About this file
This document is a Request for Quotation (RFQ) for the procurement of Roller Pads with National Stock Number 1670-01-169-9155. The RFQ is a 100% Small Business Set-Aside and will result in a Firm Fixed Price (FFP) Purchase Order. The required quantity is 7 packages (PK) with a 100% option quantity. There is a Technical Data Package (TDP) associated with this requirement that is Distribution Code "A" and available for public release.
The solicitation has a specific due date and time for proposals. Offerors must register in the System for Award Management (SAM) and submit their proposals via email to the Contract Specialist by the due date. The Government will evaluate the proposals and make a single award. First Article Testing and Approval is required unless waived. The Government will accept supplies that conform to the specified quality standards outlined in the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION This RFQ is is not a small business set-aside Page Of
(This is NOT an Order)
1. Request No. 2. Date Issued 3. Requisition/Purchase Request No. 4. Cert For Nat Def. Under BDSA Rating
See Schedule Reg. 2 and/or DMS Reg. 1 5A. Issued By 6. Deliver by (Date)
See Schedule
7. Delivery
FOB Other Destination
5B. For Information Call: (Name and telephone no.) (No collect calls)
8. To: Name and Address, Including Zip Code 9. Destination (Consignee and address, including Zip Code)
See Schedule
10. Please Furnish Quotations to the Issuing Office in Block 5A On or Before Close of Business (Date)
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please indicate on this form and return it to the address in Block 5B. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services.
Supplies are of domestic origin unless otherwise indicated by quoter. Any interpretations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. Schedule (Include applicable Federal, State, and local taxes)
Item Number (a)
Supplies/Services (b)
Quantity (c)
Unit (d)
Unit Price (e)
Amount (f)
(See Schedule)
12. Discount For Prompt Payment a. 10 Calendar Days b. 20 Calendar Days c. 30 Calendar Days d. Calendar Days % % % Number Percentage
NOTE: Additional provisions and representations are are not attached.
13. Name and Address of Quoter (Street, City, County, State and 14. Signature of Person Authorized to Sign 15. Date of Quotation Zip Code) Quotation
16. Signer
a. Name (Type or Print) b. Telephone
Area Code
c. Title (Type or Print) Number
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 18 (Rev. 8-95) PREVIOUS EDITIONS NOT USABLE 18-118 Prescribed by GSA-FAR (43 CFR) 53.215-1(a)
X
W912CH-24-Q-0016 2024JUL29 DOA4
W912CHACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
CAITLIN TAYLOR (571)644-4099
CCTA-APN-B
EMAIL: CAITLIN.M.TAYLOR11.CIV@ARMY.MIL
X
2024AUG28
1 54
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: CAITLIN TAYLOR
Buyer Office Symbol/Telephone Number: CCTA-APN-B/(571)644-4099
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
Weapon System: Air Delivery Equipment
*** End of Narrative A0000 ***
A.01 This solicitation, W912CH-24-Q-0016, will result in a Firm-Fixed Price (FFP) Purchase Order for the procurement of the following:
Noun NSN Part Number Quantity____ ___ ___________ ________
ROLLER PAD 1670-01-169-9155 11-1-2795-7 7 PK
100% option available*
A.02 Interested Offerors shall submit a proposal, no later than 5PM EST 05 July 2024 via email to the Contract Specialist
(caitlin.m.taylor11.civ@army.mil) and cc the corresponding Contracting Officer (shanari.n.wadecki.civ@army.mil) with the subject header:
Proposal Submission - W912CH-24-Q-0016 (company name). Once a proposal is received, the Contract Specialist/Contracting Officer will reply with the respective Offeror stating receipt of proposal submission.
A.03 Electronic Contracting
(a) All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website
(https://www.sam.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b Unless directed to do otherwise in Section L of this solicitation, offerors shall follow the instructions in paragraph (c) below.
(c) With the recent transition from www.FBO.gov to www.beta.sam.gov and then to www.sam.gov , the www.sam.gov site has been experiencing a number of issues. Interested Offerors shall submit a proposal via email to the Contract Specialist
(caitlin.m.taylor11.civ@army.mil) and cc the corresponding Contracting Officer (shanari.n.wadecki.civ@army.mil) with the subject header:
Proposal Submission - W912CH-24-Q-0016 (company name). Once a proposal is received, the Contract Specialist/Contracting Officer will reply with the respective Offeror stating receipt of proposal submission.
(1) Maximum size of each e-mail shall be 10 megabytes. You may use multiple e-mail messages for each bid/submission, however, you must annotate the subject lines as described above for each message, and number them in this manner: Message 1 of 3, 2 of 3, 3 of 3.
Bids can be submitted can be submitted using any of the following electronic formats:
(2) Microsoft Office Products; Word, Excel, or PowerPoint. Spreadsheets must be sent in a format that includes all formulate macro and format information. Print image is not acceptable.
(3) Files in Adobe PDF (Portable Document Format). Scanners should be set to 300 dots per inch.
(4) Files in HTML (Hypertext Markup Language). HTML documents must not contain active links to live Internet sites or pages.
All linked information must be contained within your electronic bid/offer and be accessible offline.
(5) Other electronic formats are not acceptable.
Ensure that filenames of attachments DO NOT contain spaces to limit virus scanners rejecting the email as unscannable.
(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
(e) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the
Government infrastructure (in this case, received through SAM) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are
2 54
W912CH-24-Q-0016
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
(f) Solicitations may remain posted on www.sam.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the
Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
A.04 ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
A.05 ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website: https://www.tacom.army.mil/ombudsperson .
(Best viewed using Google Chrome or Microsoft Edge)
A.06 ALL OR NONE
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.
*** END OF NARRATIVE A0001 ***
3 54
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0001 ROLLER PAD
NSN: 1670-01-169-9155
Mfr CAGE: 81337
Mfr Part Number: 11-1-2795-7
0001AA PRODUCTION QUANTITY 7 PK $ $ ___________________ ______________ __________________
COMMODITY NAME: ROLLER PAD
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH4C0229EH PRON AMD: 02
AMS CD: SM2B1100000
1 PK consists of 4 each.
(End of narrative B001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W58HZ14025V021 W25G1U J 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 7 0480
FOB POINT: Destination
SHIP TO:
(W25G1U) SR W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2001 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND,PA,17070-5002
0001AB FIRST ARTICLE TEST & REPORT-NOT SEPARATELY PRICED 1 EA $ ** NSP ** $ ** NSP ** _________________________________________________ ______________ __________________
COMMODITY NAME: FIRST ARTICLE TEST & REPORT
A FIRST ARTICLE TEST REPORT IS REQUIRED IN ACCORDANCE
4 54
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
WITH THE CLAUSE ENTITLED "FIRST ARTICLE APPROVAL--
CONTRACTOR TESTING," FAR 52.209-3.
The Contractor may request for a FAT Waiver with the
Attachment 0002 "FIRST ARTICLE - WAIVER WORKSHEET".
The waiver must be submitted with the proposal in accordance with Section L, narrative L.05 PROVISION
FOR WAIVER OF REQUIRED FIRST ARTICLE APPROVAL.
Additional information on the FAT and FATR can be found in Section E, narratives E.02 NOTICE REGARDING
FIRST ARTICLE TEST SAMPLE, E.03 INSPECTION AND
ACCEPTANCE (FIRST ARTICLE APPROVAL), and E.05 NOTICE
REGARDING FIRST ARTICLE.
NOTE TO OFFEROR:
Please fill in the dollar amount you have
INCLUDED in Production CLIN 0001AA to cover the cost of performing FAT and writing the FATR:
WE ARE REQUESTING OFFERORS TO FILL IN
THE DOLLAR AMOUNT IN THE PARAGRAPH ABOVE
SO WE WILL KNOW HOW MUCH TO SUBTRACT
FROM THE PRODUCTION CLIN IF WE WAIVE
FIRST ARTICLE TEST.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Government Approval/Disapproval Days: 30
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0270
FOB POINT: Destination
SHIP TO:
(W912CH) XR W6QK ACC- DTA
KO DIRECTORATE OF CONTRACTING
6501 EAST 11 MILE ROAD
WARREN,MI,48397-5000
0002 ROLLER PAD
NSN: 1670-01-169-9155
Mfr CAGE: 81337
5 54
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Mfr Part Number: 11-1-2795-7
0002AA UNEXERCISED OPTION QUANTITY 7 PK $ $ ___________________________ ______________ __________________
COMMODITY NAME: ROLLER PAD
CLIN CONTRACT TYPE:
Firm Fixed Price
OPTION QUANTITY, PURSUANT TO THE CLAUSE ENTITLED -
OPTION FOR INCREASED QUANTITY - SEPARATELY PRICED
LINE ITEM 52.217-7.
The quantity stated for the option CLIN DOES NOT form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.
The failure of the offeror to insert a unit price applicable to the option quantity must mean that the offeror will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the offeror will be evaluated for award accordingly.
(End of narrative B001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 7 0180
FOB POINT: Destination
SHIP TO:
(W25G1U) SR W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2001 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND,PA,17070-5002
6 54
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
9999 BASIC CLIN FOR ELIN ___________________
The below Exhibit Line Item Numbers (ELINs) are associated with the Data Item Numbers on the Contract
Data Requirements List (CDRL, DD Form 1423), in
Section J.
(End of narrative A001)
A001 SERVICE DATA ITEM 1 LO $ ** NSP ** _________________ __________________
SERVICE REQUESTED: CDRL A001 MEETING MINUTES
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A002 SERVICE DATA ITEM 1 LO $ ** NSP ** _________________ __________________
SERVICE REQUESTED: CDRL A002 ECP
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A003 SERVICE DATA ITEM 1 LO $ ** NSP ** _________________ __________________
SERVICE REQUESTED: CDRL A003 RFV
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
7 54
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A004 SERVICE DATA ITEM 1 LO $ ** NSP ** _________________ __________________
SERVICE REQUESTED: CDRL A004 NOR
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
8 54
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.01 TECHNICAL DATA PACKAGE INFORMATION
The following Xd item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ X ] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov ) associated with this solicitation number:
W912CH-24-Q-0016
To access the data through SAM:
a. Log on to the SAM web site: https://SAM.gov .
b. Search for the solicitation number.
c. Click on the attachment you would like to view.
d. If the attachment is restricted, request access to the document.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with
Defense Logistics Information Service (DLIS). To obtain certification, go to https://public.logisticsinformationservice.dla.mil/jcp/search.aspx
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the Contract
Specialist and Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.
f. If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.
Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ . The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.
g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed Use and
Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
C.02 CONTRACT MANAGEMENT
a. Meetings/Reports. The Contractor shall prepare the agenda and provide minutes of all program meetings detailed below in accordance with (IAW) CDRL A001.
b. Start of Work Meeting. The Contractor will coordinate, schedule, and conduct a Start of Work Meeting with the Government at the
Contractor's facility unless some other location is designated in the contract. The Government anticipates this conference to be conducted within 30 calendar days of the contract award.
(1) Conduct a review of the contract requirements to ensure that there is a mutual understanding between the Government and the
Contractor.
9 54
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(2) Make available if needed to Government representative(s) the documentation for production planning, manufacturing methods and controls, material and manpower resource allocation, production engineering, quality control and assurance program, production management organization, and controls over major subcontractors.
c. Monthly Integrated Project Team (IPT) meetings. The Contractor shall conduct monthly IPT meetings to support discussion related to contract status, FAT, production, delivery schedule, etc.
d. Program Manager (PM). The Contractor shall assign a Program Manager (PM). This individual shall serve as primary Point of
Contact (POC) between the Government and the Contractor and shall be responsible for the coordination of all Contractor activities related to the contract. This person shall have the authority to commit the Contractor to specific courses of action and accept direction from the Contracting Officer. This person shall be responsible for coordinating all meetings between the Government and the
Contractor. The PM shall be responsible for immediately bringing to the Contracting Officers attention any conflicts in the Contractor's interpretation of the contract requirements (first by telephone and then followed up in an email) or problems that could adversely affect the Contractor's ability to meet the stated quality, cost, or production/delivery schedule requirements.
e. Incorporation of Proposal. Parts of the Contractor's Technical Proposal, as negotiated and accepted by the Government, may be incorporated by reference into the resultant contract. Some or all of the information furnished by the Contractor may be subject to disclosure under the Freedom of Information Act. For this reason, the Contractor shall identify information contained in the proposal that the Contractor specifically does not want to be incorporated by reference. Any changes in these arrangements are to be submitted to the Contracting Officer in advance for approval. In the event of any conflict or ambiguity between the Contractor's Technical Proposal and the Government's Statement of Work (SOW), the Government's SOW shall govern.
C.03 DRAWING LIMITATIONS
a. The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are adequate to permit manufacture, and:
(1) depict the completed (item(s), and
(2) serve as the basis for inspection of the completed item(s).
b. These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.
c. The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.
d. The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.
e. Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the
Government and no delivery schedule extension.
C.04 CONFIGURATION MANAGEMENT DOCUMENTATION
The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).
a. The Configuration Change Management section of SAE EIA-649-1 (current revision) Configuration Management Requirement for Defense
Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); and the second sentence of paragraph 3.3.1.8.1(1).
b. Furnished item(s) shall conform to the approved configuration requirements/revision unless an RFV is processed and approved as provided by Paragraph e. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1
10 54
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(current revision) and should be referred to Section I Clause 52.248-1 VALUE ENGINEERING.
d. All ECPs submitted will be deemed routine. The Contractor must include justification for an ECP it considers emergency or urgent in the submittal and include all supporting documentation.
e. For ECPs, RFVs, and NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/NOR without processing.
(i) for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A002.
(ii) for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A003.
(iii) for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A004.
f. The Governments acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Governments sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.
g. The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO), copy to the
Administrative Contracting Officer (ACO).
h. The submission of an ECP/RFV/NOR does not affect the required delivery date of the contract.
C.05 NOTIFICATION OF CHANGE
a. Material and Material Supplier Changes. The Contractor shall notify the Government at least 30 days in advance of any changes in material, material suppliers, manufacturing processes (including quality control), or plant location. Also, the Contractor shall ensure that produced end items conform to specified product and quality requirements and shall immediately report any deviation in form, fit, or function of items produced. The contractor shall submit an RFV in accordance with section C.04 for approval prior to implementing any changes.
b. Manufacturing Process Changes. A change in the process flow reviewed by the Government during inspection, such as combining operations or using additional/different equipment, constitutes a manufacturing process change. Any change in location or ownership of the plant where a previously qualified product was manufactured requires reevaluation of the qualification and approval from the
Contracting Officer. Routine maintenance and the switching of comparable equipment are not considered a process change. The contractor shall submit an RFV in accordance with section C.04 for approval prior to implementing any changes.
*** END OF NARRATIVE C0001 ***
PACKAGING AND MARKING
D.01 PACKAGING REQUIREMENTS (SELECTIVE GROUP PACKAGING REQUIREMENTS)
(a) Military preservation, packing, and marking for this contract shall be accomplished in accordance with the specific requirements identified below and all the applicable requirements of MIL-STD-2073-1
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: B
(3) QUANTITY PER UNIT PACKAGE: 001
(b) MIL-STD-2073-1, Appendix J establishes and defines codes used in describing military packaging methods and materials. The following codes from Appendix J apply:
(1) Preservation Method Code: 10 (Table j.i. and j.ia.)
(2) Cleaning Procedure Code: 1 (Table j.ii)
11 54
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(3) Preservative Material Code: 00 (Table j.iii)
(4) Wrapping Material Code: 00 (Table j.iv)
(5) Cushioning and Dunnage Code: 00 (Table j.v)
(6) Thickness of Cushioning or Dunnage Code: 0 (Table j.vi)
(7) Unit Container Code: ZZ (Table j.vii)
(8) Intermediate Container Code: 00 (Table j.vii)
(9) Quantity per Intermediate Container Code: 000 (Appendix J.4.11)
(10) Packing Code: F (Table j.IX and J.IXa)
(11) Special Marking Code: 00 (Table j.x)
(c) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage
(d) Marking:
All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive material will not identify the nature of the material. Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html (best viewed with Internet Explorer 11 or higher, or FireFox) for the current
DoD Suppliers Passive RFID Information Guide. When an item is assigned Unique Item Identifier (UII) markings as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at:
https://www.acq.osd.mil/dpap/pdi/uid/guides.html ) for development of the UII and MIL-STD-129 for UII package marking requirements.
Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
(e) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging
Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging
Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:
http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
(3) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.
The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
(f) These packaging requirements are intended to provide protection against environmentally induced corrosion and deterioration, 12 54
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
physical and mechanical damage, and other forms of degradation during storage, multiple handling, and shipment associated with the military distribution system. The Government encourages contractors to submit requests for changes that will result in savings or improve the packaging. Please submit request for changes in accordance with the RFD clause of the contract. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, blocking, bracing, cushioning, and packing at contractors expense.
(g) Hazardous Materials (as applicable):
(1) Hazardous Materials is defined as a substance or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) Packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the
United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(h) SUPPLEMENTAL INSTRUCTIONS: Unit of issue is four per unit pack. Pack in accordance with drawing 11-1-4202, Section J - Attachment
0001.
*** END OF NARRATIVE D0001 ***
INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2015
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E.01 USE OF MIL-STD 1916
(a) The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of Product. The
Verification Level (VL) shall be VL IV for major characteristics and VL II for minor characteristics.
(b) MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.
13 54
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
E.02 NOTICE REGARDING FIRST ARTICLE TEST SAMPLE
(a) The approved first article items, as described elsewhere in this contract, consist of a quantity of 0 EA that will be consumed or destroyed in testing. Any items consumed or destroyed in testing shall not be delivered as part of the contractually required quantity as set forth in the schedule. The cost of any items that are consumed or destroyed shall be included in the overall offer or contract price. A quantity of 1 EA that successfully passes all specified tests, less the destructive tests, if any, shall serve as a manufacturing standard for the remainder of the contract.
(b) A manufacturing standard is an item, which conforms to all technical performance requirements. A manufacturing standard will serve as 1) an aid in identifying configuration changes not controlled by the contractual design. 2) an aid in identifying any process changes, or 3) the approved workmanship sample, when required, unless alternate samples are submitted for specific characteristics by the Contractor and approved by the Government.
(c) The manufacturing standard will only be used to supplement contractual acceptance/rejection criteria for those process characteristics that require approved workmanship samples. For other characteristics, if configuration or process changes are identified in production units, the contractor will notify the contracting officer for disposition. Manufacturing items that serve as a manufacturing standard may be delivered as part of the contractual quantity with the last shipment made under this contract provided it meets all contractual requirements existing at time of delivery.
E.03 INSPECTION AND ACCEPTANCE (FIRST ARTICLE APPROVAL)
In addition to inspection requirements specified in applicable drawings and/or specifications, the following provisions shall apply to this contract:
(a) FIRST ARTICLE APPROVAL-CONTRACTOR TESTING: First Article Approval-Contractor Testing shall be performed in accordance with QP 11-2-
2795-7, Section J - Attachment 0003.
(b) The First Article Test Report (FATR) shall be compiled by the contractor to the contractor's own format. The FATR shall document the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable).
The FATR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the contractor to allow the designated
Government representative to determine that the First Article Test was successfully completed.
E.04 INSPECTION AND ACCEPTANCE POINTS: ORIGIN
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
E.05 NOTICE REGARDING FIRST ARTICLE
(a) Notwithstanding the provisions for waiver of first article, an additional first article sample (or portion thereof) may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
14 54
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(b) When any of the conditions above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.
(c) Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the Contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.
E.06 TECHNICAL DATA FOR INSPECTION
(a) When requested, the Contractor shall make available to the Government Inspector, the drawings, specifications, and any applicable
Engineering Exceptions associated to the technical data, to which the product was manufactured. Upon completion of product inspection and acceptance by the Government Inspector, all drawings, specifications and Engineering Exceptions, will be returned to the Contractor.
(b) If the contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.) the contractor shall ensure that subcontractor technical data is available for review to support the Government's inspection requirements.
*** END OF NARRATIVE E0001 ***
DELIVERIES OR PERFORMANCE
4 52.242-15 STOP-WORK ORDER AUG/1989
5 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
6 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
7 52.211-8 TIME OF DELIVERY JUN/1997
(a) The Government requires delivery to be made according to the following schedule:
(1) REQUIRED DELIVERY SCHEDULE WITH FIRST ARTICLE TEST (FAT)
ITEM NO. QUANTITY WITHIN DAYS
AFTER CONTRACT AWARD
CLIN 0001AA PRODUCTION QUANTITY W/FAT 7 PK 480 DAYS AFTER AWARD
CLIN 0001AB FIRST ARTICLE TEST & REPORT 1 EA 270 DAYS AFTER AWARD
CLIN 0002AA UNEXERCISED OPTION QUANTITY 7 PK IF EXERCISED, 180 DAYS AFTER AWARD
(2) REQUIRED DELIVERY SCHEDULE IF THERE IS NO FIRST ARTICLE TEST (FAT), OR IF FAT IS WAIVED
ITEM NO. QUANTITY WITHIN DAYS
AFTER CONTRACT AWARD
CLIN 0001AA PRODUCTION QUANTITY 7 PK 180 DAYS AFTER AWARD
CLIN 0002AA UNEXERCISED OPTION QUANTITY 7 PK IF EXERCISED, 180 DAYS AFTER AWARD
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFERORS PROPOSED DELIVERY SCHEDULE
15 54
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the
Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the
Contractors date of receipt of the contract or notice of award by adding
(1) five calendar days for delivery of the award through the ordinary mails, or
(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(End of Clause)
8 252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) JAN/2023
(a) Definitions. As used in this clause--
"Automatic identification device" means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.
"Concatenated unique item identifier" means
(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or
(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.
"Data matrix" means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200 (ECC200) specification found within International Standards
Organization (ISO)/International Electrotechnical Commission (IEC) 16022.
"Data qualifier" means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.
"DoD recognized unique identification equivalent" means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html .
"DoD item unique identification" means a system of marking items delivered to DoD with unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items. For items that are serialized within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier and a unique serial number. For items that are serialized within the part, lot, or batch number within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier; the original part, lot, or batch number; and the serial number.
16 54
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
"Enterprise" means the entity (e.g., a manufacturer or vendor) responsible for assigning unique item identifiers to items.
"Enterprise identifier" means a code that is uniquely assigned to an enterprise by an issuing agency.
"Governments unit acquisition cost" means
(1) For fixed-price type line, subline, or exhibit line items, the unit price identified in the contract at the time of delivery;
(2) For cost-type or undefinitized line, subline, or exhibit line items, the Contractors estimated fully burdened unit cost to the
Government at the time of delivery; and
(3) For items produced under a time-and-materials contract, the Contractors estimated fully burdened unit cost to the Government at the time of delivery.
"Issuing agency" means an organization responsible for assigning a globally unique identifier to an enterprise, as indicated in the
Register of Issuing Agency Codes for ISO/IEC 15459, located at http://www.aimglobal.org/?Reg_Authority15459 .
"Issuing agency code" means a code that designates the registration (or controlling) authority for the enterprise identifier.
"Item" means a single hardware article or a single unit formed by a grouping of subassemblies, components, or constituent parts.
"Lot or batch number" means an identifying number assigned by the enterprise to a designated group of items, usually referred to as either a lot or a batch, all of which were manufactured under identical conditions.
"Machine-readable" means an automatic identification technology media, such as bar codes, contact memory buttons, radio frequency identification, or optical memory cards.
"Original part number" means a combination of numbers or letters assigned by the enterprise at item creation to a class of items with the same form, fit, function, and interface.
"Parent item" means the item assembly, intermediate component, or subassembly that has an embedded item with a unique item identifier or DoD recognized unique identification equivalent.
"Serial number within the enterprise identifier" means a combination of numbers, letters, or symbols assigned by the enterprise to an item that provides for the differentiation of that item from any other like and unlike item and is never used again within the enterprise.
"Serial number within the part, lot, or batch number" means a combination of numbers or letters assigned by the enterprise to an item that provides for the differentiation of that item from any other like item within a part, lot, or batch number assignment.
"Serialization within the enterprise identifier" means each item produced is assigned a serial number that is unique among all the tangible items produced by the enterprise and is never used again. The enterprise is responsible for ensuring unique serialization within the enterprise identifier.
"Serialization within the part, lot, or batch number" means each item of a particular…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .