Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
13 14
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
DPW ENGINEERING DIVISION
ANIBAL NEGRON
DIRECTOR OF PUBLIC WORKS
LUIS E. TORRES
ENGINEERING DIVISION CHIEF
PROJECT MANAGER
MECHANICAL DESIGN
ELECTRICAL DESIGN
GOVERNMENT REPRESENTATIVE:
REVISIONS
REV. NO. DATE APPD. BY
DRAWING #: DPW-010
PROJECT #: 010
IJO:
DATE: APRIL, 2022
SHEET TITLE NAME
PROJECT NAME
FT. BUCHANAN, PUERTO RICO
GENERAL
REPAIRS
BUILDING 223
CIVIL / ARCH. / DESIGN DEVELOPMENT
SCALE: AS SHOWN
OF 8
F.ZAYAS.
F.ZAYAS.
X
A.GONZALEZ.
C.IRIZARRY.
RECOMMENDED APPROVAL:
APPROVED BY:
A1
E4
E1
E2
E3
1/2" = 1'-0"
NEW FLOOR PLAN
BATHROOM 1
1/2" = 1'-0"
NEW ELEVATION E1
1/2" = 1'-0"
NEW ELEVATION E2
1/2" = 1'-0"
NEW ELEVATION E3
1/2" = 1'-0"
NEW ELEVATION E4
1/2" = 1'-0"
NEW REFLECTED CEILING PLAN
BATHROOM 1
NEW WORK NOTES (THIS SHEET ONLY):
NEW CERAMIC FLOOR TILES TO BE INSTALLED OVER NEW SELF LEVELING
CONCRETE TOPPING
NEW FIBERGLASS REINFORCED PANELS AND 6" HIGH CERAMIC TILE
COVE BASE
NEW EXHAUST FAN TO BE INSTALLED
NEW ELONGATED TOILET WITH MANUAL FLUSH VALVE AND DRAINAGE
FLANGE
NEW TWO WALL TOILET 48" X 36" & L-SHAPED SHOWER BAR 16' X 32" TO
BE INSTALLED
NEW SURFACE MOUNTED WASTE RECEPTACLE SIMILAR OR EQUAL TO
BRADLEY 344, 12 GALLON
NEW METAL FRAME, WOOD DOOR INCLUDING ALUMINUM SADDLER SIMILAR
OR EQUAL TO CR LAURENCE MODEL 39A363.
NEW LAVATORY WITH FAUCET, SHUT-OFF VALVES, FLEXIBLE
CONNECTIONS, DRAINAGE PIPE & SINGLE CARRIER SIMILAR OR EQUAL
TO J.R. SMITH 0700E
NEW STAINLESS STEEL ANGLE FRAME FIXED-POSITION TILT MIRROR 24"X36"
NEW TOILET SEAT COVER DISPENSER14
3/8" = 1'-0"
SUNKED FLOOR REPAIR PLAN
NEW VINYL FLOOR TILES TO BE INSTALLED OVER NEW SELF LEVELING
CONCRETE TOPPING AND EXISTING FLOORING
NEW 2 X 4 CEILING LIGHTING REFER TO SHEET EI -118
NEW RECESSED SHAMPOO AND SOAP NICHE.
NEW 24" SURFACE MOUNTED SQUARE TOWEL BAR SIMILAR OR EQUAL TO
BOBRICK B6737-24
NEW ROUND SLIDING SHOWER ENCLOSURE WITH BASE SIMILAR OR
EQUAL TO PERIGOLD DREAMLINE DL-6152-01CLAND SHOWER FAUCET
SYSTEM WITH 8" SHOWER HEAD AND HAND SHOWER
NEW WORKS
SHOWER ROOM #1
A-1
NEW CEILING 2' x 2' TILES ON METAL GRID SYSTEM (SEE DETAILS ON
THIS SHEET)
NOT TO SCALE
2' X 2' ACOUSTIC CEILING DETAILS
19 19 20
NEW TILES REDUCER TO BE INSTALL AT THE END OF THE NEW VINYL TILES
(NEW VINYL TILES LIMIT)
TOILET TISSUE DISPENSER PREVIOUSLY REMOVED AND STORED
SOAP DISPENSER PREVIOUSLY REMOVED AND STORED
PAPER TOWEL DISPENSER PREVIOUSLY REMOVED AND STORED
#1 7/18/22 A. GONZALEZ
REV.1
REV.1
REV.1
AutoCAD SHX Text
BATHROOM #1
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
1. PROVIDE SPLAY BRACING @ HANGER WIRES OF ALL SUSP. ACOUSTICAL
AutoCAD SHX Text
CEILINGS NOT MORE THAN 12'-0" O.C. AND NOT MORE THAN 6'-0"
AutoCAD SHX Text
FROM ALL WALL AND PARTITIONS. (SUBMIT LAYOUT FOR APPROVAL).
AutoCAD SHX Text
2. SPLICES AND INTERSECTIONS OF RUNNERS SHALL BE ATTACHED
AutoCAD SHX Text
WITH MECHANICAL INTERLOCKING CONNECTORS SUCH AS POP RIVET,
AutoCAD SHX Text
SCREWS PINS PLATES WITH BENT TABS OR OTHER APPROVED CONNECTORS.
AutoCAD SHX Text
WALL TRIM
AutoCAD SHX Text
HANGER WIRE
AutoCAD SHX Text 2' x 2' x 5/8"
AutoCAD SHX Text
ACOUSTICAL
AutoCAD SHX Text
12 GA. VERTICAL HANGER
AutoCAD SHX Text
WIRES @ 4'-0" O.C.
AutoCAD SHX Text
SEISMIC LOCKING PIN
AutoCAD SHX Text
MAIN RUNNER
AutoCAD SHX Text
CROSS RUNNER
AutoCAD SHX Text
WIRE GA. 12, @ 4'-0"
AutoCAD SHX Text
CONT. HORIZ. STRUT
AutoCAD SHX Text
TO PREVENT SPREADING
AutoCAD SHX Text
OF RUNNERS
AutoCAD SHX Text
MAIN RUNNER
AutoCAD SHX Text
GALV. STEEL SPLAY
AutoCAD SHX Text
BRACE WIRE, GA. 12
AutoCAD SHX Text
CROSS RUNNER
AutoCAD SHX Text
SPLICE
AutoCAD SHX Text 45%%D
AutoCAD SHX Text 45%%D
AutoCAD SHX Text 45%%D
AutoCAD SHX Text 45%%D
AutoCAD SHX Text 2"
AutoCAD SHX Text
MAX
AutoCAD SHX Text
3. CROSS AND MAIN RUNNERS SHALL BE CORROSION RESISTANCE WHITE
AutoCAD SHX Text
BAKED ENAMEL PAINTED.
AutoCAD SHX Text
GALV. STEEL HANGER
AutoCAD SHX Text
O.C. EACH WAY
AutoCAD SHX Text
GALVANIZED STEEL
AutoCAD SHX Text
GALV. STEEL
AutoCAD SHX Text
GA. 12
AutoCAD SHX Text
4. GRID SYSTEM: 2'-0" x 2'-0" TYPE FOR MAIN AND CROSS RUNNERS.
AutoCAD SHX Text
TILES
AutoCAD SHX Text
5. INSTALL ACOUSTICAL CEILING SYSTEM AT 8'-0" ABOVE FINISHED FLOOR ELEVATION.
AutoCAD SHX Text
SHADOW MOLDING
AutoCAD SHX Text
6. INSTALL FACED FIBERGLASS ACOUSTIC BATT INSULATION OVER CEILING SYSTEM.
AutoCAD SHX Text
CONCRETE OR METAL
AutoCAD SHX Text
STRUCTURAL ROOF SLAB
A2 E5
E8
E7
E6
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
DPW ENGINEERING DIVISION
ANIBAL NEGRON
DIRECTOR OF PUBLIC WORKS
LUIS E. TORRES
ENGINEERING DIVISION CHIEF
PROJECT MANAGER
MECHANICAL DESIGN
ELECTRICAL DESIGN
GOVERNMENT REPRESENTATIVE:
REVISIONS
REV. NO. DATE APPD. BY
DRAWING #: DPW-010
PROJECT #: 010
IJO:
DATE: APRIL, 2022
SHEET TITLE NAME
PROJECT NAME
FT. BUCHANAN, PUERTO RICO
GENERAL
REPAIRS
BUILDING 223
CIVIL / ARCH. / DESIGN DEVELOPMENT
SCALE: AS SHOWN
OF 8
F.ZAYAS.
F.ZAYAS.
X
A.GONZALEZ.
C.IRIZARRY.
RECOMMENDED APPROVAL:
APPROVED BY:
1/2" = 1'-0"
NEW FLOOR PLAN
BATHROOM 2
1/2" = 1'-0"
ELEVATION E5
1/2" = 1'-0"
ELEVATION E6
1/2" = 1'-0"
ELEVATION E7
1/2" = 1'-0"
ELEVATION E8
NEW WORK NOTES (THIS SHEET ONLY):
NEW CEILING 2' x 2' TILES ON METAL GRID SYSTEM (SEE DETAILS ON THIS SHEET)
NEW CERAMIC FLOOR TILES TO BE INSTALLED OVER NEW SELF LEVELING
CONCRETE TOPPING
NEW FIBERGLASS REINFORCED PANELS AND 6" HIGH CERAMIC TILES COVE BASE
NEW EXHAUST FAN TO BE INSTALLED
NEW ROUND SLIDING SHOWER ENCLOSURE WITH BASE AND SHOWER FAUCET
SYSTEM WITH SHOWER HEAD AND HAND SHOWER
NEW TWO WALL BAR FOR TOILET 48" X 36" & L-SHAPED BAR FOR SHOWER
16' X 32" TO BE INSTALLED
NEW SURFACE MOUNTED WASTE RECEPTACLE TO BE INSTALLED
TOILET TISSUE DISPENSER PREVIOUSLY REMOVED AND STORED
EXISTING METAL DOOR FRAME TO BE PAINT, INSTALL NEW DOOR CLOSER, WALL STOP AND
ALUMINUM SADDLER EQUAL OR SIMILAR TO CR LAURENCE MODEL 39A363..
NEW 2 X 4 CEILING LIGHTING TO BE INSTALLED, REFER TO SHEET EI-1.
NEW LAVATORY WITH FAUCET, P-TRAP, SHUT-OFF VALVES & FLEXIBLE CONNECTIONS.
NEW STAINLESS STEEL ANGLE FRAME H.C. TILT MIRROR (24"X36")
SOAP DISPENSER PREVIOUSLY REMOVED AND STORED
1/2" = 1'-0"
NEW REFLECTED CEILING PLAN
BATHROOM 2
NEW TOILET SEAT COVER DISPENSER
NEW 22" X 15" RECESSED SHOWER SHAMPOO SHELF SOAP DISH
PAPER TOWEL DISPENSER PREVIOUSLY REMOVED AND STORED9
NEW SURFACE MOUNTED TOWEL BAR SIMILAR OR
EQUAL TO BOBRICK B6737X24
NEW ELONGATED TOILET WITH MANUAL FLUSH VALVE AND DRAINAGE FLANGE
NEW WORKS
SHOWER ROOM #2
A-2
NOT TO SCALE
2' X 2' ACOUSTICAL CEILING DETAILS
#1 7/18/22 A. GONZALEZ
REV.1
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
1. PROVIDE SPLAY BRACING @ HANGER WIRES OF ALL SUSP. ACOUSTICAL
AutoCAD SHX Text
CEILINGS NOT MORE THAN 12'-0" O.C. AND NOT MORE THAN 6'-0"
AutoCAD SHX Text
FROM ALL WALL AND PARTITIONS. (SUBMIT LAYOUT FOR APPROVAL).
AutoCAD SHX Text
2. SPLICES AND INTERSECTIONS OF RUNNERS SHALL BE ATTACHED
AutoCAD SHX Text
WITH MECHANICAL INTERLOCKING CONNECTORS SUCH AS POP RIVET,
AutoCAD SHX Text
SCREWS PINS PLATES WITH BENT TABS OR OTHER APPROVED CONNECTORS.
AutoCAD SHX Text
WALL TRIM
AutoCAD SHX Text
HANGER WIRE
AutoCAD SHX Text 2' x 2' x 5/8"
AutoCAD SHX Text
ACOUSTICAL
AutoCAD SHX Text
12 GA. VERTICAL HANGER
AutoCAD SHX Text
WIRES @ 4'-0" O.C.
AutoCAD SHX Text
SEISMIC LOCKING PIN
AutoCAD SHX Text
MAIN RUNNER
AutoCAD SHX Text
CROSS RUNNER
AutoCAD SHX Text
WIRE GA. 12, @ 4'-0"
AutoCAD SHX Text
CONT. HORIZ. STRUT
AutoCAD SHX Text
TO PREVENT SPREADING
AutoCAD SHX Text
OF RUNNERS
AutoCAD SHX Text
MAIN RUNNER
AutoCAD SHX Text
GALV. STEEL SPLAY
AutoCAD SHX Text
BRACE WIRE, GA. 12
AutoCAD SHX Text
CROSS RUNNER
AutoCAD SHX Text
SPLICE
AutoCAD SHX Text 45%%D
AutoCAD SHX Text 45%%D
AutoCAD SHX Text 45%%D
AutoCAD SHX Text 45%%D
AutoCAD SHX Text 2"
AutoCAD SHX Text
MAX
AutoCAD SHX Text
3. CROSS AND MAIN RUNNERS SHALL BE CORROSION RESISTANCE WHITE
AutoCAD SHX Text
BAKED ENAMEL PAINTED.
AutoCAD SHX Text
GALV. STEEL HANGER
AutoCAD SHX Text
O.C. EACH WAY
AutoCAD SHX Text
GALVANIZED STEEL
AutoCAD SHX Text
GALV. STEEL
AutoCAD SHX Text
GA. 12
AutoCAD SHX Text
4. GRID SYSTEM: 2'-0" x 2'-0" TYPE FOR MAIN AND CROSS RUNNERS.
AutoCAD SHX Text
TILES
AutoCAD SHX Text
5. INSTALL ACOUSTICAL CEILING SYSTEM AT 8'-0" ABOVE FINISHED FLOOR ELEVATION.
AutoCAD SHX Text
SHADOW MOLDING
AutoCAD SHX Text
6. INSTALL FACED FIBERGLASS ACOUSTIC BATT INSULATION OVER CEILING SYSTEM.
AutoCAD SHX Text
CONCRETE OR METAL
STRUCTURAL ROOF SLAB
DPW ENGINEERING DIVISION
ANIBAL NEGRON
DIRECTOR OF PUBLIC WORKS
LUIS E. TORRES
ENGINEERING DIVISION CHIEF
PROJECT MANAGER
MECHANICAL DESIGN
ELECTRICAL DESIGN
GOVERNMENT REPRESENTATIVE:
REVISIONS
REV. NO. DATE APPD. BY
DRAWING #: DPW-010
PROJECT #: 010
IJO:
DATE: APRIL, 2022
SHEET TITLE NAME
PROJECT NAME
FT. BUCHANAN, PUERTO RICO
GENERAL
REPAIRS
BUILDING 223
CIVIL / ARCH. / DESIGN DEVELOPMENT
SCALE: AS SHOWN
OF 8
F.ZAYAS.
F.ZAYAS.
X
A.GONZALEZ.
C.IRIZARRY.
RECOMMENDED APPROVAL:
APPROVED BY:8
D1 E1
E4
E3
E2
12'
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
10 11
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
13 4
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
12'
1/2" = 1'-0"
DEMOLITION FLOOR PLAN
BATHROOM 1
1/2" = 1'-0"
DEMOLITION CEILING PLAN
BATHROOM 1
1/2" = 1'-0"
EXSTING ELEVATION E3
1/2" = 1'-0"
EXISTING ELEVATION E1
1/2" = 1'-0"
EXISTING ELEVATION E2
1/2" = 1'-0"
EXISTING ELEVATION E4
DEMOLITION NOTES:
EXISTING ACOUSTIC CEILING TILE AND TEGULAR GRID TO BE REMOVED
EXISTING SUSPENDED GYPSUM CEILINGTO BE REMOVED
REMOVE POLISH WAX FINISH ON EXISTING RESILIENT VINYL FLOOR TO REMAIN
EXISTING 4" HIGH RUBBER COVE WALL BASE TO BE REMOVED
EXISTING GYPSUM BOARD WALL TO BE REMOVED
EXISTING EXHAUST FAN TO BE REMOVED
EXISTING SHOWER, STALL, RECEPTOR TO BE REMOVED
SHOWER FLOOR DRAIN & TOILET FLANGE TO BE REMOVED
EXISTING TOILETE TO BE REMOVED
EXISTING GRAB BARS TO BE REMOVED
EXISTING SEMI-RECESED TOWEL DISPENSER TO BE REMOVED
EXISTING TOILET TISSUE DISPENSER TO BE REMOVED AND STORAGE
LIQUID SOAP DISPENSER TO BE REMOVED AND STORAGE
EXISTING INTERIOR WOOD DOOR & FRAME TO BE REMOVED
EXISTING 2 X 4 CEILING LIGHTING FIXTURES TO BE REMOVED
DEMOLITION WORKS
SHOWER ROOM #1
EXISTING LAVATORY, WITH FAUCET, SHUTOFF VALVES, FLEXIBLE
CONNECTIONS AND DRAINAGE PIPE TO BE REMOVED
1/2" = 1'-0"
SUNKEN FLOOR AREA
D-1
REMOVE THE POLISH WAX FINISH ON VINYL TILES17
1717 17
EXISTING MIRROR TO BE REMOVED18
#1 7/18/22 A. GONZALEZ
EXISTING PLASTIC TOWEL DISPENSER TO BE REMOVED AND STORAGE12'
REV.1
REV.1
REV.1
REV.1
REV.1
REV.1
REV.1
BATHROOM #1
D2 E5
E8
E7
E6
12'
D2 E5
E8
E7
E6
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
12'
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
1 6
DPW ENGINEERING DIVISION
ANIBAL NEGRON
DIRECTOR OF PUBLIC WORKS
LUIS E. TORRES
ENGINEERING DIVISION CHIEF
PROJECT MANAGER
MECHANICAL DESIGN
ELECTRICAL DESIGN
GOVERNMENT REPRESENTATIVE:
REVISIONS
REV. NO. DATE APPD. BY
DRAWING #: DPW-010
PROJECT #: 010
IJO:
DATE: APRIL, 2022
SHEET TITLE NAME
PROJECT NAME
FT. BUCHANAN, PUERTO RICO
GENERAL
REPAIRS
BUILDING 223
CIVIL / ARCH. / DESIGN DEVELOPMENT
SCALE: AS SHOWN
OF 8
F.ZAYAS.
F.ZAYAS.
X
A.GONZALEZ.
C.IRIZARRY.
RECOMMENDED APPROVAL:
APPROVED BY:
1/2" = 1'-0"
DEMOLITION FLOOR PLAN
BATHROOM 2
1/2" = 1'-0"
DEMOLITION CEILING PLAN
BATHROOM 2
1/2" = 1'-0"
EXISTING ELEVATION E5
1/2" = 1'-0"
EXISTING ELEVATION E6
1/2" = 1'-0"
EXISTING ELEVATION E7
1/2" = 1'-0"
EXISTING ELEVATION E8
DEMOLITION NOTES:
EXISTING ACOUSTIC CEILING TILE AND TEGULAR GRID TO BE REMOVED
AND DISPOSE
EXISTING SUSPENDED GYPSUM CEILINGTO BE REMOVED
EXISTING RESILIENT VINYL FLOOR TO REMOVE THE WAX FINISH.
EXISTING 4" HIGH RUBBER COVE WALL BASE TO BE REMOVED
EXISTING GYPSUM BOARD WALL TO BE REMOVED
EXISTING EXHAUST FAN AND GRILL TO BE REMOVED
EXISTING SHOWER, STALL, RECEPTOR AND CURTAIN TO BE REMOVED
EXISTING TOILETE TO BE REMOVED
EXISTING LAVATORY, WITH FAUCET, SHUTOFF VALVES, FLEXIBLE
CONNECTIONS AND DRAINAGE PIPE TO BE REMOVED
EXISTING GRAB BARS TO BE REMOVED
EXISTING SEMI-RECESED TOWEL DISPENSER TO BE REMOVED
EXISTING TOILET TISSUE DISPENSER TO BE REMOVED
LIQUID SOAP DISPENSER TO BE REMOVED AND STORAGE
EXISTING INTERIOR METAL DOOR & FRAME TO REMAIN
EXISTING SHOWER TOWER BAR TO BE REMOVED
DEMOLITION WORKS
SHOWER ROOM #2
SHOWER FLOOR DRAIN & TOILET FLANGE TO BE REMOVED
D-2
EXISTING 2 X 4 CEILING LIGHTING FIXTURES TO BE REMOVED17
EXISTING MIRROR TO BE REMOVED18
#1 7/18/22 A. GONZALEZ
REV.1
EXISTING PLASTIC TOWEL DISPENSER TO BE REMOVED AND STORAGE12'
REV.1
REV.1
REV.1
| 20220718 General Repairs Bldg 223.dwg REV1-A-1 |
| Sheets and Views |
| A-1 |
| 20220718 General Repairs Bldg 223.dwg REV1-A-2 |
| Sheets and Views |
| A-2 |
| 20220718 General Repairs Bldg 223.dwg REV1-D-1 |
| Sheets and Views |
| D-1 |
| 20220718 General Repairs Bldg 223.dwg REV1-D-2 |
| Sheets and Views |
| D-2 |