This is a Request for Proposals (RFP) issued by the Army Contracting Command - Detroit Arsenal for a Firm-Fixed-Price contract to procure 796 each (with 100% option quantity) of Heater, Water and Ration (HWR), NSN 7310-01-387-1305, Part Number 5-13-6900-1. The solicitation includes a First Article Test requirement that may be waived if the contractor meets certain conditions.
Proposals are due by 4:00 PM Eastern Time on March 14, 2025, with a minimum acceptance period of 120 calendar days. The evaluation will be based on three factors: Delivery Schedule (slightly more important than Price), Price (significantly more important than Small Business Participation), and Small Business Participation. The government has set small business participation goals including 15.7% Small Business, 2.4% Small Disadvantaged Business, 2.4% Woman Owned Small Business, and 1.4% each for HUBZone, Veteran Owned, and Service Disabled Veteran Owned Small Business. A Technical Data Package with Distribution Code "A" is available. Proposals must be submitted electronically to the Contract Specialist with a copy to the Contracting Officer.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W912CH-24-R-0085
X
2025FEB12
2025MAR1404:00pm
DOC9
2025FEB12 SEE SCHEDULE
W912CH
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
CAITLIN TAYLOR
(571)644-4099
CCTA-APN-B
CAITLIN.M.TAYLOR11.CIV@ARMY.MIL
1 74
X 1
X 5 X 11
X 14 X 16 X 18
X 24
X 26
X 49
X 50
X 62
X 71
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: CAITLIN TAYLOR
Buyer Office Symbol/Telephone Number: CCTA-APN-B/(571)644-4099
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
Weapon System: Food Services Equipment
*** End of Narrative A0000 ***
A.1 DESCRIPTION OF THE ACTION _________________________
A.1.1. This solicitation is intended to result in the award of a Firm-Fixed Price (FFP) contract for the procurement of the following:
Noun: Heater, Water and Ration (HWR)
Part Number: 5-13-6900-1
NSN: 7310-01-387-1305
Quantity: 796 Each (EA) with 100% Option
A.1.2. This solicitation is intended to result in the following Contract Line Items Numbers (CLINs):
CLIN Description NSN____ ___________ ___
0001AA Production Quantity - HWR Type II 7310-01-387-1305
0001AB First Article Test Report
0002AA Unexercised Option Quantity - HWR Type II 7310-01-387-1305
The Government reserves the right to make no award as a result of this solicitation.
A.1.3. There is a Technical Data Package (TDP) associated with this requirement. It is Distribution Code "A", which is available for public release.
A.1.4. First Article Testing (FAT) is required in accordance with FAR 52.209-3, Section E.2, Section E.3, and Section E.5. To request the FAT to be waived, see Section L.6., Provision for Waiver of Required First Article Approval, and Attachment 0001, First Article
Waiver Worksheet.
A.1.5. This solicitation contains provisions and clauses that require you, the Offeror, to complete fill-ins and/or representations.
Please review and complete all such fill-ins. Your offer may be determined ineligible for award if these fill-ins and representations are not completed.
A.1.6. Please acknowledge all amendments to this solicitation in the space provided under Section A.6. Include the number and date of each amendment.
A.1.7. To be considered for award, please return one signed copy of your offer, completed and properly executed, by the date and time indicated in block 9 (above).
A.1.8. All questions pertaining to this solicitation shall be directed in writing to:
CAITLIN TAYLOR
CONTRACT SPECIALIST, ARMY CONTRACTING COMMAND - DETROIT ARSENAL
E-MAIL: CAITLIN.M.TAYLOR11.CIV@ARMY.MIL
A.2 EVALUATION FACTORS FOR AWARD ____________________________
Offerors are encouraged to review Section M of this solicitation for evaluation factors and basis for award.
A.3 SOLICITATION STRUCTURE ______________________
The Government will utilize North American Industry Classification System (NAICS) code 335999 (All Other Miscellaneous Electrical
Equipment and Component Manufacturing).
