSPECTION
(a) When requested, the Contractor shall make available to the Government Inspector, the drawings, specifications, and any applicable
Engineering Exceptions associated to the technical data, to which the product was manufactured. Upon completion of product inspection and acceptance by the Government Inspector, all drawings, specifications and Engineering Exceptions, will be returned to the Contractor.
(b) If the contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.) the contractor shall ensure that subcontractor technical data is available for review to support the Government's inspection requirements.
E.03 USE OF MIL-STD 1916
(a) The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of Product. The
Verification Level (VL) shall be VL IV…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .