Attachment2a-Drawings-W912C322R0007-GeneralRepairsB223-20220701.pdf
PDF 3 MB Posted
- Solicitation number
- W912C322R0007
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
G
F
N
M
S
R
C
B
A E
L
K
J
P
O
X
W
U
V
T
H
I
OUTSIDE DIAMETER
OPENING
OUTSIDE BLADE DAMPER
PLATE
PRELIMINARY
POLYVINYL CHLORIDE
POUNDS PER SQUARE INCH
POINT OF VERTICAL CURVE,
REFERENCE, REFER TO
REINFORCEMENT
REVISION
ROOM
SCHEDULE
SECTION
SHEET
POUNDS PER SQUARE FOOT
RADIUS, RISER, RUBBER SHEATH
SPLITTER DAMPER
CKT
CLG
CMU
COL
CONC
CND,C
CONN
CONST
COND
D
L
C
DEPTH, DEEP, DEGREE OF CURVATURE
GB
GW
GPM
GR
GRD
CONCRETE MASONRY UNITS
CONCRETE
CONDUCTOR
CONNECTION
CONSTRUCTION
COLUMN
CONDUIT
CENTERLINE
CEILING
CIRCUIT
GALV
GA, G
FT
FL
FIN
FFE
GYPSUM BOARD
GALLONS PER MINUTE
GROUND WATER
GRADE
GROUND
NTS
NO
NIC
FLOOR, FLASHING
GAGE
FOOT, FEET
GALVANIZED
FINISHED FLOOR ELEVATION
FINISH
N, NW
MISC
MTD
MECH
MIN
MAX
LED
NOT IN CONTRACT
NUMBER
NOT TO SCALE
SHT
NORTH, NEW
MISCELLANEOUS
MOUNTED
MAXIMUM
MECHANICAL
MINIMUM
LIGHTING EMITING DIODE
RM
SD
REINF
REV
SCH, SCHED
SECT
R
RE, REF
PSF
DET, DTL
EL, ELEV
EXIST, EX, E
LIST OF ABBREVIATIONS
A/C
AFF
AP
ARR
ARCH
ALT
A.B.I.
AL, ALUM
AMP,A
APPROX
BLDG, B
CC,CTC
B, BOT
AWG
BD
BUILDING
CENTER TO CENTER
BOARD
ALUMINUM
ARRESTOR
ALTERNATE
ACCESS PANEL
APPROXIMATE
ARCHITECTURAL
ABOVE FINISH FLOOR
AMERICAN WIRE GAGE
BOTTOM
AMPERE
EW
ELEC
EMT
D PNL
DWG
EA
DN
D, DIAM.
DIM
ACOUSTICAL BATT INSULATION
AIR CONDITIONING
ELECTRICAL METALLIC TUBING
ELECTRIC, ELECTRICAL
EACH WAY
EXISTING
ELEVATION
DISTRIBUTION PANEL
EACH
DRAWING
DIAMETER
DIMENSION
DOWN
KW
L
LBS
KV
KVA
JB
DETAIL
KILOVOLT-AMPERE
LENGTH, LENGTH OF CURVE
KILOVOLT
KILOWATT
POUNDS
JUNCTION BOX
PL
PSI
PRELIM
PVC
OD
OBD
OPNG
UNDERGROUND
TRANSFORMER
VENT, VOLT, VALVE
VITRIFIED CLAY PIPE
WATERPROOF, WEATHERPROOF
ANGULAR
WIDTH, WASTE, WATER, WATT, WEST
XFMR
WT WEIGHT
VERT
W
WP
W/
VCP
V
UG
TON
WITH
VERTICAL
TONELATE
SPECIFICATION
STRUCTURE, STRUCTURAL
STAINLESS STEEL
TOP, TANGENT
THREE POLE
TUBULAR STEELTS
3/P
STRUCT
STD
T
SW
STL
SQ
SS
STANDARD
STEEL
SWITCH
SQUARE
SPEC
BW BOTH WAY
CFM CUBIC FEET PER MINUTE
NOTE: SOME ABBREVIATIONS LISTED ARE NOT CONTAINED IN THESE DRAWINGS
EMB
EMBBEDED
EF
EACH FACE
ETC ETCETERA
C7 CIRCUIT NUMBER
FD
FLEXIBLE DUCT
FDB
FARENHEIT DRY BULB
FWB
FARENHEIT WET BULB
H, HGT, HT
HEX HEXAGONAL
HEIGHT
IN
ID INSIDE DIAMETER, INSIDE DIMENSION
INCH
AT
NUMBER, POUND
Ø
DIAMETER
MD MANUAL DAMPER
MBH MEGA BRITISH HOUR
GI
GALVANIZED IRON
IN C.W. INCH COLD WATER
LT LIGHT
AND
3W
THREE WAYS
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
90°
ANGLE DEGREE
RATED LOAD AMPERERLA
RETURN REGISTERRR
RETURN GRILLERG
ROOF TOP UNITRTU
HP HORSEPOWER
F
FARENHEIT
STO STORAGE
TYP TYPICAL
P
A
T
R
IO
T
B
L V
D
C A
L A
B A
S H
S T
F L A
M
B O
Y A
N
S T
H
O
W
Z
E
R
I V
E
ISABELA STREET
D
E
P
O
T
R
D
F
I
R
E
L
A
N
E
M
E
M
O
R
I
A
L
I
V
E
P
A
T
R
I
O
T
B
V
D
R
D
P
A
T
R
IO
T
B
L
V
D
V
I C
T
O
R
Y
D
R
C O
L U
M B
U S
SERVICE
D A
V I D
S
N
P
A
T
R
I
V
D
D
O
U
B
G
V
E
D
O
U
B
G
E
N
U
E
D
O
U
B
G
E
N
U
E
G
R
A
S
S E
R V
I C
E
R
D
S
E
R
V
I
C
E
R
D
S
O
U
T
H
S E
R V
I C
E R
D
D
E
P
O
T
R
D
S
O
U
H
R
M
I
N
N
O
R
T
H
T
E
R
M
IN
A
L
R
D
S O
U
R
M I N
COCONUT GROVE
N A
Y
W
Y
Driving Range
Golf
C o u r s e
R
D
R
E
S
E
R
V
A
T
I
U
N
D
A
R
Y
R
E
S
E
R
V
A
T
I
U
N
D
A
R
Y
P L
A Y
IN
G
F
IE
L D
X
G
U
A
Y
A
C
S E
A G
R A
P
T
O
T
O
D
A
V
I
W
H
I
T
N
H
E
N
G
A
T
E
R
D
P A
T R
IO
T B
L V
D
SO
UTH TERM
INAL RD.
X
X
X
X
X
X
X
X
X
X
X
X
P
E
R
I
M
E
T
C
O
L U
M
B
U
S
S
T
P
E
R
I
M
E
T
E
R
R
D
S
O
U
T
E
R D
R
E
S
E
R
V
A
T
I
U
N
D
A
R
Y
R
E
S
E
R
V
A
T
I
U
N
D
A
R
Y
R
E
S
E
R
V
A
T
I
U
N
D
A
R
Y
T
O
S
O
U
R
M
I
N
X
XX
X
H
H
H
H
H
H
H
BORINQUENEER RD.
S
A
N
M
I
N
R
R
A
C
K
H
E
N
R
R
A
C
A
I
B
O
N
I
R
R
A
C
A
G
U
A
D
I
L
R
R
A
C
M
A
Y
A
G
U
E
Z
N
O
R
R
M
I N
F
R
E
E
D
O
M
T
E
W
A
Y
W
H
I
T
N
H
H
H
H
H
H
C
I
T
I
Z
E
N
S
O
L
D
I
W
Y
C
A
L
A
B
A
A
U
S
U
HOWZE DRIVE
P
E
R
I M
E
T
R A
I N
T R
S
E
R
V
I
C
E
P
E
R
I
M
E
T
Golf Course
COURT NO. 1
COURT NO. 2
D
O
U
B
G
E
N
U
E x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
C O
N S
T I T
U T
I O
N
A
V E
F
R
E
E
D
O
M
'S
T
E
W
A
Y
P
PLAY
GROUND
P
L
A
Y
G
R
O
U
N
D
P
P N
P
N
P
N
S T
PRNG
REDINESS CENTER
S A
N T
IA
G
O S
T
SANTIAGO ST.
130.8849
BORINQUENEER GATE
ELEMENTARY SCHOOL
HIGH SCHOOL
NEW DPW
FACILITY
MAXIE WILLIAMS
JR FIELD
Softball Field
GOLF COURSE
Basketball
Aqua Park
L A K E
MIDDLE SCHOOL
1,000,000 GAL.
WATER TANK
20 MVA SUBSTATION
LAS COLINAS
ELEMENTARY SCHOOL
NEW ANTILLES
Basketball Playground
Softball
Softball
Court
USAR
CENTER
Baseball
Picnic
FAC NO. 7
Picnic
PX
79 80
68 66
807812
218 220
396366
1234 1231
829 831
Area
Maxie Williams Parking
10771075
Court
COMMISSARY AND PX
WASH
RACK
820821
01094
PN218
PN202
PN1140
PN376
PN192
353 357
354 356
PN021
PN1339
PN404
PN404
10741138
1134 1132
1152 1154
PN354
PN355
Tennis
Tennis
F1094
10291037
105610571058
P1029
PLAY COURT
RW
Ply
PN218
PN224
PN566 PN152
P1068
PN239
P
PN025
PN148
P N
PN148
PN183 PN292
PN
PN152
01003
Area
PN614
PN363
Ply 006
P N
Skate Park
Ply 01 Ply 02Ply 04
Ply 05
Ply 03
PN
PN353
236241
PN348
328PN1300
PN
PN067
PN399
RT 039
WIND TURBINE 2
WIND TURBINE 1
CONTRACTOR 'S STAGING AREA
FD TRAINING AREA
AAFES CONTAINER 'S STORAGE SITE
500,000 GAL.
WATER TANK
(VACANT)
Soldiers Plaza
NEW CDC YC
Aparatus Bldg.
R
O
P
DE DIEGO EXPRESSWAY ( ROAD NO PR-28 )
C
T
A
N
O
R
O
A
D
N
O
P
R
-1
J
O
F
T
Z
G
E
R
A
N
N
E
E
F
R
A
N
K
L
R
O
O
S
E
V
E
E
T
O
H
A
T
O
R
E
Y
Y
A
M
O
N
B-7
B-1
B-9
B-5
B-2
B-6
B-8
B-10
B-11
B-3
B-4
B
B B
PUNTA BORINQUEN
(FORMER RAMEY U.S. AIR FORCE BASE)
SCALE IN MILEC A R I B B E A N S E A
P U E R T O R I C O
SALINAS
TRAING AREA
N
5 10
A T L A N T I C O C E A N
FORT BUCHANAN
SAN JUAN
U. S. NAVAL STATION
ROOSEVELT ROADS
DPW ENGINEERING DIVISION
RECOMMENDED APPROVAL:
ANIBAL NEGRON
DIRECTOR OF PUBLIC WORKS
LUIS E. TORRES
ENGINEERING DIVISION CHIEF
PROJECT TEAM
PROJECT MANAGER
CIVIL / ARCH. / DESIGN DEVELOPMENT
MECHANICAL DESIGN
ELECTRICAL DESIGN
GOV REP
REVISIONS
REV. NO. DATE APPD. BY
SCALE: N.T.S.
T-1
OF
DRAWING #:DPW-010
PROJECT #: 010
IJO:
DATE: APRIL/2022
SHEET TITLE NAME
PROJECT NAME
FT. BUCHANAN, PUERTO RICO
DAVIS STREET
ENVIRONMENTAL DIVISION (DPW)
ACTIVITY
O&M DIVISION (DPW)
MASTER PLANNING (DPW)
ENERGY MANAGER (DPW)
PHYSICAL SECURITY (DES)
POLICE SERVICES (DES)
SAFETY OFFICE
FIRE DEPARTMENT (DES)
FORCE PROTECTION (DPTMS)
NETWORK ENTERPRISE CENTER
(NEC)
TENANT
PRINT NAME INITIALS DATE
DEPARTMENT OF THE ARMY
GENERAL REPAIRS, BUILDING # 223
FORT BUCHANAN, PUERTO RICO
INDEX OF DRAWINGS
DRAWING NO.
T-1
D-1
A-1
TITLE
TITLE SHEET, LOCATION SITE MAPS & DRAWING INDEX
DEMOLITION WORKS SHOWER ROOM #1
PROJECT SITE LOCATION
FORT BUCHANAN SITE MAP
LOCATION MAP
GENERAL REPAIRS
BUILDING 223
ED-1 ELECTRICAL DEMOLITION PLAN
EI-1 ELECTRICAL INSTALLATION PLAN
NEW WORKS SHOWER ROOM #1
F.ZAYAS.
F.ZAYAS.
C.IRIZARRY.
A.GONZALEZ.
SHEET NO.
Site Location
TITLE SHEET, LOCATION SITE
MAPS & DRAWING INDEX
A-2
NEW WORKS SHOWER ROOM #2
APPROVED BY:
X
D
O
U
B
G
E
N
U
E
S
O
U
T
H
D
A
V
W
H
I
T
N
H
E
N
G
A
T
E
R
D
H
H
H
H
H
H
H
F
R
E
E
D
O
M
T
E
W
A
Y
W
H
I
T
N
H
H
H
H
H
H
F
R
E
E
D
O
M
T
E
W
A
Y
Basketball
218 220
PN218
PN202
PN192
PN355
PN218
PN224
PN239
PN183 PN292
PN
PN
236241
Site Location
Staging Area Location
D-2 DEMOLITION WORKS SHOWER ROOM #24
SI-1 NEW WORKS LOCATION PLAN AND NEW WATER COOLER FOUNTAIN INSTALLATION DETAILS2
AutoCAD SHX Text
EL
AutoCAD SHX Text
TORO
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
BAILEY RD.
AutoCAD SHX Text Playground
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CERRO
AutoCAD SHX Text
DOÑA JUANA ST.
AutoCAD SHX Text
CERRO PUNTA ST.
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text
PUNTA ST.
AutoCAD SHX Text L A K E
AutoCAD SHX Text
SPC VEGA GATE
AutoCAD SHX Text
EL
AutoCAD SHX Text
TORO
AutoCAD SHX Text
CREEK
NEW
" WATER SUPPLY COPPER PIPE
FOR ICE MAKER & DRINKING
FOUNTAIN (SEE NOTE 9)
NEW BALL GATE
VALVE CONNECTED
TO THE EXISTING
COPPER PIPE
DPW ENGINEERING DIVISION
ANIBAL NEGRON
DIRECTOR OF PUBLIC WORKS
LUIS E. TORRES
ENGINEERING DIVISION CHIEF
PROJECT MANAGER
MECHANICAL DESIGN
ELECTRICAL DESIGN
GOVERNMENT REPRESENTATIVE:
REVISIONS
REV. NO. DATE APPD. BY
DRAWING #: DPW-010
PROJECT #: 010
IJO:
DATE: APRIL, 2022
SHEET TITLE NAME
PROJECT NAME
FT. BUCHANAN, PUERTO RICO
GENERAL
REPAIRS
BUILDING 223
CIVIL / ARCH. / DESIGN DEVELOPMENT
SCALE: AS SHOWN
OF
F.ZAYAS.
F.ZAYAS.
X
A.GONZALEZ.
C.IRIZARRY.
RECOMMENDED APPROVAL:
APPROVED BY:
EE-1 IS-1
NEW WORKS BUILDING NOTES:
THE BUILDING SHALL KEEP IN OPERATION, CONTRACTOR SHALL PREPARE THE
CONSTRUCTION PROGRESS SCHEDULE IN COORDINATION WITH C.O.R. & TENANT.
NEW WALL MOUNTED WATER COOLER FOUNTAIN.
THE DESIGNED AREA FOR INSTALLATION OF TEMPORARY WAREHOUSE TRAILER
SHALL BE AT CONTRACTORS STAGING AREA, SEE PROJECT SITE LOCATION MAP.
3/16" = 1'-0"
BUILDING EXTERIOR ELEVATION EE-1
SHADE AREA IDENTIFIES SUNKEN FLOOR SLAB TO BE REPAIR WITH
SELF-LEVELING CONCRETE PRODUCT OVER EXISTING VINYL TILES.
NEW LOCATION OF EXISTING ICE MACHINE TO INSTALL NEW DRINKING FOUNTAIN.
EXISTING
" PVC PIPE SHALL BE SUBSTITUTE BY
" COPPER PIPE ATTACHED TO
WALL WITH S-STRUT CLAMP (SEE ELEVATION EE-1 FOR REFERENCE).
10 NEW WATER FILTER SYSTEM WITH TWO-STEP FILTRATION SYSTEM WITH
SEDIMENT FILTER CARTRIDGE & PREMIUM FILTER CARTRIDGE, 2.5 GPM FLOW
RATE, KDF MEDIA PREVENT LIME SCALE & BACTERIA GROWTH WHEN FILTER IS
NOT IN USE. THE NEW FILTER SYSTEM SHALL SUPPLY WATER TO EXISTING ICE
MAKER AND NEW DRINKING WATER FOUNTAIN WITH TWO
" DIA. X 5'-O"
STAINLESS STEEL WATER HOSE.
3/16" = 1'-0"
BUILDING INTERIOR SECTION IS-1
NEW WORKS LOCATION PLAN
AND NEW WATER COOLER
FOUNTAIN INSTALLATION
DETAILS
3/16" = 1'-0"
ELEVATION REFERENCE PLAN
3/16" = 1'-0"
NEW WORKS LOCATION PLAN
EXISTING ICE MACHINE AND NEW DRINKING FOUNTAIN SHALL DRAINAGE TO THE OUT
SITE OF THE BUILDING IN 2" PVC PIPE AND DISCHARGE USED WATER, BELOW GROUND
LEVEL, TO THE EXISTING CONCRETE OPEN CHANNEL.
THE DETAILS AND INFORMATION PRESENTED HERE ARE CONCEPTUAL, THE
CONTRACTOR HAS TO VERIFY THE FINAL DISTANCES, ELEVATIONS AND LOCATIONS OF
THE EQUIPMENT. IN THE EVENT THAT THE CONTRACTOR FINDS ANY DISCREPANCIES,
THIS MATTER SHALL BE NOTIFIED IMMEDIATELY TO THE GOVERNMENT.
TO AVOID THE ENTRANCE OF SMALL ANIMALS TROUGH THE DISCHARGE PIPE,
CONTRACTOR SHALL INSTALL 2" SCREEN TERMINATION PVC MESH CAP.
SI-1
HATCH AREAS IDENTIFY
SUNKEN FLOOR TO REPAIR
6 FLOOR AREAS WITH NEW VINYL TILES OVER NEW CONCRETE SELF LEVELING AND
EXISTING VINYL TILES. INSTALL TRANSITION TILE REDUCER WHERE NEW VINYL TILES
FINISH AND EXISTING FLOORING CONTINUE.
6 6 6
AutoCAD SHX Text
BATHROOM #2
BATHROOM #1
DPW ENGINEERING DIVISION
ANIBAL NEGRON
DIRECTOR OF PUBLIC WORKS
LUIS E. TORRES
ENGINEERING DIVISION CHIEF
PROJECT MANAGER
MECHANICAL DESIGN
ELECTRICAL DESIGN
GOVERNMENT REPRESENTATIVE:
REVISIONS
REV. NO. DATE APPD. BY
DRAWING #: DPW-010
PROJECT #: 010
IJO:
DATE: APRIL, 2022
SHEET TITLE NAME
PROJECT NAME
FT. BUCHANAN, PUERTO RICO
GENERAL
REPAIRS
BUILDING 223
CIVIL / ARCH. / DESIGN DEVELOPMENT
SCALE: AS SHOWN
OF 8
F.ZAYAS.
F.ZAYAS.
X
A.GONZALEZ.
C.IRIZARRY.
RECOMMENDED APPROVAL:
APPROVED BY:8
D1 E1
E4
E3
E2
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
10 11
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
13 4
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
1/2" = 1'-0"
DEMOLITION FLOOR PLAN
BATHROOM 1
1/2" = 1'-0"
DEMOLITION CEILING PLAN
BATHROOM 1
1/2" = 1'-0"
EXSTING ELEVATION E3
1/2" = 1'-0"
EXISTING ELEVATION E1
1/2" = 1'-0"
EXISTING ELEVATION E2
1/2" = 1'-0"
EXISTING ELEVATION E4
DEMOLITION NOTES:
EXISTING ACOUSTIC CEILING TILE AND TEGULAR GRID TO BE REMOVED
EXISTING SUSPENDED GYPSUM CEILINGTO BE REMOVED
REMOVE POLISH WAX FINISH ON EXISTING RESILIENT VINYL FLOOR TO REMAIN
EXISTING 4" HIGH RUBBER COVE WALL BASE TO BE REMOVED
EXISTING GYPSUM BOARD WALL TO BE REMOVED
EXISTING EXHAUST FAN TO BE REMOVED
EXISTING SHOWER, STALL, RECEPTOR TO BE REMOVED
SHOWER FLOOR DRAIN & TOILET FLANGE TO BE REMOVED
EXISTING TOILETE TO BE REMOVED
EXISTING GRAB BARS TO BE REMOVED
EXISTING SEMI-RECESED TOWEL DISPENSER TO BE REMOVED
EXISTING TOILET TISSUE DISPENSER TO BE REMOVED AND STORAGE
LIQUID SOAP DISPENSER TO BE REMOVED AND STORAGE
EXISTING INTERIOR WOOD DOOR & FRAME TO BE REMOVED
EXISTING 2 X 4 CEILING LIGHTING FIXTURES TO BE REMOVED
DEMOLITION WORKS
SHOWER ROOM #1
EXISTING LAVATORY, WITH FAUCET, SHUTOFF VALVES, FLEXIBLE
CONNECTIONS AND DRAINAGE PIPE TO BE REMOVED
1/2" = 1'-0"
SUNKEN FLOOR AREA
D-1
REMOVE THE POLISH WAX FINISH ON VINYL TILES17
1717 17
BATHROOM #1
D2 E5
E8
E7
E6
D2 E5
E8
E7
E6
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
Floor Level 0' - 0"
Acoustic Ceiling Level 8' - 0"
1 6
DPW ENGINEERING DIVISION
ANIBAL NEGRON
DIRECTOR OF PUBLIC WORKS
LUIS E. TORRES
ENGINEERING DIVISION CHIEF
PROJECT MANAGER
MECHANICAL DESIGN
ELECTRICAL DESIGN
GOVERNMENT REPRESENTATIVE:
REVISIONS
REV. NO. DATE APPD. BY
DRAWING #: DPW-010
PROJECT #: 010
IJO:
DATE: APRIL, 2022
SHEET TITLE NAME
PROJECT NAME
FT. BUCHANAN, PUERTO RICO
GENERAL
REPAIRS
BUILDING 223
CIVIL / ARCH. / DESIGN DEVELOPMENT
SCALE: AS SHOWN
OF 8
F.ZAYAS.
F.ZAYAS.
X
A.GONZALEZ.
C.IRIZARRY.
RECOMMENDED APPROVAL:
APPROVED BY:
1/2" = 1'-0"
DEMOLITION FLOOR PLAN
BATHROOM 2
1/2" = 1'-0"
DEMOLITION CEILING PLAN
BATHROOM 2
1/2" = 1'-0"
EXISTING ELEVATION E5
1/2" = 1'-0"
EXISTING ELEVATION E6
1/2" = 1'-0"
EXISTING ELEVATION E7
1/2" = 1'-0"
EXISTING ELEVATION E8
DEMOLITION NOTES:
EXISTING ACOUSTIC CEILING TILE AND TEGULAR GRID TO BE REMOVED
AND DISPOSE
EXISTING SUSPENDED GYPSUM CEILINGTO BE REMOVED
EXISTING RESILIENT VINYL FLOOR TO REMOVE THE WAX FINISH.
EXISTING 4" HIGH RUBBER COVE WALL BASE TO BE REMOVED
EXISTING GYPSUM BOARD WALL TO BE REMOVED
EXISTING EXHAUST FAN AND GRILL TO BE REMOVED
EXISTING SHOWER, STALL, RECEPTOR AND CURTAIN TO BE REMOVED
EXISTING TOILETE TO BE REMOVED
EXISTING LAVATORY, WITH FAUCET, SHUTOFF VALVES, FLEXIBLE
CONNECTIONS AND DRAINAGE PIPE TO BE REMOVED
EXISTING GRAB BARS TO BE REMOVED
EXISTING SEMI-RECESED TOWEL DISPENSER TO BE REMOVED
EXISTING TOILET TISSUE DISPENSER TO BE REMOVED
LIQUID SOAP DISPENSER TO BE REMOVED
EXISTING INTERIOR METAL DOOR & FRAME TO REMAIN
EXISTING SHOWER TOWER BAR TO BE REMOVED
DEMOLITION WORKS
SHOWER ROOM #2
SHOWER FLOOR DRAIN & TOILET FLANGE TO BE REMOVED
D-2
EXISTING 2 X 4 CEILING LIGHTING FIXTURES TO BE REMOVED17
EXISTING MIRROR TO BE REMOVED18
Floor Level
0' - 0"
Acoustic Ceiling
Level
8' - 0"
Floor Level
0' - 0"
Acoustic Ceiling
Level
8' - 0"
Floor Level
0' - 0"
Acoustic Ceiling
Level
8' - 0"
Floor Level
0' - 0"
Acoustic Ceiling
Level
8' - 0"
DPW ENGINEERING DIVISION
ANIBAL NEGRON
DIRECTOR OF PUBLIC WORKS
LUIS E. TORRES
ENGINEERING DIVISION CHIEF
PROJECT MANAGER
MECHANICAL DESIGN
ELECTRICAL DESIGN
GOVERNMENT REPRESENTATIVE:
REVISIONS
REV. NO. DATE APPD. BY
DRAWING #: DPW-010
PROJECT #: 010
IJO:
DATE: APRIL, 2022
SHEET TITLE NAME
PROJECT NAME
FT. BUCHANAN, PUERTO RICO
GENERAL
REPAIRS
BUILDING 223
CIVIL / ARCH. / DESIGN DEVELOPMENT
SCALE: AS SHOWN
OF
F.ZAYAS.
F.ZAYAS.
X
A.GONZALEZ.
C.IRIZARRY.
RECOMMENDED APPROVAL:
APPROVED BY:
A1
E4
E1
E2
E3
1/2" = 1'-0"
NEW FLOOR PLAN
BATHROOM 1
1/2" = 1'-0"
NEW ELEVATION E1
1/2" = 1'-0"
NEW ELEVATION E2
1/2" = 1'-0"
NEW ELEVATION E3
1/2" = 1'-0"
NEW ELEVATION E4
1/2" = 1'-0"
NEW REFLECTED CEILING PLAN
BATHROOM 1
NEW WORK NOTES (THIS SHEET ONLY):
NEW CERAMIC FLOOR TILES TO BE INSTALLED OVER NEW SELF LEVELING
CONCRETE TOPPING
NEW FIBERGLASS REINFORCED PANELS AND 6" HIGH CERAMIC TILE
COVE BASE
NEW EXHAUST FAN TO BE INSTALLED
NEW ELONGATED TOILET WITH MANUAL FLUSH VALVE AND DRAINAGE
FLANGE
NEW TWO WALL TOILET 48" X 36" & L-SHAPED SHOWER BAR 16' X 32" TO
BE INSTALLED
NEW SURFACE MOUNTED WASTE RECEPTACLE SIMILAR OR EQUAL TO
BRADLEY 344, 12 GALLON
NEW TWO ROLL TOILET TISSUE DISPENSER SIMILAR OR EQUAL TO GLOBAL
INDUSTRIAL WR640933
NEW METAL FRAME AND WOOD DOOR
NEW LAVATORY WITH FAUCET, SHUT-OFF VALVES, FLEXIBLE
CONNECTIONS, DRAINAGE PIPE & SINGLE CARRIER SIMILAR OR EQUAL
TO J.R. SMITH 0700E
NEW STAINLESS STEEL ANGLE FRAME FIXED-POSITION TILT MIRROR 24"X36"
NEW IMPACT RESISTANT PLASTIC SHELL SOAP DISPENSER TO BE INSTALLED
NEW TOILET SEAT COVER DISPENSER14
3/8" = 1'-0"
SUNKED FLOOR REPAIR PLAN
NEW VINYL FLOOR TILES TO BE INSTALLED OVER NEW SELF LEVELING
CONCRETE TOPPING AND EXISTING FLOORING
NEW 2 X 4 CEILING LIGHTING REFER TO SHEET EI -1
NEW RECESSED SHAMPOO AND SOAP NICHE.
NEW PAPER TOWEL DISPENSER SIMILAR OR EQUAL TO SAN JAMAR T950TBK
NEW 24" SURFACE MOUNTED SQUARE TOWEL BAR SIMILAR OR EQUAL TO
BOBRICK B6737-24
NEW ROUND SLIDING SHOWER ENCLOSURE WITH BASE SIMILAR OR
EQUAL TO PERIGOLD DREAMLINE DL-6152-01CLAND SHOWER FAUCET
SYSTEM WITH 8" SHOWER HEAD AND HAND SHOWER
NEW WORKS
SHOWER ROOM #1
A-1
NEW CEILING 2' x 2' TILES ON METAL GRID SYSTEM (SEE DETAILS ON
THIS SHEET)
NOT TO SCALE
2' X 2' ACOUSTIC CEILING DETAILS
19 20
NEW TILES REDUCER TO BE INSTALL AT THE END OF THE NEW VINYL TILES
(NEW VINYL TILES LIMIT)
AutoCAD SHX Text
BATHROOM #1
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
1. PROVIDE SPLAY BRACING @ HANGER WIRES OF ALL SUSP. ACOUSTICAL
AutoCAD SHX Text
CEILINGS NOT MORE THAN 12'-0" O.C. AND NOT MORE THAN 6'-0"
AutoCAD SHX Text
FROM ALL WALL AND PARTITIONS. (SUBMIT LAYOUT FOR APPROVAL).
AutoCAD SHX Text
2. SPLICES AND INTERSECTIONS OF RUNNERS SHALL BE ATTACHED
AutoCAD SHX Text
WITH MECHANICAL INTERLOCKING CONNECTORS SUCH AS POP RIVET,
AutoCAD SHX Text
SCREWS PINS PLATES WITH BENT TABS OR OTHER APPROVED CONNECTORS.
AutoCAD SHX Text
WALL TRIM
AutoCAD SHX Text
HANGER WIRE
AutoCAD SHX Text 2' x 2' x 5/8"
AutoCAD SHX Text
ACOUSTICAL
AutoCAD SHX Text
12 GA. VERTICAL HANGER
AutoCAD SHX Text
WIRES @ 4'-0" O.C.
AutoCAD SHX Text
SEISMIC LOCKING PIN
AutoCAD SHX Text
MAIN RUNNER
AutoCAD SHX Text
CROSS RUNNER
AutoCAD SHX Text
WIRE GA. 12, @ 4'-0"
AutoCAD SHX Text
CONT. HORIZ. STRUT
AutoCAD SHX Text
TO PREVENT SPREADING
AutoCAD SHX Text
OF RUNNERS
AutoCAD SHX Text
MAIN RUNNER
AutoCAD SHX Text
GALV. STEEL SPLAY
AutoCAD SHX Text
BRACE WIRE, GA. 12
AutoCAD SHX Text
CROSS RUNNER
AutoCAD SHX Text
SPLICE
AutoCAD SHX Text 45%%D
AutoCAD SHX Text 45%%D
AutoCAD SHX Text 45%%D
AutoCAD SHX Text 45%%D
AutoCAD SHX Text 2"
AutoCAD SHX Text
MAX
AutoCAD SHX Text
3. CROSS AND MAIN RUNNERS SHALL BE CORROSION RESISTANCE WHITE
AutoCAD SHX Text
BAKED ENAMEL PAINTED.
AutoCAD SHX Text
GALV. STEEL HANGER
AutoCAD SHX Text
O.C. EACH WAY
AutoCAD SHX Text
GALVANIZED STEEL
AutoCAD SHX Text
GALV. STEEL
AutoCAD SHX Text
GA. 12
AutoCAD SHX Text
4. GRID SYSTEM: 2'-0" x 2'-0" TYPE FOR MAIN AND CROSS RUNNERS.
AutoCAD SHX Text
TILES
AutoCAD SHX Text
5. INSTALL ACOUSTICAL CEILING SYSTEM AT 8'-0" ABOVE FINISHED FLOOR ELEVATION.
AutoCAD SHX Text
SHADOW MOLDING
AutoCAD SHX Text
6. INSTALL FACED FIBERGLASS ACOUSTIC BATT INSULATION OVER CEILING SYSTEM.
AutoCAD SHX Text
CONCRETE OR METAL
STRUCTURAL ROOF SLAB
A2 E5
E8
E7
E6
Floor Level
0' - 0"
Acoustic Ceiling
Level
8' - 0"
Floor Level
0' - 0"
Acoustic Ceiling
Level
8' - 0"
Floor Level
0' - 0"
Acoustic Ceiling
Level
8' - 0"
Floor Level
0' - 0"
Acoustic Ceiling
Level
8' - 0"
DPW ENGINEERING DIVISION
ANIBAL NEGRON
DIRECTOR OF PUBLIC WORKS
LUIS E. TORRES
ENGINEERING DIVISION CHIEF
PROJECT MANAGER
MECHANICAL DESIGN
ELECTRICAL DESIGN
GOVERNMENT REPRESENTATIVE:
REVISIONS
REV. NO. DATE APPD. BY
DRAWING #: DPW-010
PROJECT #: 010
IJO:
DATE: APRIL, 2022
SHEET TITLE NAME
PROJECT NAME
FT. BUCHANAN, PUERTO RICO
GENERAL
REPAIRS
BUILDING 223
CIVIL / ARCH. / DESIGN DEVELOPMENT
SCALE: AS SHOWN
OF
F.ZAYAS.
F.ZAYAS.
X
A.GONZALEZ.
C.IRIZARRY.
RECOMMENDED APPROVAL:
APPROVED BY:
1/2" = 1'-0"
NEW FLOOR PLAN
BATHROOM 2
1/2" = 1'-0"
ELEVATION E5
1/2" = 1'-0"
ELEVATION E6
1/2" = 1'-0"
ELEVATION E7
1/2" = 1'-0"
ELEVATION E8
NEW WORK NOTES (THIS SHEET ONLY):
NEW CEILING 2' x 2' TILES ON METAL GRID SYSTEM (SEE DETAILS ON THIS SHEET)
NEW CERAMIC FLOOR TILES TO BE INSTALLED OVER NEW SELF LEVELING
CONCRETE TOPPING
NEW FIBERGLASS REINFORCED PANELS AND 6" HIGH CERAMIC TILES COVE BASE
NEW EXHAUST FAN TO BE INSTALLED
NEW ROUND SLIDING SHOWER ENCLOSURE WITH BASE AND SHOWER FAUCET
SYSTEM WITH SHOWER HEAD AND HAND SHOWER
NEW TWO WALL BAR FOR TOILET 48" X 36" & L-SHAPED BAR FOR SHOWER
16' X 32" TO BE INSTALLED
NEW SURFACE MOUNTED WASTE RECEPTACLE TO BE INSTALLED
TOILET TISSUE DISPENSER PREVIOUSLY REMOVED AND STORED
EXISTING METAL DOOR FRAME TO BE PAINT, INSTALL NEW DOOR CLOSER AND WALL STOP.
NEW 2 X 4 CEILING LIGHTING TO BE INSTALLED, REFER TO SHEET EI-1.
NEW LAVATORY WITH FAUCET, P-TRAP, SHUT-OFF VALVES & FLEXIBLE CONNECTIONS.
NEW STAINLESS STEEL ANGLE FRAME H.C. TILT MIRROR (24"X36")
SOAP DISPENSER PREVIOUSLY REMOVED AND STORED
1/2" = 1'-0"
NEW REFLECTED CEILING PLAN
BATHROOM 2
NEW TOILET SEAT COVER DISPENSER
NEW 22" X 15" RECESSED SHOWER SHAMPOO SHELF SOAP DISH
PAPER TOWEL DISPENSER PREVIOUSLY REMOVED AND STORED
NEW SURFACE MOUNTED TOWEL BAR SIMILAR OR
EQUAL TO BOBRICK B6737X24
NEW ELONGATED TOILET WITH MANUAL FLUSH VALVE AND DRAINAGE FLANGE
NEW WORKS
SHOWER ROOM #2
A-2
NOT TO SCALE
2' X 2' ACOUSTICAL CEILING DETAILS
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
1. PROVIDE SPLAY BRACING @ HANGER WIRES OF ALL SUSP. ACOUSTICAL
AutoCAD SHX Text
CEILINGS NOT MORE THAN 12'-0" O.C. AND NOT MORE THAN 6'-0"
AutoCAD SHX Text
FROM ALL WALL AND PARTITIONS. (SUBMIT LAYOUT FOR APPROVAL).
AutoCAD SHX Text
2. SPLICES AND INTERSECTIONS OF RUNNERS SHALL BE ATTACHED
AutoCAD SHX Text
WITH MECHANICAL INTERLOCKING CONNECTORS SUCH AS POP RIVET,
AutoCAD SHX Text
SCREWS PINS PLATES WITH BENT TABS OR OTHER APPROVED CONNECTORS.
AutoCAD SHX Text
WALL TRIM
AutoCAD SHX Text
HANGER WIRE
AutoCAD SHX Text 2' x 2' x 5/8"
AutoCAD SHX Text
ACOUSTICAL
AutoCAD SHX Text
12 GA. VERTICAL HANGER
AutoCAD SHX Text
WIRES @ 4'-0" O.C.
AutoCAD SHX Text
SEISMIC LOCKING PIN
AutoCAD SHX Text
MAIN RUNNER
AutoCAD SHX Text
CROSS RUNNER
AutoCAD SHX Text
WIRE GA. 12, @ 4'-0"
AutoCAD SHX Text
CONT. HORIZ. STRUT
AutoCAD SHX Text
TO PREVENT SPREADING
AutoCAD SHX Text
OF RUNNERS
AutoCAD SHX Text
MAIN RUNNER
AutoCAD SHX Text
GALV. STEEL SPLAY
AutoCAD SHX Text
BRACE WIRE, GA. 12
AutoCAD SHX Text
CROSS RUNNER
AutoCAD SHX Text
SPLICE
AutoCAD SHX Text 45%%D
AutoCAD SHX Text 45%%D
AutoCAD SHX Text 45%%D
AutoCAD SHX Text 45%%D
AutoCAD SHX Text 2"
AutoCAD SHX Text
MAX
AutoCAD SHX Text
3. CROSS AND MAIN RUNNERS SHALL BE CORROSION RESISTANCE WHITE
AutoCAD SHX Text
BAKED ENAMEL PAINTED.
AutoCAD SHX Text
GALV. STEEL HANGER
AutoCAD SHX Text
O.C. EACH WAY
AutoCAD SHX Text
GALVANIZED STEEL
AutoCAD SHX Text
GALV. STEEL
AutoCAD SHX Text
GA. 12
AutoCAD SHX Text
4. GRID SYSTEM: 2'-0" x 2'-0" TYPE FOR MAIN AND CROSS RUNNERS.
AutoCAD SHX Text
TILES
AutoCAD SHX Text
5. INSTALL ACOUSTICAL CEILING SYSTEM AT 8'-0" ABOVE FINISHED FLOOR ELEVATION.
AutoCAD SHX Text
SHADOW MOLDING
AutoCAD SHX Text
6. INSTALL FACED FIBERGLASS ACOUSTIC BATT INSULATION OVER CEILING SYSTEM.
AutoCAD SHX Text
CONCRETE OR METAL
STRUCTURAL ROOF SLAB
DPW ENGINEERING DIVISION
ANIBAL NEGRON
DIRECTOR OF PUBLIC WORKS
LUIS E. TORRES
ENGINEERING DIVISION CHIEF
PROJECT MANAGER
MECHANICAL DESIGN
ELECTRICAL DESIGN
GOVERNMENT REPRESENTATIVE:
REVISIONS
REV. NO. DATE APPD. BY
DRAWING #: DPW-010
PROJECT #: 010
IJO:
DATE: APRIL, 2022
SHEET TITLE NAME
PROJECT NAME
FT. BUCHANAN, PUERTO RICO
GENERAL
REPAIRS
BUILDING 223
CIVIL / ARCH. / DESIGN DEVELOPMENT
SCALE: AS SHOWN
OF
F.ZAYAS.
F.ZAYAS.
X
A.GONZALEZ.
C.IRIZARRY.
RECOMMENDED APPROVAL:
APPROVED BY:
GFCI
GFCI
ELECTRICAL DEMOLITION
PLAN.
ED-1
ELECTRICAL REMOVAL WORK NOTES (THIS SHEET ONLY):
REMOVE AND DISPOSE RECEPTACLES ON EACH BATHROOM.
REMOVE AND STORE FIRE DETECTION FIXTURES ON EACH BATHROOM
REMOVE AND STORE STROBELIGHTS ON BATHROOMS
REMOVE AND DISPOSE RECEPTACLES ON OFFICE AREA.
REMOVE AND DISPOSE LIGHTING FIXTURES ON BATHROOMS.
REMOVE AND DISPOSE LIGHTING SWITCHES ON BATHROOMS.6
ELECTRICAL REMOVAL WORK GENERAL NOTES (THIS SHEET ONLY):
DO NOT REMOVE CIRCUITS , THEY SHALL BE REUSED.
ELECTRICAL LEGEND
GFCI GROUND FAULT CURRENT INTERRUPTING RECEPTACLE.
EXISTING FIRE ALARM CONTROL PANEL
DUPPLEX RECEPTACLE
AutoCAD SHX Text
ICE MACHINE
AutoCAD SHX Text
BATHROOM 2
AutoCAD SHX Text
BATHROOM 1
AutoCAD SHX Text
FACP
FACP
| 20220512 General Repairs Bldg 223- T-1 |
| Sheets and Views |
| Model |
| 20220408 General Repairs Bldg 223-SI-1 |
| Sheets and Views |
| SI-1 |
| 20220408 General Repairs Bldg 223-D-1 |
| 20220408 General Repairs Bldg 223-D-2 |
| 20220523 General Repairs Bldg 223-A-1 |
| 20220408 General Repairs Bldg 223-A-2 |
| 20220506 General Repairs Bldg 223-ED-1 |
| 20220506 General Repairs Bldg 223-EI-1 |
| 20220606 General Repairs Bldg 223-A-1 review.pdf |
| Sheets and Views |
| A-1 |
| 20220606 General Repairs Bldg 223-A-2 review.pdf |
| Sheets and Views |
| A-2 |
| 20220606 General Repairs Bldg 223-D-1 review.pdf |
| Sheets and Views |
| D-1 |
| 20220606 General Repairs Bldg 223-D-2 review.pdf |
| Sheets and Views |
| D-2 |
| 20220606 General Repairs Bldg 223-ED-1 review.pdf |
| Sheets and Views |
| ED-1 |
| 20220606 General Repairs Bldg 223-D-1 review.pdf |
| Sheets and Views |
| D-1 |
| 20220606 General Repairs Bldg 223-D-2 review.pdf |
| Sheets and Views |
| D-2 |
File details come from the government source that posted it. Updated .