A.4 SYSTEM FOR AWARD MANAGEMENT (SAM), SIZE STANDARDS, AND NAICS CODES __________________________________________________________________
2 74
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Failure to register in SAM for the corresponding NAICS code identified in paragraph A.3 prior to submitting a proposal against this solicitation may preclude an award being made to your company. Offerors should be aware of how U.S. Small Business (SB) concerns are defined in FAR Part 19, Defense Federal Acquisition Regulation Supplement (DFARS) Part 19, and 13 CFR 121, Small Business Size
Regulations. Offerors are advised to review 13 CFR 121.103, "How does SBA Determine Affiliation".
A.5 ELECTRONIC CONTRACTING ______________________
(a) All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website
(https://www.sam.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b Unless directed to do otherwise in Section L of this solicitation, offerors shall follow the instructions in paragraph (c) below.
(c) With the recent transition from www.FBO.gov to www.beta.sam.gov and then to www.sam.gov , the www.sam.gov site has been experiencing a number of issues. Interested Offerors shall submit a proposal via email to the Contract Specialist
(caitlin.m.taylor11.civ@army.mil) and cc the corresponding Contracting Officer (shanari.n.wadecki.civ@army.mil) with the subject header:
Proposal Submission - W912CH-24-R-0085 (company name). Once a proposal is received, the Contract Specialist/Contracting Officer will reply with the respective Offeror stating receipt of proposal submission.
(1) Maximum size of each e-mail shall be 10 megabytes. You may use multiple e-mail messages for each bid/submission, however, you must annotate the subject lines as described above for each message, and number them in this manner: Message 1 of 3, 2 of 3, 3 of 3.
Bids can be submitted can be submitted using any of the following electronic formats:
(2) Microsoft Office Products; Word, Excel, or PowerPoint. Spreadsheets must be sent in a format that includes all formulate macro and format information. Print image is not acceptable.
(3) Files in Adobe PDF (Portable Document Format). Scanners should be set to 300 dots per inch.
(4) Files in HTML (Hypertext Markup Language). HTML documents must not contain active links to live Internet sites or pages. All linked information must be contained within your electronic bid/offer and be accessible offline.
(5) Other electronic formats are not acceptable.
Ensure that filenames of attachments DO NOT contain spaces to limit virus scanners rejecting the email as unscannable.
(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
(e) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure (in this case, received through SAM) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
(f) Solicitations may remain posted on www.sam.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the
Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
3 74
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
A.6 ACKNOWLEDGEMENT OF AMENDMENTS _____________________________
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
A.7 ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA) OMBUDSPERSON ____________________________________________________________
Information regarding the Ombudsperson for this contract is located at the following website: https://www.tacom.army.mil/ombudsperson
. (Best viewed using Google Chrome or Microsoft Edge).
A.8 ALL OR NONE ___________
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.
*** END OF NARRATIVE A0001 ***
4 74
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 HEATER, WATER AND RATION
NSN: 7310-01-387-1305
Mfr CAGE: 81337
Mfr Part Number: 5-13-6900-1
0001AA PRODUCTION QUANTITY - HWR TYPE II 796 EA $ $ _________________________________ ______________ __________________
COMMODITY NAME: HEATER, WATER AND RATION
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH4C0404EH PRON AMD: 01
AMS CD: SM2B1100000
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 5-13-6900-1
DATE: 23-JAN-2004
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W58HZ14045V021 W25G1U J 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 250 0360
002 250 0390
003 250 0420
004 46 0450
FOB POINT: Destination
SHIP TO:
(W25G1U) SR W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2083 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND,PA,17070-5002
5 74
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0001AB FIRST ARTICLE TEST & REPORT-NOT SEPARATELY PRICED 1 EA $ ** NSP ** $ ** NSP ** _________________________________________________ ______________ __________________
COMMODITY NAME: HEATER, WATER AND RATION
A FIRST ARTICLE TEST REPORT (FATR) IS REQUIRED IN
ACCORDANCE WITH THE CLAUSE ENTITLED "FIRST ARTICLE
APPROVAL--
CONTRACTOR TESTING," FAR 52.209-3.
THE CONTRACTOR MAY REQUEST FOR A FAT WAIVER WITH THE
ATTACHMENT 0001 "FIRST ARTICLE WAIVER WORKSHEET".
THE WAIVER MUST BE SUBMITTED WITH THE PROPOSAL IN
ACCORDANCE WITH SECTION L, NARRATIVE L.6 PROVISION
FOR WAIVER OF REQUIRED FIRST ARTICLE APPROVAL.
ADDITIONAL INFORMATION ON THE FAT AND FATR CAN BE
FOUND IN SECTION E, NARRATIVES E.2 NOTICE REGARDING
FIRST ARTICLE TEST SAMPLE, E.3 INSPECTION AND
ACCEPTANCE (FIRST ARTICLE APPROVAL), AND E.5 NOTICE
REGARDING FIRST ARTICLE.
NOTE TO OFFEROR:
Please fill in the dollar amount you have
INCLUDED in Production CLIN 0001AA to cover the cost of performing FAT (First Article
Testing) and writing the FAT Report:
WE ARE REQUESTING OFFERORS TO FILL IN
THE DOLLAR AMOUNT IN THE PARAGRAPH ABOVE
SO WE WILL KNOW HOW MUCH TO SUBTRACT
FROM THE PRODUCTION CLIN IF WE WAIVE
FIRST ARTICLE TEST.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W912CH) XR W6QK ACC- DTA
KO DIRECTORATE OF CONTRACTING
6501 EAST 11 MILE ROAD
WARREN,MI,48397-5000
0002 HEATER, WATER AND RATION
NSN: 7310-01-387-1305
6 74
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Mfr CAGE: 81337
Mfr Part Number: 5-13-6900-1
0002AA UNEXERCISED OPTION QUANTITY - HWR TYPE II 796 EA $ $ _________________________________________ ______________ __________________
COMMODITY NAME: HEATER, WATER AND RATION
OPTION QUANTITY, PURSUANT TO THE CLAUSE ENTITLED -
OPTION FOR INCREASED QUANTITY - SEPARATELY PRICED
LINE ITEM 52.217-7.
The quantity stated for the option CLIN DOES NOT form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.
The failure of the offeror to insert a unit price applicable to the option quantity must mean that the offeror will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the offeror will be evaluated for award accordingly.
(End of narrative B001)
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 5-13-6900-1
DATE: 23-JAN-2004
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 250 0120
002 250 0150
003 250 0180
004 46 0210
FOB POINT: Destination
7 74
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SHIP TO:
(W25G1U) SR W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2083 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND,PA,17070-5002
8 74
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
9999 BASIC CLIN FOR ELIN ___________________
The below Exhibit Line Item Numbers (ELINs) are associated with the Data Item Numbers on the Contract
Data Requirements List (CDRL, DD Form 1423), in
Section J.
(End of narrative A001)
A001 SERVICE DATA ITEM 1 LO $ ** NSP ** _________________ __________________
SERVICE REQUESTED: CDRL A001 MEETING MINUTES
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A002 SERVICE DATA ITEM 1 LO $ ** NSP ** _________________ __________________
SERVICE REQUESTED: CDRL A002 ECP
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A003 SERVICE DATA ITEM 1 LO $ ** NSP ** _________________ __________________
SERVICE REQUESTED: CDRL A003 RFV
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DLVR SCH PERF COMPL
9 74
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A004 SERVICE DATA ITEM 1 LO $ ** NSP ** _________________ __________________
SERVICE REQUESTED: CDRL A004 NOR
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
10 74
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 TECHNICAL DATA PACKAGE INFORMATION __________________________________
The following Xd item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ X ] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov ) associated with this solicitation number:
W912CH-24-R-0085
To access the data through SAM:
a. Log on to the SAM web site: https://SAM.gov .
b. Search for the solicitation number.
c. Click on the attachment you would like to view.
d. If the attachment is restricted, request access to the document.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the
TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with
Defense Logistics Information Service (DLIS). To obtain certification, go to https://public.logisticsinformationservice.dla.mil/jcp/search.aspx
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the Contract Specialist and
Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.
f. If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.
Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.
g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed Use and Non-
Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
C.2 CONTRACT MANAGEMENT ___________________
C.2.1. Meetings/Reports. The Contractor shall prepare the agenda and provide minutes of all program meetings detailed below in accordance with (IAW) CDRL A001.
C.2.2. Start of Work Meeting. The Contractor will coordinate, schedule, and conduct a Start of Work Meeting with the Government at the
Contractor's facility unless some other location is designated in the contract. The Government anticipates this conference to be conducted within 30 calendar days of the contract award.
a. Conduct a review of the contract requirements to ensure that there is a mutual understanding between the Government and the
Contractor.
b. Make available if needed to Government representative(s) the documentation for production planning, manufacturing methods and controls, material and manpower resource allocation, production engineering, quality control and assurance program, production
11 74
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
management organization, and controls over major subcontractors.
C.2.3. Monthly Integrated Project Team (IPT) meetings. The Contractor shall conduct monthly IPT meetings to support discussion related to contract status, FAT, production, delivery schedule, etc.
C.2.4. Program Manager (PM). The Contractor shall assign a Program Manager (PM). This individual shall serve as primary Point of
Contact (POC) between the Government and the Contractor and shall be responsible for the coordination of all Contractor activities related to the contract. This person shall have the authority to commit the Contractor to specific courses of action and accept direction from the Contracting Officer. This person shall be responsible for coordinating all meetings between the Government and the
Contractor. The PM shall be responsible for immediately bringing to the Contracting Officers attention any conflicts in the Contractor's interpretation of the contract requirements (first by telephone and then followed up in an email) or problems that could adversely affect the Contractor's ability to meet the stated quality, cost, or production/delivery schedule requirements.
C.2.5. Incorporation of Proposal. Parts of the Contractor's Technical Proposal, as negotiated and accepted by the Government, may be incorporated by reference into the resultant contract. Some or all of the information furnished by the Contractor may be subject to disclosure under the Freedom of Information Act. For this reason, the Contractor shall identify information contained in the proposal that the Contractor specifically does not want to be incorporated by reference. Any changes in these arrangements are to be submitted to the Contracting Officer in advance for approval. In the event of any conflict or ambiguity between the Contractor's Technical Proposal and the Government's Statement of Work (SOW), the Government's SOW shall govern.
C.3 CONFIGURATION MANAGEMENT DOCUMENTATION ______________________________________
The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).
a. The Configuration Change Management section of SAE EIA-649-1 (current revision) Configuration Management Requirement for Defense
Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); and the second sentence of paragraph 3.3.1.8.1(1).
b. Furnished item(s) shall conform to the approved configuration requirements/revision unless an RFV is processed and approved as provided by Paragraph e. below. The term "Request for Variance" includes Requests for Deviations and Waivers.
c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 (current revision) and should be referred to Section I Clause 52.248-1 VALUE ENGINEERING.
d. All ECPs submitted will be deemed routine. The Contractor must include justification for an ECP it considers emergency or urgent in the submittal and include all supporting documentation.
e. For ECPs, RFVs, and NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/NOR without processing.
(i) for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A002.
(ii) for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A003.
(iii) for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A004.
f. The Governments acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Governments sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.
g. The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO), copy to the
Administrative Contracting Officer (ACO).
h. The submission of an ECP/RFV/NOR does not affect the required delivery date of the contract.
C.4 NOTIFICATION OF CHANGE ______________________
C.4.1. Material and Material Supplier Changes. The Contractor shall notify the Government at least 30 days in advance of any changes in material, material suppliers, manufacturing processes (including quality control), or plant location. Also, the Contractor shall ensure that produced end items conform to specified product and quality requirements and shall immediately report any deviation in form, fit, 12 74
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
or function of items produced. The contractor shall submit an RFV in accordance with section C.3 for approval prior to implementing any changes.
C.4.2. Manufacturing Process Changes. A change in the process flow reviewed by the Government during inspection, such as combining operations or using additional/different equipment, constitutes a manufacturing process change. Any change in location or ownership of the plant where a previously qualified product was manufactured requires reevaluation of the qualification and approval from the
Contracting Officer. Routine maintenance and the switching of comparable equipment are not considered a process change. The contractor shall submit an RFV in accordance with section C.3 for approval prior to implementing any changes.
*** END OF NARRATIVE C0001 ***
13 74
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
D.1 PACKAGING REQUIREMENTS (SELECTIVE GROUP PACKAGING REQUIREMENTS) _______________________________________________________________
(a) Military preservation, packing, and marking for this contract shall be accomplished in accordance with the specific requirements identified below and all the applicable requirements of MIL-STD-2073-1
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: B
(3) QUANTITY PER UNIT PACKAGE: 001
(b) MIL-STD-2073-1, Appendix J establishes and defines codes used in describing military packaging methods and materials. The following codes from Appendix J apply:
(1) Preservation Method Code: 31 (Table j.i. and j.ia.)
(2) Cleaning Procedure Code: 1 (Table j.ii)
(3) Preservative Material Code: 00 (Table j.iii)
(4) Wrapping Material Code: EA (Table j.iv)
(5) Cushioning and Dunnage Code: NA (Table j.v)
(6) Thickness of Cushioning or Dunnage Code: B (Table j.vi)
(7) Unit Container Code: ZZ (Table j.vii)
(8) Intermediate Container Code: 00 (Table j.vii)
(9) Quantity per Intermediate Container Code: 000 (Appendix J.4.11)
(10) Packing Code: A (Table j.IX and J.IXa)
(11) Special Marking Code: 01 (Table j.x)
(c) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
(d) Marking:
All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive material will not identify the nature of the material. When an item is assigned Unique Item Identifier (UII) markings as indicated by the inclusion of contract clause DFARS 252.211-
7003, refer to the DoD Guide to Uniquely Identifying Items (available at: https://www.acq.osd.mil/dpap/pdi/uid/guides.html ) for development of the UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
(e) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging
Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56
14 74
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging
Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:
http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
(3) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.
The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
(f) These packaging requirements are intended to provide protection against environmentally induced corrosion and deterioration, physical and mechanical damage, and other forms of degradation during storage, multiple handling, and shipment associated with the military distribution system. The Government encourages contractors to submit requests for changes that will result in savings or improve the packaging. Please submit request for changes in accordance with the RFD clause of the contract. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, blocking, bracing, cushioning, and packing at contractors expense.
(g) Hazardous Materials (as applicable):
(1) Hazardous Materials is defined as a substance or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) Packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the
United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(h) SUPPLEMENTAL INSTRUCTIONS: COIL WIRES, CUSHION/CAP PLUGS. BAG BL IN BOX ED AS UNIT CONTAINER.
*** END OF NARRATIVE D0001 ***
15 74
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2015
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E.1 USE OF MIL-STD 1916 ___________________
(a) The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of Product. The
Verification Level (VL) shall be VL IV for major characteristics and VL II for minor characteristics.
(b) MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.
E.2 NOTICE REGARDING FIRST ARTICLE TEST SAMPLE __________________________________________
(a) The approved first article items, as described elsewhere in this contract, consist of a quantity of 3 EA that will be consumed or destroyed in testing. Any items consumed or destroyed in testing shall not be delivered as part of the contractually required quantity as set forth in the schedule. The cost of any items that are consumed or destroyed shall be included in the overall offer or contract price. A quantity of 0 EA that successfully passes all specified tests, less the destructive tests, if any, shall serve as a manufacturing standard for the remainder of the contract.
(b) A manufacturing standard is an item, which conforms to all technical performance requirements. A manufacturing standard will serve as 1) an aid in identifying configuration changes not controlled by the contractual design. 2) an aid in identifying any process changes, or 3) the approved workmanship sample, when required, unless alternate samples are submitted for specific characteristics by the Contractor and approved by the Government.
(c) The manufacturing standard will only be used to supplement contractual acceptance/rejection criteria for those process characteristics that require approved workmanship samples. For other characteristics, if configuration or process changes are identified in production units, the contractor will notify the contracting officer for disposition. Manufacturing items that serve as a manufacturing standard may be delivered as part of the contractual quantity with the last shipment made under this contract provided it meets all contractual requirements existing at time of delivery.
E.3 INSPECTION AND ACCEPTANCE (FIRST ARTICLE APPROVAL) __________________________________________________
In addition to inspection requirements specified in applicable drawings and/or specifications, the following provisions shall apply to this contract:
(a) FIRST ARTICLE APPROVAL-CONTRACTOR TESTING: First Article Approval-Contractor Testing shall be performed in accordance with MIL-PRF-
44466, Section J - Attachment 0002.
(b) The First Article Test Report (FATR) shall be compiled by the contractor to the contractor's own format. The FATR shall document the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable).
The FATR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the contractor to allow the designated
Government representative to determine that the First Article Test was successfully completed.
E.4 INSPECTION AND ACCEPTANCE POINTS: ORIGIN ________________________________________
16 74
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: __________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
E.5 NOTICE REGARDING FIRST ARTICLE ______________________________
(a) Notwithstanding the provisions for waiver of first article, an additional first article sample (or portion thereof) may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
(b) When any of the conditions above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.
(c) Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the Contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.
E.6 TECHNICAL DATA FOR INSPECTION _____________________________
(a) When requested, the Contractor shall make available to the Government Inspector, the drawings, specifications, and any applicable
Engineering Exceptions associated to the technical data, to which the product was manufactured. Upon completion of product inspection and acceptance by the Government Inspector, all drawings, specifications and Engineering Exceptions, will be returned to the Contractor.
(b) If the contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.) the contractor shall ensure that subcontractor technical data is available for review to support the Government's inspection requirements.
*** END OF NARRATIVE E0001 ***
17 74
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
F-1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989
F-2 52.242-15 STOP-WORK ORDER AUG/1989
F-3 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
F-4 52.247-34 F.O.B. DESTINATION JAN/1991
F-5 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
F-6 52.211-8 TIME OF DELIVERY JUN/1997
(a) The Government solicits delivery to be made according to the following schedule:
(1) SOLICITED DELIVERY SCHEDULE
CLIN QUANTITY WITHIN DAYS AFTER
CONTRACT AWARD
0001AA 796 EA 120 DAYS WITHOUT FAT OR 360 DAYS WITH FAT, AT A RATE OF 250 EA PER MONTH*
0001AB 1 EA 210 DAYS
0002AA 796 EA 120 DAYS, AT A RATE OF 250 EA PER MONTH*
* Delivery Rate: Deliveries shall begin at a quantity of 250 EA within either: i) 360 calendar days after date of contract award when
FAT is required or ii) 120 calendar days after date of contract award if FAT is waived or not required; and continue at a rate of 250 EA every 30 calendar days until the order is fulfilled.
The Government reserves the right to award under either the solicited delivery schedule or the proposed delivery schedule when an offeror offers a delivery schedule other than identified above. If the offeror proposes no other delivery schedule, the identified delivery schedule above will apply.
(2) OFFERORS PROPOSED DELIVERY SCHEDULE
CLIN QUANTITY WITHIN DAYS AFTER
CONTRACT AWARD
0001AA 796 EA _____ DAYS WITHOUT FAT AND 240 ADDITIONAL DAYS WITH FAT, AT A RATE OF _____ EA PER MONTH
0001AB 1 EA OFFERORS MAY NOT PROPOSE AN ALTERNATIVE DELIVERY SCHEDULE FOR THIS CLIN.
0002AA 796 EA _____ DAYS, AT A RATE OF _____ EA PER MONTH
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the
Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the
Contractors date of receipt of the contract or notice of award by adding
(1) five calendar days for delivery of the award through the ordinary mails, or
(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(c) Only upon approval from the Contracting Officer, an accelerated delivery schedule may be acceptable at no additional cost to the
Government.
(End of Clause)
18 74
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
F-7 252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) JAN/2023
(a) Definitions. As used in this clause--
"Automatic identification device" means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.
"Concatenated unique item identifier" means
(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or
(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.
"Data matrix" means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200 (ECC200) specification found within International Standards
Organization (ISO)/International Electrotechnical Commission (IEC) 16022.
"Data qualifier" means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.
"DoD recognized unique identification equivalent" means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html .
"DoD item unique identification" means a system of marking items delivered to DoD with unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .